Cowen and Company
Global Metals, Mining & Materials Conference
Laurie Brlas, EVP and CFO
November 12, 2013
Cautionary statement
Cautionary Statement Regarding Forward Looking Statements, Including 2013 Outlook:
This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as
amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended to be covered by the safe
harbor created by such sections and other applicable laws. Such forward-looking statements may include, without limitation: (i)
estimates of future production and sales; (ii) estimates of future costs applicable to sales; (iii) estimates of future capital
expenditures, expenses, sustaining capital or costs, spend, and all-in sustaining cost; (iv) plans to reduce costs and increase
efficiencies; (v) expectations regarding the development, growth and exploration potential of the Company’s projects; and (vi)
expectations regarding future liquidity, balance sheet strength, borrowing availability, credit ratings, and return to shareholders.
Estimates or expectations of future events or results are based upon certain assumptions, which may prove to be incorrect. Such
assumptions, include, but are not limited to: (i) there being no significant change to current geotechnical, metallurgical,
hydrological and other physical conditions; (ii) permitting, development, operations and expansion of the Company’s projects
being consistent with current expectations and mine plans; (iii) political developments in any jurisdiction in which the Company
operates being consistent with its current expectations; (iv) certain exchange rate assumptions for the Australian dollar to the U.S.
dollar, as well as other the exchange rates being approximately consistent with current levels; (v) certain price assumptions for
gold, copper and oil; (vi) prices for key supplies being approximately consistent with current levels; and (vii) the accuracy of our
current mineral reserve and mineral resource estimates. Where the Company expresses or implies an expectation or belief as to
future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However,
such statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from
future results expressed, projected or implied by the “forward-looking statements”. Such risks include, but are not limited to, gold
and other metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates
from those assumed in mining plans, political and operational risks, community relations, conflict resolution and outcome of
projects or oppositions and governmental regulation and judicial outcomes. For a more detailed discussion of such risks and other
factors, see the Company’s 2012 Form 10-K, filed on February 22, 2013, with the Securities and Exchange Commission (the
“SEC”), as well as the Company’s other SEC filings. Investors are also encouraged to review this presentation in conjunction with
the Company’s most recent Form 10-Q filed with the SEC on October 31, 2013. The Company does not undertake any obligation
to release publicly revisions to any “forward-looking statement,” including, without limitation, outlook, to reflect events or
circumstances after the date of this presentation, or to reflect the occurrence of unanticipated events, except as may be required
under applicable securities laws. Investors should not assume that any lack of update to a previously issued “forward-looking
statement” constitutes a reaffirmation of that statement. Continued reliance on “forward-looking statements” is at investors' own
risk.

Newmont Mining Corporation | Cowen and Company | www.newmont.com

2

November 12, 2013
Strong third quarter performance across the business
Newmont total injury rate – by quarter
(injuries per 200,000 hours worked)

0.72

0.64

0.46

0.49 0.49
0.41

Q2'12 Q3'12 Q4'12 Q1'13 Q2'13 Q3'13

Newmont Mining Corporation | Cowen and Company | www.newmont.com

Nevada Safety Interaction

3

November 12, 2013
Strategy focused on improving performance and portfolio
• Secure the gold franchise
by running our existing business
more efficiently and effectively
• Strengthen the portfolio
by building longer-life, lower-cost
portfolio of gold and copper assets
• Enable the strategy
by developing the capabilities and
systems that create competitive
advantage

Batu Hijau mill, Indonesia

Newmont Mining Corporation | Cowen and Company | www.newmont.com

4

November 12, 2013
Delivering sustainable cost improvements
•

Year to date consolidated spending down
$700M1, or 13% over prior year quarter

•

Third quarter all-in sustaining costs2 of $993
per ounce, down 16% over prior year
quarter

•

Third quarter gold CAS of $649 per ounce,
down 6% over prior year quarter

•

Stronger third quarter production
performance primarily at Nevada, Tanami
and Waihi

•

Maintaining 2013 attributable gold
production outlook3

•

Capital outlook lowered $400M year to date

•

Taking steps to optimize our portfolio; sold
interest in Canadian Oil Sands
Boddington

Newmont Mining Corporation | Cowen and Company | www.newmont.com

5

November 12, 2013
Two new projects reaching commercial production
Akyem, Ghana
•

Akyem reached commercial production early in
Q4

•

Project complete on time and on budget

•

Expected to contribute 50-100 Koz in 20133

•

First 5 years’ average All-in sustaining costs of
between $750 - $850 per ounce3
Akyem first gold pour

Phoenix Copper Leach, Nevada
•

Phoenix Copper Leach produced its first copper
cathode in Q4

•

Ore previously classified as waste is treated to
produce copper

•

Project delivered on time, on budget, without
injury

•

Expected to deliver 20 Mlbs of copper annually

Newmont Mining Corporation | Cowen and Company | www.newmont.com

Copper Cathode- Phoenix

6

November 12, 2013
Solid financial performance despite challenging conditions
Q3 2012 Q3 2013 YTD 2012 YTD 2013

Sales ($M)

$2,480

$1,983

$7,392

$6,153

Net income (loss) from continuing
operations ($M)

$400

$429

$1,240

($1,349)

Net income (loss) from continuing
operations per share

$0.81

$0.86

$2.50

($2.72)

Cash from continuing operations ($M)

$578

$443

$1,542

$1,175

$1,780

$1,428

$5,241

$4,548

Adjusted net income (loss) ($M)4

$426

$227

$1,298

$531

Adjusted net income per share4

$0.86

$0.46

$2.62

$1.07

Consolidated Spending1 ($M)

Newmont Mining Corporation | Cowen and Company | www.newmont.com

7

November 12, 2013
Preserving financial flexibility across price cycles
~$5B in cash,
marketable
securities, and
revolver capacity5

Investment grade
rating and metrics5

Long-dated
maturity with
favorable terms

Scheduled debt repayments ($M)
$1,500
$3.0B Corporate Revolver Maturity

$1,100
$900

$1,000

$770
$600

$585

$185
$33
2013

$10
2014

2015

2016

2017

2018

Newmont Mining Corporation | Cowen and Company | www.newmont.com

2019

////

2022

2035
8

2039

2042

November 12, 2013
Exceptional operational performance
Q3 Attributable Gold Production

Q3 Gold Costs Applicable to Sales

Koz

$/oz
Q3 2012

600

Q3 2013

Q3 2012

1,200

500

1,000

400

800

300

600

200

400

100

Q3 2013

200

0

0
North
America

South
America

Australia/NZ

Africa

Indonesia

North
America

South
America

Australia/NZ

Africa

Indonesia

Q3 2012

Q3 2013

Q3 2012

Q3 2013

1.24 million ounces
produced

1.28 million ounces
produced

CAS of $693/oz

CAS of $649/oz

Newmont Mining Corporation | Cowen and Company | www.newmont.com

9

November 12, 2013
North America – controlling costs and regaining production
• Nevada third quarter production beats expectations at lower costs
• Full year outlook3 of 1.9 – 2.0 million ounces
• Turf Vent Shaft to add 100,000 – 150,000 annual gold production3 beginning in
2015

• Phoenix Copper Leach now online; converts waste ore to copper

Leeville

Newmont Mining Corporation | Cowen and Company | www.newmont.com

10

November 12, 2013
South America - focusing on cost and capital discipline
• Year to date production above expectations due to higher grades at Yanacocha
• Full year outlook3 of 550,000 – 600,000 ounces of gold

• Advancing the Water First approach at Conga6
− Conga access road under construction; Perol reservoir construction to
advance according to timing of water transfer permit
− Making strides in securing social acceptance

Yanacocha Gold Mill

Newmont Mining Corporation | Cowen and Company | www.newmont.com

11

November 12, 2013
Africa – delivering first production at Akyem
• Higher Q3 production due to higher grades and mill throughput

• 2013 Full year outlook3 of 625,000 – 675,000 ounces of gold
• Akyem achieves commercial production; $920 million capital spent through
September 30, 2013

