SlideShare a Scribd company logo
1 of 45
Download to read offline
Goldman Sachs Global Metals & Mining Conference
Gary Goldberg, CEO and Laurie Brlas, CFO
November 19-20, 2014
Cautionary Statement
Newmont Mining Corporation Slide 2
Cautionary statement regarding forward looking statements, including outlook:
This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section
21E of the Securities Exchange Act of 1934, as amended, which are intended to be covered by the safe harbor created by such sections and other
applicable laws. Such forward-looking statements may include, without limitation: (i) estimates of future production and sales; (ii) estimates of future
costs applicable to sales and all-in sustaining costs; (iii) estimates of future capital expenditures and development capital; (iv) plans and
expectations relating to savings, reductions in costs and expenditures, efficiency improvements and optimization; (v) expectations relating to
decisions regarding future exploration, expansion or development projects; (vi) expectations regarding the development, growth and upside potential
of operations and projects, including, without limitation, mine plans, ramp-up, first production, anticipated strip ratios, recovery rate and other project
metrics; (vii) expectations regarding the future receipt of approvals, permits and licenses, including, without limitation, export approvals; (viii)
expectations regarding the out-coming of ongoing negotiations, including, without limitation, with respect to the Contract of Work, and (ix)
expectations regarding financial flexibility, project funding, cash retention, free cash flow and portfolio optimization. Forward-looking statements often
include words such as "anticipates," "estimates," "expects," "projects," "intends," "plans," "believes" and words and terms of similar substance in
connection with discussions of future operating or financial performance. Estimates or expectations of future events or results are based upon
certain assumptions, which may prove to be incorrect. Such assumptions, include, but are not limited to: (i) there being no significant change to
current geotechnical, metallurgical, hydrological and other physical conditions; (ii) permitting, development, operations and expansion of the
Company’s projects being consistent with current expectations and mine plans; (iii) political developments in any jurisdiction in which the Company
operates being consistent with its current expectations; (iv) certain exchange rate assumptions for the Australian dollar to the U.S. dollar, as well as
other the exchange rates being approximately consistent with current levels; (v) certain price assumptions for gold, copper and oil; (vi) prices for key
supplies being approximately consistent with current levels; and (vii) the accuracy of our current mineral reserve and mineral resource estimates.
Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith
and believed to have a reasonable basis. However, such statements are subject to risks, uncertainties and other factors, which could cause actual
results to differ materially from future results expressed, projected or implied by the “forward-looking statements.” Such risks include, but are not
limited to, gold and other metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from
those assumed in mining plans, political and operational risks, community relations, conflict resolution and outcome of projects or oppositions and
governmental regulation and judicial outcomes. For a more detailed discussion of such risks and other factors, see the Company’s 2013 Annual
Report on Form 10-K, filed on February 21, 2014, with the Securities and Exchange Commission (“SEC”), as well as the Company’s other SEC
filings. The Company does not undertake any obligation to release publicly revisions to any “forward-looking statement,” including, without limitation,
outlook, to reflect events or circumstances after the date of this presentation, or to reflect the occurrence of unanticipated events, except as may be
required under applicable securities laws. Investors should not assume that any lack of update to a previously issued “forward-looking statement”
constitutes a reaffirmation of that statement. Continued reliance on “forward-looking statements” is at investors' own risk.
November 19 - 20, 2014
Why Newmont?
• Industry leading safety performance
• Optimized asset portfolio with stable
production and cash flow base with a
focus on value over volume
• Global portfolio with industry leading
project pipeline
• Continuing trajectory of sustainable
cost and efficiency improvement that
offset inflation
• Strong balance sheet and disciplined
capital allocation
• Positioned to thrive across cycles
Newmont Mining Corporation
Long Canyon
November 19 - 20, 2014 Slide 3
YTD 2014 YTD 2013
Revenue ($M) $5,275 $6,226
Adjusted Net Income ($M)2 $459 $480
Adjusted Net Income ($ per share)2 $0.92 $0.97
Cash from Continuing Operations ($M) $889 $1,175
Free Cash Flow ($M) $123 ($353)
Dividends ($ per share) $0.20 $1.025
Positioning the business to thrive across cycles
YTD 2014 YTD 2013
Average Realized Gold Price ($/oz) $1,282 $1,442
Average Realized Copper Price ($/lb) $2.75 $2.95
Attributable Gold Production (Koz) 3,584 3,617
Gold CAS ($/oz) $733 $774
Gold AISC1 ($/oz) $1,031 $1,140
Newmont Mining Corporation Slide 4
Gold AISC1 down 10% YTD
YTD $476 million improvement in free cash flow Y-O-Y
November 19 - 20, 2014
Maintaining safe operations and low injury rates
Newmont Mining Corporation
0.72
0.64
0.46
0.49 0.49
0.40
0.50
0.47
0.32
0.41
0.00
0.20
0.40
0.60
0.80
Q2
2012
Q3
2012
Q4
2012
Q1
2013
Q2
2013
Q3
2013
Q4
2013
Q1
2014
Q2
2014
Q3
2014
Total recordable accident frequency rate (per 200,000 hours worked)
November 19 - 20, 2014 Slide 5
Delivering on our commitments
Improving the business
• Q3 CAS at low end of outlook
• Q3 Gold AISC per ounce below $1,000
• Maintaining production outlook despite
asset sales*
Strengthening the portfolio
• Secured Merian Right of Exploitation
• Turf Vent Shaft on budget and schedule
• Generated almost $1.4B in asset sales in
the last 18 months**
Creating value for shareholders
• Strengthened financial flexibility
• Generated $51M in free cash flow in Q3
Loading copper concentrate for export at Batu Hijau
Newmont Mining Corporation Slide 6November 19 - 20, 2014
*With respect to outlook above, see endnote 3.
**Figure includes funds received from government of Suriname for Merian opt-in in November 2014.
$58
$117
$164
$291
$0
$100
$200
$300
$400
$500
$600
$700
2014 YTD*
Adjusted cash AISC savings4 ($M)
Cost and efficiency improvements total $630M YTD
General &
Administrative/Other**
Advanced Projects &
Exploration
Sustaining Capital
CAS improvements
Newmont Mining Corporation
$630M
*2014 year-to-date savings reflects comparison of 9-months ended 09/30/14 versus 9-months ended 09/30/13. Non-GAAP metric. See slide 43 for reconciliation.
**Includes Remediation, Treatment and Refining Costs, and Other Expense, net.
November 19 - 20, 2014 Slide 7
Maintain
(e.g.,
Carlin)
De-risk
(e.g., Conga)
Improve value
(e.g., Tanami)
Close or divest
(e.g., Midas,
Jundee,
La Herradura)
Continued portfolio optimization
All assets and opportunities are
rate/ranked on the basis of the
following:
• Generate value (Net Present Value,
Return on Capital Employed)
• Improve mine life
• Lower position on cost curve
• Represent acceptable risk
Risk
Value
Portfolio Approach
High Low
HighLow
Newmont Mining CorporationNovember 19 - 20, 2014 Slide 8
Improve financial flexibility
• >$5B in cash, marketable securities and
revolver capacity*
• $328M in Q3 cash from continuing operations
• $51M in Q3 free cash flow
Enhance portfolio
• Generated almost $1.4B in asset sales in last
18 months
• Completed sale of La Herradura for cash
proceeds of $450M on October 6
Return cash to shareholders
• Returned $102M in dividends in 2014 YTD
Strong balance sheet and disciplined capital allocation
Newmont Mining Corporation
*As of September 30, 2014; does not include Penmont sales proceeds which closed in Q4 2014.
Marketable Securities = $0.4B
Revolver
Capacity =
$3.0B
Cash and Cash
Equivalents =
$1.8B
November 19 - 20, 2014 Slide 9
180
263
842
44
1,303
1,500
600
1,100
1,000
2014
2015
2016
2017
2018
2019
Column1
2022
Column2
2035
2039
2042
Ghana PTNNT Corporate Debt
Maintaining investment grade credit rating
Newmont Mining Corporation Slide 10
Scheduled debt repayments ($M)
• Long-dated maturity with favorable terms
• No significant debt until 2019
• Revolver has one financial covenant; maximum net debt to book capital of 62.5%
compared to 27.9% as of 30 September 2014
November 19 - 20, 2014
10
Gold price linked dividend
Newmont Mining Corporation
• Highly leveraged to gold prices
• Targeting 20-25% of free cash flow for dividends, reserving the remainder for
projects and paying down debt
$0.10 $0.20
$0.40
$0.60
$0.80
$1.00
$1.20
$1.40
$1.60
$1.80
$2.00
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
<$1,200
$1,200-$1,299
$1,300-$1,399
$1,400-$1,499
$1,500-$1,599
$1,600-$1,699
$1,700-$1,799
$1,800-$1,899
$1,900-$1,999
$2,000-$2,099
$2,100-$2,199
$2,200-$2,299
Annualized dividend per share (US$)*
*For illustrative purposes, declaration of dividend remains subject to Board of Directors approval.
November 19 - 20, 2014 Slide 11
Merian offers favorable economics and prospects
Newmont Mining Corporation
Strong feasibility and economics*
• Low strip ratio of 3:1 over LOM
• Capital Costs: $0.9B – $1.0B
• Production: 400 – 500 koz per year
• Gold CAS: $650 – $750/oz
• Gold AISC: $750 – $850/oz
• Gold Reserves of 4.2Moz6 at 1.22 g/t
Exploration upside
• Agreement covers 500,000 hectares with
promising exploration results
Funding
• Government of Suriname acquired 25%
fully-funded equity stake in early November
*Capital costs reported on a 100% basis with approximately $100 million sunk to date. Metrics are reported as first
five year average unless otherwise noted. CAS and AISC are escalated assuming 3-4% inflation. See endnotes 5
and 6 for more information.
November 19 - 20, 2014 Slide 12
Merian project metrics and capital breakdown5
*Life of mine.
**100% basis.
Newmont Mining Corporation
Breakdown of consolidated capital**Low strip ratio vs. comparable
open pit projects*
3.7
4.2 4.4
2.4
West Africa Guiana
Shield
Australia North
America
Process
Plant / Tails,
25%
Indirect /
Camp /
Management,
25%
Contingency
/ Escalation /
Other, 20%
Mobile
Equipment,
15%
Infrastructure
& Power, 15%
November 19 - 20, 2014 Slide 13
Prepared for ongoing market fluctuations
Free cash flow positive across planning scenarios
2015 contingency planning
$1,200/oz gold $1,100/oz gold $1,000/oz gold
• Operating costs and sustaining
capital optimized to maintain
positive free cash flow
• Development capital prioritized for
Merian, Tanami Expansion, Long
Canyon Phase 1, and Ahafo Mill
Expansion
• Exploration spend focused on
near-mine and high value targets
• Support costs reduced across
business
• Continue with Merian
development; reprioritize earlier
stage projects based on value
metrics
• Maintain cost savings to offset
inflation
• Reduce sustaining capital spend
• Generative exploration reduced
• Further reduce support costs
across business
• Repay debt per schedule
• No dividend payments per policy
• Continue with Merian
development; potentially slow
development of earlier stage
projects
• Assess and potentially defer
highest cost laybacks
• Further reduce sustaining capital
spend
• Exploration focused on
brownfields and near mine
opportunities
• Further reduce support costs
across business
• Repay debt per schedule
• No dividend payments per policy
Newmont Mining CorporationNovember 19 - 20, 2014 Slide 15
0
20
40
60
80
100
120
2009
2010
2011
2012
2013
2014E
2015E
2016E
2017E
2018E
2019E
2020E
2021E
2022E
2023E
(Moz)
Strong gold fundamentals support long term pricing
• Longer-term mine supply growth challenged with fewer new discoveries, capital cost
inflation, increasing nationalism and activism, aging mines and declining grades
• Gold demand forecasted to grow by ~25% by 2017 in China
• Longer-term investment demand expected to strengthen due to robust central bank
demand, consumer demand growth in China and low interest rates
Newmont Mining Corporation
*Source: GaveKel Research and World Gold Council.
November 19 - 20, 2014 Slide 16
Gold demand and affluent consumer growth*Global gold mine supply projections*
Positioned to thrive in the future
More than 150 years of mining experience
Gary Goldberg,
President and CEO
Laurie Brlas,
CFO
Dr. Elaine Dorward-
King, EVP
Sustainability and
External Relations
Scott Lawson,
SVP Technical
Services
Chris Robison,
EVP Operations
and Projects
Bill MacGowan,
EVP Human
Resources
Susan Keefe, VP
Strategic
Relations
Randy Engel,
EVP Strategic
Development
Steve Gottesfeld, EVP
General Counsel and
Corporate Secretary
November 19 - 20, 2014 Newmont Mining Corporation Slide 18
Our strategy is to be the world’s leading gold miner
Strengthen
the portfolio
Create value for
shareholders
Improve the
business
Improve the underlying business
• Cost reductions and efficiency improvements more than offset planned
inflation rates
• Maintain steady gold production; focus on value over volume
Build a more valuable portfolio of long-life, low-cost assets
• Fund best projects while maintaining positive free cash flow
• Optimize portfolio and pipeline to support long-term growth
Develop capabilities and systems for competitive advantage
• Strengthen financial flexibility and maintain dividend flexibility
• Improve the balance sheet
Newmont Mining CorporationNovember 19 - 20, 2014 Slide 19
Labor 50%
Power 10%
Diesel 10%
Consumables
10%
Materials /
Parts 20%
Conservative planning assumptions
Change
Increment
FCF (US$M)
Gold ($/oz) +$100 +$350
Copper ($/lb) +$0.25 +$100
Australian Dollar -0.05 +$60
Oil ($/bbl) -$10 +$40
• Each $10/bbl reduction in oil price
adds ~$40M in free cash flow
• Every +$100/oz change in the gold
price, Newmont generates ~$350M
in additional free cash flow
• For every +$0.25/lb change in the
copper price, Newmont generates
~$100M in additional free cash flow
*All other variables held constant (i.e. FCF for flexed gold price does not include changes to copper price, AUD or WTI).
All GEO calculated using $1,200/oz Au and $3.00/lb Cu. All figures consolidated. Economics reflect a 35% portfolio tax rate.
Newmont Mining CorporationNovember 19 - 20, 2014 Slide 20
2015E operating cost breakdown
2015 sensitivities*
• Merian and Turf Vent Shaft represent approximately 80% of total development capital**
Sustaining 70%
Development 30%
Sustaining capital expected to average ~$1B per year*
Newmont Mining Corporation
Surface and
Underground
Deferred Mine
Development, 20%
November 19 - 20, 2014 Slide 21
Equipment
40%
Tailings
Facilities
and
Support
Buildings
20%
Exploration
DMD 5%
Other
Sustaining
15%
*2014 breakdown of development and sustaining capital.
**2014 to 2016 estimated capital breakdown.
Surface and UG
Deferred Mine
Development 20%
Total Newmont All-in
Sustaining Costs
2014 2015 2016
South America Indonesia
Total Newmont Cost
Applicable to Sales
Africa
Australia/New Zealand
Projecting lower costs and steady production
Newmont Mining Corporation
2014 2015 2016
Attributable gold production outlook (Moz)3
4.7 – 5.0
4.5 – 4.8
4.8 – 5.1
$1,020 – $1,080 $1,000 – $1,080 $985 – $1,085
AISC7 and CAS outlook ($/oz)3
North America
November 19 - 20, 2014 Slide 22
$710 – $750 $690 – $740 $720 – $760
South America:
Yanacocha
Conga
Merian
Maximizing productivity and efficiency across portfolio
Operations
Projects
Newmont Mining Corporation
North America:
Carlin
Turf Vent Shaft
Phoenix
Twin Creeks
Africa:
Ahafo
Akyem Australia / New
Zealand:
Boddington
KCGM
Tanami
Waihi/Correnso
Indonesia:
Batu Hijau
November 19 - 20, 2014 Slide 23
NEM market data (11/12/2014):
Market cap: $9.2 billion
Enterprise value: $16.8 billion
# of operations: 11
2013A Revenue: $8.3 billion
2013A Attrib. Production: 5.1 Moz Au
% of 2013A
gold production
North America:
38.5%
South America:
11.6%
Australia/
New Zealand: 35.6%
Indonesia:
0.5%
Africa:
13.8%
Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015 2016
Upcoming catalysts highlight profitable growth
Carlin welding shop, Nevada
Newmont Mining Corporation
• Decision to
proceed with
Subika
Underground
• Merian first
production
expected
• Turf Vent
Shaft first
production
• Correnso
production
expected
• FY14 results
published
• FY14 reserve
and resource
update
published
• Decision to
proceed with
Long Canyon
Phase 1
• Decision to
proceed with
Tanami
Expansion
• Phase 6
higher grade
ore sourced
at Batu Hijau
• Decision to
proceed with
Ahafo Mill
Expansion
November 19 - 20, 2014
• Government
of Suriname
opt-in to
Merian at
25%
Slide 24
Newmont Mining Corporation
Turf Vent Shaft
Ahafo Mill
Expansion
Ahafo
North
Subika
Underground
Correnso
Greater Leeville
Chaqui Sulfides
Long Canyon
Phase 1 Merian
Exodus
Bull Moose
Yanacocha
