L=Ld
CASE 1 CASE 2
L>=Ld P=Pmin
Press at Pmin 3 time
No decrease pressure
Stop
Press at Pmax 3 time
Stop
<10%D
P=Pmax
Settlement
Δ1+Δ2+Δ3
Conditional:Δ1>Δ2>Δ3
CASE 3
L=Ld & P=Pmin L>Ld & P=Pmin L<Ld & P=Pmax
L<Ld
P=Pmin
Press at Pmin 3 time
No decrease pressure
Stop
Ok
Yes
No
WORKING RADIUS & SETING UP PILE ON LOCATION
R=14.8m; 6.56ton
D350,D300
CRANE KATO 25T
3.6-4.8m6 m
D500
L=15m; Max=5.66ton
4.5-6m7.5 m
ZYJ 360B HYDROULIC STATIC PILE
L=12m; Max=2.89ton
ZYJ 680B HYDROULIC STATIC PILE
Working radius for D500
Working radius for D350 and D300
CRANE KATO 50T
R=12m; 8.9TON
R=12.8; 4.68 TON
R=15m; 3.6 TON
LOADING DIAGRAM AND EQUIPMENTS
Steel plate,thk=2cm
Steel plate,thk=2cm
LONG BOOM
LONG BOOM
Boom
24.7m
Boom 23.5m
LOAD CHART OF CRANE OF PRESSING MACHINE
Angle of jib
00
400
600
750
780ZYJ680
Long Jib Radius (m) 16.7 14.8 9.67 5.01 4.02
5.09 6.56 11.44 22.66 25
ZYJ360B Angle of jib 750
780
Long Jib Radius (m)
Load (ton)
12.8 8.34 4.31 3.47
3.92 4.68 7.35
300
Load (ton)
300
400
600
14.4
12 12
PRESSING MACHINE FOOT
CRANE 50T
CRANE 50T
CONVER WEIGHT
COUNTER WEIGHTPRESSING JACK
STEP 2 STEP 3
BARRICADE
BARRICAE
PRESSING MACHINE FOOT
PRESSING MACHINE FOOT
STEP 1
UNLOADING
BARRICADE
BARRICAESTEEL PLATE
Lifting : Initial lifting 30cm from
ground / wait 3 sec/ keep away
3m from lifting material
R=6.5m
TIMBERTIMBER
D22mm
WIREROPE
DETAIL A
15000
MAXLOAD4.35TONS
15000
MAXCAPACITY25.3TONS
TYPE UNIT
PHC D300
QUANTITY TABLE
PHC D300
WEIGHT OF PILE
P= 1.37*1.3= 1.78 ton
MASS
PILE
12 m length : 1.37 ton
PHC D500
NOS
NOS
NOS
426
2823
446
PHC D350 12 m length : 2.22 ton P= 2.22*1.3= 2.89 ton
PHC D500 15 m length : 4.35 ton P= 4.35*1.3= 5.66 ton
PHC D350
D500
D500
L
(0.3-0.4)*L
M2
M1
M1=M2
D500
DELIVERY & UNLOADING PILES
-NOT MORE THAN TWO LAYER
-CHECK SITE PLAN CONDITION BEFORE UNLOADING
LIFT THE PILES ACCORDING
- SETUP PILE MACHINE ON PILE LOCATION
STEP 3 : SET UP FIRST SEGMENT PILE
- LIFT THE PILE HEAD BY CRANE
- SETUP PILE ON LOCATION
PROCEDURE :
500500
D
Marking
Pile
TO THE FIGURE
STEP 2 : BY THEODOLITE
- SURVEYING BY THEODOLITE TOTAL STATION
BARRICADE
BARRICADE
500 500
STEP STAGE
STEEL PLATE 1.0MX1.0X22MM OR MORE
UNDER OUTRIGGER
LIFE LINE
LADDER
BARRICADE
60°
14000
BARRICADE
- CONTROL VERTICAL BY PLUMP OUTSIDE OF MACHINE FOLLOW X,Y
- CONTROL VERTICAL BY THEODOLITE ( IF ANY)
STEP 5 : SET UP 2nd& 3rd SEGMENT PILE
(C2&C3)
- LIFT THE 2nd SEGMENT PILE BY CRANE
- SETUP PILE ON LOCATION
STEP 6 : PILE CONNECTION
- CHECK THE VERTICAL OF SEGMENT PILE
- CONNECT BY WELDING
STEP 4 : 1st SEGMENT PILE PRESSING (C1)
- PILE PRESSING BY HYDROLIC PRESSURE
- SETTING WATER BUCKET AND FIRE EXTINGUISHER
* SAFETY POINT
BARRICADE
STEP 1 :
60°
* SAFETY POINT
- NO ENTER UNDER LIFTING MATERIALS
* SAFETY POINT
- NO ENTER INTO BARRICADE
WHEN MACHINE MOVING
BARRICADE
* SAFETY POINT: NEVER ENTER UNDER THE LIFTED PILE
(0.3-0.4)*L
* SAFETY POINT: NEVER ENTER UNDER THE LIFTED PILE
* SAFETY POINT:
L
(0.3-0.4)*L
M1
M1=M2
LIFT THE PILES ACCORDING
TO THE FIGURE
D
Marking
Pile
M2
- STOP ALL OPERATION OF PRESSING MACHINE
500 500
500500
- NO ENTER UNDER LIFTING MATERIALS.
- NO WORKER ON TRUCK BED DURING LIFTING.
- NO UNAUTHORIZED ENTER INSIDE BARRICADE.
- ALWAYS PROVIDE BANKS MAN FOR GUIDING TRUCK.
- CONTROL THE SIZE OF CABLE (DIAMETER).
- USE PROPER PPE FOR GRINDING AND WELDING
- NO ENTER UNDER MACHINE
- NO ENTER AROUND MACHINE
- NO UNAUTHORIZED WORKER ABOVE MACHINE
- STOP PILE DRIVING WHEN WORKER REMOVE LIFTING WIRE
- NO ENTER UNDER MACHINE
- NO ENTER AROUND MACHINE
- USE WOODEN SPACER FOR CLEANING PILE END
- NO ENTER UNDER LIFTING MATERIALS
- GENERATOR MUST HAVE GROUND
CABLE
- KEEP CLEAN AND NEATLY IN
OPERATOR ROOM.
