The 10 Step Marketing Plan
for Cebu Pacifc
Nathania T. Villonco
Ateneo Graduate School of Business
2013 Edition
2
10 STEP
Marketing Plan for
Cebu Pacific Air
Nathania T. Villonco
June 2013
www.nathaniavillonco.blogspot.com
This 10 Step Marketing Plan is part of the mandatory
requirements of Prof. Remigio Joseph De Ungria’s
AGSB marketing management class.
The data included in this report are based on publicly
available data such as those on internet websites,
news, package declarations, public reports.
When appropriate, data are “masked” so as not to
create unexpected conflicts.
The reports are posted and linked on slideshare, blogs
and facebook so that there is easier sharing among
students from different marketing classes.
Disclaimer
www.nathaniavillonco.blogspot.com
1. Cebu Pacific PTM consists of Filipino travelers
who are price-sensitive
2. Who wants to have an and affordable yet high-
quality travel experience
3. Can choose Airphil, PAL, ZestAir, SEAair
4. Opportunity is providing low-cost fares to the
millions of Filipinos separated by our islands
5. The market size is 20.57 million domestic
passengers in 2012. Cebu Pacific has 45%
market share.
Steps 1 to 5
Providing ways for
Every Juan to Fly
www.nathaniavillonco.blogspot.com
6. Cebu Pacific provides low-fare flights to 26
international and 34 domestic destinations
7. Promo prices are 15% to 50% less than its
competitors
8. Makes use of online and android apps for quick
promotional information and easy booking of flights
9. Cebu Pacific website and online travel agencies
10. “Low fare, Great value”
Steps 6 to 10
To get every Juan to
more places everyday
www.nathaniavillonco.blogspot.com
1. Cebu Pacific primary target market
(PTM) are the price-sensitive Filipino
travelers
 21-35 year old, male or female, social class B and C, single or
married
 Young professionals who have the earning capacity to spend on
leisure travel at an affordable amount
 Short travel trips of 2 or more times a year with groups of
workmates or friends. They demand low cost fares and
convenient flight schedules to accommodate their limited funds
and time
www.nathaniavillonco.blogspot.com
PTM needs an affordable and
reliable mode of travel
7
Reference: Maslow’s Hierarcy of Needs Marketing Management, 11th
ed, Philip Kotler
www.nathaniavillonco.blogspot.com
I want to fit-in with my
friends/co-workers
I am happy when I know myself
through traveling and experiencing
new places and cultures
2. Young professionals have
unique needs, wants & demands
Young professionals need to form networks and build relationships
and achieve Social Needs.
Young professionals prefer, choose Cebu Pacific over other
airlines because it has established itself as providing the
lowest fares through it successful campaigns such as the
“Piso Fare”. The company also appeals to the PTM because of
the “fun-filled” experience that the company promotes.
Young Professionals demand
Affordable fares for group travels, easy booking and
payment process, convenient time schedule, interesting
destinations, can increase bonding experience among
the group
www.nathaniavillonco.blogspot.com
Domestic Passenger
Traffic
www.nathaniavillonco.blogspot.com
Source: Civil Aeronautics Board, Scheduled Passenger Traffic 2006-2012
3a. Cebu Pacific has many
formidable competitors
 Direct: Airphil, PAL, Zestair,
SEAair
 Indirect: Bus Lines, Ferry,
Roro
 Variables: Age, Price, social
class, income, routes, time of
the year, flight schedule,
seasons, holidays
www.nathaniavillonco.blogspot.com
Cebu Pacific is #1 in niche for lowest
fare in domestic flights
Price/ Social
Class Matrix
A B C DE
High price
Low Price
Cebu Pacific
AirPhil
Price vs. Social Class
Matrix
Cebu Pacific
www.nathaniavillonco.blogspot.com
Zestair
PAL
SeaAir
PAL
Zestair
AirPhil
Cebu PacificZestair
AirPhil
Cebu Pacific
as of 2012
SeaAir
PAL
PAL
Zestair
AirPhil
SeaAir
SeaAir
Cebu Pacific niche positioning to
the young professional market
Benefit Positioning vs. Brand Matrix
as of 2012
Functional Benefit
Cebu
Pacific
Airphil
Express PAL ZestAir SeaAir
Website with online booking
Frequent flight schedule options
Baggage Upgrade
Inclusive of Food meals
Credit Card payments
Web-check in
Fun games on flight
Entertainment T.V.