First ore to crusher at Akyem

Newmont Mining Corporation | Cowen and Company | www.newmont.com

12

November 12, 2013
Australia and New Zealand – delivering a step-change in
performance
• Gold production increased at Boddington due to higher throughput and
recovery; higher mill throughput and ore grade from Tanami

• Full year outlook3 of 1.6 – 1.7 million ounces of gold; 60 – 70 million pounds of
copper
• Full potential on-track to deliver sustainable cost reductions at Boddington

Copper
Production ~75Mlb

3 year copper outlook6

Waihi, New Zealand

Newmont Mining Corporation | Cowen and Company | www.newmont.com

13

November 12, 2013
Indonesia – continuing to work toward higher grade ore
• Batu Hijau Phase 6 stripping continuing as planned; back into primary ore in
late 2014
• Phase 6 stripping will impact costs through 2014
• Ongoing discussion with government to address export ban

Copper
Production ~75Mlb

3 year copper outlook6

Batu Hijau mine plan

Newmont Mining Corporation | Cowen and Company | www.newmont.com

14

November 12, 2013
Delivering on our commitments
• Focusing on value over volume with prudent capital allocation

• Executing on our promise to achieve sustainable cost improvements
• Delivering our plans and projects
• Improving mining fundamentals

• Preserving financial flexibility

Newmont Mining Corporation | Cowen and Company | www.newmont.com

15

November 12, 2013
Questions
Appendix
Consolidated spending reconciliation1

Three Months Ended September 30,

Consolidated Spending ($M)

2013
Costs applicable to sales

$

Nine Months Ended September 30,

2012
1,036

$

2013
1,088

$

2012
3,733

$

3,107

Stockpile write-downs

(76)

(5)

(624)

(26)

Advanced projects, research and
development, and Exploration

127

189

360

567

48

51

158

162

Other expense, net

64

56

167

188

Sustaining capital

229

401

754

1,243

General and administrative
(1)

Consolidated Spending

$

1,428

$

1,780

$

4,548

$

5,241

(1)

Other expense, net is adjusted for restructuring of $50, TMAC transaction costs of $45, and Hope Bay care and maintenance of ($2) for 2013;
2012 other expense, net is adjusted for Hope Bay care and maintenance of $129, Boddington contingent consideration of $12, and restructuring
costs of $48.

Newmont Mining Corporation | Cowen and Company | www.newmont.com

18

November 12, 2013
All-in sustaining costs reconciliation2
All-In Sustaining Costs
Newmont has worked to develop a metric that expands on GAAP measures such as cost of goods sold and nonGAAP measures to provide visibility into the economics of our gold mining operations related to expenditures,
operating performance and the ability to generate cash flow from operations.
Current GAAP-measures used in the gold industry, such as cost of goods sold, do not capture all of the
expenditures incurred to discover, develop, and sustain gold production. Therefore, we believe that all-in
sustaining costs and attributable all-in sustaining costs are non-GAAP measures that provide additional information
to management, investors, and analysts that aid in the understanding of the economics of our operations and
performance compared to other gold producers and in the investor’s visibility by better defining the total costs
associated with producing gold.
All-in sustaining costs (“AISC”) amounts are intended to provide additional information only and do not have any
standardized meaning prescribed by GAAP and should not be considered in isolation or as a substitute for
measures of performance prepared in accordance with GAAP. The measures are not necessarily indicative of
operating profit or cash flow from operations as determined under GAAP. Other companies may calculate these
measures differently as a result of differences in the underlying accounting principles, policies applied and in
accounting frameworks such as in International Financial Reporting Standards (“IFRS”), or by reflecting the benefit
from selling non-gold metals as a reduction to AISC. Differences may also arise related to definitional differences
of sustaining versus development capital activities based upon each company’s internal policies.

Newmont Mining Corporation | Cowen and Company | www.newmont.com

19

November 12, 2013
All-in sustaining costs reconciliation2
Costs

Three Months Ended
September 30, 2013

Nevada
La Herradura
Other North America
North America

Advanced

Applicable
to Sales(1)(2)

$

251
40
291

Remediation
Costs(3)

$

3
3

$

All-In

25
10
2
37

General and
Administrative

$

-

Expense,
Net(4)

$

Sustaining
Capital(5)

5
1
6

$

62
11
1
74

$

Ounces

All-In
Sustaining

Sustaining
Costs

Other

Projects and
Exploration

Sold
(000)(6)

Costs
per ounce

346
61
4
411

479
52
531

$

722
1,173
774

Yanacocha
Conga
Other South America
South America
Attributable to Newmont

154
154

23
23

9
15
4
28

-

36
3
(1)
38

38
38

260
18
3
281
146

261
261
134

1,077
1,090

Boddington
Other Australia/New
Zealand
Australia/New Zealand

152

2

1

-

1

20

176

147

1,197

202
354

7
9

7
8

-

8
9

41
61

265
441

267
414

993
1,065

Batu Hijau
Indonesia
Attributable to Newmont

11
11

-

1
1

-

-

3
3

15
15
8

14
14
7

1,071
1,071
1,143

Ahafo
Akyem
Other Africa
Africa

75
75

-

12
2
3
17

-

7
7

23
23

117
2
3
122

146
146

801

$

87
1,357

1,366

$

993

$

1,215

1,232

$

986

Corporate and Other
Consolidated

$

885

$

35

$

36
127

$

Attributable to Newmont(6)

48
48

$

2
62

$

1
200

996

836

(1) Excludes Amortization and Reclamation and remediation.
(2) Includes stockpile and leachpad write-downs of $3 at Nevada, $10 at Yanacocha, $20 at Boddington, and $2 at Batu Hijau.
(3) Remediation costs include operating accretion and amortization of asset retirement costs.
(4) Other expense, net is adjusted for restructuring of $20.
(5) Excludes capital expenditures for the following development projects: Phoenix Copper Leach, Turf Vent Shaft, Yanacocha Bio Leach, Conga, Merian,
Ahafo Mill Expansion, and Akyem for 2013.
(6) Excludes our attributable production from La Zanja and Duketon.

Newmont Mining Corporation | Cowen and Company | www.newmont.com

20

November 12, 2013
All-in sustaining costs reconciliation2
Costs

Three Months Ended
September 30, 2012

Nevada
La Herradura
Other North America
North America

Advanced

Applicable
to Sales(1)(2)

$

292
31
323

Remediation
Costs(3)

$

3
3

$

All-In

47
11
1
59

General and
Administrative

$

-

Expense,
Net(4)

$

Sustaining
Capital(5)

7
7

$

101
10
111

$

Ounces

All-In
Sustaining

Sustaining
Costs

Other

Projects and
Exploration

Sold
(000)(6)

Costs
per ounce

450
52
1
503

442
51
493

$

1,018
1,020
1,020

142
(1)
141

362
9
16
387
206

356
356
183

1,017
1,087
1,126

Yanacocha
Conga
Other South America
South America
Attributable to Newmont

185
185

8
8

14
9
15
38

-

13
2
15

Boddington
Other Australia/New
Zealand
Australia/New Zealand

155

2

2

-

-

19

178

167

1,066

201
356

6
8

23
25

-

11
11

59
78

300
478

216
383

1,389
1,248

Batu Hijau
Indonesia
Attributable to Newmont

17
17

1
1

1
1

-

1
1

5
5

25
25
10

15
15
7

1,667
1,667
1,667

Ahafo
Akyem
Other Africa
Africa

69
69

1
1

20
6
2
28

-

7
7

25
25

122
6
2
130

123
123

992
1,057

$

92
1,615

1,370

$

1,179

$

1,419

1,189

$

1,193

Corporate and Other
Consolidated

$

950

$

21

$

31
182

$

Attributable to Newmont(6)

51
51

$

6
47

$

4
364

(1) Excludes Amortization and Reclamation and remediation.
(2) Includes stockpile and leach pad write-downs of $2 at Yanacocha and $2 at Other Australia/New Zealand.
(3) Remediation costs include operating accretion and amortization of asset retirement costs.
(4) Other expense, net is adjusted for Hope Bay care and maintenance of $27 and restructuring of $48.
(5) Excludes capital expenditures for the following development projects: Phoenix Copper Leach, Turf Vent Shaft, Emigrant, Yanacocha Bio Leach,
Conga, Merian, Tanami Shaft, Ahafo Mill Expansion, and Akyem for 2012.
(6) Excludes our attributable production from La Zanja and Duketon.