-THE MATERIAL PUT ON SITE SHOULD BE ALONG WITH
PARELLEL AGAINST X.Y AXIS
Rig Number sign have to be attached
on each machine/ put identification
of the leader and operator
on each machine.
KATO 25 T
60°
D
100100
180
300
420
380
100001000012000
SEGMENT01SEGMENT02SEGMENT03
Water level
SAND MIX CONC.
CLAY
CLAY
CLAY
SAND
70
AND STONE BALLAST
32000
GL±0.00
2000
DESCRIPTION
DESCRIPTION
DATENo
2020
FEB Remark
SCHEDULE OF MASS PILE
5
1
2
3
4
6
7
8
9
10
11
12
13
14
15
16
W4 W1 W2 W4
MAR
W1 W2 W3 W4W3
PRESSING MACHINE NO.1
PRESSING MACHINE NO.2
PRESSING MACHINE NO.3
PRESSING MACHINE NO.5
PRESSING MACHINE NO.6
PRESSING MACHINE NO.7
PRESSING MACHINE NO.8
PRESSING MACHINE NO.9
PRESSING MACHINE NO.10
PRESSING MACHINE NO.11
PRESSING MACHINE NO.4
PRESSING MACHINE NO.12
PRESSING MACHINE NO.13
PRESSING MACHINE NO.14
PRESSING MACHINE NO.15
PRESSING MACHINE NO.16
TET'SHOLIDAY
W3
APR
W1 W2
02
l« m1 l« m2 l« m3 l« m4 l« m5 l« m6
8000 40000 15000280000 11003108000
Existing Fence
chØgiíix©ydùng
N
A
L
A
88000
1 1 1 35 1 4
SAND STOCK YARD
10
STOCK YARD
OF TRASH
TEMPORARY FENCE-BY METAL SHEET
109650
50000
temp.road
mug deposition hole
STOCK YARD
OF SUB-CONTRACTOR
ON HOLD
NO.2
NO.1
NO.3
NO.5
NO.4
NO.6
NO.7
NO.8
NO.10
NO.9
NO.11
NO.12
NO.13 NO.15
NO.14
EXSTING FACTORY
(n) bN
T
D
TEMPORARYFENCE-BYMETALSHEET
temp. access
12345678910
H
G
F
E
D
C
B
A
12345678910
H
G
F
E
D
C
B
A
NO.16
LIFE LINE
LADDER
kato crane 50T
STEEL PLATE 1.2MX1.6MX22MM OR MORE
UNDER OUTRIGE
BARRICADE
PREPARED BY CHECKED BY APPROVED BY
VINATA ENGINEER PROJECT MANAGER QA/QC CONS. DIRECTORSITE MANAGER AREA MANAGER
Project TOTO 3rd FACTORY PROJECT
Type of Pile PILE PHC CLASS A D300, D350, D500 Sub-Contractor
PHAN VU
CHECK SHEET OF METHOD STATEMENT
I. Drawing
A. Construction Plan Layout
1. Adjacent Bourdary Line, Temporary Fence (Steel fence H=2000)
Land form (Flat)
High - Voltage line is nothing. Overhead cable is nothing
Neighboring building
2. Layout of equipment..
3.Specification of pile Cylinder D50 cm, L=10m+10m+10m = 30m
Compressive strength of concrete 80 Mpa
B. Adjacent section drawing
4. Construction Procedure As for drawing
1. Adjacent Building
2. Open cut, Retaining wall
None
N/A
C. Pile length & Leader As per drawing
II. History of land Back filling Controled fill Slope Demolition Bring hole histogram
Yes No Yes No Yes No Yes No Yes No
III. Soil bearing Method of bearing 1. Plate loading test
IV. Machine model
Type/Model
Max weight
VI. Strong wind and
Stormy weather
Mobile crane Piling machine
When the average 1. To be pulled down the material
wind speed for 10
minutes exceed 10m/s
work should be stopped
on the ground and take off hook
2. The hook fixes to boom not to
swing by wind
3. Roll up the hook, put on the
brakes th tum & driving and lock
then stop the engine
1. Any lifting material
to be pulled down
2. Welding work to be
immediately stopped
3. Any worker standing
above machine to down
4. Piling to be held by
machine and stop jacking
process
When the expected
that the maximum
momentary wind speed
exceed 15.0 m/s
site should be closed
1. Procedure of piling work
Check Correction
2. Inspection sheet for crane
3. Check sheet of soil capacity & soil stabilization
Access road
Check
ORGANIZATION CHART
Project Manager Nguyen Trung Thanh
Site Manager Nghiem Tuan Truong
Stability
ZYJ 680B HYDROULIC STATIC PILE
ZYJ 460B HYDROULIC STATIC PILE
ZYJ 360B HYDROULIC STATIC PILE
KATO KR-25H (for Assembly)
Max Ground
Pressure
modulus
Driving Running
723T
462.0T
362.0T
Max Capacity Quantity
0425T
Area Manager Mr. Furuse
Item
Date
VINATA (Attendence)
Subcon (Attendence)
Phan Vu
Pre Toolbox Meeting Confirmation Toolbox Meeting