Sulfides
Quecher
Exploration /
Conceptual
PrefeasibilityScoping
Feasibility /
Engineering
Execution
Longboat in SurinameSouth AmericaNorth America Africa Australia/New Zealand
Federation
Conga
Tanami
Expansion
Optimized project pipeline and execution approach
November 19 - 20, 2014 Slide 25
71%
60%
47% 43%
22%
9%
Agnico Eagle Newmont Barrick Newcrest Goldcorp Kinross
88% 87% 86% 82%
71% 67%
Newmont Newcrest Kinross Agnico Goldcorp Barrick
88Moz of reserves with long term exploration upside
Newmont Mining Corporation
2013 gold reserves in lower risk jurisdictions*
*All reserves as reported in reserve statements as of December 31, 2013; low risk jurisdictions include US, Canada and Australia.
2013 gold reserves at operating properties*
November 19 - 20, 2014 Slide 26
Why Newmont?
• Industry leading safety performance
• Optimized asset portfolio with stable
production and cash flow base with a
focus on value over volume
• Global portfolio with industry leading
project pipeline
• Continuing trajectory of sustainable
cost and efficiency improvement that
offset inflation
• Strong balance sheet and disciplined
capital allocation
• Positioned to thrive across cycles
Newmont Mining Corporation
Long Canyon
November 19 - 20, 2014 Slide 27
Appendix
Africa – our most prospective region
Carlin welding shop, Nevada
Newmont Mining Corporation
• Akyem recently poured its 500,000 ounce
and remains amongst the cheapest assets in
the portfolio
• Ahafo unit CAS decreased one percent in Q3
2014 from the prior year period, primarily due
to lower labor costs and better synchronized
mining and milling rates
• Ahafo Mill Expansion and Subika
Underground present further upside potential
First ore to crusher at Akyem
Africa YTD Q314 2014 Outlook
Attributable
Production (Kozs)
675 855 - 920
Consolidated CAS
($/oz)
444 $495 - $540
All-in-Sustaining
Costs ($/oz)
$619 $660 - $725
Consolidated
Capital
Expenditures ($M)
86 $115 - $140
November 19 - 20, 2014 Slide 29
Australia/New Zealand - improving performance and efficiency
Newmont Mining Corporation
Waihi, New Zealand
• Boddington unit CAS decreased nine
percent in Q3 2014 from the prior year
period in part due to lower mill maintenance
costs and the repeal of Australia’s carbon tax
• The Correnso underground mine at Waihi is
expected to deliver 150,000 ounces per
annum and adds roughly fours years to
Waihi’s mine life. An investment decision is
expected to be made in early 2015
Australia and New
Zealand
YTD Q314 2014 Outlook
Attributable
Production (Kozs)
1,294 1,625 – 1,725
Consolidated CAS
($/oz)
$794 $805 - $880
All-in-Sustaining
Costs ($/oz)
$974 $990 - $1,080
Consolidated
Capital
Expenditures ($M)
$166 $275 - $300
November 19 - 20, 2014 Slide 30
Batu Hijau safely restarted in September 20148
Batu haul truck, Indonesia
Newmont Mining Corporation
Batu Hijau, Indonesia
• Export permit received September 22;
export shipping has resumed and the
mine is running at full capacity
• Memorandum of Understanding signed
with the government on September 3
• Contract of Work amendment
negotiations are on-going
• On track to reach higher Phase 6 ore in
H1 2015
Batu Hijau, Indonesia 2014 Outlook
Attributable
Production (kozs, kt)
25 - 35
30 - 40
Consolidated CAS*
($/oz, $/lb)
$1,090 - $1,200
$3.15 - $3.45
All-in-Sustaining
Costs* ($/oz)
$1,430 - $1,560
Consolidated Capital
Expenditures ($M)
$65 - $70
November 19 - 20, 2014 Slide 31
*Batu Hijau 2014 CAS and AISC outlook includes net realizable value (NRV) inventory adjustments of approximately $160-170M primarily due to the change in royalties
and export duties as a result of PTNNT's recently signed MoU.
North America - generating strong and stable cash flow
Carlin welding shop, Nevada
Newmont Mining Corporation
• Stripping campaigns at Carlin and Twin
Creeks through mid-2015 extend mine
life and stabilize production
• The Turf Vent Shaft project adds higher
grade ore to Mill 6 and is on time and on
budget. The project is expected to reach
full depth of 2,050 feet in Q1 2015 with
first production achieved later that year
• Completing feasibility studies at Long
Canyon. Record of decision expected at
year end 2014
Turf Vent Shaft
North America YTD Q314 2014 Outlook
Attributable
Production (Kozs)
1,235 1,550 – 1,650
Consolidated CAS
($/oz)
$760 $750 - $810
All-in-Sustaining
Costs ($/oz)
$1,007 $1,000 - $1,100
Consolidated
Capital
Expenditures ($M)
$308 $500 - $550
November 19 - 20, 2014 Slide 32
South America - moving ahead in Suriname with Merian
Carlin welding shop, Nevada
Newmont Mining Corporation
• Expect higher second half 2014 production as Yanacocha mines planned higher grades
• Completed review of Conga alternative development options, continue to assess
reducing development capital, especially with earthworks
• Approved Merian project with an anticipated start date of late 2016
• Progressing Yanacocha sulfide options
Chailhuagón reservoir
South America YTD Q314 2014 Outlook
Attributable
Production (Kozs)
364 510 – 560
Consolidated CAS
($/oz)
$830 $660 - $720
All-in-Sustaining
Costs ($/oz)
$1,159 $1,090 - $1,180
Consolidated
Capital
Expenditures ($M)
$89 $360 - $400
November 19 - 20, 2014 Slide 33
• Mine supply has grown by ~2 percent annually since
2004
• Scrap supply averaged over 54M ounces per year from
2009 to 2012, prior to retreating to ~41M ounces last year
• Strong market surplus in 2013 driven by ETF liquidations*
Gold supply and demand overview – last decade
Newmont Mining Corporation
*For market balance calculations, this analysis treats ETF buying as demand and liquidations as added supply to the market.
Total supply growth outpaced demand over last decade
• Jewelry decline of ~1 percent per year more than
offset by increase in gold bar & coin demand
− Global bar & coin demand has increased from
~12M ounces in 2004 to over 57M ounces last
year
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
$1,800
0
20
40
60
80
100
120
140
160
180
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
GoldPrice($/oz.)
Supply&Demand(Moz.)
Total Supply Total Demand Gold Price (US$/toz)
November 19 - 20, 2014 Slide 34
Gold supply and demand overview - future
• Jewelry demand expected to increase over 2 percent annually through 2017
• Central banks acquisitions expected to offset further ETF liquidations
− ETF additions anticipated in 2018 onward, increasing to ~13M ounces by 2021
• Mine supply expected to decrease by ~15 percent by 2017 after slightly increasing in 2014
Near-term balance leads to supply deficit in 2017 onward*
Newmont Mining Corporation
*GFMS Base Case projections (May 2014).
0
20
40
60
80
100
120
140
160
180
2009
2010
2011
2012
2013
2014E
2015E
2016E
2017E
2018E
2019E
2020E
2021E
2022E
2023E
Supply&Demand(Moz.)
Total Supply Total Demand
November 19 - 20, 2014 Slide 35
Chinese consumption to spur copper demand*
• China accounts for over 40 percent of global copper demand; the power sector represents
nearly half of Chinese demand and is a key driver to copper prices over the longer term
• The average Chinese citizen uses:
– less than one-third the amount of electricity a South Korean citizen uses; and
– 25 percent of what the average person in the United States consumes
Newmont Mining Corporation
*Source: GaveKel Research and Bloomberg.
November 19 - 20, 2014 Slide 36
Copper price expectationsElectric power consumption – China vs.
developed world
Adjusted net income
Non-GAAP financial measures are intended to provide additional information only and do not have any standard meaning prescribed by generally
accepted accounting principles (“GAAP”). These measures should not be considered in isolation or as a substitute for measures of performance
prepared in accordance with GAAP.
Adjusted net income (loss)
Management of the Company uses Adjusted net income (loss) to evaluate the Company’s operating performance, and for planning and forecasting
future business operations. The Company believes the use of Adjusted net income (loss) allows investors and analysts to compare results of the
continuing operations of the Company and its direct and indirect subsidiaries relating to the production and sale of minerals to similar operating
results of other mining companies, by excluding exceptional or unusual items. Management’s determination of the components of Adjusted net
income (loss) are evaluated periodically and based, in part, on a review of non-GAAP financial measures used by mining industry analysts. Net
income (loss) attributable to Newmont stockholders is reconciled to Adjusted net income (loss) as follows:
Newmont Mining Corporation Slide 37
Three Months Ended September 30, Nine Months Ended September 30,
2014 2013 2014 2013
Net income (loss) attributable to Newmont stockholders $ 213 $ 398 $ 493 $ (1,347)
Loss (income) from discontinued operations (3) 21 16 (53)
Impairments and loss provisions 5 29 12 1,530
Tax valuation allowance 21 - (77) 535
Restructuring and other 11 12 18 28
Asset sales (17) (243) (31) (243)
Abnormal production costs at Batu Hijau 19 - 28 -
TMAC transaction costs - - - 30
Adjusted net income (loss) $ 249 $ 217 $ 459 $ 480
Adjusted net income (loss) per share, basic $ 0.50 $ 0.44 $ 0.92 $ 0.97
Adjusted net income (loss) per share, diluted $ 0.50 $ 0.44 $ 0.92 $ 0.97
November 19 - 20, 2014
2014 Outlooka as of October 30, 2014
Newmont Mining Corporation
a The outlook ranges presented herein
represent forward looking statements, which
are subject to certain risks and uncertainties.
See cautionary statement at the end of this
presentation on slide 44. Additionally,
individual site ranges in the table above may
not sum to total regional or Company levels to
provide for portfolio flexibility.
b Non-GAAP measure, see endnote 1 on
slide 44.
c Includes Lone Tree operations.
d Includes GTRJV operations.
e Both consolidated and attributable
production are shown on a pro-rata basis with
a 44% ownership interest for La Herradura (up
until closing of the sale on October 6, 2014)
and a 50% ownership for KCGM.
f Consolidated production for Yanacocha is
presented on a total production basis for the
mine site; whereas attributable production
represents a 51.35% ownership interest.
g La Zanja and Duketon are not included in
the consolidated figures above; attributable
production figures are presented based upon
a 46.94% ownership interest at La Zanja and
a 19.45% ownership interest in Duketon.
h Consolidated production for Batu Hijau is
presented on a total production basis for the
mine site; whereas attributable production
represents 48.5% ownership interest in 2014
and an expected 44.5625% ownership
interest in 2015- 2016 outlook (which
assumes completion of the remaining share
divestiture in early 2015). Outlook for Batu
Hijau remains subject to various factors,
including, without limitation, renegotiation of
the CoW, issuance of future export approvals
following the expiration of the six-month
permit, negotiations with the labor union,
future in-country smelting availability and
regulations relating to export quotas, and
certain other factors.
See endnote 8.
Consolidated
Production
Attributable
Production
Consolidated CAS All-in Sustaining
Costs
b
Consolidated
Capital
Expenditures
(kozs, kt) (kozs, kt) ($/oz, $/lb) ($/oz, $/lb) ($M)
North America
Carlin 850 - 930 850 - 930 $830 - $900 $240 - $265
Phoenixc
200 - 220 200 - 220 $655 - $715 $30 - $35
Twin Creeksd
360 - 400 360 - 400 $500 - $550 $110 - $120
La Herradurae
115 - 125 115 - 125 $700 - $750 $20 - $30
Other North America $25 - $35
Total 1,550 - 1,650 1,550 - 1,650 $730 - $790 $990 - $1,080 $425 - $465
South America
Yanacochaf
910 - 990 470 - 510 $700 - $770 $85 - $100
La Zanjag
60 - 70
Other South America $200 - $220
Total 910 - 990 530 - 580 $700 - $770 $1,020 - $1,110 $280 - $300
Australia/New Zealand
Boddington 665 - 725 665 - 725 $880 - $960 $85 - $95
Tanami 330 - 360 330 - 360 $700 - $765 $85 - $95
Jundee 138 - 140 138 - 140 $610 - $620 $15
Waihi 130 - 140 130 - 140 $560 - $610 $15 - $20
KCGMe
310 - 340 310 - 340 $850 - $930 $30 - $35
Duketong
45 - 50
Other Australia/NZ $5 - $10
Total 1,575 - 1,675 1,625 - 1,725 $790 - $860 $970 - $1,050 $230 - $255
Batu Hijau, Indonesiah
55 - 65 25 – 35 $1,090 - $1,200 $1,430 - $1,560 $65 - $70
Africa
Ahafo 415 - 440 415 - 440 $540 - $590 $95 - $110
Akyem 440 - 480 440 - 480 $370 - $410 $15 - $25
Total 855 - 920 855 - 920 $450 - $490 $650 - $700 $115 - $130
Corporate/Other $15 - $20
Total Gold 5,100 - 5,400 4,725 - 5,000 $710 - $750 $1,020 - $1,080 $1,150 - $1,220
Phoenix 15 - 25 15 - 25 $2.10 - $2.30
Boddington 25 - 35 25 - 35 $2.50 - $2.70
Batu Hijauh
65 - 75 30 - 40 $3.15 - $3.45
Total Copper 120 - 125 80 - 90 $2.80 - $3.10 $3.50 - $3.80
November 19 - 20, 2014 Slide 38
2014 – 2016 Outlooka as of October 30, 2014
Newmont Mining Corporation
2014 Expense Outlook
General & Administrative $175 - $200
Other Expense $150 - $175
Interest Expense $325 - $350
DD&A $1,210 - $1,320
Exploration and Projects $370 - $410
Sustaining Capital $910 - $1,000
Tax Rate 17% - 22%
2014 2015 2016
Production (koz, kt)
Consolidated Gold 5,100 - 5,400 5,100 - 5,450 5,370 - 5,700
Attributable Gold 4,725 - 5,000 4,500 - 4,750 4,800 - 5,100
Consolidated Copper 120 - 125 250 - 270 210 - 220
Attributable Copper 80 - 90 140 - 150 120 - 140
CAS ($/oz, $/lb)
North America $730 - $790 $720 - $790 $650 - $710
South America $700 - $770 $560 - $615 $770 - $840
Australia/New Zealand $790 - $860 $865 - $950 $850 - $925
Batu Hijau, Indonesia $1,090 - $1,200 $440 - $500 $440 - $500
Africa $450 - $490 $695 - $760 $730 - $800
Total Gold $710 - $750 $690 - $740 $720 - $760
Total Copper $2.80 - $3.10 $1.30 - $1.60 $1.35 - $1.65
AISC ($/oz, $/lb)
North America $990 - $1,080 $960 - $1,040 $810 - $890
South America $1,020 - $1,110 $900 - $990 $1,180 - $1,290
Australia/New Zealand $970 - $1,050 $1,040 - $1,140 $985 - $1,075
Batu Hijau, Indonesia $1,430 - $1,560 $610 - $680 $600 - $670
Africa $650 - $700 $875 - $995 $885 - $965
Total Gold $1,020 - $1,080 $1,000 - $1,080 $985 - $1,085
Total Copper $3.50 - $3.80 $1.75 - $2.05 $1.85 - $2.15
Capital Expenditures ($M)
North America $425 - $465 $420 - $460 $250 - $280
South America $280 - $300 $600 - $655 $420 - $455
Australia/New Zealand $230 - $255 $220 - $245 $190 - $210
Batu Hijau, Indonesia $65 - $70 $125 - $140 $125 - $140
Africa $115 - $130 $80 - $90 $80 - $90
Total $1,150 - $1,220 $1,500 - $1,600 $1,180 - $1,250
November 19 - 20, 2014 Slide 39
All-in sustaining costs
Newmont has worked to develop a metric that expands on GAAP measures such as cost of goods sold and non-GAAP measures to provide visibility into the economics of our mining operations related to
expenditures, operating performance and the ability to generate cash flow from operations.
Current GAAP-measures used in the mining industry, such as cost of goods sold, do not capture all of the expenditures incurred to discover, develop, and sustain gold production. Therefore, we believe that
All-in sustaining costs and attributable All-in sustaining costs are non-GAAP measures that provide additional information to management, investors, and analysts that aid in the understanding of the economics
of our operations and performance compared to other producers and in the investor’s visibility by better defining the total costs associated with production.
All-in sustaining cost (“AISC”) amounts are intended to provide additional information only and do not have any standardized meaning prescribed by GAAP and should not be considered in isolation or as a
substitute for measures of performance prepared in accordance with GAAP. The measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP. Other
companies may calculate these measures differently as a result of differences in the underlying accounting principles, policies applied and in accounting frameworks such as in International Financial Reporting
Standards (“IFRS”), or by reflecting the benefit from selling non-gold metals as a reduction to AISC. Differences may also arise related to definitional differences of sustaining versus development capital
activities based upon each company’s internal policies.
The following disclosure provides information regarding the adjustments made in determining Newmont’s All-in sustaining costs measure:
Cost Applicable to Sales - Includes all direct and indirect costs related to current production incurred to execute the current mine plan. Costs Applicable to Sales (“CAS”) includes by-product credits from certain
metals obtained during the process of extracting and processing the primary ore-body. CAS is accounted for on an accrual basis and excludes Amortization and Reclamation and remediation, which is
consistent with our presentation of CAS on the Condensed Consolidated Statements of Income. In determining All-in sustaining costs, only the CAS associated with producing and selling an ounce of gold or a
pound of copper is included in the measure. Therefore, the amount of CAS included in AISC is derived from the CAS presented in the Company’s Condensed Consolidated Statements of Income. The allocation