Newmont Mining Corporation | Cowen and Company | www.newmont.com

21

November 12, 2013
2013 Outlook3
Attributable
Production

a

Nevada

La Herradura
North America
Yanacocha
La Zanja

Consolidated
CAS exclusive of
stockpile writedowns

Consolidated Capital
Expenditures

Attributable Capital
Expenditures

(Kozs, Mlbs)

Region

Consolidated
CAS inclusive of
stockpile writedowns
($/oz, $/lb)b

($/oz, $/lb)b

($M)c

($M)c

1,700 - 1,800

$600 - $650

$600 - $650

$500 - $550

$500 - $550

200 - 250

$650 - $700

$650 - $700

$125 - $175

$125 - $175

1,900 - 2,000

$600 - $650

$600 - $650

$625 - $675

$625 - $675

475 - 525

$650 - $700

$600 - $650

$225 - $275

$100 - $150

$200 - $250

$100 - $125

40 - 50

Conga
South America

550 - 600

$650 - $700

$600 - $650

$425 - $525

$200 - $275

Boddington

700 - 750

$1,050 - $1,150

$850 - $950

$100 - $150

$100 - $150

Other
Australia/NZ

925 - 975

$1,000 - $1,100

$950 - $1,050

$175 - $225

$175 - $225

1,625 - 1,725

$1,000 - $1,100

$900 - $1,000

$275 - $325

$275 - $325

20 - 30

$2,100 - $2,300

$900 - $1,000

$75 - $125

525 - 575

$550 - $600

$550 - $600

$225 - $275

$225 - $275

50 - 100

$450 - $500

$450 - $500

$225 - $275

$225 - $275

625 - 675

$525 - $575

$525 - $575

$475 - $525

$475 - $525

$20 - $30

$20 - $30

$2,000 - $2,200

$1,700 - $1,900

Australia/
NewZealand
Batu Hijau,
Indonesiad
Ahafo
Akyem
Africa
Corporate/Other
Total Gold

4,800 - 5,100

$750 - $825

$675 - $750

Boddington

60 - 70

$2.75 - $2.95

$2.45 - $2.65

Batu - Hijau

70 - 75

$4.70 - $5.10

$2.20 - $2.40

135 - 145

$4.05 - $4.40

$25 - $75

$2.25 - $2.50

Total Copper
a

Nevada CAS includes by-product credits from an estimated 30-40 million pounds of copper production at Phoenix, net of treatment
and refining charges.
b
2013 Attributable CAS Outlook is $750 - $825 per ounce inclusive of stockpile write-downs or $675 - $750 per ounce exclusive of
stockpile write-downs. CAS Outlook is inclusive of hedge gains and losses.
c

Excludes capitalized interest of approximately $88 million, consolidated and attributable.

d

Assumes Batu Hijau economic interest of 48.5% for 2013, subject to final divestiture obligations.

Newmont Mining Corporation | Cowen and Company | www.newmont.com

22

November 12, 2013
2013 Expense and All-in Sustaining Costs Outlook3
2013 Expense Outlook8

Consolidated
Expenses

Attributable
Expenses

($M)

($M)

$180 - $230

$180 - $230

Description

General & Administrative
DD&A excluding stockpile write-downs

$1,050 - $1,100

$900 - $950

DD&A including stockpile write-downs

$1,250 - $1,300

$1,000 - $1,050

Exploration Expense

$250 - $300

$225 - $275

Advanced Projects & R&D

$250 - $300

$225 - $275

Other Expense

$300 - $350

$200 - $250

Sustaining Capital

$1,200 - $1,300

$1,000 - $1,100

Interest Expense

$275 - $325

$250 - $300

a

Tax Rate

0% - 5%

0% - 5%

All-in sustaining cost excluding stockpile write-downs ($/ounce)b

$1,100 - $1,200

$1,100 - $1,200

All-in sustaining cost including stockpile write-downs ($/ounce)b

$1,100 - $1,200

$1,100 - $1,200

a

Although, the Company expects to remain in a pretax loss for the year, it does not anticipate being in an overall tax benefit position.
Income tax expense equal to 0-5% of the loss is projected. This projected expense primarily relates to mining taxes in Nevada and
Peru.
b
All-in sustaining cost (“AISC”) is a non-GAAP metric defined as the sum of cost applicable to sales (including all direct and indirect
costs related to current gold production incurred to execute on the current mine plan), remediation costs (including operating
accretion and amortization of asset retirement costs), G&A, exploration expense, advanced projects and R&D, other expense, net of
one-time adjustments and sustaining capital. Note that the company has updated this metric to now include the sum of costs
associated with producing and selling an ounce of gold, exclusively, from all operations. See the AISC disclosure starting on slide
23.

Newmont Mining Corporation | Cowen and Company | www.newmont.com

23

November 12, 2013
Adjusted Net Income reconciliation4
Reconciliation of Adjusted Net Income to GAAP Net Income
Management uses the non-GAAP financial measure Adjusted net income to evaluate the Company’s operating
performance, and for planning and forecasting future business operations. The Company believes the use of Adjusted
net income allows investors and analysts to compare the results of the continuing operations of the Company and its
direct and indirect subsidiaries relating to the production and sale of minerals to similar operating results of other mining
companies, by excluding exceptional or unusual items, income or loss from discontinued operations and the permanent
impairment of assets, including marketable securities and goodwill. Management’s determination of the components of
Adjusted net income are evaluated periodically and based, in part, on a review of non-GAAP financial measures used by
mining industry analysts.
Net income attributable to Newmont stockholders is reconciled to Adjusted net income as follows:
Three Months Ended September 30,
2013

Net income (loss) attributable to Newmont
stockholders
Loss (income) from discontinued operations
Impairments
Tax valuation allowance
TMAC transaction costs
Restructuring and other
Asset sales
Boddington contingent consideration
Adjusted net income
Adjusted net income per share, basic
Adjusted net income per share, diluted

$

Nine Months Ended September 30,

2012

$

$

410
21
29
12
(243)
229

$
$

0.46
0.46

Newmont Mining Corporation | Cowen and Company | www.newmont.com

2013

$

$

367
33
7
20
(1)
426

$
$

0.86
0.85

2012

$

$

(1,294)
(53)
1,530
535
30
28
(243)
533

$

1,136
104
38
20
(8)
8
1,298

$
$

1.07
1.07

$
$

2.62
2.60

24

November 12, 2013
Endnotes
Investors are encouraged to read the information contained in this presentation in conjunction with the following endnotes, the Cautionary Statement on
slide 2 and the factors described under the “Risk Factors” section of the Company’s most recent Form 10-K, filed with the SEC on February 22, 2013.

1. Non-GAAP metric. See page 18 for reconciliation.
2. All-in sustaining costs is a non-GAAP metric. See pages 19 to 21 for reconciliation.
3. 2013 Outlook projections used in this presentation (“Outlook”) are considered “forward-looking statements” and represent management’s good faith
estimates or expectations of future production results as of October 31, 2013 and are based upon certain assumptions, including, but not limited to
metal prices, oil prices, and Australian dollar exchange rate. Consequently, Outlook cannot be guaranteed. Investors are cautioned that the
Company does not undertake to subsequently reaffirm, provide comfort or otherwise update Outlook to reflect events or circumstances after the date
hereof or to reflect the occurrence of unanticipated events. Investors should not assume that any lack of update constitutes a current reaffirmation of
Outlook.
4. Adjusted net income is a non-GAAP metric. See page 24 for reconciliation to net income.
5. As of September 30, 2013.
6. Conga development contingent on generating acceptable project returns, as well as community and government support and key approvals. See
also Risk Factors.