4. Others ( )
V. Safety
requirement when 1. Slope of working area. Ground Less than 1/100, To be Kept flat
2. Machine road, To be set steel plate in right angle for the course of machine
(Edge of steel plate and caterpiller make gap more than 50cm)
3. To be moved hammer & attachments on leader when machine move.
4. To be kept less than 5 for slope when leader stands
5. Others
1)
2)
3)
* In - house standard
running
12
o
25
18.512
o
12
o
12
o
12
o
12
o
Ultimate Soil Allowable Ground Bearing
Bearing Capacity Pu Capacity
2. Sounding 3. Others ( )
Soil Stabilization
12 T/m² 10.1 T/m² Depth m Material Ratio kg/.
(Comment)
PILING WORK PLAN
DETAIL A
ASSEMBLY PILE MACHINE
FIRE EXTINGUISHER
WATER BUCKET
USE MASK
HOT WORK PERMIT
- HAVE FIRE EXTINGUISHER
PRIORITY DANGEROUS WORK; METHOD STATEMENT OF PILING WORK
- HAVE WATER BUCKET
- CHECK AGAIN AFTER FINISH WORKS.
PROTECTION PILELOCK TYPE OF LIFTING WIRE
Ø20 - D350 ; D300
STOCK PILELIFTING WIRE ROPE ARRANGEMENT
SPECIFICATION OF SUPPORT CRANE TADANO-50H
WEIGHTS OF PART ZYJ680B MACHINE
Biken
capacity
VII. Check item for
inspection
machine move.
BIKEN
BIKE PARKING PLAN
HOT WORKS METHOD
Outline
Contract Period 2 months
NEW FACTORY
08th Feb 2020 ~ 29th Mar 2020
UseCons.
Period
Structure PC ground floor, steel structure &
metal roof, cladding wall
Floor 3 story high
Location: PLOT M7, M8, N3, RE8
Location: THANG LONG II IZ-YEN MY-HUNG YEN
06/FEB/2020
Mr. Furuse, Mr.Thanh, Mr.Truong &S.E
0450T
(MPa) (Mpa)
thick=20mm
Protect by polywood t=12mm
Stopper
D500, WEIGHT= 5.66 TONS PER SEGMENT (15m)
- ELECTRICAL DEVICE/WELDING MACHINE GEN-SET SHOULD HAVE
Max 16T, Radius max 6m Max 7T, Radius max 9m
Use safety harness when worker above weiht
Barricade
M1 M2 M3 M4
N.C.Hieu N.D.Quang T.D.Thanh N.Q.Vuong
Site Manager: D.T.Anh
Leader
Operator
Welder
Worker
PHAN VU
SUB-CON 1: PHAN VU
VINATA
MAX CAPACITY
D500, L=15M MAX LOAD 4.35 TONS , SAFETY FACTOR 6.75
25.5
PRESSING PILE FLOW CHART
Site Manager: H.V.Tinh
SUB-CON 2: BIKEN
D.V.Khanh
D.V.Thanh
D.V.Thinh
P.V.Quan
N.T.Huan
N.V.Truong
B.Q.Khoa
D.V.Hung
H.N.Tuyen
T.D.Sinh
N.V.Vi
D.V.Chau N.V.Truong P.V.Hoa N.V.Quan
M1
16.0
7.00
MARKING BEFORE LIFTING
INPECTION TAPE
GROUND CABLE AND PROPERLY SET ON THE GROUND
- HOT WORKS/FIRE EXTINGUIGHER/CHECK FIRE TO BE EXTINGUISHED
BEFORE FINISH WORK
QA-QC: H.M.Ha
Vi. Safety SurveyorFAC: C.D.Viet
D.V.Dai D.V.Toi
N.B.Khang
B.Q.Vinh
D.V.Thin
11.79
11.79
11.79
deformation
T.V.Minh
C.X.Phuong
C.V.Dong
T.V.Huy
Leader
Operator
Welder
Worker
D.T.Tinh
L.V.Nam
B.V.Cong
T.V.Duong
T.H.Minh
T.V.Hung
P.T.Vinh
N.B.Tuan
H.C.Trinh
M.V.Hoi
V.V.Phuong
H.V.Canh C.V.Huong L.D.Hai V.V.Sang
N.B.Tuan
N.M.Hai
C.N.Phong
N.V.Duong
H.H.Hoang
M2 M3 M4 M5 M6 M7 M16
M9 M10 M11 M12 M13 M14 M15M8
BIKEN
M6
L.Q.Thanh
P.T.Dung B
M7 M8 M9 M10 M11 M12
M13 M14 M15 M16
PV.Engineer
Biken
Engineer
H.V.Trung P.H.Tu T.T.Hiep B.D.Chien T.K.Duy L.V.Hao L.D.Thanh H.V.Huy
H.V.Dien L.V.Anh P.H.Tu T.X.Linh V.V.Thuan V.D.Tuyen P.V.Vinh V.D.Thuy
V.V.Viet N.D.Trung L.N.Hoang
D.V.Thu N.T.Doanh
Welder
D.V.Thinh N.H.Nhon
N.C.Thuy
N.D.Truong
N.M.Ha
N.C.Chien
D.V.Tuan N.V.Nghia V.V.ThaiT.V.Huy
D.V.Tien
P.D.Hung
L.C.Canh
N.V.Long
T.D.Minh
D.Q.Chung
N.X.Hoan
N.V.Huy
B.D.Cong
T.D.Son
Welder
B.V.Cong
T.V.Thanh
V.H.Thuong
V.T.Tung
V.V.Nghiem
N.V.Trong P.H.Tuyen V.H.Thang
N.V.Duc
N.X.Hien
N.T.Anh
N.X.Hai
N.M.Thang
N.T.Dong
P.V.Giang
N.T.Minh
N.V.Hung
N.V.Huan
M5
T.H.Su
L.C.Tuan T.X.Thu N.V.Bien
N.Q.Nhat N.D.Son
20/JAN/2020 Everyday
Ø22 - D500
NOTE: PILE D350, D300 USE D20MM
WH:N.V.Trung RH: T.T.Dung
Inspection PC Piles
1. N.N.Dung
2.
3.
4.
CRANE ASSEMBLY (DISASSEMBLY) METHOD
SPECIFICATION OF SUPPORT CRANE KATO 25T

