Property
Assessed Clean
Energy (PACE)
Disclaimer: Energy consumption proforma’s are not included with this illustration
PACE Equity Solution
Energy Performance Contracting Solution
Confidential - PACE Equity 2
PACE Financing
100% financing of installed equipment
Energy Performance
Contracting Program
• Technical Sales
• Performance Contract
• Procurement
Copyright 2017-2020
Earth Orbit
Tech., Inc.
Energy Efficient Lighting Building Envelope Improvements High Efficiency Furnaces
Lighting Control Strategies Water Conservation / Plumbing Fixtures Solar Domestic Water Heaters
Exterior Lighting Enhancements High Efficiency Boiler Replacement Waste Management
Security Cameras Facility Management Controls Energy Star Appliances
Photovoltaic HVAC Improvements Meter Strategies
Technical Sales
Copyright 2017-2020
Earth Orbit
Tech., Inc.
We will offer “pass through” financing (i.e. the finance rate from Pace Equity LLC)
to customers. EOT has no financial interest, other than providing the greatest
product value to PACE customers in designing and building the EPC project.
Developer Bundle IllustrationDeveloper Bundle IllustrationDeveloper Bundle IllustrationDeveloper Bundle Illustration
Building A
Building D
Building E
Building C Building B
e.g.(Not To Scale)
Copyright 2017-2020
Earth Orbit
Tech., Inc.
Projects are selected based on building types / zoning that closely match proforma estimates
for facility upgrade financing. We are proposing a templated, process oriented, performance
contract system. All energy upgrade systems will be produced using contract manufacturing
OEM cooperation's ISO2009 Earth Orbit Technologies e.g. (Our warranty period is 10 years).
Contract Term
Copyright 2017-2020
Earth Orbit
Tech., Inc.
The option to finance improvements over a 20-year term allows PACE Equity
LLC to install a more comprehensive set of ECMs under a self-funding EPC,
while providing the business with either significant net positive cash flow or
an opportunity to include additional Energy Conservation Measures.
Contract Term EPC Principal Amount
3 Units
Total Term Cumulative Savings
10 - Year Term 160,000 USD 304,000 USD
18 - Year Term 320,000 USD 590,000 USD
Additional Benefit of 20-year Program 160,000 USD 285,000 USD
Performance Contract
Copyright 2017-2020
Earth Orbit
Tech., Inc.
Earth Orbit Technologies seeks to structure PACE energy performance contracts such that payments to
finance the total project cost plus payments for ongoing incremental project maintenance are to be paid
in full by the value of measured energy savings resulting from the project. The proposer may propose any
underlying project financing mechanism so long as it meets the objectives of Pace Equity LLC and complies
with HUD and State Laws, rules and regulations.
24 CFR 965 -Energy Audits, Metering,
Allowances, LBP & Fire Safety
Procurement
Copyright 2017-2020
Earth Orbit
Tech., Inc.
Earth Orbit Technologies standard performance contract guarantees are structured that the energy
savings to our customers will be sufficient to pay all “up-front” project costs including the debt service as
well as all fees related to project development and implementation. The project cost include but not
limited to costs associated with-the Audit, Financing, Design and Specification. The Bid Solicitation,
Construction Interest, and Construction Management are paid from “ACTUAL REALIZED SAVINGS”. Annual
service fee e.g. (Savings Measurement, Verification, and Monitoring) replacement program. The
commercial program and cost to maintain the program will be paid for from ACTUAL savings.
Actual Savings include consumption reduction, rate reduction,
allowances, grants, rebates, and fuel switching
Copyright 2017-2020
Earth Orbit
Tech., Inc.
LAND VALUE ANALYSIS
Land Value Analysis (LVA) is a algorithm in
Microsoft Excel. This is used for Earth Orbit’s
internal software analysis for each site
proforma package executed. Services are
being made available to Pace Equity LLC upon
request.
Project Bundle IllustrationProject Bundle IllustrationProject Bundle IllustrationProject Bundle Illustration
Building A
Building D
Building E
Building C Building B
e.g.(Not To Scale)
Metro Detroit
$0
$75,000 $52,000 $38,000
$22,000 $22,000
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
ML Light
Manufacturing
Commercial Local Business
District
OR-1 Office-
Retail
O-1 Office
Building
A B C D E
Energy Performance Contracting Program
Value (USD) Developer Cost Square Foot (Sq. Ft.)
Value/DeveloperCost
BuildingSquareFootage
Copyright 2017-2020
Earth Orbit
Tech., Inc.
$209,000 USD
Earth Orbit Technologies project costs for building e.g. ( A, B, C).
Any structures <= 10,000 Square feet are excluded from the EPC
technical sales model.
PROJECT OVERVIEW
Performance Contract Numbers
CONTACT US TODAY: PURCHASING@EARTHORBITTECH.COM
Copyright 2017-2020
Earth Orbit
Tech., Inc.