Harder to stand out amidst the competitive clutter.
www.nathaniavillonco.blogspot.com
4. Cebu Pacific positions strongly
as providing the lowest fares
Cebu Pacific is the first airline
 To provide the market with the
lowest fares
 that allows young professionals
 to afford leisure travel
PAL has created their own brand
of Airphil express to copy the
position of low-cost carriers.
www.nathaniavillonco.blogspot.com
5a. Based on the Department of
Tourism, there have been 37.5 million
domestic passengers in 2012
2012: Market size for domestic tourists: 37.5 million
 Cebu Pacific: 45%
 AirPhil: 22%
 PAL: 21%
 Zest Air: 10%
 SeaAir: 1%
www.nathaniavillonco.blogspot.com
5a. Based on the Department of
Tourism data domestic passenger
market is 37.5 million in 2012
References
 http://www.rappler.com/business/18371-low-cost-carriers-drive-
aviation-growth
 http://www.philstar.com/business/2013/02/14/909101/domestic-
airline-passenger-traffic-hit-record-20.57-m-2012
 http://www.abs-cbnnews.com/business/02/14/13/cebu-pacific-
flew-more-local-passengers-airphil-pal
www.nathaniavillonco.blogspot.com
5b. Based on data from CAB (Civil
Aeronautics Board), where Cebu Pacific
share is 45%, total market size is 20.57
million
1. Cebu Pacific domestic passengers data may be
9.2 million
2. Cebu Pacific claims market share of 45%
3. The total domestic passenger market size is P 9.2
million/.46 = 20.57 million
www.nathaniavillonco.blogspot.com
 According to 2009 NSO Survey:
 Average trips a year: 2
 Average Expenditure:
Independent travelers: Php 1,818
Package tour: Php 17,981
5c. Consumer data indicates a size of
37.5 million domestic passengers
www.nathaniavillonco.blogspot.com
5. Concluded that domestic passenger
market is 37.5 million
1. Department of Tourism data= 37.5 million
2. Civil Aeronautics Board data = 20.57 million
3. Domestic Passenger market data = 37.5
million
www.nathaniavillonco.blogspot.com
6a. Cebu Pacific domestic
destinations
www.nathaniavillonco.blogspot.com
Destinations: 32 domestic
19 international
Fleet: 41
Source: http://www.rappler.com/business/18371-low-cost-carriers-drive-aviation-growth
6a. Cebu Pacific competitors
domestic destinations
Destinations: 29 domestic
31 international
Fleet: 40
www.nathaniavillonco.blogspot.com
Source: http://www.rappler.com/business/18371-low-cost-carriers-drive-aviation-growth
6a. Cebu Pacific competitors
domestic destinations
Destinations: 30 domestic
3 international
Fleet: 21
Source: http://www.rappler.com/business/18371-low-cost-carriers-drive-aviation-growth
www.nathaniavillonco.blogspot.com
6a. Cebu Pacific competitors
domestic destinations
Destinations: 14 domestic
4 international
Fleet: 14
Source: http://www.rappler.com/business/18371-low-cost-carriers-drive-aviation-growth
www.nathaniavillonco.blogspot.com
6a. Cebu Pacific competitors
domestic destinations
Destinations: 10 domestic
5 international
Fleet: 5
Source: http://www.rappler.com/business/18371-low-cost-carriers-drive-aviation-growth
www.nathaniavillonco.blogspot.com
6a. Cebu Pacific competitors
www.nathaniavillonco.blogspot.com
6b. What makes Cebu
Pacific different?