More Related Content

Similar to 20200116 tvn3- onesheet of piling works-rv5

Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013Aamer Pathan
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.ppt
bala506586
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019
David H Moloney
 
Operations ETI-DLH
Operations ETI-DLHOperations ETI-DLH
Operations ETI-DLH
Win Nyunt Aung
 
1. va1 lici-00 eg-i-m4d-das-0001.positive displacement flowmeters
1. va1 lici-00 eg-i-m4d-das-0001.positive displacement flowmeters1. va1 lici-00 eg-i-m4d-das-0001.positive displacement flowmeters
1. va1 lici-00 eg-i-m4d-das-0001.positive displacement flowmetersKhang Trang
 
Company frofile 2015 (wooil)
Company frofile 2015 (wooil)Company frofile 2015 (wooil)
Company frofile 2015 (wooil)
wooilindo
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, Oman
David H Moloney
 
BULK-FLOW Straight Mass Flow Hopper brochure
BULK-FLOW Straight Mass Flow Hopper brochureBULK-FLOW Straight Mass Flow Hopper brochure
BULK-FLOW Straight Mass Flow Hopper brochure
Oswaldo Mino
 
Piping material-specification
Piping material-specificationPiping material-specification
Piping material-specification
ChiragShah127
 
KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...
KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...
KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...
SandipPaul46
 
Site visit report of Raikela & Tantra Iron.pptx
Site visit report of Raikela & Tantra Iron.pptxSite visit report of Raikela & Tantra Iron.pptx
Site visit report of Raikela & Tantra Iron.pptx
ssuser9d0ede
 
QX1902 VDL(H) spec.
QX1902 VDL(H) spec.QX1902 VDL(H) spec.
QX1902 VDL(H) spec.
Ann Wee (RIGID HVAC)
 