of CAS between gold and copper at the Phoenix, Boddington, and Batu Hijau mines is based upon the relative production percentage of copper and gold sold during the period.
Remediation Costs - Includes accretion expense related to asset retirement obligations (“ARO”) and the amortization of the related Asset Retirement Cost (“ARC”) for the Company’s operating properties
recorded as an ARC asset. Accretion related to ARO and the amortization of the ARC assets for reclamation and remediation do not reflect annual cash outflows but are calculated in accordance with GAAP.
The accretion and amortization reflect the periodic costs of reclamation and remediation associated with current gold production and are therefore included in the measure. The allocation of these costs to gold
and copper is determined using the same allocation used in the allocation of CAS between gold and copper at the Phoenix, Boddington, and Batu Hijau mines.
Advanced Projects and Exploration - Includes incurred expenses related to projects that are designed to increase or enhance current gold production and gold exploration. We note that as current resources are
depleted, exploration and advance projects are necessary for us to replace the depleting reserves or enhance the recovery and processing of the current reserves. As this relates to sustaining our gold
production, and is considered a continuing cost of a mining company, these costs are included in the AISC measure. These costs are derived from the Advanced projects, research and development and
Exploration amounts presented in the Company’s Condensed Consolidated Statements of Income. The allocation of these costs to gold and copper is determined using the same allocation used in the
allocation of CAS between gold and copper at the Phoenix, Boddington, and Batu Hijau mines.
General and Administrative - Includes cost related to administrative tasks not directly related to current gold production, but rather related to support our corporate structure and fulfilling our obligations to
operate as a public company. Including these expenses in the AISC metric provides visibility of the impact that general and administrative activities have on current operations and profitability on a per ounce
basis.
Other Expense, net - Includes costs related to regional administration and community development to support current production. We exclude certain exceptional or unusual expenses from Other expense, net,
such as restructuring, as these are not indicative to sustaining our current operations. Furthermore, this adjustment to Other expense, net is also consistent with the nature of the adjustments made to Net
income (loss) as disclosed in the Company’s non-GAAP financial measure Adjusted net income (loss). The allocation of these costs to gold and copper is determined using the same allocation used in the
allocation of CAS between gold and copper at the Phoenix, Boddington, and Batu Hijau mines.
Treatment and Refining Costs - Includes costs paid to smelters for treatment and refining of our concentrates to produce the salable precious metal. These costs are presented net as a reduction of Sales.
Sustaining Capital - We determined sustaining capital as those capital expenditures that are necessary to maintain current gold production and execute the current mine plan. Capital expenditures to develop
new operations, or related to projects at existing operations where these projects will enhance gold production or reserves, are considered development. We determined the breakout of sustaining and
development capital costs based on a systematic review of our project portfolio in light of the nature of each project. Sustaining capital costs are relevant to the AISC metric as these are needed to maintain the
Company’s current gold operations and provide improved transparency related to our ability to finance these expenditures from current operations. The allocation of these costs to gold and copper is determined
using the same allocation used in the allocation of CAS between gold and copper at the Phoenix, Boddington, and Batu Hijau mines.
Newmont Mining CorporationNovember 19 - 20, 2014 Slide 40
All-in sustaining costs
Newmont Mining CorporationNovember 19 - 20, 2014
(1)Excludes Depreciation and
amortization and Reclamation and
remediation.
(2)Includes by-product credits of $66.
(3)Includes planned stockpile and leach
pad inventory adjustments of $95 at
Carlin, $4 at Phoenix, $7 at Twin
Creeks, $64 at Yanacocha, $69 at
Boddington, and $191 at Batu Hijau.
(4)Remediation costs include operating
accretion of $54 and amortization of
asset retirement costs of $78.
(5)Other expense, net is adjusted for
restructuring costs of $32.
(6)Excludes development capital
expenditures, capitalized interest, and
the decrease in accrued capital of $188.
The following are major development
projects: Turf Vent Shaft, Conga, and
Merian for 2014.
Nine Months Ended
September 30, 2014
Costs
Applicable
to Sales (1)
(2)(3)
Remediation
Costs (4)
Advanced
Projects
and
Exploration
General and
Administrative
Other
Expense,
Net (5)
Treatment
and
Refining
Costs
Sustaining
Capital (6)
All-In
Sustaining
Costs
Ounces
(000)/
Pounds
(millions)
Sold
All-In
Sustaining
Costs per
oz/lb
GOLD
Carlin $ 607 $ 3 $ 16 $ - $ 6 $ - $ 96 $ 728 673 $ 1,082
Phoenix 116 2 3 - 2 8 12 143 177 808
Twin Creeks 147 2 4 - 2 - 86 241 289 834
La Herradura 86 2 10 - - - 19 117 116 1,009
Other North America - - 20 - 9 - 6 35 - -
North America 956 9 53 - 19 8 219 1,264 1,255 1,007
Yanacocha 530 80 24 - 24 - 56 714 640 1,116
Other South America - - 26 - 2 - - 28 - -
South America 530 80 50 - 26 - 56 742 640 1,159
Boddington 425 8 - - 2 3 50 488 476 1,025
Tanami 185 4 9 - 1 - 56 255 251 1,016
Jundee 85 5 1 - 1 - 16 108 140 771
Waihi 58 1 3 - 2 - 2 66 102 647
Kalgoorlie 213 3 4 - 1 2 16 239 248 964
Other Australia/New
Zealand - - 3 - 20 - 6 29 - -
Australia/New Zealand 966 21 20 - 27 5 146 1,185 1,217 974
Batu Hijau 43 1 - - 3 4 7 58 24 2,417
Other Indonesia - - - - 1 - - 1 - -
Indonesia 43 1 - - 4 4 7 59 24 2,458
Ahafo 182 6 18 - 5 - 65 276 339 814
Akyem 120 2 - - 6 - 5 133 339 392
Other Africa - - 6 - 5 - - 11 - -
Africa 302 8 24 - 16 - 70 420 678 619
Corporate and Other - - 88 138 19 - 16 261 - -
Total Gold $ 2,797 $ 119 $ 235 $ 138 $ 111 $ 17 $ 514 $ 3,931 3,814 $ 1,031
COPPER
Phoenix $ 81 $ 1 $ 2 $ - $ 1 $ 4 $ 10 $ 99 35 $ 2.83
Boddington 112 2 - - - 17 12 143 45 3.18
Batu Hijau 338 10 2 - 17 19 41 427 61 7.00
Total Copper $ 531 $ 13 $ 4 $ - $ 18 $ 40 $ 63 $ 669 141 $ 4.74
Consolidated $ 3,328 $ 132 $ 239 $ 138 $ 129 $ 57 $ 577 $ 4,600
Slide 41
All-in sustaining costs
Newmont Mining CorporationNovember 19 - 20, 2014
(1)Excludes Depreciation and
amortization and Reclamation and
remediation.
(2)Includes by-product credits of $84.
(3)Includes stockpile and leach pad
inventory adjustments of at $3 Carlin,
$63 at Yanacocha, $110 at
Boddington, $1 at Tanami, $3 at
Waihi, $45 at Kalgoorlie, and $385 at
Batu Hijau.
(4)Remediation costs include
operating accretion of $45 and
amortization of asset retirement costs
of $70.
(5)Other expense, net is adjusted for
restructuring costs of $50 and TMAC
transaction costs of $45.
(6)Excludes development capital
expenditures, capitalized interest, and
the increase in accrued capital of
$775. The following are major
development projects: Phoenix
Copper Leach, Turf Vent Shaft, Vista
Vein, La Herradura Mill, Yanacocha
Bio Leach, Conga, Merian, Ahafo
North, Ahafo Mill Expansion, Subika
Underground, and Akyem for 2013.
Nine Months Ended
September 30, 2013
Costs
Applicable
to Sales (1)
(2)(3)
Remediation
Costs (4)
Advanced
Projects
and
Exploration
General and
Administrative
Other
Expense,
Net (5)
Treatment
and
Refining
Costs
Sustaining
Capital (6)
All-In
Sustaining
Costs
Ounces
(000)/
Pounds
(millions)
Sold
All-In
Sustaining
Costs per
oz/lb
GOLD
Carlin $ 513 $ 4 $ 31 $ - $ 4 $ 12 $ 120 $ 684 705 $ 970
Phoenix 125 2 6 - 2 8 15 158 181 873
Twin Creeks 193 4 7 - 3 - 42 249 344 724
La Herradura 122 - 31 - - - 62 215 161 1,335
Other North America - - 32 - 8 - 17 57 - -
North America 953 10 107 - 17 20 256 1,363 1,391 980
Yanacocha 520 68 32 - 60 - 107 787 836 941
Other South America - - 23 - 1 - - 24 - -
South America 520 68 55 - 61 - 107 811 836 970
Boddington 578 5 1 - 1 4 65 654 539 1,213
Tanami 203 2 7 - 2 - 66 280 218 1,284
Jundee 154 10 7 - 1 - 33 205 216 949
Waihi 74 2 4 - - - 7 87 77 1,130
Kalgoorlie 266 5 2 - 1 - 10 284 231 1,229
Other Australia/New
Zealand - - 11 - 25 - - 36 - -
Australia/New Zealand 1,275 24 32 - 30 4 181 1,546 1,281 1,207
Batu Hijau 81 2 2 - 4 4 10 103 33 3,121
Other Indonesia - - - - - - - - - -
Indonesia 81 2 2 - 4 4 10 103 33 3,121
Ahafo 226 2 36 - 3 - 97 364 407 894
Akyem - - 7 - - - - 7 - -
Other Africa - - 7 - 17 - - 24 - -
Africa 226 2 50 - 20 - 97 395 407 971
Corporate and Other - - 101 158 17 - 8 284 - -
Total Gold $ 3,055 $ 106 $ 347 $ 158 $ 149 $ 28 $ 659 $ 4,502 3,948 $ 1,140
COPPER
Phoenix $ 41 $ 1 $ 2 $ - $ - $ 4 $ 6 $ 54 24 $ 2.25
Boddington 139 1 - - - 14 16 170 53 3.21
Batu Hijau 582 7 11 - 16 31 72 719 104 6.91
Total Copper $ 762 $ 9 $ 13 $ - $ 16 $ 49 $ 94 $ 943 181 $ 5.21
Consolidated $ 3,817 $ 115 $ 360 $ 158 $ 165 $ 77 $ 753 $ 5,445
Slide 42
Adjusted cash all-in sustaining cost savings
(1) AISC is a non-GAAP metric, for reconciliation to CAS see slides 40 – 42.
(2) Jundee was sold on July 1, 2014.
(3) Midas was sold on February 11, 2014 and was included in the Twin Creeks segment.
(4) Referred to elsewhere as NRV adjustments.
Newmont Mining Corporation Slide 43
Costs Advanced Other
Treatment
and All-In
Nine Months Ended September 30, Applicable Remediation Projects and General and Expense, Refining Sustaining Sustaining
2014 to Sales Costs Exploration Administrative Net Costs Capital Costs
Gold and Copper Consolidated1 $ 3,328 $ 132 $ 239 $ 138 $ 129 $ 57 $ 577 $ 4,600
Adjustments:
Stockpile and Leach Pad Inventory4 (430) - - - - - - (430)
Abnormal Production Costs at Batu Hijau (53) - - - - - - (53)
Adjusted Consolidated AISC $ 2,845 $ 132 $ 239 $ 138 $ 129 $ 57 $ 577 $ 4,117
Costs Advanced Other
Treatment
and All-In
Nine Months Ended September 30, Applicable Remediation Projects and General and Expense, Refining Sustaining Sustaining
2013 to Sales Costs Exploration Administrative Net Costs Capital Costs
Gold and Copper Consolidated1 $ 3,817 $ 115 $ 360 $ 158 $ 165 $ 77 $ 753 $ 5,445
Adjustments:
Stockpile and Leach Pad Inventory4 (610) - - - - - - (610)
Jundee2 (49) - (3) - - - (9) (61)
Midas3 (22) - (1) - (1) - (3) (27)
Adjusted Consolidated AISC $ 3,136 $ 115 $ 356 $ 158 $ 164 $ 77 $ 741 $ 4,747
November 19 - 20, 2014
Investors are encouraged to read the information contained in this presentation in conjunction with the following notes, the Cautionary Statement on slide 2 and the
factors described under the “Risk Factors” section of the Company’s most recent Form 10-K, filed with the SEC on February 21, 2014, and disclosure in the
Company’s recent SEC filings including the Form 10-Q.
1. AISC or All-in sustaining cost is a non-GAAP metric. See pages 40 to 42 for more information and a reconciliation to the nearest GAAP metric.
2. Adj. Net Income is a non-GAAP metric. See page 37 for more information and reconciliation to the nearest GAAP metric.
3. 2014 and 2014 - 2016 Outlook projections used in this presentation (“Outlook”) are considered “forward-looking statements” and represent management’s good faith
estimates or expectations as October 30, 2014. However, Outlook is based upon certain assumptions, including, but not limited to, metal prices, oil prices, certain
exchange rates and other assumptions (including, without limitation, those set forth on slide 2). For example, 2014 Outlook assumes $1,200/oz Au, $3.00/lb Cu, $0.95
USD/AUD exchange rate and $100/barrel WTI ; 2015 Outlook assumes $1,200/oz Au, $2.75/lb Cu, $0.90 USD/AUD exchange rate and $100/barrel WTI; and 2016
Outlook assumes $1,200/oz Au, $2.75/lb Cu, $0.90 USD/AUD exchange rate and $100/barrel WTI and other assumptions. Such assumptions may prove to be incorrect
and actual results may differ materially from those anticipated. Consequently, Outlook cannot be guaranteed. As such, investors are cautioned not to place undue
reliance upon Outlook and forward-looking statements as there can be no assurance that the plans, assumptions or expectations upon which they are placed will occur.
4. Adjusted cash AISC is a non-GAAP metric and is calculated as gold and copper all-in sustaining cost less net realizable value (NRV), Batu related abnormal costs, and
adjusted for the sales of Midas and Jundee. See slide 43 for details.
5. The project metrics presented for the Merian project are based upon management’s reasonable good faith belief as of the date of this presentation and are presented on
a consolidated basis. The listed project metrics constitute forward-looking statements and are subject to certain risks and uncertainties.
6. Reserves at Merian (as of December 31, 2013 on a 100% consolidated basis) were estimated at 108,250 ktonnes of Probable Reserves, grading 1.22 gpt for 4.2Moz,
using a $1,300/oz gold price assumption. Resources at Merian (as of December 31, 2013 on a 100% consolidated basis and using a $1,400/oz gold price assumption)
were 750 kounces of Measured and Indicated resources, comprised of Measured resources of approximately 77 kounces (2,400 ktonnes, at 0.98 grams per tonne) and
Indicated resources of approximately 677 kounces (20,500 ktonnes, at 1.03 grams per tonne). Inferred resources totaled approximately 926 kounces (26,800 ktonnes, at
1.07 grams per tonne). U.S. investors are reminded that “reserves” were prepared in compliance with Industry Guide 7 published by the U.S. SEC. Whereas, the terms
“resources,” “Measured and Indicated resources” and Inferred resources” are not SEC recognized terms. Newmont has determined that such “resources” would be
substantively the same as those prepared using the Guidelines established by the Society of Mining, Metallurgy and Exploration and defined as “Mineral Resource”.
Estimates of resources are subject to further exploration and development, are subject to additional risks, and no assurance can be given that they will eventually convert
to future reserves. Inferred Resources, in particular, have a great amount of uncertainty as to their existence and their economic and legal feasibility. Investors are
cautioned not to assume that any part or all of the Inferred Resource exists, or is economically or legally mineable. Mineral inventory is also subject to an even greater
degree of uncertainty. Investors are reminded that even if significant mineralization is discovered and converted to reserves, during the time necessary to ultimately move
such mineralization to production the economic feasibility of production may change. See the Company’s Annual Report filed with the SEC on February 21, 2014 for the
“Proven and Probable Reserve” tables prepared in compliance with the SEC’s Industry Guide 7. Investors are reminded that the tables presented in the Annual Report
are estimates as of December 31, 2013 and were presented on an attributable basis reflecting the Company’s ownership interest at such time. The company presently
holds a 75% equity interest in the Merian project as a result of the government of Suriname recent opt-in.
Endnotes
Newmont Mining Corporation Slide 44November 19 - 20, 2014
7. All-in sustaining cost (“AISC”) as used in the Company’s Outlook is a non-GAAP metric defined as the sum of cost applicable to sales (including all direct and indirect
costs related to current gold production incurred to execute on the current mine plan), remediation costs (including operating accretion and amortization of asset
retirement costs), G&A, exploration expense, advanced projects and R&D, treatment and refining costs, other expense, net of one-time adjustments and sustaining
capital.
8. Investors are reminded that the negotiation of the amendment to the Contract of Work contemplated by the MoU remains on-going. Continued future operations at
Batu Hijau are subject to various factors, including, without limitation, the successful renegotiation of the Contract of Work, issuance of future export permits and
approvals following the expiration of the six-month permit, negotiations with the labor union, future in-country smelting availability and regulations relating to export
quotas, and certain other factors. For a discussion of other factors which could impact future financial performance and operating results at Batu Hijau, see Item 1A,
under the heading “Risk Factors,” of the Company’s Form 10-K, filed on February 21, 2014, as well as Note 2 under the heading “Summary of Significant
Accounting Policies - Risks and Uncertainties” of the Notes to the Financial Statements contained in the Company’s Form 10-Q, filed on or about October 30, 2014.
Endnotes
Newmont Mining Corporation Slide 45November 19 - 20, 2014