Newmont Mining Corporation | Cowen and Company | www.newmont.com

25

November 12, 2013

More Related Content

What's hot

Q22015 earningspresentation 22july2015 final.v1
Q22015 earningspresentation 22july2015 final.v1Q22015 earningspresentation 22july2015 final.v1
Q22015 earningspresentation 22july2015 final.v1Newmont Mining Corporation
 
CIBC 17th Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
CIBC 17th  Annual Whistler Institutional Investor Conference Laurie Brlas, EV...CIBC 17th  Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
CIBC 17th Annual Whistler Institutional Investor Conference Laurie Brlas, EV...Newmont Mining Corporation
 
QNBFS Weekly Market Report January 27, 2022
QNBFS Weekly Market Report January 27, 2022QNBFS Weekly Market Report January 27, 2022
QNBFS Weekly Market Report January 27, 2022QNB Group
 
2020.02.24 Roth New Pacific Report
2020.02.24 Roth New Pacific Report2020.02.24 Roth New Pacific Report
2020.02.24 Roth New Pacific ReportHindenburg Research
 
Claude Resources Inc. European Gold Forum Presentation April 2016
Claude Resources Inc. European Gold Forum Presentation April 2016Claude Resources Inc. European Gold Forum Presentation April 2016
Claude Resources Inc. European Gold Forum Presentation April 2016Marc Lepage, CPIR
 
Apr 2007_SK Corp Earnings Forecast for FY 2007
Apr 2007_SK Corp Earnings Forecast for FY 2007Apr 2007_SK Corp Earnings Forecast for FY 2007
Apr 2007_SK Corp Earnings Forecast for FY 2007Alfred Park
 
Claude Resources Inc. Corporate Presentation - January 25, 2016
Claude Resources Inc. Corporate Presentation - January 25, 2016Claude Resources Inc. Corporate Presentation - January 25, 2016
Claude Resources Inc. Corporate Presentation - January 25, 2016Marc Lepage, CPIR
 
Claude Resources Inc. Corporate Presentation - November 2014
Claude Resources Inc. Corporate Presentation - November 2014 Claude Resources Inc. Corporate Presentation - November 2014
Claude Resources Inc. Corporate Presentation - November 2014 Claude Resources Inc.
 
Claude Resources Inc. April 2015 Corporate Presentation
Claude Resources Inc. April 2015 Corporate Presentation Claude Resources Inc. April 2015 Corporate Presentation
Claude Resources Inc. April 2015 Corporate Presentation Claude Resources Inc.
 
Royal Gold - October 2014 Presentation
Royal Gold - October 2014 PresentationRoyal Gold - October 2014 Presentation
Royal Gold - October 2014 PresentationRoyalGold
 
Claude Resources Inc. Q3 2014 Earnings Call and Webcast
Claude Resources Inc. Q3 2014 Earnings Call and WebcastClaude Resources Inc. Q3 2014 Earnings Call and Webcast
Claude Resources Inc. Q3 2014 Earnings Call and WebcastClaude Resources Inc.
 
Q2 2013 conference call and webcast claude resourcesinc
Q2 2013 conference call and webcast claude resourcesincQ2 2013 conference call and webcast claude resourcesinc
Q2 2013 conference call and webcast claude resourcesincClaude Resources Inc.
 
Denver gold forum final (v2)
Denver gold forum final (v2)Denver gold forum final (v2)
Denver gold forum final (v2)RoyalGold
 
October presentation (cibc) october 2014
October presentation   (cibc) october 2014October presentation   (cibc) october 2014
October presentation (cibc) october 2014RoyalGold
 
April 2022 MND IR PPT_final.pptx
April 2022 MND IR PPT_final.pptxApril 2022 MND IR PPT_final.pptx
April 2022 MND IR PPT_final.pptxMandalayResources
 
Claude Resources Inc. Corporate Presentation - January 2016
Claude Resources Inc. Corporate Presentation - January 2016Claude Resources Inc. Corporate Presentation - January 2016
Claude Resources Inc. Corporate Presentation - January 2016Claude Resources Inc.
 

What's hot (19)

Q22015 earningspresentation 22july2015 final.v1
Q22015 earningspresentation 22july2015 final.v1Q22015 earningspresentation 22july2015 final.v1
Q22015 earningspresentation 22july2015 final.v1
 
CIBC 17th Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
CIBC 17th  Annual Whistler Institutional Investor Conference Laurie Brlas, EV...CIBC 17th  Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
CIBC 17th Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
 
QNBFS Weekly Market Report January 27, 2022
QNBFS Weekly Market Report January 27, 2022QNBFS Weekly Market Report January 27, 2022
QNBFS Weekly Market Report January 27, 2022
 
2017 Denver Gold Forum Presentation
2017 Denver Gold Forum Presentation2017 Denver Gold Forum Presentation
2017 Denver Gold Forum Presentation
 
2020.02.24 Roth New Pacific Report
2020.02.24 Roth New Pacific Report2020.02.24 Roth New Pacific Report
2020.02.24 Roth New Pacific Report
 
Claude Resources Inc. European Gold Forum Presentation April 2016
Claude Resources Inc. European Gold Forum Presentation April 2016Claude Resources Inc. European Gold Forum Presentation April 2016
Claude Resources Inc. European Gold Forum Presentation April 2016
 
Q3 2017 results presentation_final
Q3 2017 results presentation_finalQ3 2017 results presentation_final
Q3 2017 results presentation_final
 
Apr 2007_SK Corp Earnings Forecast for FY 2007
Apr 2007_SK Corp Earnings Forecast for FY 2007Apr 2007_SK Corp Earnings Forecast for FY 2007
Apr 2007_SK Corp Earnings Forecast for FY 2007
 
Claude Resources Inc. Corporate Presentation - January 25, 2016
Claude Resources Inc. Corporate Presentation - January 25, 2016Claude Resources Inc. Corporate Presentation - January 25, 2016
Claude Resources Inc. Corporate Presentation - January 25, 2016
 
Claude Resources Inc. Corporate Presentation - November 2014
Claude Resources Inc. Corporate Presentation - November 2014 Claude Resources Inc. Corporate Presentation - November 2014
Claude Resources Inc. Corporate Presentation - November 2014
 
Claude Resources Inc. April 2015 Corporate Presentation
Claude Resources Inc. April 2015 Corporate Presentation Claude Resources Inc. April 2015 Corporate Presentation
Claude Resources Inc. April 2015 Corporate Presentation
 
Royal Gold - October 2014 Presentation
Royal Gold - October 2014 PresentationRoyal Gold - October 2014 Presentation
Royal Gold - October 2014 Presentation
 
Claude Resources Inc. Q3 2014 Earnings Call and Webcast
Claude Resources Inc. Q3 2014 Earnings Call and WebcastClaude Resources Inc. Q3 2014 Earnings Call and Webcast
Claude Resources Inc. Q3 2014 Earnings Call and Webcast
 
Q2 2013 conference call and webcast claude resourcesinc
Q2 2013 conference call and webcast claude resourcesincQ2 2013 conference call and webcast claude resourcesinc
Q2 2013 conference call and webcast claude resourcesinc
 
Denver gold forum final (v2)
Denver gold forum final (v2)Denver gold forum final (v2)
Denver gold forum final (v2)
 
October presentation (cibc) october 2014
October presentation   (cibc) october 2014October presentation   (cibc) october 2014
October presentation (cibc) october 2014
 
April 2022 MND IR PPT_final.pptx
April 2022 MND IR PPT_final.pptxApril 2022 MND IR PPT_final.pptx
April 2022 MND IR PPT_final.pptx
 
Claude Resources Inc. Corporate Presentation - January 2016
Claude Resources Inc. Corporate Presentation - January 2016Claude Resources Inc. Corporate Presentation - January 2016
Claude Resources Inc. Corporate Presentation - January 2016
 
Denver Gold Forum
Denver Gold ForumDenver Gold Forum
Denver Gold Forum
 

Viewers also liked

2012 RBC Capital Markets' Industrials Conference final
2012 RBC Capital Markets' Industrials Conference final2012 RBC Capital Markets' Industrials Conference final
2012 RBC Capital Markets' Industrials Conference finalMasco_Investors
 