326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx
mohdsuriamohdsuhaimi
 
IRJET - Fly Ash Interlocking Brick by using Geopolymer Concrete
IRJET - Fly Ash Interlocking Brick by using Geopolymer ConcreteIRJET - Fly Ash Interlocking Brick by using Geopolymer Concrete
IRJET - Fly Ash Interlocking Brick by using Geopolymer Concrete
IRJET Journal
 
Die extrusion
Die extrusionDie extrusion
Die extrusion
Veer Singh
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Emeka Ngwobia
 
QX1903 VDL(H) spec.
QX1903 VDL(H) spec.QX1903 VDL(H) spec.
QX1903 VDL(H) spec.
Ann Wee (RIGID HVAC)
 
Modelo 1
Modelo 1Modelo 1
Modelo 1
Luis Revoredo
 

Similar to 20200116 tvn3- onesheet of piling works-rv5 (20)

Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013
 
Biddeford_7.28.15
Biddeford_7.28.15Biddeford_7.28.15
Biddeford_7.28.15
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.ppt
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019
 
Operations ETI-DLH
Operations ETI-DLHOperations ETI-DLH
Operations ETI-DLH
 
1. va1 lici-00 eg-i-m4d-das-0001.positive displacement flowmeters
1. va1 lici-00 eg-i-m4d-das-0001.positive displacement flowmeters1. va1 lici-00 eg-i-m4d-das-0001.positive displacement flowmeters
1. va1 lici-00 eg-i-m4d-das-0001.positive displacement flowmeters
 
Company frofile 2015 (wooil)
Company frofile 2015 (wooil)Company frofile 2015 (wooil)
Company frofile 2015 (wooil)
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, Oman
 
BULK-FLOW Straight Mass Flow Hopper brochure
BULK-FLOW Straight Mass Flow Hopper brochureBULK-FLOW Straight Mass Flow Hopper brochure
BULK-FLOW Straight Mass Flow Hopper brochure
 
Piping material-specification
Piping material-specificationPiping material-specification
Piping material-specification
 
KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...
KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...
KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...
 
Site visit report of Raikela & Tantra Iron.pptx
Site visit report of Raikela & Tantra Iron.pptxSite visit report of Raikela & Tantra Iron.pptx
Site visit report of Raikela & Tantra Iron.pptx
 
QX1902 VDL(H) spec.
QX1902 VDL(H) spec.QX1902 VDL(H) spec.
QX1902 VDL(H) spec.
 
326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx
 
project in drilling engineering
project in drilling engineeringproject in drilling engineering
project in drilling engineering
 
IRJET - Fly Ash Interlocking Brick by using Geopolymer Concrete
IRJET - Fly Ash Interlocking Brick by using Geopolymer ConcreteIRJET - Fly Ash Interlocking Brick by using Geopolymer Concrete
IRJET - Fly Ash Interlocking Brick by using Geopolymer Concrete
 
Die extrusion
Die extrusionDie extrusion
Die extrusion
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
 
QX1903 VDL(H) spec.
QX1903 VDL(H) spec.QX1903 VDL(H) spec.
QX1903 VDL(H) spec.
 
Modelo 1
Modelo 1Modelo 1
Modelo 1
 

Recently uploaded

一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 

Recently uploaded (20)