More Related Content

What's hot

Bank of America Merrill Lynch 2016 Canada Mining Fireside Chat Presentation
Bank of America Merrill Lynch 2016 Canada Mining Fireside Chat PresentationBank of America Merrill Lynch 2016 Canada Mining Fireside Chat Presentation
Bank of America Merrill Lynch 2016 Canada Mining Fireside Chat PresentationNewmont Mining Corporation
 
EGM Presentation to Foyson Shareholders
EGM Presentation to Foyson ShareholdersEGM Presentation to Foyson Shareholders
EGM Presentation to Foyson ShareholdersFOYSONRESOURCESLTD
 

What's hot (17)

13 december 2016 investor deck
13 december 2016 investor deck13 december 2016 investor deck
13 december 2016 investor deck
 
Q3 Earnings Results Presentation 2016
Q3 Earnings Results Presentation 2016Q3 Earnings Results Presentation 2016
Q3 Earnings Results Presentation 2016
 
Investor presentation may2017
Investor presentation may2017Investor presentation may2017
Investor presentation may2017
 
Newmont q4 and fy 2017 results presentation
Newmont q4 and fy 2017 results presentationNewmont q4 and fy 2017 results presentation
Newmont q4 and fy 2017 results presentation
 
Bank of America Merrill Lynch 2016 Canada Mining Fireside Chat Presentation
Bank of America Merrill Lynch 2016 Canada Mining Fireside Chat PresentationBank of America Merrill Lynch 2016 Canada Mining Fireside Chat Presentation
Bank of America Merrill Lynch 2016 Canada Mining Fireside Chat Presentation
 
Q3 earningspresentation oct2014 103014_final
Q3 earningspresentation oct2014 103014_finalQ3 earningspresentation oct2014 103014_final
Q3 earningspresentation oct2014 103014_final
 
Full Year and Q4 2016 Earnings
Full Year and Q4 2016 EarningsFull Year and Q4 2016 Earnings
Full Year and Q4 2016 Earnings
 
Bmo presentation 20 feb2015 final.v1
Bmo presentation 20 feb2015 final.v1Bmo presentation 20 feb2015 final.v1
Bmo presentation 20 feb2015 final.v1
 
Bmo presentation 20 feb2015 final
Bmo presentation 20 feb2015 finalBmo presentation 20 feb2015 final
Bmo presentation 20 feb2015 final
 
2017 Denver Gold Forum Presentation
2017 Denver Gold Forum Presentation2017 Denver Gold Forum Presentation
2017 Denver Gold Forum Presentation
 
3 19 2014 barclays conference v001
3 19 2014 barclays conference v0013 19 2014 barclays conference v001
3 19 2014 barclays conference v001
 
Q3 2017 results presentation_final
Q3 2017 results presentation_finalQ3 2017 results presentation_final
Q3 2017 results presentation_final
 
Q2 2017 results presentation_final
Q2 2017 results presentation_finalQ2 2017 results presentation_final
Q2 2017 results presentation_final
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
 
Presentation dgf
Presentation dgfPresentation dgf
Presentation dgf
 
11 12 2013 cowen and co final
11 12 2013 cowen and co final11 12 2013 cowen and co final
11 12 2013 cowen and co final
 
EGM Presentation to Foyson Shareholders
EGM Presentation to Foyson ShareholdersEGM Presentation to Foyson Shareholders
EGM Presentation to Foyson Shareholders
 

Viewers also liked

02. furniture bedroom
02. furniture bedroom02. furniture bedroom
02. furniture bedroompchukrallah
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceNewmontMining
 
Networking presentation
Networking presentation Networking presentation
Networking presentation beaum30
 
Domain Services for Windows on OES11SP1
Domain Services for Windows on OES11SP1Domain Services for Windows on OES11SP1
Domain Services for Windows on OES11SP1Bas Penris
 
Paragon Relocation Presents America’s Hidden Treasures: Small Towns with Big ...
Paragon Relocation Presents America’s Hidden Treasures: Small Towns with Big ...Paragon Relocation Presents America’s Hidden Treasures: Small Towns with Big ...
Paragon Relocation Presents America’s Hidden Treasures: Small Towns with Big ...Paragon Relocation
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceNewmontMining
 
07 30-2014-q2-earnings-presentation-final
07 30-2014-q2-earnings-presentation-final07 30-2014-q2-earnings-presentation-final
07 30-2014-q2-earnings-presentation-finalNewmontMining
 
Np fr vr.pdf fr
Np fr vr.pdf frNp fr vr.pdf fr
Np fr vr.pdf frhyazzi90
 
Lay magistrates powerpoint
Lay magistrates powerpoint Lay magistrates powerpoint
Lay magistrates powerpoint AroosaShabir
 
Egypte antique3
Egypte antique3Egypte antique3
Egypte antique3MCB_num
 
Une histoire de la photo 19eme
Une histoire de la photo 19emeUne histoire de la photo 19eme
Une histoire de la photo 19emecdipasteur
 
Predicate adjectives
Predicate adjectivesPredicate adjectives
Predicate adjectivesTammy Tusing
 

Viewers also liked (15)

02. furniture bedroom
02. furniture bedroom02. furniture bedroom
02. furniture bedroom
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining Conference
 
Networking presentation
Networking presentation Networking presentation
Networking presentation
 
Domain Services for Windows on OES11SP1
Domain Services for Windows on OES11SP1Domain Services for Windows on OES11SP1
Domain Services for Windows on OES11SP1
 
Paragon Relocation Presents America’s Hidden Treasures: Small Towns with Big ...
Paragon Relocation Presents America’s Hidden Treasures: Small Towns with Big ...Paragon Relocation Presents America’s Hidden Treasures: Small Towns with Big ...
Paragon Relocation Presents America’s Hidden Treasures: Small Towns with Big ...
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining Conference
 
07 30-2014-q2-earnings-presentation-final
07 30-2014-q2-earnings-presentation-final07 30-2014-q2-earnings-presentation-final
07 30-2014-q2-earnings-presentation-final
 
Np fr vr.pdf fr
Np fr vr.pdf frNp fr vr.pdf fr
Np fr vr.pdf fr
 
Holidays Around the World
Holidays Around the WorldHolidays Around the World
Holidays Around the World
 
Vasso
VassoVasso
Vasso
 
Adjectives yay!!!
Adjectives yay!!!Adjectives yay!!!
Adjectives yay!!!
 