Pfizer Tactics To Combat Generic Drugmakers Financial Times Dec 5, 2011
Pfizer Tactics To Combat Generic Drugmakers   Financial Times   Dec 5, 2011Pfizer Tactics To Combat Generic Drugmakers   Financial Times   Dec 5, 2011
Pfizer Tactics To Combat Generic Drugmakers Financial Times Dec 5, 2011Rhonda Greenapple
 
Cowen and company report - ONTY
Cowen and company report - ONTY Cowen and company report - ONTY
Cowen and company report - ONTY DailyDoseEquities
 
national oilwell varco 2001 Form 10-K
national oilwell varco 	2001 Form 10-Knational oilwell varco 	2001 Form 10-K
national oilwell varco 2001 Form 10-Kfinance40
 
Emily Ellen Peacock & Thomas Smith
Emily Ellen Peacock & Thomas SmithEmily Ellen Peacock & Thomas Smith
Emily Ellen Peacock & Thomas SmithJoeAnd41
 

Viewers also liked (6)

Billys resume # 2
Billys resume # 2Billys resume # 2
Billys resume # 2
 
2012 RBC Capital Markets' Industrials Conference final
2012 RBC Capital Markets' Industrials Conference final2012 RBC Capital Markets' Industrials Conference final
2012 RBC Capital Markets' Industrials Conference final
 
Pfizer Tactics To Combat Generic Drugmakers Financial Times Dec 5, 2011
Pfizer Tactics To Combat Generic Drugmakers   Financial Times   Dec 5, 2011Pfizer Tactics To Combat Generic Drugmakers   Financial Times   Dec 5, 2011
Pfizer Tactics To Combat Generic Drugmakers Financial Times Dec 5, 2011
 
Cowen and company report - ONTY
Cowen and company report - ONTY Cowen and company report - ONTY
Cowen and company report - ONTY
 
national oilwell varco 2001 Form 10-K
national oilwell varco 	2001 Form 10-Knational oilwell varco 	2001 Form 10-K
national oilwell varco 2001 Form 10-K
 
Emily Ellen Peacock & Thomas Smith
Emily Ellen Peacock & Thomas SmithEmily Ellen Peacock & Thomas Smith
Emily Ellen Peacock & Thomas Smith
 

Similar to Cowen and Company Global Metals, Mining & Materials Conference Newmont CFO Presentation

BoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, TorontoBoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, TorontoDetourGold
 
Dgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDetourGold
 
Dgc Denver Gold Forum
Dgc Denver Gold ForumDgc Denver Gold Forum
Dgc Denver Gold ForumDetourGold
 
Denver Gold corporate presentation
Denver Gold corporate presentationDenver Gold corporate presentation
Denver Gold corporate presentationDetourGold
 
Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate PresentationDetourGold
 
Detour Gold corporate presentation
Detour Gold corporate presentationDetour Gold corporate presentation
Detour Gold corporate presentationDetourGold
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014NewmontMining
 
Denver Gold Forum September, 2014
Denver Gold Forum September, 2014Denver Gold Forum September, 2014
Denver Gold Forum September, 2014NewmontMining
 
Dgc 13 08_13_corporate
Dgc 13 08_13_corporateDgc 13 08_13_corporate
Dgc 13 08_13_corporateDetourGold
 
Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate PresentationDetourGold
 
Bank of America Merrill Lynch Global Metals, Mining and Steel Conference
Bank of America Merrill Lynch Global Metals, Mining and Steel ConferenceBank of America Merrill Lynch Global Metals, Mining and Steel Conference
Bank of America Merrill Lynch Global Metals, Mining and Steel ConferenceNewmont Mining Corporation
 
Goldman sachs global metals mining presentation final presentation
Goldman sachs global metals mining presentation final presentationGoldman sachs global metals mining presentation final presentation
Goldman sachs global metals mining presentation final presentationNewmont Mining Corporation
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceNewmontMining
 
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0wGoldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0wNewmontMining
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceNewmontMining
 

Similar to Cowen and Company Global Metals, Mining & Materials Conference Newmont CFO Presentation (20)

Q1 2013 Earnings Presentation
Q1 2013 Earnings PresentationQ1 2013 Earnings Presentation
Q1 2013 Earnings Presentation
 
Denver goldforum goldberg 22sept2015 final v1
Denver goldforum goldberg 22sept2015 final v1Denver goldforum goldberg 22sept2015 final v1
Denver goldforum goldberg 22sept2015 final v1
 
BoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, TorontoBoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, Toronto
 
Dgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conference
 
Dgc Denver Gold Forum
Dgc Denver Gold ForumDgc Denver Gold Forum
Dgc Denver Gold Forum
 
Denver Gold corporate presentation
Denver Gold corporate presentationDenver Gold corporate presentation
Denver Gold corporate presentation
 
Presentation dgf
Presentation dgfPresentation dgf
Presentation dgf
 
Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate Presentation
 
Detour Gold corporate presentation
Detour Gold corporate presentationDetour Gold corporate presentation
Detour Gold corporate presentation
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
 
Denver Gold Forum September, 2014
Denver Gold Forum September, 2014Denver Gold Forum September, 2014
Denver Gold Forum September, 2014
 
Dgc 13 08_13_corporate
Dgc 13 08_13_corporateDgc 13 08_13_corporate
Dgc 13 08_13_corporate
 
Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate Presentation
 
Bank of America Merrill Lynch Global Metals, Mining and Steel Conference
Bank of America Merrill Lynch Global Metals, Mining and Steel ConferenceBank of America Merrill Lynch Global Metals, Mining and Steel Conference
Bank of America Merrill Lynch Global Metals, Mining and Steel Conference
 
BAML 2013 Presentation
BAML 2013 PresentationBAML 2013 Presentation
BAML 2013 Presentation
 
Goldman sachs global metals mining presentation final presentation
Goldman sachs global metals mining presentation final presentationGoldman sachs global metals mining presentation final presentation
Goldman sachs global metals mining presentation final presentation
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining Conference
 
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0wGoldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining Conference
 

More from Newmont Mining Corporation

Q2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation finalQ2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation finalNewmont Mining Corporation
 
Newmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont Mining Corporation
 

More from Newmont Mining Corporation (20)

August investor presentation final
August investor presentation finalAugust investor presentation final
August investor presentation final
 
Q2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation finalQ2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation final
 
2018 esg briefing slides 21 may2018_final
2018 esg briefing slides 21 may2018_final2018 esg briefing slides 21 may2018_final
2018 esg briefing slides 21 may2018_final
 
2018 baml conference presentation print final
2018 baml conference presentation print final2018 baml conference presentation print final
2018 baml conference presentation print final
 
2018 may investor presentation final (1)
2018 may investor presentation final (1)2018 may investor presentation final (1)
2018 may investor presentation final (1)
 
Q12018 earnings-presentation final
Q12018 earnings-presentation finalQ12018 earnings-presentation final
Q12018 earnings-presentation final
 
2018 march investor presentation final (2)
2018 march investor presentation final (2)2018 march investor presentation final (2)
2018 march investor presentation final (2)
 
2018 february investor presentation final
2018 february investor presentation final2018 february investor presentation final
2018 february investor presentation final
 
Investor Presentation February 2018
Investor Presentation February 2018Investor Presentation February 2018
Investor Presentation February 2018
 
Newmont q4 and fy 2017 results presentation
Newmont q4 and fy 2017 results presentationNewmont q4 and fy 2017 results presentation
Newmont q4 and fy 2017 results presentation
 
January 2018 investor presentation final
January 2018 investor presentation finalJanuary 2018 investor presentation final
January 2018 investor presentation final
 
2017 newmont investor day presentation
2017 newmont investor day presentation2017 newmont investor day presentation
2017 newmont investor day presentation
 
Newmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont november 2017 investor presentation final
Newmont november 2017 investor presentation final
 