 Offers the most routes for domestic destinations
 More options of flight schedule
 Pioneer in creative pricing strategies
 Offers fun in the skies with its games on board
known as Fun Flights
 Fun shop of Inflight Duty Free merchandise
 First local airline to introduce e-ticketing, prepaid
excess baggage and seat selection
www.nathaniavillonco.blogspot.com
6b. Cebu Pacific Website
www.nathaniavillonco.blogspot.com
6b. Catchy phrases of Cebu
Pacific Promos
www.nathaniavillonco.blogspot.com
7. Price Conclusion
Cebu Pacific fares are 15% to 50% less
than its competitors
www.nathaniavillonco.blogspot.com
Cebu
Pacific
AirPhil PAL SeaAir
Manila-Cebu 2,316 5,072 3,176 2,654
Manila-Davao 2,787 5,132 4,576 2,550
Manila-Iloilo 2,664 5,352 2,606 3,126
Top 3 Domestic Destinations
Round Trip
June 12-18, 2013
8a. Which of these modes
does your product use?
** Pls. rank most used, 1-highest use
www.nathaniavillonco.blogspot.com
1
2
3
4
5
Cebu Pacific Website
8a. Billboard in Butuan City
www.nathaniavillonco.blogspot.com
Marketing events and
sponsorships
www.nathaniavillonco.blogspot.com
Cebu Pacific tie-up with Citibank Card
for Advanced alerts and CEB points
www.nathaniavillonco.blogspot.com
Cebu Pacific Filipino Time
Commercial
Link: http://www.youtube.com/watch?v=5atoa8UxRnQ
www.nathaniavillonco.blogspot.com
Experience Cebu Pacific’s “Fun-
filled” Christmas in the Air
Link: http://www.youtube.com/watch?v=p3DZ-_ObIIg
www.nathaniavillonco.blogspot.com
Airphil Express Website
www.nathaniavillonco.blogspot.com
AirPhil express of P1,
P27, P88 Promo deals
www.nathaniavillonco.blogspot.com
ZestAir Promotions
www.nathaniavillonco.blogspot.com
ZestAir celebrity endorsers
www.nathaniavillonco.blogspot.com
SeaAir Website
www.nathaniavillonco.blogspot.com
SeaAir Promo
www.nathaniavillonco.blogspot.com
9. Cebu Pacific is accessible
anytime, anywhere
 Cebu Pacific website is accessible 24/7
which promotes convenient online
booking
 Travel Agencies
 Online Travel service providers
 Cebu Pacific ticketing office
www.nathaniavillonco.blogspot.com
10. Cebu Pacific
differentiation
 Cebu Pacific’s main strategy is to
provide its passengers with the lowest
fares so that everyone can fly
 It differentiates itself through its various
games on board to make the
experience uniquely Cebu Pacific
www.nathaniavillonco.blogspot.com
44
SUMMARY
www.nathaniavillonco.blogspot.com
1. Cebu Pacific PTM consists of Filipino travelers
who are price-sensitive
2. Who wants to have an and affordable yet high-
quality travel experience
3. Can choose Airphil, PAL, ZestAir, SEAair
4. Opportunity is providing low-cost fares to the
millions of Filipinos separated by our islands
5. The market size is 20.57 million domestic
passengers in 2012. Cebu Pacific has 46.1%
market share.
Steps 1 to 5
Providing ways for
Every Juan to Fly
www.nathaniavillonco.blogspot.com
6. Cebu Pacific provides low-fare flights to 26
international and 34 domestic destinations
7. Promo prices are 15% to 50% less than its
competitors
8. Makes use of online and android apps for quick
promotional information and easy booking of flights
9. Cebu Pacific website and online travel agencies
10. “Low fare, Great value”
Steps 6 to 10
To get every Juan to
more places everyday
www.nathaniavillonco.blogspot.com
The 10 Step Marketing Plan
for Cebu Pacific
Nathania T. Villonco
Ateneo Graduate School of Business
2013 Edition
www.nathaniavillonco.blogspot.com

10 step marketing plan cebu pacific

  • 1.
