This document provides background information on the Mikoyan-Gurevich MiG-21 aircraft. The MiG-21 was a supersonic jet fighter that served as the mainstay of Soviet fighter aviation from the 1960s-1970s. Over 10,000 MiG-21s were produced and it was exported to over 50 countries. While early versions were considered first and second generation jets, later versions were third and fourth generation. The MiG-21 had short range but was capable of Mach 2 speed. It continues to serve in many air forces globally despite being replaced by newer fighters in the Soviet Union in the 1970s-1980s.