一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 

20200116 tvn3- onesheet of piling works-rv5

  • 1. L=Ld CASE 1 CASE 2 L>=Ld P=Pmin Press at Pmin 3 time No decrease pressure Stop Press at Pmax 3 time Stop <10%D P=Pmax Settlement Δ1+Δ2+Δ3 Conditional:Δ1>Δ2>Δ3 CASE 3 L=Ld & P=Pmin L>Ld & P=Pmin L<Ld & P=Pmax L<Ld P=Pmin Press at Pmin 3 time No decrease pressure Stop Ok Yes No WORKING RADIUS & SETING UP PILE ON LOCATION R=14.8m; 6.56ton D350,D300 CRANE KATO 25T 3.6-4.8m6 m D500 L=15m; Max=5.66ton 4.5-6m7.5 m ZYJ 360B HYDROULIC STATIC PILE L=12m; Max=2.89ton ZYJ 680B HYDROULIC STATIC PILE Working radius for D500 Working radius for D350 and D300 CRANE KATO 50T R=12m; 8.9TON R=12.8; 4.68 TON R=15m; 3.6 TON LOADING DIAGRAM AND EQUIPMENTS Steel plate,thk=2cm Steel plate,thk=2cm LONG BOOM LONG BOOM Boom 24.7m Boom 23.5m LOAD CHART OF CRANE OF PRESSING MACHINE Angle of jib 00 400 600 750 780ZYJ680 Long Jib Radius (m) 16.7 14.8 9.67 5.01 4.02 5.09 6.56 11.44 22.66 25 ZYJ360B Angle of jib 750 780 Long Jib Radius (m) Load (ton) 12.8 8.34 4.31 3.47 3.92 4.68 7.35 300 Load (ton) 300 400 600 14.4 12 12 PRESSING MACHINE FOOT CRANE 50T CRANE 50T CONVER WEIGHT COUNTER WEIGHTPRESSING JACK STEP 2 STEP 3 BARRICADE BARRICAE PRESSING MACHINE FOOT PRESSING MACHINE FOOT STEP 1 UNLOADING BARRICADE BARRICAESTEEL PLATE Lifting : Initial lifting 30cm from ground / wait 3 sec/ keep away 3m from lifting material R=6.5m TIMBERTIMBER D22mm WIREROPE DETAIL A 15000 MAXLOAD4.35TONS 15000 MAXCAPACITY25.3TONS TYPE UNIT PHC D300 QUANTITY TABLE PHC D300 WEIGHT OF PILE P= 1.37*1.3= 1.78 ton MASS PILE 12 m length : 1.37 ton PHC D500 NOS NOS NOS 426 2823 446 PHC D350 12 m length : 2.22 ton P= 2.22*1.3= 2.89 ton PHC D500 15 m length : 4.35 ton P= 4.35*1.3= 5.66 ton PHC D350 D500 D500 L (0.3-0.4)*L M2 M1 M1=M2 D500 DELIVERY & UNLOADING PILES -NOT MORE THAN TWO LAYER -CHECK SITE PLAN CONDITION BEFORE UNLOADING LIFT THE PILES ACCORDING - SETUP PILE MACHINE ON PILE LOCATION STEP 3 : SET UP FIRST SEGMENT PILE - LIFT THE PILE HEAD BY CRANE - SETUP PILE ON LOCATION PROCEDURE : 500500 D Marking Pile TO THE FIGURE STEP 2 : BY THEODOLITE - SURVEYING BY THEODOLITE TOTAL STATION BARRICADE BARRICADE 500 500 STEP STAGE STEEL PLATE 1.0MX1.0X22MM OR MORE UNDER OUTRIGGER LIFE LINE LADDER BARRICADE 60° 14000 BARRICADE - CONTROL VERTICAL BY PLUMP OUTSIDE OF MACHINE FOLLOW X,Y - CONTROL VERTICAL BY THEODOLITE ( IF ANY) STEP 5 : SET UP 2nd& 3rd SEGMENT PILE (C2&C3) - LIFT THE 2nd SEGMENT PILE BY CRANE - SETUP PILE ON LOCATION STEP 6 : PILE CONNECTION - CHECK THE VERTICAL OF SEGMENT PILE - CONNECT BY WELDING STEP 4 : 1st SEGMENT PILE PRESSING (C1) - PILE PRESSING BY HYDROLIC PRESSURE - SETTING WATER BUCKET AND FIRE EXTINGUISHER * SAFETY POINT BARRICADE STEP 1 : 60° * SAFETY POINT - NO ENTER UNDER LIFTING MATERIALS * SAFETY POINT - NO ENTER INTO BARRICADE WHEN MACHINE MOVING BARRICADE * SAFETY POINT: NEVER ENTER UNDER THE LIFTED PILE (0.3-0.4)*L * SAFETY POINT: NEVER ENTER UNDER THE LIFTED PILE * SAFETY POINT: L (0.3-0.4)*L M1 M1=M2 LIFT THE PILES ACCORDING TO THE FIGURE D Marking Pile M2 - STOP ALL OPERATION OF PRESSING MACHINE 500 500 500500 - NO ENTER UNDER LIFTING MATERIALS. - NO WORKER ON TRUCK BED DURING LIFTING. - NO UNAUTHORIZED ENTER INSIDE BARRICADE. - ALWAYS PROVIDE BANKS MAN FOR GUIDING TRUCK. - CONTROL THE SIZE OF CABLE (DIAMETER). - USE PROPER PPE FOR GRINDING AND WELDING - NO ENTER UNDER MACHINE - NO ENTER AROUND MACHINE - NO UNAUTHORIZED WORKER ABOVE MACHINE - STOP PILE DRIVING WHEN WORKER REMOVE LIFTING WIRE - NO ENTER UNDER MACHINE - NO ENTER AROUND MACHINE - USE WOODEN SPACER FOR CLEANING PILE END - NO ENTER UNDER LIFTING MATERIALS - GENERATOR