    The 10 StepMarketing Plan for Cebu Pacifc Nathania T. Villonco Ateneo Graduate School of Business 2013 Edition
  • 2.
    2 10 STEP Marketing Planfor Cebu Pacific Air Nathania T. Villonco June 2013 www.nathaniavillonco.blogspot.com
  • 3.
    This 10 StepMarketing Plan is part of the mandatory requirements of Prof. Remigio Joseph De Ungria’s AGSB marketing management class. The data included in this report are based on publicly available data such as those on internet websites, news, package declarations, public reports. When appropriate, data are “masked” so as not to create unexpected conflicts. The reports are posted and linked on slideshare, blogs and facebook so that there is easier sharing among students from different marketing classes. Disclaimer www.nathaniavillonco.blogspot.com
  • 4.
    1. Cebu PacificPTM consists of Filipino travelers who are price-sensitive 2. Who wants to have an and affordable yet high- quality travel experience 3. Can choose Airphil, PAL, ZestAir, SEAair 4. Opportunity is providing low-cost fares to the millions of Filipinos separated by our islands 5. The market size is 20.57 million domestic passengers in 2012. Cebu Pacific has 45% market share. Steps 1 to 5 Providing ways for Every Juan to Fly www.nathaniavillonco.blogspot.com
  • 5.
    6. Cebu Pacificprovides low-fare flights to 26 international and 34 domestic destinations 7. Promo prices are 15% to 50% less than its competitors 8. Makes use of online and android apps for quick promotional information and easy booking of flights 9. Cebu Pacific website and online travel agencies 10. “Low fare, Great value” Steps 6 to 10 To get every Juan to more places everyday www.nathaniavillonco.blogspot.com
  • 6.
    1. Cebu Pacificprimary target market (PTM) are the price-sensitive Filipino travelers  21-35 year old, male or female, social class B and C, single or married  Young professionals who have the earning capacity to spend on leisure travel at an affordable amount  Short travel trips of 2 or more times a year with groups of workmates or friends. They demand low cost fares and convenient flight schedules to accommodate their limited funds and time www.nathaniavillonco.blogspot.com
  • 7.
    PTM needs anaffordable and reliable mode of travel 7 Reference: Maslow’s Hierarcy of Needs Marketing Management, 11th ed, Philip Kotler www.nathaniavillonco.blogspot.com I want to fit-in with my friends/co-workers I am happy when I know myself through traveling and experiencing new places and cultures
  • 8.
    2. Young professionalshave unique needs, wants & demands Young professionals need to form networks and build relationships and achieve Social Needs. Young professionals prefer, choose Cebu Pacific over other airlines because it has established itself as providing the lowest fares through it successful campaigns such as the “Piso Fare”. The company also appeals to the PTM because of the “fun-filled” experience that the company promotes. Young Professionals demand Affordable fares for group travels, easy booking and payment process, convenient time schedule, interesting destinations, can increase bonding experience among the group www.nathaniavillonco.blogspot.com
  • 9.
    Domestic Passenger Traffic www.nathaniavillonco.blogspot.com Source: CivilAeronautics Board, Scheduled Passenger Traffic 2006-2012
  • 10.
    3a. Cebu Pacifichas many formidable competitors  Direct: Airphil, PAL, Zestair, SEAair  Indirect: Bus Lines, Ferry, Roro  Variables: Age, Price, social class, income, routes, time of the year, flight schedule, seasons, holidays www.nathaniavillonco.blogspot.com
  • 11.