More Related Content

What's hot

Money and the Role of Building Physics Software in the Valuation Chain
Money and the Role of Building Physics Software in the Valuation ChainMoney and the Role of Building Physics Software in the Valuation Chain
Money and the Role of Building Physics Software in the Valuation ChainIES VE
 
Results from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot ProgramResults from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot ProgramCenter for Energy and Environment
 
SPARK16 Presentation: Connecting Facilities Performance Data with Your Real E...
SPARK16 Presentation: Connecting Facilities Performance Data with Your Real E...SPARK16 Presentation: Connecting Facilities Performance Data with Your Real E...
SPARK16 Presentation: Connecting Facilities Performance Data with Your Real E...Urjanet
 
Beyond Big Data: Harnessing the Industrial Internet for Wind Power
Beyond Big Data: Harnessing the Industrial Internet for Wind PowerBeyond Big Data: Harnessing the Industrial Internet for Wind Power
Beyond Big Data: Harnessing the Industrial Internet for Wind PowerGE_India
 
KIC Coal and Gas Technologies Report
KIC Coal and Gas Technologies ReportKIC Coal and Gas Technologies Report
KIC Coal and Gas Technologies ReportMarcin Lewenstein
 
Defense contractor teeg
Defense contractor teegDefense contractor teeg
Defense contractor teegKim Ellerman
 
Energy Management with Fiber Networks
Energy Management with Fiber NetworksEnergy Management with Fiber Networks
Energy Management with Fiber NetworksBroadbandProperties
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Gensol Engineering Limited
 
Bringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserBringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserEMEX
 

What's hot (11)

Money and the Role of Building Physics Software in the Valuation Chain
Money and the Role of Building Physics Software in the Valuation ChainMoney and the Role of Building Physics Software in the Valuation Chain
Money and the Role of Building Physics Software in the Valuation Chain
 
Results from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot ProgramResults from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot Program
 
SPARK16 Presentation: Connecting Facilities Performance Data with Your Real E...
SPARK16 Presentation: Connecting Facilities Performance Data with Your Real E...SPARK16 Presentation: Connecting Facilities Performance Data with Your Real E...
SPARK16 Presentation: Connecting Facilities Performance Data with Your Real E...
 
Beyond Big Data: Harnessing the Industrial Internet for Wind Power
Beyond Big Data: Harnessing the Industrial Internet for Wind PowerBeyond Big Data: Harnessing the Industrial Internet for Wind Power
Beyond Big Data: Harnessing the Industrial Internet for Wind Power
 
The Clean Energy Sector and Workforce
The Clean Energy Sector and WorkforceThe Clean Energy Sector and Workforce
The Clean Energy Sector and Workforce
 
KIC Coal and Gas Technologies Report
KIC Coal and Gas Technologies ReportKIC Coal and Gas Technologies Report
KIC Coal and Gas Technologies Report
 
Defense contractor teeg
Defense contractor teegDefense contractor teeg
Defense contractor teeg
 
Data and Design - Open Architecture Collaborative
Data and Design - Open Architecture Collaborative Data and Design - Open Architecture Collaborative
Data and Design - Open Architecture Collaborative
 
Energy Management with Fiber Networks
Energy Management with Fiber NetworksEnergy Management with Fiber Networks
Energy Management with Fiber Networks
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
 
Bringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserBringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the User
 