Lay magistrates powerpoint
Lay magistrates powerpoint Lay magistrates powerpoint
Lay magistrates powerpoint
 
Egypte antique3
Egypte antique3Egypte antique3
Egypte antique3
 
Une histoire de la photo 19eme
Une histoire de la photo 19emeUne histoire de la photo 19eme
Une histoire de la photo 19eme
 
Predicate adjectives
Predicate adjectivesPredicate adjectives
Predicate adjectives
 

Similar to Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w

Goldman sachs global metals mining presentation final presentation
Goldman sachs global metals mining presentation final presentationGoldman sachs global metals mining presentation final presentation
Goldman sachs global metals mining presentation final presentationNewmont Mining Corporation
 
Investor day presentation 3 dec2015 (final merged)
Investor day presentation 3 dec2015 (final merged)Investor day presentation 3 dec2015 (final merged)
Investor day presentation 3 dec2015 (final merged)Newmont Mining Corporation
 
Cibc presentation jan 2016v final.01.12.16 with corp expense outlook
Cibc presentation jan 2016v final.01.12.16 with corp expense outlookCibc presentation jan 2016v final.01.12.16 with corp expense outlook
Cibc presentation jan 2016v final.01.12.16 with corp expense outlookNewmont Mining Corporation
 
Q22015 earningspresentation 22july2015 final.v1
Q22015 earningspresentation 22july2015 final.v1Q22015 earningspresentation 22july2015 final.v1
Q22015 earningspresentation 22july2015 final.v1Newmont Mining Corporation
 
CIBC 18th Annual Whistler Institutional Investor Conference 2015
CIBC 18th Annual Whistler Institutional Investor Conference 2015CIBC 18th Annual Whistler Institutional Investor Conference 2015
CIBC 18th Annual Whistler Institutional Investor Conference 2015Newmont Mining Corporation
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014NewmontMining
 
Denver Gold Forum September, 2014
Denver Gold Forum September, 2014Denver Gold Forum September, 2014
Denver Gold Forum September, 2014NewmontMining
 
Bmo presentation goldberg feb2014 final v001_q8e51f
Bmo presentation goldberg feb2014 final v001_q8e51fBmo presentation goldberg feb2014 final v001_q8e51f
Bmo presentation goldberg feb2014 final v001_q8e51fNewmont Mining Corporation
 
CIBC 17th Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
CIBC 17th  Annual Whistler Institutional Investor Conference Laurie Brlas, EV...CIBC 17th  Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
CIBC 17th Annual Whistler Institutional Investor Conference Laurie Brlas, EV...Newmont Mining Corporation
 
Newmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont Mining Corporation
 

Similar to Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w (16)

Goldman sachs global metals mining presentation final presentation
Goldman sachs global metals mining presentation final presentationGoldman sachs global metals mining presentation final presentation
Goldman sachs global metals mining presentation final presentation
 
Investor day presentation 3 dec2015 (final merged)
Investor day presentation 3 dec2015 (final merged)Investor day presentation 3 dec2015 (final merged)
Investor day presentation 3 dec2015 (final merged)
 
Cibc presentation jan 2016v final.01.12.16 with corp expense outlook
Cibc presentation jan 2016v final.01.12.16 with corp expense outlookCibc presentation jan 2016v final.01.12.16 with corp expense outlook
Cibc presentation jan 2016v final.01.12.16 with corp expense outlook
 
Q22015 earningspresentation 22july2015 final.v1
Q22015 earningspresentation 22july2015 final.v1Q22015 earningspresentation 22july2015 final.v1
Q22015 earningspresentation 22july2015 final.v1
 
CIBC 18th Annual Whistler Institutional Investor Conference 2015
CIBC 18th Annual Whistler Institutional Investor Conference 2015CIBC 18th Annual Whistler Institutional Investor Conference 2015
CIBC 18th Annual Whistler Institutional Investor Conference 2015
 
Baml presentation goldberg may2015 final.v1
Baml presentation goldberg may2015 final.v1Baml presentation goldberg may2015 final.v1
Baml presentation goldberg may2015 final.v1
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
 
Denver Gold Forum September, 2014
Denver Gold Forum September, 2014Denver Gold Forum September, 2014
Denver Gold Forum September, 2014
 
13 december 2016 investor deck final
13 december 2016 investor deck final13 december 2016 investor deck final
13 december 2016 investor deck final
 
Nem december 2016 investor presentation
Nem december 2016 investor presentationNem december 2016 investor presentation
Nem december 2016 investor presentation
 
Bmo presentation goldberg feb2014 final v001_q8e51f
Bmo presentation goldberg feb2014 final v001_q8e51fBmo presentation goldberg feb2014 final v001_q8e51f
Bmo presentation goldberg feb2014 final v001_q8e51f
 
CIBC 17th Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
CIBC 17th  Annual Whistler Institutional Investor Conference Laurie Brlas, EV...CIBC 17th  Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
CIBC 17th Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
 
Q1 2015 earnings presentation
Q1 2015 earnings presentationQ1 2015 earnings presentation
Q1 2015 earnings presentation
 
Baml presentation.goldberg.may2016 final
Baml presentation.goldberg.may2016 finalBaml presentation.goldberg.may2016 final
Baml presentation.goldberg.may2016 final
 
Newmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont november 2017 investor presentation final
Newmont november 2017 investor presentation final
 
Q3 2015 earnings presentation
Q3 2015 earnings presentationQ3 2015 earnings presentation
Q3 2015 earnings presentation
 

Recently uploaded

Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfProbe Gold
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServicePooja Nehwal
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanurdharasingh5698
 
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationSysco_Investors
 
SME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxSME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxindia IPO
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsaronly4webmaster01
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanhanshkumar9870
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦anilsa9823
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingFalcon Invoice Discounting
 

Recently uploaded (20)

young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
 
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
 
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
 
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
 
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Vip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
 
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call Presentation
 
SME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxSME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptx
 
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
 
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Green Park @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 

Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w

  • 1. Goldman Sachs Global Metals & Mining Conference Gary Goldberg, CEO and Laurie Brlas, CFO November 19-20, 2014
  • 2. Cautionary Statement Newmont Mining Corporation Slide 2 Cautionary statement regarding forward looking statements, including outlook: This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended to be covered by the safe harbor created by such sections and other applicable laws. Such forward-looking statements may include, without limitation: (i) estimates of future production and sales; (ii) estimates of future costs applicable to sales and all-in sustaining costs; (iii) estimates of future capital expenditures and development capital; (iv) plans and expectations relating to savings, reductions in costs and expenditures, efficiency improvements and optimization; (v) expectations relating to decisions regarding future exploration, expansion or development projects; (vi) expectations regarding the development, growth and upside potential of operations and projects, including, without limitation, mine plans, ramp-up, first production, anticipated strip ratios, recovery rate and other project metrics; (vii) expectations regarding the future receipt of approvals, permits and licenses, including, without limitation, export approvals; (viii) expectations regarding the out-coming of ongoing negotiations, including, without limitation, with respect to the Contract of Work, and (ix) expectations regarding financial flexibility, project funding, cash retention, free cash flow and portfolio optimization. Forward-looking statements often include words such as "anticipates," "estimates," "expects," "projects," "intends," "plans," "believes" and words and terms of similar substance in connection with discussions of future operating or financial performance. Estimates or expectations of future events or results are based upon certain assumptions, which may prove to be incorrect. Such assumptions, include, but are not limited to: (i) there being no significant change to current geotechnical, metallurgical, hydrological and other physical conditions; (ii) permitting, development, operations and expansion of the Company’s projects being consistent with current expectations and mine plans; (iii) political developments in any jurisdiction in which the Company operates being consistent with its current expectations; (iv) certain exchange rate assumptions for the Australian dollar to the U.S. dollar, as well as other the exchange rates being approximately consistent with current levels; (v) certain price assumptions for gold, copper and oil; (vi) prices for key supplies being approximately consistent with current levels; and (vii) the accuracy of our current mineral reserve and mineral resource estimates. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, such statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by the “forward-looking statements.” Such risks include, but are not limited to, gold and other metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, political and operational risks, community relations, conflict resolution and outcome of projects or oppositions and governmental regulation and judicial outcomes. For a more detailed discussion of such risks and other factors, see the Company’s 2013 Annual Report on Form 10-K, filed on February 21, 2014, with the Securities and Exchange Commission (“SEC”), as well as the Company’s other SEC filings. The Company does not undertake any obligation to release publicly revisions to any “forward-looking statement,” including, without limitation, outlook, to reflect events or circumstances after the date of this presentation, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. Investors should not assume that any lack of update to a previously issued “forward-looking statement” constitutes a reaffirmation of that statement. Continued reliance on “forward-looking statements” is at investors' own risk. November 19 - 20, 2014
  • 3. Why Newmont? • Industry leading safety performance • Optimized asset portfolio with stable production and cash flow base with a focus on value over volume • Global portfolio with industry leading project pipeline • Continuing trajectory of sustainable cost and efficiency improvement that offset inflation • Strong balance sheet and disciplined capital allocation • Positioned to thrive across cycles Newmont Mining Corporation Long Canyon November 19 - 20, 2014 Slide 3
  • 4. YTD 2014 YTD 2013 Revenue ($M) $5,275 $6,226 Adjusted Net Income ($M)2 $459 $480 Adjusted Net Income ($ per share)2 $0.92 $0.97 Cash from Continuing Operations ($M) $889 $1,175 Free Cash Flow ($M) $123 ($353) Dividends ($ per share) $0.20 $1.025 Positioning the business to thrive across cycles YTD 2014 YTD 2013 Average Realized Gold Price ($/oz) $1,282 $1,442 Average Realized Copper Price ($/lb) $2.75 $2.95 Attributable Gold Production (Koz) 3,584 3,617 Gold CAS ($/oz) $733 $774 Gold AISC1 ($/oz) $1,031 $1,140 Newmont Mining Corporation Slide 4 Gold AISC1 down 10% YTD YTD $476 million improvement in free cash flow Y-O-Y November 19 - 20, 2014
  • 5. Maintaining safe operations and low injury rates Newmont Mining Corporation 0.72 0.64 0.46 0.49 0.49 0.40 0.50 0.47 0.32 0.41 0.00 0.20 0.40 0.60 0.80 Q2 2012 Q3 2012 Q4 2012 Q1 2013 Q2 2013 Q3 2013 Q4 2013 Q1 2014 Q2 2014 Q3 2014 Total recordable accident frequency rate (per 200,000 hours worked) November 19 - 20, 2014 Slide 5
  • 6. Delivering on our commitments Improving the business • Q3 CAS at low end of outlook • Q3 Gold AISC per ounce below $1,000 • Maintaining production outlook despite asset sales* Strengthening the portfolio • Secured Merian Right of Exploitation • Turf Vent Shaft on budget and schedule • Generated almost $1.4B in asset sales in the last 18 months** Creating value for shareholders • Strengthened financial flexibility • Generated $51M in free cash flow in Q3 Loading copper concentrate for export at Batu Hijau Newmont Mining Corporation Slide 6November 19 - 20, 2014 *With respect to outlook above, see endnote 3. **Figure includes funds received from government of Suriname for Merian opt-in in November 2014.
  • 7. $58 $117 $164 $291 $0 $100 $200 $300 $400 $500 $600 $700 2014 YTD* Adjusted cash AISC savings4 ($M) Cost and efficiency improvements total $630M YTD General & Administrative/Other** Advanced Projects & Exploration Sustaining Capital CAS improvements Newmont Mining Corporation $630M *2014 year-to-date savings reflects comparison of 9-months ended 09/30/14 versus 9-months ended 09/30/13. Non-GAAP metric. See slide 43 for reconciliation. **Includes Remediation, Treatment and Refining Costs, and Other Expense, net. November 19 - 20, 2014 Slide 7
  • 8. Maintain (e.g., Carlin) De-risk (e.g., Conga) Improve value (e.g., Tanami) Close or divest (e.g., Midas, Jundee, La Herradura) Continued portfolio optimization All assets and opportunities are rate/ranked on the basis of the following: • Generate value (Net Present Value, Return on Capital Employed) • Improve mine life • Lower position on cost curve • Represent acceptable risk Risk Value Portfolio Approach High Low HighLow Newmont Mining CorporationNovember 19 - 20, 2014 Slide 8
  • 9. Improve financial flexibility • >$5B in cash, marketable securities and revolver capacity* • $328M in Q3 cash from continuing operations • $51M in Q3 free cash flow Enhance portfolio • Generated almost $1.4B in asset sales in last 18 months • Completed sale of La Herradura for cash proceeds of $450M on October 6 Return cash to shareholders • Returned $102M in dividends in 2014 YTD Strong balance sheet and disciplined capital allocation Newmont Mining Corporation *As of September 30, 2014; does not include Penmont sales proceeds which closed in Q4 2014. Marketable Securities = $0.4B Revolver Capacity = $3.0B Cash and Cash Equivalents = $1.8B November 19 - 20, 2014 Slide 9
  • 10. 180 263 842 44 1,303 1,500 600 1,100 1,000 2014 2015 2016 2017 2018 2019 Column1 2022 Column2 2035 2039 2042 Ghana PTNNT Corporate Debt Maintaining investment grade credit rating Newmont Mining Corporation Slide 10 Scheduled debt repayments ($M) • Long-dated maturity with favorable terms • No significant debt until 2019 • Revolver has one financial covenant; maximum net debt to book capital of 62.5% compared to 27.9% as of 30 September 2014 November 19 - 20, 2014 10
  • 11. Gold price linked dividend Newmont Mining Corporation • Highly leveraged to gold prices • Targeting 20-25% of free cash flow for dividends, reserving the remainder for projects and paying down debt $0.10 $0.20 $0.40 $0.60 $0.80 $1.00 $1.20 $1.40 $1.60 $1.80 $2.00 $0.00 $0.50 $1.00 $1.50 $2.00 $2.50 <$1,200 $1,200-$1,299 $1,300-$1,399 $1,400-$1,499 $1,500-$1,599 $1,600-$1,699 $1,700-$1,799 $1,800-$1,899 $1,900-$1,999 $2,000-$2,099 $2,100-$2,199 $2,200-$2,299 Annualized dividend per share (US$)* *For illustrative purposes, declaration of dividend remains subject to Board of Directors approval. November 19 - 20, 2014 Slide 11
  • 12. Merian offers favorable economics and prospects Newmont Mining Corporation Strong feasibility and economics* • Low strip ratio of 3:1 over LOM • Capital Costs: $0.9B – $1.0B • Production: 400 – 500 koz per year • Gold CAS: $650 – $750/oz • Gold AISC: $750 – $850/oz • Gold Reserves of 4.2Moz6 at 1.22 g/t Exploration upside • Agreement covers 500,000 hectares with promising exploration results Funding • Government of Suriname acquired 25% fully-funded equity stake in early November *Capital costs reported on a 100% basis with approximately $100 million sunk to date. Metrics are reported as first five year average unless otherwise noted. CAS and AISC are escalated assuming 3-4% inflation. See endnotes 5 and 6 for more information. November 19 - 20, 2014 Slide 12
  • 13. Merian project metrics and capital breakdown5 *Life of mine. **100% basis. Newmont Mining Corporation Breakdown of consolidated capital**Low strip ratio vs. comparable open pit projects* 3.7 4.2 4.4 2.4 West Africa Guiana Shield Australia North America Process Plant / Tails, 25% Indirect / Camp / Management, 25% Contingency / Escalation / Other, 20% Mobile Equipment, 15% Infrastructure & Power, 15% November 19 - 20, 2014 Slide 13
  • 14. Prepared for ongoing market fluctuations
  • 15. Free cash flow positive across planning scenarios 2015 contingency planning $1,200/oz gold $1,100/oz gold $1,000/oz gold • Operating costs and sustaining capital optimized to maintain positive free cash flow • Development capital prioritized for Merian, Tanami Expansion, Long Canyon Phase 1, and Ahafo Mill Expansion • Exploration spend focused on near-mine and high value targets • Support costs reduced across business • Continue with Merian development; reprioritize earlier stage projects based on value metrics • Maintain cost savings to offset inflation • Reduce sustaining capital spend • Generative exploration reduced • Further reduce support costs across business • Repay debt per schedule • No dividend payments per policy • Continue with Merian development; potentially slow development of earlier stage projects • Assess and potentially defer highest cost laybacks • Further reduce sustaining capital spend • Exploration focused on brownfields and near mine opportunities • Further reduce support costs across business • Repay debt per schedule • No dividend payments per policy Newmont Mining CorporationNovember 19 - 20, 2014 Slide 15
  • 16. 0 20 40 60 80 100 120 2009 2010 2011 2012 2013 2014E 2015E 2016E 2017E 2018E 2019E 2020E 2021E 2022E 2023E (Moz) Strong gold fundamentals support long term pricing • Longer-term mine supply growth challenged with fewer new discoveries, capital cost inflation, increasing nationalism and activism, aging mines and declining grades • Gold demand forecasted to grow by ~25% by 2017 in China • Longer-term investment demand expected to strengthen due to robust central bank demand, consumer demand growth in China and low interest rates Newmont Mining Corporation *Source: GaveKel Research and World Gold Council. November 19 - 20, 2014 Slide 16 Gold demand and affluent consumer growth*Global gold mine supply projections*
  • 17. Positioned to thrive in the future
  • 18. More than 150 years of mining experience Gary Goldberg, President and CEO Laurie Brlas, CFO Dr. Elaine Dorward- King, EVP Sustainability and External Relations Scott Lawson, SVP Technical Services Chris Robison, EVP Operations and Projects Bill MacGowan, EVP Human Resources Susan Keefe, VP Strategic Relations Randy Engel, EVP Strategic Development Steve Gottesfeld, EVP General Counsel and Corporate Secretary November 19 - 20, 2014 Newmont Mining Corporation Slide 18
  • 19. Our strategy is to be the world’s leading gold miner Strengthen the portfolio Create value for shareholders Improve the business Improve the underlying business • Cost reductions and efficiency improvements more than offset planned inflation rates • Maintain steady gold production; focus on value over volume Build a more valuable portfolio of long-life, low-cost assets • Fund best projects while maintaining positive free cash flow • Optimize portfolio and pipeline to support long-term growth Develop capabilities and systems for competitive advantage • Strengthen financial flexibility and maintain dividend flexibility • Improve the balance sheet Newmont Mining CorporationNovember 19 - 20, 2014 Slide 19
  • 20. Labor 50% Power 10% Diesel 10% Consumables 10% Materials / Parts 20% Conservative planning assumptions Change Increment FCF (US$M) Gold ($/oz) +$100 +$350 Copper ($/lb) +$0.25 +$100 Australian Dollar -0.05 +$60 Oil ($/bbl) -$10 +$40 • Each $10/bbl reduction in oil price adds ~$40M in free cash flow • Every +$100/oz change in the gold price, Newmont generates ~$350M in additional free cash flow • For every +$0.25/lb change in the copper price, Newmont generates ~$100M in additional free cash flow *All other variables held constant (i.e. FCF for flexed gold price does not include changes to copper price, AUD or WTI). All GEO calculated using $1,200/oz Au and $3.00/lb Cu. All figures consolidated. Economics reflect a 35% portfolio tax rate. Newmont Mining CorporationNovember 19 - 20, 2014 Slide 20 2015E operating cost breakdown 2015 sensitivities*
  • 21. • Merian and Turf Vent Shaft represent approximately 80% of total development capital** Sustaining 70% Development 30% Sustaining capital expected to average ~$1B per year* Newmont Mining Corporation Surface and Underground Deferred Mine Development, 20% November 19 - 20, 2014 Slide 21 Equipment 40% Tailings Facilities and Support Buildings 20% Exploration DMD 5% Other Sustaining 15% *2014 breakdown of development and sustaining capital. **2014 to 2016 estimated capital breakdown. Surface and UG Deferred Mine Development 20%
  • 22. Total Newmont All-in Sustaining Costs 2014 2015 2016 South America Indonesia Total Newmont Cost Applicable to Sales Africa Australia/New Zealand Projecting lower costs and steady production Newmont Mining Corporation 2014 2015 2016 Attributable gold production outlook (Moz)3 4.7 – 5.0 4.5 – 4.8 4.8 – 5.1 $1,020 – $1,080 $1,000 – $1,080 $985 – $1,085 AISC7 and CAS outlook ($/oz)3 North America November 19 - 20, 2014 Slide 22 $710 – $750 $690 – $740 $720 – $760
  • 23. South America: Yanacocha Conga Merian Maximizing productivity and efficiency across portfolio Operations Projects Newmont Mining Corporation North America: Carlin Turf Vent Shaft Phoenix Twin Creeks Africa: Ahafo Akyem Australia / New Zealand: Boddington KCGM Tanami Waihi/Correnso Indonesia: Batu Hijau November 19 - 20, 2014 Slide 23 NEM market data (11/12/2014): Market cap: $9.2 billion Enterprise value: $16.8 billion # of operations: 11 2013A Revenue: $8.3 billion 2013A Attrib. Production: 5.1 Moz Au % of 2013A gold production North America: 38.5% South America: 11.6% Australia/ New Zealand: 35.6% Indonesia: 0.5% Africa: 13.8%
  • 24. Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015 2016 Upcoming catalysts highlight profitable growth Carlin welding shop, Nevada Newmont Mining Corporation • Decision to proceed with Subika Underground • Merian first production expected • Turf Vent Shaft first production • Correnso production expected • FY14 results published • FY14 reserve and resource update published • Decision to proceed with Long Canyon Phase 1 • Decision to proceed with Tanami Expansion • Phase 6 higher grade ore sourced at Batu Hijau • Decision to proceed with Ahafo Mill Expansion November 19 - 20, 2014 • Government of Suriname opt-in to Merian at 25% Slide 24
  • 25. Newmont Mining Corporation Turf Vent Shaft Ahafo Mill Expansion Ahafo North Subika Underground Correnso Greater Leeville Chaqui Sulfides Long Canyon Phase 1 Merian Exodus Bull Moose Yanacocha Sulfides Quecher Exploration / Conceptual PrefeasibilityScoping Feasibility / Engineering Execution Longboat in SurinameSouth AmericaNorth America Africa Australia/New Zealand Federation Conga Tanami Expansion Optimized project pipeline and execution approach November 19 - 20, 2014 Slide 25