2017 nevada site tour
2017 nevada site tour2017 nevada site tour
2017 nevada site tour
 
2017 denver gold forum presentation
2017 denver gold forum presentation2017 denver gold forum presentation
2017 denver gold forum presentation
 
2017 nevada site tour
2017 nevada site tour2017 nevada site tour
2017 nevada site tour
 
September 2017 investor presentation
September 2017 investor presentationSeptember 2017 investor presentation
September 2017 investor presentation
 
August 2017 investor presentation
August 2017 investor presentationAugust 2017 investor presentation
August 2017 investor presentation
 
Q2 2017 results presentation_final
Q2 2017 results presentation_finalQ2 2017 results presentation_final
Q2 2017 results presentation_final
 
Baml presentation may2017 final
Baml presentation may2017 finalBaml presentation may2017 final
Baml presentation may2017 final
 

Recently uploaded

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 

Recently uploaded (20)

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 

Cowen and Company Global Metals, Mining & Materials Conference Newmont CFO Presentation

  • 1. Cowen and Company Global Metals, Mining & Materials Conference Laurie Brlas, EVP and CFO November 12, 2013
  • 2. Cautionary statement Cautionary Statement Regarding Forward Looking Statements, Including 2013 Outlook: This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended to be covered by the safe harbor created by such sections and other applicable laws. Such forward-looking statements may include, without limitation: (i) estimates of future production and sales; (ii) estimates of future costs applicable to sales; (iii) estimates of future capital expenditures, expenses, sustaining capital or costs, spend, and all-in sustaining cost; (iv) plans to reduce costs and increase efficiencies; (v) expectations regarding the development, growth and exploration potential of the Company’s projects; and (vi) expectations regarding future liquidity, balance sheet strength, borrowing availability, credit ratings, and return to shareholders. Estimates or expectations of future events or results are based upon certain assumptions, which may prove to be incorrect. Such assumptions, include, but are not limited to: (i) there being no significant change to current geotechnical, metallurgical, hydrological and other physical conditions; (ii) permitting, development, operations and expansion of the Company’s projects being consistent with current expectations and mine plans; (iii) political developments in any jurisdiction in which the Company operates being consistent with its current expectations; (iv) certain exchange rate assumptions for the Australian dollar to the U.S. dollar, as well as other the exchange rates being approximately consistent with current levels; (v) certain price assumptions for gold, copper and oil; (vi) prices for key supplies being approximately consistent with current levels; and (vii) the accuracy of our current mineral reserve and mineral resource estimates. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, such statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by the “forward-looking statements”. Such risks include, but are not limited to, gold and other metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, political and operational risks, community relations, conflict resolution and outcome of projects or oppositions and governmental regulation and judicial outcomes. For a more detailed discussion of such risks and other factors, see the Company’s 2012 Form 10-K, filed on February 22, 2013, with the Securities and Exchange Commission (the “SEC”), as well as the Company’s other SEC filings. Investors are also encouraged to review this presentation in conjunction with the Company’s most recent Form 10-Q filed with the SEC on October 31, 2013. The Company does not undertake any obligation to release publicly revisions to any “forward-looking statement,” including, without limitation, outlook, to reflect events or circumstances after the date of this presentation, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. Investors should not assume that any lack of update to a previously issued “forward-looking statement” constitutes a reaffirmation of that statement. Continued reliance on “forward-looking statements” is at investors' own risk. Newmont Mining Corporation | Cowen and Company | www.newmont.com 2 November 12, 2013
  • 3. Strong third quarter performance across the business Newmont total injury rate – by quarter (injuries per 200,000 hours worked) 0.72 0.64 0.46 0.49 0.49 0.41 Q2'12 Q3'12 Q4'12 Q1'13 Q2'13 Q3'13 Newmont Mining Corporation | Cowen and Company | www.newmont.com Nevada Safety Interaction 3 November 12, 2013
  • 4. Strategy focused on improving performance and portfolio • Secure the gold franchise by running our existing business more efficiently and effectively • Strengthen the portfolio by building longer-life, lower-cost portfolio of gold and copper assets • Enable the strategy by developing the capabilities and systems that create competitive advantage Batu Hijau mill, Indonesia Newmont Mining Corporation | Cowen and Company | www.newmont.com 4 November 12, 2013
  • 5. Delivering sustainable cost improvements • Year to date consolidated spending down $700M1, or 13% over prior year quarter • Third quarter all-in sustaining costs2 of $993 per ounce, down 16% over prior year quarter • Third quarter gold CAS of $649 per ounce, down 6% over prior year quarter • Stronger third quarter production performance primarily at Nevada, Tanami and Waihi • Maintaining 2013 attributable gold production outlook3 • Capital outlook lowered $400M year to date • Taking steps to optimize our portfolio; sold interest in Canadian Oil Sands Boddington Newmont Mining Corporation | Cowen and Company | www.newmont.com 5 November 12, 2013
  • 6. Two new projects reaching commercial production Akyem, Ghana • Akyem reached commercial production early in Q4 • Project complete on time and on budget • Expected to contribute 50-100 Koz in 20133 • First 5 years’ average All-in sustaining costs of between $750 - $850 per ounce3 Akyem first gold pour Phoenix Copper Leach, Nevada • Phoenix Copper Leach produced its first copper cathode in Q4 • Ore previously classified as waste is treated to produce copper • Project delivered on time, on budget, without injury • Expected to deliver 20 Mlbs of copper annually Newmont Mining Corporation | Cowen and Company | www.newmont.com Copper Cathode- Phoenix 6 November 12, 2013
  • 7. Solid financial performance despite challenging conditions Q3 2012 Q3 2013 YTD 2012 YTD 2013 Sales ($M) $2,480 $1,983 $7,392 $6,153 Net income (loss) from continuing operations ($M) $400 $429 $1,240 ($1,349) Net income (loss) from continuing operations per share $0.81 $0.86 $2.50 ($2.72) Cash from continuing operations ($M) $578 $443 $1,542 $1,175 $1,780 $1,428 $5,241 $4,548 Adjusted net income (loss) ($M)4 $426 $227 $1,298 $531 Adjusted net income per share4 $0.86 $0.46 $2.62 $1.07 Consolidated Spending1 ($M) Newmont Mining Corporation | Cowen and Company | www.newmont.com 7 November 12, 2013
  • 8. Preserving financial flexibility across price cycles ~$5B in cash, marketable securities, and revolver capacity5 Investment grade rating and metrics5 Long-dated maturity with favorable terms Scheduled debt repayments ($M) $1,500 $3.0B Corporate Revolver Maturity $1,100 $900 $1,000 $770 $600 $585 $185 $33 2013 $10 2014 2015 2016 2017 2018 Newmont Mining Corporation | Cowen and Company | www.newmont.com 2019 //// 2022 2035 8 2039 2042 November 12, 2013
  • 9. Exceptional operational performance Q3 Attributable Gold Production Q3 Gold Costs Applicable to Sales Koz $/oz Q3 2012 600 Q3 2013 Q3 2012 1,200 500 1,000 400 800 300 600 200 400 100 Q3 2013 200 0 0 North America South America Australia/NZ Africa Indonesia North America South America Australia/NZ Africa Indonesia Q3 2012 Q3 2013 Q3 2012 Q3 2013 1.24 million ounces produced 1.28 million ounces produced CAS of $693/oz CAS of $649/oz Newmont Mining Corporation | Cowen and Company | www.newmont.com 9 November 12, 2013