Similar to 2017 Energy Performance Contracting EOT Q2

Property Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) ProgramProperty Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) Programlerchearly
 
GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing GRESB
 
Energy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaEnergy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaZAINI ABDUL WAHAB
 
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17RudySturkCGB
 
Energy costs reduction through Energy Performance Contracting projects implem...
Energy costs reduction through Energy Performance Contracting projects implem...Energy costs reduction through Energy Performance Contracting projects implem...
Energy costs reduction through Energy Performance Contracting projects implem...ZAINI ABDUL WAHAB
 
2009 Sdge It Virtualization Presentation
2009 Sdge It Virtualization Presentation2009 Sdge It Virtualization Presentation
2009 Sdge It Virtualization Presentationfowlk9
 
Utilising Energy Modelling for LCSF and PSDS Funding Applications
Utilising Energy Modelling for LCSF and PSDS Funding ApplicationsUtilising Energy Modelling for LCSF and PSDS Funding Applications
Utilising Energy Modelling for LCSF and PSDS Funding ApplicationsIES VE
 
29th Annual ROTH Conference
29th Annual ROTH Conference29th Annual ROTH Conference
29th Annual ROTH ConferenceADAESIR
 
SLCC Annual Energy Report FY 15-16
SLCC Annual Energy Report FY 15-16SLCC Annual Energy Report FY 15-16
SLCC Annual Energy Report FY 15-16Ezra Nielsen
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects Avanceon
 
Experience in Developing EE projects in Building Sector - investment opportun...
Experience in Developing EE projects in Building Sector - investment opportun...Experience in Developing EE projects in Building Sector - investment opportun...
Experience in Developing EE projects in Building Sector - investment opportun...OECD Environment
 
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...Contract Cities
 
L06 cost management
L06 cost managementL06 cost management
L06 cost managementAsa Chan
 
AUG25_WEBNGRN_MIP_SLDSDIST.PPT
AUG25_WEBNGRN_MIP_SLDSDIST.PPTAUG25_WEBNGRN_MIP_SLDSDIST.PPT
AUG25_WEBNGRN_MIP_SLDSDIST.PPTssuser3bfeec
 
Sample energy saving proposal
Sample energy saving proposalSample energy saving proposal
Sample energy saving proposalRoyal Mail
 
Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )Ghafoor Butt
 
Company Introduction- Vostok 2015-16
Company Introduction- Vostok 2015-16Company Introduction- Vostok 2015-16
Company Introduction- Vostok 2015-16Jitesh Pandit
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsScottMadden, Inc.
 

Similar to 2017 Energy Performance Contracting EOT Q2 (20)

Property Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) ProgramProperty Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) Program
 
GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing
 
Energy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaEnergy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in Malaysia
 
PACE in Mo. Ppt11
PACE in Mo. Ppt11PACE in Mo. Ppt11
PACE in Mo. Ppt11
 
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
 
Energy costs reduction through Energy Performance Contracting projects implem...
Energy costs reduction through Energy Performance Contracting projects implem...Energy costs reduction through Energy Performance Contracting projects implem...
Energy costs reduction through Energy Performance Contracting projects implem...
 
2009 Sdge It Virtualization Presentation
2009 Sdge It Virtualization Presentation2009 Sdge It Virtualization Presentation
2009 Sdge It Virtualization Presentation
 
Utilising Energy Modelling for LCSF and PSDS Funding Applications
Utilising Energy Modelling for LCSF and PSDS Funding ApplicationsUtilising Energy Modelling for LCSF and PSDS Funding Applications
Utilising Energy Modelling for LCSF and PSDS Funding Applications
 
100Roscommon
100Roscommon100Roscommon
100Roscommon
 
29th Annual ROTH Conference
29th Annual ROTH Conference29th Annual ROTH Conference
29th Annual ROTH Conference
 
SLCC Annual Energy Report FY 15-16
SLCC Annual Energy Report FY 15-16SLCC Annual Energy Report FY 15-16
SLCC Annual Energy Report FY 15-16
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects
 
Experience in Developing EE projects in Building Sector - investment opportun...
Experience in Developing EE projects in Building Sector - investment opportun...Experience in Developing EE projects in Building Sector - investment opportun...
Experience in Developing EE projects in Building Sector - investment opportun...
 