  • 26. 71% 60% 47% 43% 22% 9% Agnico Eagle Newmont Barrick Newcrest Goldcorp Kinross 88% 87% 86% 82% 71% 67% Newmont Newcrest Kinross Agnico Goldcorp Barrick 88Moz of reserves with long term exploration upside Newmont Mining Corporation 2013 gold reserves in lower risk jurisdictions* *All reserves as reported in reserve statements as of December 31, 2013; low risk jurisdictions include US, Canada and Australia. 2013 gold reserves at operating properties* November 19 - 20, 2014 Slide 26
  • 27. Why Newmont? • Industry leading safety performance • Optimized asset portfolio with stable production and cash flow base with a focus on value over volume • Global portfolio with industry leading project pipeline • Continuing trajectory of sustainable cost and efficiency improvement that offset inflation • Strong balance sheet and disciplined capital allocation • Positioned to thrive across cycles Newmont Mining Corporation Long Canyon November 19 - 20, 2014 Slide 27
  • 29. Africa – our most prospective region Carlin welding shop, Nevada Newmont Mining Corporation • Akyem recently poured its 500,000 ounce and remains amongst the cheapest assets in the portfolio • Ahafo unit CAS decreased one percent in Q3 2014 from the prior year period, primarily due to lower labor costs and better synchronized mining and milling rates • Ahafo Mill Expansion and Subika Underground present further upside potential First ore to crusher at Akyem Africa YTD Q314 2014 Outlook Attributable Production (Kozs) 675 855 - 920 Consolidated CAS ($/oz) 444 $495 - $540 All-in-Sustaining Costs ($/oz) $619 $660 - $725 Consolidated Capital Expenditures ($M) 86 $115 - $140 November 19 - 20, 2014 Slide 29
  • 30. Australia/New Zealand - improving performance and efficiency Newmont Mining Corporation Waihi, New Zealand • Boddington unit CAS decreased nine percent in Q3 2014 from the prior year period in part due to lower mill maintenance costs and the repeal of Australia’s carbon tax • The Correnso underground mine at Waihi is expected to deliver 150,000 ounces per annum and adds roughly fours years to Waihi’s mine life. An investment decision is expected to be made in early 2015 Australia and New Zealand YTD Q314 2014 Outlook Attributable Production (Kozs) 1,294 1,625 – 1,725 Consolidated CAS ($/oz) $794 $805 - $880 All-in-Sustaining Costs ($/oz) $974 $990 - $1,080 Consolidated Capital Expenditures ($M) $166 $275 - $300 November 19 - 20, 2014 Slide 30
  • 31. Batu Hijau safely restarted in September 20148 Batu haul truck, Indonesia Newmont Mining Corporation Batu Hijau, Indonesia • Export permit received September 22; export shipping has resumed and the mine is running at full capacity • Memorandum of Understanding signed with the government on September 3 • Contract of Work amendment negotiations are on-going • On track to reach higher Phase 6 ore in H1 2015 Batu Hijau, Indonesia 2014 Outlook Attributable Production (kozs, kt) 25 - 35 30 - 40 Consolidated CAS* ($/oz, $/lb) $1,090 - $1,200 $3.15 - $3.45 All-in-Sustaining Costs* ($/oz) $1,430 - $1,560 Consolidated Capital Expenditures ($M) $65 - $70 November 19 - 20, 2014 Slide 31 *Batu Hijau 2014 CAS and AISC outlook includes net realizable value (NRV) inventory adjustments of approximately $160-170M primarily due to the change in royalties and export duties as a result of PTNNT's recently signed MoU.
  • 32. North America - generating strong and stable cash flow Carlin welding shop, Nevada Newmont Mining Corporation • Stripping campaigns at Carlin and Twin Creeks through mid-2015 extend mine life and stabilize production • The Turf Vent Shaft project adds higher grade ore to Mill 6 and is on time and on budget. The project is expected to reach full depth of 2,050 feet in Q1 2015 with first production achieved later that year • Completing feasibility studies at Long Canyon. Record of decision expected at year end 2014 Turf Vent Shaft North America YTD Q314 2014 Outlook Attributable Production (Kozs) 1,235 1,550 – 1,650 Consolidated CAS ($/oz) $760 $750 - $810 All-in-Sustaining Costs ($/oz) $1,007 $1,000 - $1,100 Consolidated Capital Expenditures ($M) $308 $500 - $550 November 19 - 20, 2014 Slide 32
  • 33. South America - moving ahead in Suriname with Merian Carlin welding shop, Nevada Newmont Mining Corporation • Expect higher second half 2014 production as Yanacocha mines planned higher grades • Completed review of Conga alternative development options, continue to assess reducing development capital, especially with earthworks • Approved Merian project with an anticipated start date of late 2016 • Progressing Yanacocha sulfide options Chailhuagón reservoir South America YTD Q314 2014 Outlook Attributable Production (Kozs) 364 510 – 560 Consolidated CAS ($/oz) $830 $660 - $720 All-in-Sustaining Costs ($/oz) $1,159 $1,090 - $1,180 Consolidated Capital Expenditures ($M) $89 $360 - $400 November 19 - 20, 2014 Slide 33
  • 34. • Mine supply has grown by ~2 percent annually since 2004 • Scrap supply averaged over 54M ounces per year from 2009 to 2012, prior to retreating to ~41M ounces last year • Strong market surplus in 2013 driven by ETF liquidations* Gold supply and demand overview – last decade Newmont Mining Corporation *For market balance calculations, this analysis treats ETF buying as demand and liquidations as added supply to the market. Total supply growth outpaced demand over last decade • Jewelry decline of ~1 percent per year more than offset by increase in gold bar & coin demand − Global bar & coin demand has increased from ~12M ounces in 2004 to over 57M ounces last year $0 $200 $400 $600 $800 $1,000 $1,200 $1,400 $1,600 $1,800 0 20 40 60 80 100 120 140 160 180 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 GoldPrice($/oz.) Supply&Demand(Moz.) Total Supply Total Demand Gold Price (US$/toz) November 19 - 20, 2014 Slide 34
  • 35. Gold supply and demand overview - future • Jewelry demand expected to increase over 2 percent annually through 2017 • Central banks acquisitions expected to offset further ETF liquidations − ETF additions anticipated in 2018 onward, increasing to ~13M ounces by 2021 • Mine supply expected to decrease by ~15 percent by 2017 after slightly increasing in 2014 Near-term balance leads to supply deficit in 2017 onward* Newmont Mining Corporation *GFMS Base Case projections (May 2014). 0 20 40 60 80 100 120 140 160 180 2009 2010 2011 2012 2013 2014E 2015E 2016E 2017E 2018E 2019E 2020E 2021E 2022E 2023E Supply&Demand(Moz.) Total Supply Total Demand November 19 - 20, 2014 Slide 35
  • 36. Chinese consumption to spur copper demand* • China accounts for over 40 percent of global copper demand; the power sector represents nearly half of Chinese demand and is a key driver to copper prices over the longer term • The average Chinese citizen uses: – less than one-third the amount of electricity a South Korean citizen uses; and – 25 percent of what the average person in the United States consumes Newmont Mining Corporation *Source: GaveKel Research and Bloomberg. November 19 - 20, 2014 Slide 36 Copper price expectationsElectric power consumption – China vs. developed world
  • 37. Adjusted net income Non-GAAP financial measures are intended to provide additional information only and do not have any standard meaning prescribed by generally accepted accounting principles (“GAAP”). These measures should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. Adjusted net income (loss) Management of the Company uses Adjusted net income (loss) to evaluate the Company’s operating performance, and for planning and forecasting future business operations. The Company believes the use of Adjusted net income (loss) allows investors and analysts to compare results of the continuing operations of the Company and its direct and indirect subsidiaries relating to the production and sale of minerals to similar operating results of other mining companies, by excluding exceptional or unusual items. Management’s determination of the components of Adjusted net income (loss) are evaluated periodically and based, in part, on a review of non-GAAP financial measures used by mining industry analysts. Net income (loss) attributable to Newmont stockholders is reconciled to Adjusted net income (loss) as follows: Newmont Mining Corporation Slide 37 Three Months Ended September 30, Nine Months Ended September 30, 2014 2013 2014 2013 Net income (loss) attributable to Newmont stockholders $ 213 $ 398 $ 493 $ (1,347) Loss (income) from discontinued operations (3) 21 16 (53) Impairments and loss provisions 5 29 12 1,530 Tax valuation allowance 21 - (77) 535 Restructuring and other 11 12 18 28 Asset sales (17) (243) (31) (243) Abnormal production costs at Batu Hijau 19 - 28 - TMAC transaction costs - - - 30 Adjusted net income (loss) $ 249 $ 217 $ 459 $ 480 Adjusted net income (loss) per share, basic $ 0.50 $ 0.44 $ 0.92 $ 0.97 Adjusted net income (loss) per share, diluted $ 0.50 $ 0.44 $ 0.92 $ 0.97 November 19 - 20, 2014
  • 38. 2014 Outlooka as of October 30, 2014 Newmont Mining Corporation a The outlook ranges presented herein represent forward looking statements, which are subject to certain risks and uncertainties. See cautionary statement at the end of this presentation on slide 44. Additionally, individual site ranges in the table above may not sum to total regional or Company levels to provide for portfolio flexibility. b Non-GAAP measure, see endnote 1 on slide 44. c Includes Lone Tree operations. d Includes GTRJV operations. e Both consolidated and attributable production are shown on a pro-rata basis with a 44% ownership interest for La Herradura (up until closing of the sale on October 6, 2014) and a 50% ownership for KCGM. f Consolidated production for Yanacocha is presented on a total production basis for the mine site; whereas attributable production represents a 51.35% ownership interest. g La Zanja and Duketon are not included in the consolidated figures above; attributable production figures are presented based upon a 46.94% ownership interest at La Zanja and a 19.45% ownership interest in Duketon. h Consolidated production for Batu Hijau is presented on a total production basis for the mine site; whereas attributable production represents 48.5% ownership interest in 2014 and an expected 44.5625% ownership interest in 2015- 2016 outlook (which assumes completion of the remaining share divestiture in early 2015). Outlook for Batu Hijau remains subject to various factors, including, without limitation, renegotiation of the CoW, issuance of future export approvals following the expiration of the six-month permit, negotiations with the labor union, future in-country smelting availability and regulations relating to export quotas, and certain other factors. See endnote 8. Consolidated Production Attributable Production Consolidated CAS All-in Sustaining Costs b Consolidated Capital Expenditures (kozs, kt) (kozs, kt) ($/oz, $/lb) ($/oz, $/lb) ($M) North America Carlin 850 - 930 850 - 930 $830 - $900 $240 - $265 Phoenixc 200 - 220 200 - 220 $655 - $715 $30 - $35 Twin Creeksd 360 - 400 360 - 400 $500 - $550 $110 - $120 La Herradurae 115 - 125 115 - 125 $700 - $750 $20 - $30 Other North America $25 - $35 Total 1,550 - 1,650 1,550 - 1,650 $730 - $790 $990 - $1,080 $425 - $465 South America Yanacochaf 910 - 990 470 - 510 $700 - $770 $85 - $100 La Zanjag 60 - 70 Other South America $200 - $220 Total 910 - 990 530 - 580 $700 - $770 $1,020 - $1,110 $280 - $300 Australia/New Zealand Boddington 665 - 725 665 - 725 $880 - $960 $85 - $95 Tanami 330 - 360 330 - 360 $700 - $765 $85 - $95 Jundee 138 - 140 138 - 140 $610 - $620 $15 Waihi 130 - 140 130 - 140 $560 - $610 $15 - $20 KCGMe 310 - 340 310 - 340 $850 - $930 $30 - $35 Duketong 45 - 50 Other Australia/NZ $5 - $10 Total 1,575 - 1,675 1,625 - 1,725 $790 - $860 $970 - $1,050 $230 - $255 Batu Hijau, Indonesiah 55 - 65 25 – 35 $1,090 - $1,200 $1,430 - $1,560 $65 - $70 Africa Ahafo 415 - 440 415 - 440 $540 - $590 $95 - $110 Akyem 440 - 480 440 - 480 $370 - $410 $15 - $25 Total 855 - 920 855 - 920 $450 - $490 $650 - $700 $115 - $130 Corporate/Other $15 - $20 Total Gold 5,100 - 5,400 4,725 - 5,000 $710 - $750 $1,020 - $1,080 $1,150 - $1,220 Phoenix 15 - 25 15 - 25 $2.10 - $2.30 Boddington 25 - 35 25 - 35 $2.50 - $2.70 Batu Hijauh 65 - 75 30 - 40 $3.15 - $3.45 Total Copper 120 - 125 80 - 90 $2.80 - $3.10 $3.50 - $3.80 November 19 - 20, 2014 Slide 38
  • 39. 2014 – 2016 Outlooka as of October 30, 2014 Newmont Mining Corporation 2014 Expense Outlook General & Administrative $175 - $200 Other Expense $150 - $175 Interest Expense $325 - $350 DD&A $1,210 - $1,320 Exploration and Projects $370 - $410 Sustaining Capital $910 - $1,000 Tax Rate 17% - 22% 2014 2015 2016 Production (koz, kt) Consolidated Gold 5,100 - 5,400 5,100 - 5,450 5,370 - 5,700 Attributable Gold 4,725 - 5,000 4,500 - 4,750 4,800 - 5,100 Consolidated Copper 120 - 125 250 - 270 210 - 220 Attributable Copper 80 - 90 140 - 150 120 - 140 CAS ($/oz, $/lb) North America $730 - $790 $720 - $790 $650 - $710 South America $700 - $770 $560 - $615 $770 - $840 Australia/New Zealand $790 - $860 $865 - $950 $850 - $925 Batu Hijau, Indonesia $1,090 - $1,200 $440 - $500 $440 - $500 Africa $450 - $490 $695 - $760 $730 - $800 Total Gold $710 - $750 $690 - $740 $720 - $760 Total Copper $2.80 - $3.10 $1.30 - $1.60 $1.35 - $1.65 AISC ($/oz, $/lb) North America $990 - $1,080 $960 - $1,040 $810 - $890 South America $1,020 - $1,110 $900 - $990 $1,180 - $1,290 Australia/New Zealand $970 - $1,050 $1,040 - $1,140 $985 - $1,075 Batu Hijau, Indonesia $1,430 - $1,560 $610 - $680 $600 - $670 Africa $650 - $700 $875 - $995 $885 - $965 Total Gold $1,020 - $1,080 $1,000 - $1,080 $985 - $1,085 Total Copper $3.50 - $3.80 $1.75 - $2.05 $1.85 - $2.15 Capital Expenditures ($M) North America $425 - $465 $420 - $460 $250 - $280 South America $280 - $300 $600 - $655 $420 - $455 Australia/New Zealand $230 - $255 $220 - $245 $190 - $210 Batu Hijau, Indonesia $65 - $70 $125 - $140 $125 - $140 Africa $115 - $130 $80 - $90 $80 - $90 Total $1,150 - $1,220 $1,500 - $1,600 $1,180 - $1,250 November 19 - 20, 2014 Slide 39
  • 40. All-in sustaining costs Newmont has worked to develop a metric that expands on GAAP measures such as cost of goods sold and non-GAAP measures to provide visibility into the economics of our mining operations related to expenditures, operating performance and the ability to generate cash flow from operations. Current GAAP-measures used in the mining industry, such as cost of goods sold, do not capture all of the expenditures incurred to discover, develop, and sustain gold production. Therefore, we believe that All-in sustaining costs and attributable All-in sustaining costs are non-GAAP measures that provide additional information to management, investors, and analysts that aid in the understanding of the economics of our operations and performance compared to other producers and in the investor’s visibility by better defining the total costs associated with production. All-in sustaining cost (“AISC”) amounts are intended to provide additional information only and do not have any standardized meaning prescribed by GAAP and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. The measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP. Other companies may calculate these measures differently as a result of differences in the underlying accounting principles, policies applied and in accounting frameworks such as in International Financial Reporting Standards (“IFRS”), or by reflecting the benefit from selling non-gold metals as a reduction to AISC. Differences may also arise related to definitional differences of sustaining versus development capital activities based upon each company’s internal policies. The following disclosure provides information regarding the adjustments made in determining Newmont’s All-in sustaining costs measure: Cost Applicable to Sales - Includes all direct and indirect costs related to current production incurred to execute the current mine plan. Costs Applicable to Sales (“CAS”) includes by-product credits from certain metals obtained during the process of extracting and processing the primary ore-body. CAS is accounted for on an accrual basis and excludes Amortization and Reclamation and remediation, which is consistent with our presentation of CAS on the Condensed Consolidated Statements of Income. In determining All-in sustaining costs, only the CAS associated with producing and selling an ounce of gold or a pound of copper is included in the measure. Therefore, the amount of CAS included in AISC is derived from the CAS presented in the Company’s Condensed Consolidated Statements of Income. The allocation of CAS between gold and copper at the Phoenix, Boddington, and