  • 10. North America – controlling costs and regaining production • Nevada third quarter production beats expectations at lower costs • Full year outlook3 of 1.9 – 2.0 million ounces • Turf Vent Shaft to add 100,000 – 150,000 annual gold production3 beginning in 2015 • Phoenix Copper Leach now online; converts waste ore to copper Leeville Newmont Mining Corporation | Cowen and Company | www.newmont.com 10 November 12, 2013
  • 11. South America - focusing on cost and capital discipline • Year to date production above expectations due to higher grades at Yanacocha • Full year outlook3 of 550,000 – 600,000 ounces of gold • Advancing the Water First approach at Conga6 − Conga access road under construction; Perol reservoir construction to advance according to timing of water transfer permit − Making strides in securing social acceptance Yanacocha Gold Mill Newmont Mining Corporation | Cowen and Company | www.newmont.com 11 November 12, 2013
  • 12. Africa – delivering first production at Akyem • Higher Q3 production due to higher grades and mill throughput • 2013 Full year outlook3 of 625,000 – 675,000 ounces of gold • Akyem achieves commercial production; $920 million capital spent through September 30, 2013 First ore to crusher at Akyem Newmont Mining Corporation | Cowen and Company | www.newmont.com 12 November 12, 2013
  • 13. Australia and New Zealand – delivering a step-change in performance • Gold production increased at Boddington due to higher throughput and recovery; higher mill throughput and ore grade from Tanami • Full year outlook3 of 1.6 – 1.7 million ounces of gold; 60 – 70 million pounds of copper • Full potential on-track to deliver sustainable cost reductions at Boddington Copper Production ~75Mlb 3 year copper outlook6 Waihi, New Zealand Newmont Mining Corporation | Cowen and Company | www.newmont.com 13 November 12, 2013
  • 14. Indonesia – continuing to work toward higher grade ore • Batu Hijau Phase 6 stripping continuing as planned; back into primary ore in late 2014 • Phase 6 stripping will impact costs through 2014 • Ongoing discussion with government to address export ban Copper Production ~75Mlb 3 year copper outlook6 Batu Hijau mine plan Newmont Mining Corporation | Cowen and Company | www.newmont.com 14 November 12, 2013
  • 15. Delivering on our commitments • Focusing on value over volume with prudent capital allocation • Executing on our promise to achieve sustainable cost improvements • Delivering our plans and projects • Improving mining fundamentals • Preserving financial flexibility Newmont Mining Corporation | Cowen and Company | www.newmont.com 15 November 12, 2013
  • 18. Consolidated spending reconciliation1 Three Months Ended September 30, Consolidated Spending ($M) 2013 Costs applicable to sales $ Nine Months Ended September 30, 2012 1,036 $ 2013 1,088 $ 2012 3,733 $ 3,107 Stockpile write-downs (76) (5) (624) (26) Advanced projects, research and development, and Exploration 127 189 360 567 48 51 158 162 Other expense, net 64 56 167 188 Sustaining capital 229 401 754 1,243 General and administrative (1) Consolidated Spending $ 1,428 $ 1,780 $ 4,548 $ 5,241 (1) Other expense, net is adjusted for restructuring of $50, TMAC transaction costs of $45, and Hope Bay care and maintenance of ($2) for 2013; 2012 other expense, net is adjusted for Hope Bay care and maintenance of $129, Boddington contingent consideration of $12, and restructuring costs of $48. Newmont Mining Corporation | Cowen and Company | www.newmont.com 18 November 12, 2013
  • 19. All-in sustaining costs reconciliation2 All-In Sustaining Costs Newmont has worked to develop a metric that expands on GAAP measures such as cost of goods sold and nonGAAP measures to provide visibility into the economics of our gold mining operations related to expenditures, operating performance and the ability to generate cash flow from operations. Current GAAP-measures used in the gold industry, such as cost of goods sold, do not capture all of the expenditures incurred to discover, develop, and sustain gold production. Therefore, we believe that all-in sustaining costs and attributable all-in sustaining costs are non-GAAP measures that provide additional information to management, investors, and analysts that aid in the understanding of the economics of our operations and performance compared to other gold producers and in the investor’s visibility by better defining the total costs associated with producing gold. All-in sustaining costs (“AISC”) amounts are intended to provide additional information only and do not have any standardized meaning prescribed by GAAP and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. The measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP. Other companies may calculate these measures differently as a result of differences in the underlying accounting principles, policies applied and in accounting frameworks such as in International Financial Reporting Standards (“IFRS”), or by reflecting the benefit from selling non-gold metals as a reduction to AISC. Differences may also arise related to definitional differences of sustaining versus development capital activities based upon each company’s internal policies. Newmont Mining Corporation | Cowen and Company | www.newmont.com 19 November 12, 2013
  • 20. All-in sustaining costs reconciliation2 Costs Three Months Ended September 30, 2013 Nevada La Herradura Other North America North America Advanced Applicable to Sales(1)(2) $ 251 40 291 Remediation Costs(3) $ 3 3 $ All-In 25 10 2 37 General and Administrative $ - Expense, Net(4) $ Sustaining Capital(5) 5 1 6 $ 62 11 1 74 $ Ounces All-In Sustaining Sustaining Costs Other Projects and Exploration Sold (000)(6) Costs per ounce 346 61 4 411 479 52 531 $ 722 1,173 774 Yanacocha Conga Other South America South America Attributable to Newmont 154 154 23 23 9 15 4 28 - 36 3 (1) 38 38 38 260 18 3 281 146 261 261 134 1,077 1,090 Boddington Other Australia/New Zealand Australia/New Zealand 152 2 1 - 1 20 176 147 1,197 202 354 7 9 7 8 - 8 9 41 61 265 441 267 414 993 1,065 Batu Hijau Indonesia Attributable to Newmont 11 11 - 1 1 - - 3 3 15 15 8 14 14 7 1,071 1,071 1,143 Ahafo Akyem Other Africa Africa 75 75 - 12 2 3 17 - 7 7 23 23 117 2 3 122 146 146 801 $ 87 1,357 1,366 $ 993 $ 1,215 1,232 $ 986 Corporate and Other Consolidated $ 885 $ 35 $ 36 127 $ Attributable to Newmont(6) 48 48 $ 2 62 $ 1 200 996 836 (1) Excludes Amortization and Reclamation and remediation. (2) Includes stockpile and leachpad write-downs of $3 at Nevada, $10 at Yanacocha, $20 at Boddington, and $2 at Batu Hijau. (3) Remediation costs include operating accretion and amortization of asset retirement costs. (4) Other expense, net is adjusted for restructuring of $20. (5) Excludes capital expenditures for the following development projects: Phoenix Copper Leach, Turf Vent Shaft, Yanacocha Bio Leach, Conga, Merian, Ahafo Mill Expansion, and Akyem for 2013. (6) Excludes our attributable production from La Zanja and Duketon. Newmont Mining Corporation | Cowen and Company | www.newmont.com 20 November 12, 2013