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
AUG25_WEBNGRN_MIP_SLDSDIST.PPT
AUG25_WEBNGRN_MIP_SLDSDIST.PPTAUG25_WEBNGRN_MIP_SLDSDIST.PPT
AUG25_WEBNGRN_MIP_SLDSDIST.PPT
 
Sample energy saving proposal
Sample energy saving proposalSample energy saving proposal
Sample energy saving proposal
 
Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )
 
Company Introduction- Vostok 2015-16
Company Introduction- Vostok 2015-16Company Introduction- Vostok 2015-16
Company Introduction- Vostok 2015-16
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCs
 

Recently uploaded

Tirupati Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Tirupati Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceTirupati Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Tirupati Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
Dàni Velvet Personal Brand Exploration (1).pptx
Dàni Velvet Personal Brand Exploration (1).pptxDàni Velvet Personal Brand Exploration (1).pptx
Dàni Velvet Personal Brand Exploration (1).pptxdmtillman
 
Lucknow Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Lucknow Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceLucknow Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Lucknow Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
Bangalore Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Bangalore Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceBangalore Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Bangalore Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
Hyderabad Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Hyderabad Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceHyderabad Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Hyderabad Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
Sohna Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Sohna Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceSohna Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Sohna Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Dehradun Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Dehradun Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDehradun Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Dehradun Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...StartupSprouts.in
 
Sangareddy Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Sangareddy Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceSangareddy Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Sangareddy Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.inEV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.inStartupSprouts.in
 
Call girls in Andheri with phone number 9892124323
Call girls in Andheri with phone number 9892124323Call girls in Andheri with phone number 9892124323
Call girls in Andheri with phone number 9892124323Pooja Nehwal
 
Famedesired Project portfolio1 . Fullsail
Famedesired Project portfolio1 . FullsailFamedesired Project portfolio1 . Fullsail
Famedesired Project portfolio1 . Fullsailfergusonamani
 

Recently uploaded (12)

Tirupati Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Tirupati Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceTirupati Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Tirupati Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Dàni Velvet Personal Brand Exploration (1).pptx
Dàni Velvet Personal Brand Exploration (1).pptxDàni Velvet Personal Brand Exploration (1).pptx
Dàni Velvet Personal Brand Exploration (1).pptx
 
Lucknow Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Lucknow Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceLucknow Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Lucknow Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Bangalore Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Bangalore Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceBangalore Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Bangalore Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Hyderabad Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Hyderabad Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceHyderabad Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Hyderabad Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Sohna Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Sohna Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceSohna Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Sohna Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Dehradun Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Dehradun Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDehradun Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Dehradun Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
 
Sangareddy Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Sangareddy Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceSangareddy Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Sangareddy Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.inEV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
 
Call girls in Andheri with phone number 9892124323
Call girls in Andheri with phone number 9892124323Call girls in Andheri with phone number 9892124323
Call girls in Andheri with phone number 9892124323
 
Famedesired Project portfolio1 . Fullsail
Famedesired Project portfolio1 . FullsailFamedesired Project portfolio1 . Fullsail
Famedesired Project portfolio1 . Fullsail
 