    Cebu Pacific is#1 in niche for lowest fare in domestic flights Price/ Social Class Matrix A B C DE High price Low Price Cebu Pacific AirPhil Price vs. Social Class Matrix Cebu Pacific www.nathaniavillonco.blogspot.com Zestair PAL SeaAir PAL Zestair AirPhil Cebu PacificZestair AirPhil Cebu Pacific as of 2012 SeaAir PAL PAL Zestair AirPhil SeaAir SeaAir
  • 12.
    Cebu Pacific nichepositioning to the young professional market Benefit Positioning vs. Brand Matrix as of 2012 Functional Benefit Cebu Pacific Airphil Express PAL ZestAir SeaAir Website with online booking Frequent flight schedule options Baggage Upgrade Inclusive of Food meals Credit Card payments Web-check in Fun games on flight Entertainment T.V. Harder to stand out amidst the competitive clutter. www.nathaniavillonco.blogspot.com
  • 13.
    4. Cebu Pacificpositions strongly as providing the lowest fares Cebu Pacific is the first airline  To provide the market with the lowest fares  that allows young professionals  to afford leisure travel PAL has created their own brand of Airphil express to copy the position of low-cost carriers. www.nathaniavillonco.blogspot.com
  • 14.
    5a. Based onthe Department of Tourism, there have been 37.5 million domestic passengers in 2012 2012: Market size for domestic tourists: 37.5 million  Cebu Pacific: 45%  AirPhil: 22%  PAL: 21%  Zest Air: 10%  SeaAir: 1% www.nathaniavillonco.blogspot.com
  • 15.
    5a. Based onthe Department of Tourism data domestic passenger market is 37.5 million in 2012 References  http://www.rappler.com/business/18371-low-cost-carriers-drive- aviation-growth  http://www.philstar.com/business/2013/02/14/909101/domestic- airline-passenger-traffic-hit-record-20.57-m-2012  http://www.abs-cbnnews.com/business/02/14/13/cebu-pacific- flew-more-local-passengers-airphil-pal www.nathaniavillonco.blogspot.com
  • 16.
    5b. Based ondata from CAB (Civil Aeronautics Board), where Cebu Pacific share is 45%, total market size is 20.57 million 1. Cebu Pacific domestic passengers data may be 9.2 million 2. Cebu Pacific claims market share of 45% 3. The total domestic passenger market size is P 9.2 million/.46 = 20.57 million www.nathaniavillonco.blogspot.com
  • 17.
     According to2009 NSO Survey:  Average trips a year: 2  Average Expenditure: Independent travelers: Php 1,818 Package tour: Php 17,981 5c. Consumer data indicates a size of 37.5 million domestic passengers www.nathaniavillonco.blogspot.com
  • 18.
    5. Concluded thatdomestic passenger market is 37.5 million 1. Department of Tourism data= 37.5 million 2. Civil Aeronautics Board data = 20.57 million 3. Domestic Passenger market data = 37.5 million www.nathaniavillonco.blogspot.com
  • 19.
    6a. Cebu Pacificdomestic destinations www.nathaniavillonco.blogspot.com Destinations: 32 domestic 19 international Fleet: 41 Source: http://www.rappler.com/business/18371-low-cost-carriers-drive-aviation-growth
  • 20.
    6a. Cebu Pacificcompetitors domestic destinations Destinations: 29 domestic 31 international Fleet: 40 www.nathaniavillonco.blogspot.com Source: http://www.rappler.com/business/18371-low-cost-carriers-drive-aviation-growth
  • 21.
    6a. Cebu Pacificcompetitors domestic destinations Destinations: 30 domestic 3 international Fleet: 21 Source: http://www.rappler.com/business/18371-low-cost-carriers-drive-aviation-growth www.nathaniavillonco.blogspot.com
  • 22.
    6a. Cebu Pacificcompetitors domestic destinations Destinations: 14 domestic 4 international Fleet: 14 Source: http://www.rappler.com/business/18371-low-cost-carriers-drive-aviation-growth www.nathaniavillonco.blogspot.com
  • 23.