  • 21. All-in sustaining costs reconciliation2 Costs Three Months Ended September 30, 2012 Nevada La Herradura Other North America North America Advanced Applicable to Sales(1)(2) $ 292 31 323 Remediation Costs(3) $ 3 3 $ All-In 47 11 1 59 General and Administrative $ - Expense, Net(4) $ Sustaining Capital(5) 7 7 $ 101 10 111 $ Ounces All-In Sustaining Sustaining Costs Other Projects and Exploration Sold (000)(6) Costs per ounce 450 52 1 503 442 51 493 $ 1,018 1,020 1,020 142 (1) 141 362 9 16 387 206 356 356 183 1,017 1,087 1,126 Yanacocha Conga Other South America South America Attributable to Newmont 185 185 8 8 14 9 15 38 - 13 2 15 Boddington Other Australia/New Zealand Australia/New Zealand 155 2 2 - - 19 178 167 1,066 201 356 6 8 23 25 - 11 11 59 78 300 478 216 383 1,389 1,248 Batu Hijau Indonesia Attributable to Newmont 17 17 1 1 1 1 - 1 1 5 5 25 25 10 15 15 7 1,667 1,667 1,667 Ahafo Akyem Other Africa Africa 69 69 1 1 20 6 2 28 - 7 7 25 25 122 6 2 130 123 123 992 1,057 $ 92 1,615 1,370 $ 1,179 $ 1,419 1,189 $ 1,193 Corporate and Other Consolidated $ 950 $ 21 $ 31 182 $ Attributable to Newmont(6) 51 51 $ 6 47 $ 4 364 (1) Excludes Amortization and Reclamation and remediation. (2) Includes stockpile and leach pad write-downs of $2 at Yanacocha and $2 at Other Australia/New Zealand. (3) Remediation costs include operating accretion and amortization of asset retirement costs. (4) Other expense, net is adjusted for Hope Bay care and maintenance of $27 and restructuring of $48. (5) Excludes capital expenditures for the following development projects: Phoenix Copper Leach, Turf Vent Shaft, Emigrant, Yanacocha Bio Leach, Conga, Merian, Tanami Shaft, Ahafo Mill Expansion, and Akyem for 2012. (6) Excludes our attributable production from La Zanja and Duketon. Newmont Mining Corporation | Cowen and Company | www.newmont.com 21 November 12, 2013
  • 22. 2013 Outlook3 Attributable Production a Nevada La Herradura North America Yanacocha La Zanja Consolidated CAS exclusive of stockpile writedowns Consolidated Capital Expenditures Attributable Capital Expenditures (Kozs, Mlbs) Region Consolidated CAS inclusive of stockpile writedowns ($/oz, $/lb)b ($/oz, $/lb)b ($M)c ($M)c 1,700 - 1,800 $600 - $650 $600 - $650 $500 - $550 $500 - $550 200 - 250 $650 - $700 $650 - $700 $125 - $175 $125 - $175 1,900 - 2,000 $600 - $650 $600 - $650 $625 - $675 $625 - $675 475 - 525 $650 - $700 $600 - $650 $225 - $275 $100 - $150 $200 - $250 $100 - $125 40 - 50 Conga South America 550 - 600 $650 - $700 $600 - $650 $425 - $525 $200 - $275 Boddington 700 - 750 $1,050 - $1,150 $850 - $950 $100 - $150 $100 - $150 Other Australia/NZ 925 - 975 $1,000 - $1,100 $950 - $1,050 $175 - $225 $175 - $225 1,625 - 1,725 $1,000 - $1,100 $900 - $1,000 $275 - $325 $275 - $325 20 - 30 $2,100 - $2,300 $900 - $1,000 $75 - $125 525 - 575 $550 - $600 $550 - $600 $225 - $275 $225 - $275 50 - 100 $450 - $500 $450 - $500 $225 - $275 $225 - $275 625 - 675 $525 - $575 $525 - $575 $475 - $525 $475 - $525 $20 - $30 $20 - $30 $2,000 - $2,200 $1,700 - $1,900 Australia/ NewZealand Batu Hijau, Indonesiad Ahafo Akyem Africa Corporate/Other Total Gold 4,800 - 5,100 $750 - $825 $675 - $750 Boddington 60 - 70 $2.75 - $2.95 $2.45 - $2.65 Batu - Hijau 70 - 75 $4.70 - $5.10 $2.20 - $2.40 135 - 145 $4.05 - $4.40 $25 - $75 $2.25 - $2.50 Total Copper a Nevada CAS includes by-product credits from an estimated 30-40 million pounds of copper production at Phoenix, net of treatment and refining charges. b 2013 Attributable CAS Outlook is $750 - $825 per ounce inclusive of stockpile write-downs or $675 - $750 per ounce exclusive of stockpile write-downs. CAS Outlook is inclusive of hedge gains and losses. c Excludes capitalized interest of approximately $88 million, consolidated and attributable. d Assumes Batu Hijau economic interest of 48.5% for 2013, subject to final divestiture obligations. Newmont Mining Corporation | Cowen and Company | www.newmont.com 22 November 12, 2013
  • 23. 2013 Expense and All-in Sustaining Costs Outlook3 2013 Expense Outlook8 Consolidated Expenses Attributable Expenses ($M) ($M) $180 - $230 $180 - $230 Description General & Administrative DD&A excluding stockpile write-downs $1,050 - $1,100 $900 - $950 DD&A including stockpile write-downs $1,250 - $1,300 $1,000 - $1,050 Exploration Expense $250 - $300 $225 - $275 Advanced Projects & R&D $250 - $300 $225 - $275 Other Expense $300 - $350 $200 - $250 Sustaining Capital $1,200 - $1,300 $1,000 - $1,100 Interest Expense $275 - $325 $250 - $300 a Tax Rate 0% - 5% 0% - 5% All-in sustaining cost excluding stockpile write-downs ($/ounce)b $1,100 - $1,200 $1,100 - $1,200 All-in sustaining cost including stockpile write-downs ($/ounce)b $1,100 - $1,200 $1,100 - $1,200 a Although, the Company expects to remain in a pretax loss for the year, it does not anticipate being in an overall tax benefit position. Income tax expense equal to 0-5% of the loss is projected. This projected expense primarily relates to mining taxes in Nevada and Peru. b All-in sustaining cost (“AISC”) is a non-GAAP metric defined as the sum of cost applicable to sales (including all direct and indirect costs related to current gold production incurred to execute on the current mine plan), remediation costs (including operating accretion and amortization of asset retirement costs), G&A, exploration expense, advanced projects and R&D, other expense, net of one-time adjustments and sustaining capital. Note that the company has updated this metric to now include the sum of costs associated with producing and selling an ounce of gold, exclusively, from all operations. See the AISC disclosure starting on slide 23. Newmont Mining Corporation | Cowen and Company | www.newmont.com 23 November 12, 2013
  • 24. Adjusted Net Income reconciliation4 Reconciliation of Adjusted Net Income to GAAP Net Income Management uses the non-GAAP financial measure Adjusted net income to evaluate the Company’s operating performance, and for planning and forecasting future business operations. The Company believes the use of Adjusted net income allows investors and analysts to compare the results of the continuing operations of the Company and its direct and indirect subsidiaries relating to the production and sale of minerals to similar operating results of other mining companies, by excluding exceptional or unusual items, income or loss from discontinued operations and the permanent impairment of assets, including marketable securities and goodwill. Management’s determination of the components of Adjusted net income are evaluated periodically and based, in part, on a review of non-GAAP financial measures used by mining industry analysts. Net income attributable to Newmont stockholders is reconciled to Adjusted net income as follows: Three Months Ended September 30, 2013 Net income (loss) attributable to Newmont stockholders Loss (income) from discontinued operations Impairments Tax valuation allowance TMAC transaction costs Restructuring and other Asset sales Boddington contingent consideration Adjusted net income Adjusted net income per share, basic Adjusted net income per share, diluted $ Nine Months Ended September 30, 2012 $ $ 410 21 29 12 (243) 229 $ $ 0.46 0.46 Newmont Mining Corporation | Cowen and Company | www.newmont.com 2013 $ $ 367 33 7 20 (1) 426 $ $ 0.86 0.85 2012 $ $ (1,294) (53) 1,530 535 30 28 (243) 533 $ 1,136 104 38 20 (8) 8 1,298 $ $ 1.07 1.07 $ $ 2.62 2.60 24 November 12, 2013
  • 25. Endnotes Investors are encouraged to read the information contained in this presentation in conjunction with the following endnotes, the Cautionary Statement on slide 2 and the factors described under the “Risk Factors” section of the Company’s most recent Form 10-K, filed with the SEC on February 22, 2013. 1. Non-GAAP metric. See page 18 for reconciliation. 2. All-in sustaining costs is a non-GAAP metric. See pages 19 to 21 for reconciliation. 3. 2013 Outlook projections used in this presentation (“Outlook”) are considered “forward-looking statements” and represent management’s good faith estimates or expectations of future production results as of October 31, 2013 and are based upon certain assumptions, including, but not limited to metal prices, oil prices, and Australian dollar exchange rate. Consequently, Outlook cannot be guaranteed. Investors are cautioned that the Company does not undertake to subsequently reaffirm, provide comfort or otherwise update Outlook to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events. Investors should not assume that any lack of update constitutes a current reaffirmation of Outlook. 4. Adjusted net income is a non-GAAP metric. See page 24 for reconciliation to net income. 5. As of September 30, 2013. 6. Conga development contingent on generating acceptable project returns, as well as community and government support and key approvals. See also Risk Factors. Newmont Mining Corporation | Cowen and Company | www.newmont.com 25 November 12, 2013