Batu Hijau mines is based upon the relative production percentage of copper and gold sold during the period. Remediation Costs - Includes accretion expense related to asset retirement obligations (“ARO”) and the amortization of the related Asset Retirement Cost (“ARC”) for the Company’s operating properties recorded as an ARC asset. Accretion related to ARO and the amortization of the ARC assets for reclamation and remediation do not reflect annual cash outflows but are calculated in accordance with GAAP. The accretion and amortization reflect the periodic costs of reclamation and remediation associated with current gold production and are therefore included in the measure. The allocation of these costs to gold and copper is determined using the same allocation used in the allocation of CAS between gold and copper at the Phoenix, Boddington, and Batu Hijau mines. Advanced Projects and Exploration - Includes incurred expenses related to projects that are designed to increase or enhance current gold production and gold exploration. We note that as current resources are depleted, exploration and advance projects are necessary for us to replace the depleting reserves or enhance the recovery and processing of the current reserves. As this relates to sustaining our gold production, and is considered a continuing cost of a mining company, these costs are included in the AISC measure. These costs are derived from the Advanced projects, research and development and Exploration amounts presented in the Company’s Condensed Consolidated Statements of Income. The allocation of these costs to gold and copper is determined using the same allocation used in the allocation of CAS between gold and copper at the Phoenix, Boddington, and Batu Hijau mines. General and Administrative - Includes cost related to administrative tasks not directly related to current gold production, but rather related to support our corporate structure and fulfilling our obligations to operate as a public company. Including these expenses in the AISC metric provides visibility of the impact that general and administrative activities have on current operations and profitability on a per ounce basis. Other Expense, net - Includes costs related to regional administration and community development to support current production. We exclude certain exceptional or unusual expenses from Other expense, net, such as restructuring, as these are not indicative to sustaining our current operations. Furthermore, this adjustment to Other expense, net is also consistent with the nature of the adjustments made to Net income (loss) as disclosed in the Company’s non-GAAP financial measure Adjusted net income (loss). The allocation of these costs to gold and copper is determined using the same allocation used in the allocation of CAS between gold and copper at the Phoenix, Boddington, and Batu Hijau mines. Treatment and Refining Costs - Includes costs paid to smelters for treatment and refining of our concentrates to produce the salable precious metal. These costs are presented net as a reduction of Sales. Sustaining Capital - We determined sustaining capital as those capital expenditures that are necessary to maintain current gold production and execute the current mine plan. Capital expenditures to develop new operations, or related to projects at existing operations where these projects will enhance gold production or reserves, are considered development. We determined the breakout of sustaining and development capital costs based on a systematic review of our project portfolio in light of the nature of each project. Sustaining capital costs are relevant to the AISC metric as these are needed to maintain the Company’s current gold operations and provide improved transparency related to our ability to finance these expenditures from current operations. The allocation of these costs to gold and copper is determined using the same allocation used in the allocation of CAS between gold and copper at the Phoenix, Boddington, and Batu Hijau mines. Newmont Mining CorporationNovember 19 - 20, 2014 Slide 40
  • 41. All-in sustaining costs Newmont Mining CorporationNovember 19 - 20, 2014 (1)Excludes Depreciation and amortization and Reclamation and remediation. (2)Includes by-product credits of $66. (3)Includes planned stockpile and leach pad inventory adjustments of $95 at Carlin, $4 at Phoenix, $7 at Twin Creeks, $64 at Yanacocha, $69 at Boddington, and $191 at Batu Hijau. (4)Remediation costs include operating accretion of $54 and amortization of asset retirement costs of $78. (5)Other expense, net is adjusted for restructuring costs of $32. (6)Excludes development capital expenditures, capitalized interest, and the decrease in accrued capital of $188. The following are major development projects: Turf Vent Shaft, Conga, and Merian for 2014. Nine Months Ended September 30, 2014 Costs Applicable to Sales (1) (2)(3) Remediation Costs (4) Advanced Projects and Exploration General and Administrative Other Expense, Net (5) Treatment and Refining Costs Sustaining Capital (6) All-In Sustaining Costs Ounces (000)/ Pounds (millions) Sold All-In Sustaining Costs per oz/lb GOLD Carlin $ 607 $ 3 $ 16 $ - $ 6 $ - $ 96 $ 728 673 $ 1,082 Phoenix 116 2 3 - 2 8 12 143 177 808 Twin Creeks 147 2 4 - 2 - 86 241 289 834 La Herradura 86 2 10 - - - 19 117 116 1,009 Other North America - - 20 - 9 - 6 35 - - North America 956 9 53 - 19 8 219 1,264 1,255 1,007 Yanacocha 530 80 24 - 24 - 56 714 640 1,116 Other South America - - 26 - 2 - - 28 - - South America 530 80 50 - 26 - 56 742 640 1,159 Boddington 425 8 - - 2 3 50 488 476 1,025 Tanami 185 4 9 - 1 - 56 255 251 1,016 Jundee 85 5 1 - 1 - 16 108 140 771 Waihi 58 1 3 - 2 - 2 66 102 647 Kalgoorlie 213 3 4 - 1 2 16 239 248 964 Other Australia/New Zealand - - 3 - 20 - 6 29 - - Australia/New Zealand 966 21 20 - 27 5 146 1,185 1,217 974 Batu Hijau 43 1 - - 3 4 7 58 24 2,417 Other Indonesia - - - - 1 - - 1 - - Indonesia 43 1 - - 4 4 7 59 24 2,458 Ahafo 182 6 18 - 5 - 65 276 339 814 Akyem 120 2 - - 6 - 5 133 339 392 Other Africa - - 6 - 5 - - 11 - - Africa 302 8 24 - 16 - 70 420 678 619 Corporate and Other - - 88 138 19 - 16 261 - - Total Gold $ 2,797 $ 119 $ 235 $ 138 $ 111 $ 17 $ 514 $ 3,931 3,814 $ 1,031 COPPER Phoenix $ 81 $ 1 $ 2 $ - $ 1 $ 4 $ 10 $ 99 35 $ 2.83 Boddington 112 2 - - - 17 12 143 45 3.18 Batu Hijau 338 10 2 - 17 19 41 427 61 7.00 Total Copper $ 531 $ 13 $ 4 $ - $ 18 $ 40 $ 63 $ 669 141 $ 4.74 Consolidated $ 3,328 $ 132 $ 239 $ 138 $ 129 $ 57 $ 577 $ 4,600 Slide 41
  • 42. All-in sustaining costs Newmont Mining CorporationNovember 19 - 20, 2014 (1)Excludes Depreciation and amortization and Reclamation and remediation. (2)Includes by-product credits of $84. (3)Includes stockpile and leach pad inventory adjustments of at $3 Carlin, $63 at Yanacocha, $110 at Boddington, $1 at Tanami, $3 at Waihi, $45 at Kalgoorlie, and $385 at Batu Hijau. (4)Remediation costs include operating accretion of $45 and amortization of asset retirement costs of $70. (5)Other expense, net is adjusted for restructuring costs of $50 and TMAC transaction costs of $45. (6)Excludes development capital expenditures, capitalized interest, and the increase in accrued capital of $775. The following are major development projects: Phoenix Copper Leach, Turf Vent Shaft, Vista Vein, La Herradura Mill, Yanacocha Bio Leach, Conga, Merian, Ahafo North, Ahafo Mill Expansion, Subika Underground, and Akyem for 2013. Nine Months Ended September 30, 2013 Costs Applicable to Sales (1) (2)(3) Remediation Costs (4) Advanced Projects and Exploration General and Administrative Other Expense, Net (5) Treatment and Refining Costs Sustaining Capital (6) All-In Sustaining Costs Ounces (000)/ Pounds (millions) Sold All-In Sustaining Costs per oz/lb GOLD Carlin $ 513 $ 4 $ 31 $ - $ 4 $ 12 $ 120 $ 684 705 $ 970 Phoenix 125 2 6 - 2 8 15 158 181 873 Twin Creeks 193 4 7 - 3 - 42 249 344 724 La Herradura 122 - 31 - - - 62 215 161 1,335 Other North America - - 32 - 8 - 17 57 - - North America 953 10 107 - 17 20 256 1,363 1,391 980 Yanacocha 520 68 32 - 60 - 107 787 836 941 Other South America - - 23 - 1 - - 24 - - South America 520 68 55 - 61 - 107 811 836 970 Boddington 578 5 1 - 1 4 65 654 539 1,213 Tanami 203 2 7 - 2 - 66 280 218 1,284 Jundee 154 10 7 - 1 - 33 205 216 949 Waihi 74 2 4 - - - 7 87 77 1,130 Kalgoorlie 266 5 2 - 1 - 10 284 231 1,229 Other Australia/New Zealand - - 11 - 25 - - 36 - - Australia/New Zealand 1,275 24 32 - 30 4 181 1,546 1,281 1,207 Batu Hijau 81 2 2 - 4 4 10 103 33 3,121 Other Indonesia - - - - - - - - - - Indonesia 81 2 2 - 4 4 10 103 33 3,121 Ahafo 226 2 36 - 3 - 97 364 407 894 Akyem - - 7 - - - - 7 - - Other Africa - - 7 - 17 - - 24 - - Africa 226 2 50 - 20 - 97 395 407 971 Corporate and Other - - 101 158 17 - 8 284 - - Total Gold $ 3,055 $ 106 $ 347 $ 158 $ 149 $ 28 $ 659 $ 4,502 3,948 $ 1,140 COPPER Phoenix $ 41 $ 1 $ 2 $ - $ - $ 4 $ 6 $ 54 24 $ 2.25 Boddington 139 1 - - - 14 16 170 53 3.21 Batu Hijau 582 7 11 - 16 31 72 719 104 6.91 Total Copper $ 762 $ 9 $ 13 $ - $ 16 $ 49 $ 94 $ 943 181 $ 5.21 Consolidated $ 3,817 $ 115 $ 360 $ 158 $ 165 $ 77 $ 753 $ 5,445 Slide 42
  • 43. Adjusted cash all-in sustaining cost savings (1) AISC is a non-GAAP metric, for reconciliation to CAS see slides 40 – 42. (2) Jundee was sold on July 1, 2014. (3) Midas was sold on February 11, 2014 and was included in the Twin Creeks segment. (4) Referred to elsewhere as NRV adjustments. Newmont Mining Corporation Slide 43 Costs Advanced Other Treatment and All-In Nine Months Ended September 30, Applicable Remediation Projects and General and Expense, Refining Sustaining Sustaining 2014 to Sales Costs Exploration Administrative Net Costs Capital Costs Gold and Copper Consolidated1 $ 3,328 $ 132 $ 239 $ 138 $ 129 $ 57 $ 577 $ 4,600 Adjustments: Stockpile and Leach Pad Inventory4 (430) - - - - - - (430) Abnormal Production Costs at Batu Hijau (53) - - - - - - (53) Adjusted Consolidated AISC $ 2,845 $ 132 $ 239 $ 138 $ 129 $ 57 $ 577 $ 4,117 Costs Advanced Other Treatment and All-In Nine Months Ended September 30, Applicable Remediation Projects and General and Expense, Refining Sustaining Sustaining 2013 to Sales Costs Exploration Administrative Net Costs Capital Costs Gold and Copper Consolidated1 $ 3,817 $ 115 $ 360 $ 158 $ 165 $ 77 $ 753 $ 5,445 Adjustments: Stockpile and Leach Pad Inventory4 (610) - - - - - - (610) Jundee2 (49) - (3) - - - (9) (61) Midas3 (22) - (1) - (1) - (3) (27) Adjusted Consolidated AISC $ 3,136 $ 115 $ 356 $ 158 $ 164 $ 77 $ 741 $ 4,747 November 19 - 20, 2014
  • 44. Investors are encouraged to read the information contained in this presentation in conjunction with the following notes, the Cautionary Statement on slide 2 and the factors described under the “Risk Factors” section of the Company’s most recent Form 10-K, filed with the SEC on February 21, 2014, and disclosure in the Company’s recent SEC filings including the Form 10-Q. 1. AISC or All-in sustaining cost is a non-GAAP metric. See pages 40 to 42 for more information and a reconciliation to the nearest GAAP metric. 2. Adj. Net Income is a non-GAAP metric. See page 37 for more information and reconciliation to the nearest GAAP metric. 3. 2014 and 2014 - 2016 Outlook projections used in this presentation (“Outlook”) are considered “forward-looking statements” and represent management’s good faith estimates or expectations as October 30, 2014. However, Outlook is based upon certain assumptions, including, but not limited to, metal prices, oil prices, certain exchange rates and other assumptions (including, without limitation, those set forth on slide 2). For example, 2014 Outlook assumes $1,200/oz Au, $3.00/lb Cu, $0.95 USD/AUD exchange rate and $100/barrel WTI ; 2015 Outlook assumes $1,200/oz Au, $2.75/lb Cu, $0.90 USD/AUD exchange rate and $100/barrel WTI; and 2016 Outlook assumes $1,200/oz Au, $2.75/lb Cu, $0.90 USD/AUD exchange rate and $100/barrel WTI and other assumptions. Such assumptions may prove to be incorrect and actual results may differ materially from those anticipated. Consequently, Outlook cannot be guaranteed. As such, investors are cautioned not to place undue reliance upon Outlook and forward-looking statements as there can be no assurance that the plans, assumptions or expectations upon which they are placed will occur. 4. Adjusted cash AISC is a non-GAAP metric and is calculated as gold and copper all-in sustaining cost less net realizable value (NRV), Batu related abnormal costs, and adjusted for the sales of Midas and Jundee. See slide 43 for details. 5. The project metrics presented for the Merian project are based upon management’s reasonable good faith belief as of the date of this presentation and are presented on a consolidated basis. The listed project metrics constitute forward-looking statements and are subject to certain risks and uncertainties. 6. Reserves at Merian (as of December 31, 2013 on a 100% consolidated basis) were estimated at 108,250 ktonnes of Probable Reserves, grading 1.22 gpt for 4.2Moz, using a $1,300/oz gold price assumption. Resources at Merian (as of December 31, 2013 on a 100% consolidated basis and using a $1,400/oz gold price assumption) were 750 kounces of Measured and Indicated resources, comprised of Measured resources of approximately 77 kounces (2,400 ktonnes, at 0.98 grams per tonne) and Indicated resources of approximately 677 kounces (20,500 ktonnes, at 1.03 grams per tonne). Inferred resources totaled approximately 926 kounces (26,800 ktonnes, at 1.07 grams per tonne). U.S. investors are reminded that “reserves” were prepared in compliance with Industry Guide 7 published by the U.S. SEC. Whereas, the terms “resources,” “Measured and Indicated resources” and Inferred resources” are not SEC recognized terms. Newmont has determined that such “resources” would be substantively the same as those prepared using the Guidelines established by the Society of Mining, Metallurgy and Exploration and defined as “Mineral Resource”. Estimates of resources are subject to further exploration and development, are subject to additional risks, and no assurance can be given that they will eventually convert to future reserves. Inferred Resources, in particular, have a great amount of uncertainty as to their existence and their economic and legal feasibility. Investors are cautioned not to assume that any part or all of the Inferred Resource exists, or is economically or legally mineable. Mineral inventory is also subject to an even greater degree of uncertainty. Investors are reminded that even if significant mineralization is discovered and converted to reserves, during the time necessary to ultimately move such mineralization to production the economic feasibility of production may change. See the Company’s Annual Report filed with the SEC on February 21, 2014 for the “Proven and Probable Reserve” tables prepared in compliance with the SEC’s Industry Guide 7. Investors are reminded that the tables presented in the Annual Report are estimates as of December 31, 2013 and were presented on an attributable basis reflecting the Company’s ownership interest at such time. The company presently holds a 75% equity interest in the Merian project as a result of the government of Suriname recent opt-in. Endnotes Newmont Mining Corporation Slide 44November 19 - 20, 2014
  • 45. 7. All-in sustaining cost (“AISC”) as used in the Company’s Outlook is a non-GAAP metric defined as the sum of cost applicable to sales (including all direct and indirect costs related to current gold production incurred to execute on the current mine plan), remediation costs (including operating accretion and amortization of asset retirement costs), G&A, exploration expense, advanced projects and R&D, treatment and refining costs, other expense, net of one-time adjustments and sustaining capital. 8. Investors are reminded that the negotiation of the amendment to the Contract of Work contemplated by the MoU remains on-going. Continued future operations at Batu Hijau are subject to various factors, including, without limitation, the successful renegotiation of the Contract of Work, issuance of future export permits and approvals following the expiration of the six-month permit, negotiations with the labor union, future in-country smelting availability and regulations relating to export quotas, and certain other factors. For a discussion of other factors which could impact future financial performance and operating results at Batu Hijau, see Item 1A, under the heading “Risk Factors,” of the Company’s Form 10-K, filed on February 21, 2014, as well as Note 2 under the heading “Summary of Significant Accounting Policies - Risks and Uncertainties” of the Notes to the Financial Statements contained in the Company’s Form 10-Q, filed on or about October 30, 2014. Endnotes Newmont Mining Corporation Slide 45November 19 - 20, 2014