    6a. Cebu Pacificcompetitors domestic destinations Destinations: 10 domestic 5 international Fleet: 5 Source: http://www.rappler.com/business/18371-low-cost-carriers-drive-aviation-growth www.nathaniavillonco.blogspot.com
  • 24.
    6a. Cebu Pacificcompetitors www.nathaniavillonco.blogspot.com
  • 25.
    6b. What makesCebu Pacific different?  Offers the most routes for domestic destinations  More options of flight schedule  Pioneer in creative pricing strategies  Offers fun in the skies with its games on board known as Fun Flights  Fun shop of Inflight Duty Free merchandise  First local airline to introduce e-ticketing, prepaid excess baggage and seat selection www.nathaniavillonco.blogspot.com
  • 26.
    6b. Cebu PacificWebsite www.nathaniavillonco.blogspot.com
  • 27.
    6b. Catchy phrasesof Cebu Pacific Promos www.nathaniavillonco.blogspot.com
  • 28.
    7. Price Conclusion CebuPacific fares are 15% to 50% less than its competitors www.nathaniavillonco.blogspot.com Cebu Pacific AirPhil PAL SeaAir Manila-Cebu 2,316 5,072 3,176 2,654 Manila-Davao 2,787 5,132 4,576 2,550 Manila-Iloilo 2,664 5,352 2,606 3,126 Top 3 Domestic Destinations Round Trip June 12-18, 2013
  • 29.
    8a. Which ofthese modes does your product use? ** Pls. rank most used, 1-highest use www.nathaniavillonco.blogspot.com 1 2 3 4 5
  • 30.
  • 31.
    8a. Billboard inButuan City www.nathaniavillonco.blogspot.com
  • 32.
  • 33.
    Cebu Pacific tie-upwith Citibank Card for Advanced alerts and CEB points www.nathaniavillonco.blogspot.com
  • 34.
    Cebu Pacific FilipinoTime Commercial Link: http://www.youtube.com/watch?v=5atoa8UxRnQ www.nathaniavillonco.blogspot.com
  • 35.
    Experience Cebu Pacific’s“Fun- filled” Christmas in the Air Link: http://www.youtube.com/watch?v=p3DZ-_ObIIg www.nathaniavillonco.blogspot.com
  • 36.
  • 37.
    AirPhil express ofP1, P27, P88 Promo deals www.nathaniavillonco.blogspot.com
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
    9. Cebu Pacificis accessible anytime, anywhere  Cebu Pacific website is accessible 24/7 which promotes convenient online booking  Travel Agencies  Online Travel service providers  Cebu Pacific ticketing office www.nathaniavillonco.blogspot.com
  • 43.
    10. Cebu Pacific differentiation Cebu Pacific’s main strategy is to provide its passengers with the lowest fares so that everyone can fly  It differentiates itself through its various games on board to make the experience uniquely Cebu Pacific www.nathaniavillonco.blogspot.com
  • 44.
  • 45.
    1. Cebu PacificPTM consists of Filipino travelers who are price-sensitive 2. Who wants to have an and affordable yet high- quality travel experience 3. Can choose Airphil, PAL, ZestAir, SEAair 4. Opportunity is providing low-cost fares to the millions of Filipinos separated by our islands 5. The market size is 20.57 million domestic passengers in 2012. Cebu Pacific has 46.1% market share. Steps 1 to 5 Providing ways for Every Juan to Fly www.nathaniavillonco.blogspot.com
  • 46.
    6. Cebu Pacificprovides low-fare flights to 26 international and 34 domestic destinations 7. Promo prices are 15% to 50% less than its competitors 8. Makes use of online and android apps for quick promotional information and easy booking of flights 9. Cebu Pacific website and online travel agencies 10. “Low fare, Great value” Steps 6 to 10 To get every Juan to more places everyday www.nathaniavillonco.blogspot.com
  • 47.
    The 10 StepMarketing Plan for Cebu Pacific Nathania T. Villonco Ateneo Graduate School of Business 2013 Edition www.nathaniavillonco.blogspot.com