MUST HAVE GROUND CABLE - KEEP CLEAN AND NEATLY IN OPERATOR ROOM. -THE MATERIAL PUT ON SITE SHOULD BE ALONG WITH PARELLEL AGAINST X.Y AXIS Rig Number sign have to be attached on each machine/ put identification of the leader and operator on each machine. KATO 25 T 60° D 100100 180 300 420 380 100001000012000 SEGMENT01SEGMENT02SEGMENT03 Water level SAND MIX CONC. CLAY CLAY CLAY SAND 70 AND STONE BALLAST 32000 GL±0.00 2000 DESCRIPTION DESCRIPTION DATENo 2020 FEB Remark SCHEDULE OF MASS PILE 5 1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 W4 W1 W2 W4 MAR W1 W2 W3 W4W3 PRESSING MACHINE NO.1 PRESSING MACHINE NO.2 PRESSING MACHINE NO.3 PRESSING MACHINE NO.5 PRESSING MACHINE NO.6 PRESSING MACHINE NO.7 PRESSING MACHINE NO.8 PRESSING MACHINE NO.9 PRESSING MACHINE NO.10 PRESSING MACHINE NO.11 PRESSING MACHINE NO.4 PRESSING MACHINE NO.12 PRESSING MACHINE NO.13 PRESSING MACHINE NO.14 PRESSING MACHINE NO.15 PRESSING MACHINE NO.16 TET'SHOLIDAY W3 APR W1 W2 02 l« m1 l« m2 l« m3 l« m4 l« m5 l« m6 8000 40000 15000280000 11003108000 Existing Fence chØgiíix©ydùng N A L A 88000 1 1 1 35 1 4 SAND STOCK YARD 10 STOCK YARD OF TRASH TEMPORARY FENCE-BY METAL SHEET 109650 50000 temp.road mug deposition hole STOCK YARD OF SUB-CONTRACTOR ON HOLD NO.2 NO.1 NO.3 NO.5 NO.4 NO.6 NO.7 NO.8 NO.10 NO.9 NO.11 NO.12 NO.13 NO.15 NO.14 EXSTING FACTORY (n) bN T D TEMPORARYFENCE-BYMETALSHEET temp. access 12345678910 H G F E D C B A 12345678910 H G F E D C B A NO.16 LIFE LINE LADDER kato crane 50T STEEL PLATE 1.2MX1.6MX22MM OR MORE UNDER OUTRIGE BARRICADE PREPARED BY CHECKED BY APPROVED BY VINATA ENGINEER PROJECT MANAGER QA/QC CONS. DIRECTORSITE MANAGER AREA MANAGER Project TOTO 3rd FACTORY PROJECT Type of Pile PILE PHC CLASS A D300, D350, D500 Sub-Contractor PHAN VU CHECK SHEET OF METHOD STATEMENT I. Drawing A. Construction Plan Layout 1. Adjacent Bourdary Line, Temporary Fence (Steel fence H=2000) Land form (Flat) High - Voltage line is nothing. Overhead cable is nothing Neighboring building 2. Layout of equipment.. 3.Specification of pile Cylinder D50 cm, L=10m+10m+10m = 30m Compressive strength of concrete 80 Mpa B. Adjacent section drawing 4. Construction Procedure As for drawing 1. Adjacent Building 2. Open cut, Retaining wall None N/A C. Pile length & Leader As per drawing II. History of land Back filling Controled fill Slope Demolition Bring hole histogram Yes No Yes No Yes No Yes No Yes No III. Soil bearing Method of bearing 1. Plate loading test IV. Machine model Type/Model Max weight VI. Strong wind and Stormy weather Mobile crane Piling machine When the average 1. To be pulled down the material wind speed for 10 minutes exceed 10m/s work should be stopped on the ground and take off hook 2. The hook fixes to boom not to swing by wind 3. Roll up the hook, put on the brakes th tum & driving and lock then stop the engine 1. Any lifting material to be pulled down 2. Welding work to be immediately stopped 3. Any worker standing above machine to down 4. Piling to be held by machine and stop jacking process When the expected that the maximum momentary wind speed exceed 15.0 m/s site should be closed 1. Procedure of piling work Check Correction 2. Inspection sheet for crane 3. Check sheet of soil capacity & soil stabilization Access road Check ORGANIZATION CHART Project Manager Nguyen Trung Thanh Site Manager Nghiem Tuan Truong Stability ZYJ 680B HYDROULIC STATIC PILE ZYJ 460B HYDROULIC STATIC PILE ZYJ 360B HYDROULIC STATIC PILE KATO KR-25H (for Assembly) Max Ground Pressure modulus Driving Running 723T 462.0T 362.0T Max Capacity Quantity 0425T Area Manager Mr. Furuse Item Date VINATA (Attendence) Subcon (Attendence) Phan Vu Pre Toolbox