2017 Energy Performance Contracting EOT Q2

  • 1. Copyright 2017-2020 Earth Orbit Tech., Inc. Energy Performance Contracting (EPC) – Metro Detroit Earth Orbit Technologies Inc. 03/06/17 Presenter: Leon Brown Property Assessed Clean Energy (PACE) Disclaimer: Energy consumption proforma’s are not included with this illustration
  • 2. PACE Equity Solution Energy Performance Contracting Solution Confidential - PACE Equity 2 PACE Financing 100% financing of installed equipment Energy Performance Contracting Program • Technical Sales • Performance Contract • Procurement Copyright 2017-2020 Earth Orbit Tech., Inc.
  • 3. Energy Efficient Lighting Building Envelope Improvements High Efficiency Furnaces Lighting Control Strategies Water Conservation / Plumbing Fixtures Solar Domestic Water Heaters Exterior Lighting Enhancements High Efficiency Boiler Replacement Waste Management Security Cameras Facility Management Controls Energy Star Appliances Photovoltaic HVAC Improvements Meter Strategies Technical Sales Copyright 2017-2020 Earth Orbit Tech., Inc. We will offer “pass through” financing (i.e. the finance rate from Pace Equity LLC) to customers. EOT has no financial interest, other than providing the greatest product value to PACE customers in designing and building the EPC project.
  • 4. Developer Bundle IllustrationDeveloper Bundle IllustrationDeveloper Bundle IllustrationDeveloper Bundle Illustration Building A Building D Building E Building C Building B e.g.(Not To Scale) Copyright 2017-2020 Earth Orbit Tech., Inc. Projects are selected based on building types / zoning that closely match proforma estimates for facility upgrade financing. We are proposing a templated, process oriented, performance contract system. All energy upgrade systems will be produced using contract manufacturing OEM cooperation's ISO2009 Earth Orbit Technologies e.g. (Our warranty period is 10 years).
  • 5. Contract Term Copyright 2017-2020 Earth Orbit Tech., Inc. The option to finance improvements over a 20-year term allows PACE Equity LLC to install a more comprehensive set of ECMs under a self-funding EPC, while providing the business with either significant net positive cash flow or an opportunity to include additional Energy Conservation Measures. Contract Term EPC Principal Amount 3 Units Total Term Cumulative Savings 10 - Year Term 160,000 USD 304,000 USD 18 - Year Term 320,000 USD 590,000 USD Additional Benefit of 20-year Program 160,000 USD 285,000 USD
  • 6. Performance Contract Copyright 2017-2020 Earth Orbit Tech., Inc. Earth Orbit Technologies seeks to structure PACE energy performance contracts such that payments to finance the total project cost plus payments for ongoing incremental project maintenance are to be paid in full by the value of measured energy savings resulting from the project. The proposer may propose any underlying project financing mechanism so long as it meets the objectives of Pace Equity LLC and complies with HUD and State Laws, rules and regulations. 24 CFR 965 -Energy Audits, Metering, Allowances, LBP & Fire Safety
  • 7. Procurement Copyright 2017-2020 Earth Orbit Tech., Inc. Earth Orbit Technologies standard performance contract guarantees are structured that the energy savings to our customers will be sufficient to pay all “up-front” project costs including the debt service as well as all fees related to project development and implementation. The project cost include but not limited to costs associated with-the Audit, Financing, Design and Specification. The Bid Solicitation, Construction Interest, and Construction Management are paid from “ACTUAL REALIZED SAVINGS”. Annual service fee e.g. (Savings Measurement, Verification, and Monitoring) replacement program. The commercial program and cost to maintain the program will be paid for from ACTUAL savings. Actual Savings include consumption reduction, rate reduction, allowances, grants, rebates, and fuel switching
  • 8. Copyright 2017-2020 Earth Orbit Tech., Inc. LAND VALUE ANALYSIS Land Value Analysis (LVA) is a algorithm in Microsoft Excel. This is used for Earth Orbit’s internal software analysis for each site proforma package executed. Services are being made available to Pace Equity LLC upon request.
  • 9. Project Bundle IllustrationProject Bundle IllustrationProject Bundle IllustrationProject Bundle Illustration Building A Building D Building E Building C Building B e.g.(Not To Scale) Metro Detroit $0 $75,000 $52,000 $38,000 $22,000 $22,000 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 $0 $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 ML Light Manufacturing Commercial Local Business District OR-1 Office- Retail O-1 Office Building A B C D E Energy Performance Contracting Program Value (USD) Developer Cost Square Foot (Sq. Ft.) Value/DeveloperCost BuildingSquareFootage Copyright 2017-2020 Earth Orbit Tech., Inc. $209,000 USD Earth Orbit Technologies project costs for building e.g. ( A, B, C). Any structures <= 10,000 Square feet are excluded from the EPC technical sales model.
  • 10. PROJECT OVERVIEW Performance Contract Numbers CONTACT US TODAY: PURCHASING@EARTHORBITTECH.COM Copyright 2017-2020 Earth Orbit Tech., Inc.