Meeting Confirmation Toolbox Meeting 4. Others ( ) V. Safety requirement when 1. Slope of working area. Ground Less than 1/100, To be Kept flat 2. Machine road, To be set steel plate in right angle for the course of machine (Edge of steel plate and caterpiller make gap more than 50cm) 3. To be moved hammer & attachments on leader when machine move. 4. To be kept less than 5 for slope when leader stands 5. Others 1) 2) 3) * In - house standard running 12 o 25 18.512 o 12 o 12 o 12 o 12 o Ultimate Soil Allowable Ground Bearing Bearing Capacity Pu Capacity 2. Sounding 3. Others ( ) Soil Stabilization 12 T/m² 10.1 T/m² Depth m Material Ratio kg/. (Comment) PILING WORK PLAN DETAIL A ASSEMBLY PILE MACHINE FIRE EXTINGUISHER WATER BUCKET USE MASK HOT WORK PERMIT - HAVE FIRE EXTINGUISHER PRIORITY DANGEROUS WORK; METHOD STATEMENT OF PILING WORK - HAVE WATER BUCKET - CHECK AGAIN AFTER FINISH WORKS. PROTECTION PILELOCK TYPE OF LIFTING WIRE Ø20 - D350 ; D300 STOCK PILELIFTING WIRE ROPE ARRANGEMENT SPECIFICATION OF SUPPORT CRANE TADANO-50H WEIGHTS OF PART ZYJ680B MACHINE Biken capacity VII. Check item for inspection machine move. BIKEN BIKE PARKING PLAN HOT WORKS METHOD Outline Contract Period 2 months NEW FACTORY 08th Feb 2020 ~ 29th Mar 2020 UseCons. Period Structure PC ground floor, steel structure & metal roof, cladding wall Floor 3 story high Location: PLOT M7, M8, N3, RE8 Location: THANG LONG II IZ-YEN MY-HUNG YEN 06/FEB/2020 Mr. Furuse, Mr.Thanh, Mr.Truong &S.E 0450T (MPa) (Mpa) thick=20mm Protect by polywood t=12mm Stopper D500, WEIGHT= 5.66 TONS PER SEGMENT (15m) - ELECTRICAL DEVICE/WELDING MACHINE GEN-SET SHOULD HAVE Max 16T, Radius max 6m Max 7T, Radius max 9m Use safety harness when worker above weiht Barricade M1 M2 M3 M4 N.C.Hieu N.D.Quang T.D.Thanh N.Q.Vuong Site Manager: D.T.Anh Leader Operator Welder Worker PHAN VU SUB-CON 1: PHAN VU VINATA MAX CAPACITY D500, L=15M MAX LOAD 4.35 TONS , SAFETY FACTOR 6.75 25.5 PRESSING PILE FLOW CHART Site Manager: H.V.Tinh SUB-CON 2: BIKEN D.V.Khanh D.V.Thanh D.V.Thinh P.V.Quan N.T.Huan N.V.Truong B.Q.Khoa D.V.Hung H.N.Tuyen T.D.Sinh N.V.Vi D.V.Chau N.V.Truong P.V.Hoa N.V.Quan M1 16.0 7.00 MARKING BEFORE LIFTING INPECTION TAPE GROUND CABLE AND PROPERLY SET ON THE GROUND - HOT WORKS/FIRE EXTINGUIGHER/CHECK FIRE TO BE EXTINGUISHED BEFORE FINISH WORK QA-QC: H.M.Ha Vi. Safety SurveyorFAC: C.D.Viet D.V.Dai D.V.Toi N.B.Khang B.Q.Vinh D.V.Thin 11.79 11.79 11.79 deformation T.V.Minh C.X.Phuong C.V.Dong T.V.Huy Leader Operator Welder Worker D.T.Tinh L.V.Nam B.V.Cong T.V.Duong T.H.Minh T.V.Hung P.T.Vinh N.B.Tuan H.C.Trinh M.V.Hoi V.V.Phuong H.V.Canh C.V.Huong L.D.Hai V.V.Sang N.B.Tuan N.M.Hai C.N.Phong N.V.Duong H.H.Hoang M2 M3 M4 M5 M6 M7 M16 M9 M10 M11 M12 M13 M14 M15M8 BIKEN M6 L.Q.Thanh P.T.Dung B M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 PV.Engineer Biken Engineer H.V.Trung P.H.Tu T.T.Hiep B.D.Chien T.K.Duy L.V.Hao L.D.Thanh H.V.Huy H.V.Dien L.V.Anh P.H.Tu T.X.Linh V.V.Thuan V.D.Tuyen P.V.Vinh V.D.Thuy V.V.Viet N.D.Trung L.N.Hoang D.V.Thu N.T.Doanh Welder D.V.Thinh N.H.Nhon N.C.Thuy N.D.Truong N.M.Ha N.C.Chien D.V.Tuan N.V.Nghia V.V.ThaiT.V.Huy D.V.Tien P.D.Hung L.C.Canh N.V.Long T.D.Minh D.Q.Chung N.X.Hoan N.V.Huy B.D.Cong T.D.Son Welder B.V.Cong T.V.Thanh V.H.Thuong V.T.Tung V.V.Nghiem N.V.Trong P.H.Tuyen V.H.Thang N.V.Duc N.X.Hien N.T.Anh N.X.Hai N.M.Thang N.T.Dong P.V.Giang N.T.Minh N.V.Hung N.V.Huan M5 T.H.Su L.C.Tuan T.X.Thu N.V.Bien N.Q.Nhat N.D.Son 20/JAN/2020 Everyday Ø22 - D500 NOTE: PILE D350, D300 USE D20MM WH:N.V.Trung RH: T.T.Dung Inspection PC Piles 1. N.N.Dung 2. 3. 4. CRANE ASSEMBLY (DISASSEMBLY) METHOD SPECIFICATION OF SUPPORT CRANE KATO 25T