SlideShare a Scribd company logo
1 of 71
Download to read offline
www.kinross.com
1
KINROSS GOLD CORPORATION
Denver Gold Forum
September 18-21
2016
www.kinross.com
2
CAUTIONARY STATEMENT ON FORWARD-LOOKING
INFORMATION
All statements, other than statements of historical fact, contained or incorporated by reference in or made in giving this presentation and responses to questions,
including but not limited to any information as to the future performance of Kinross, constitute “forward looking statements” within the meaning of applicable securities
laws, including the provisions of the Securities Act (Ontario) and the provisions for “safe harbor” under the United States Private Securities Litigation Reform Act of
1995 and are based on expectations, estimates and projections as of the date of this presentation. Forward-looking statements contained in this presentation include
those statements on slides with, and statements made under, the headings “2016 Production & Cost Outlook”, “Tasiast Update”, “Attractive Growth Opportunities”,
“Strong Balance Sheet”, and “Principles for Building Value”, and include without limitation statements with respect to our guidance for production, production costs of
sales, all-in sustaining cost and capital expenditures, project schedules, mine life, continuous improvement and other cost savings opportunities, as well as
references and other statements with respect to other possible events and opportunities, including, without limitation, estimates and the realization of such estimates
(such as mineral or gold reserves and resources, and mine life); future development, mining activities, production and growth (including but not limited to cost and
timing); success of exploration or development of operations; the future price of gold and silver; currency fluctuations; expected capital requirements; government
regulation; and environmental risks and proceedings. The words “2016E”, “ahead”, “anticipate”, “assumption”, “believe”, “budget”, “contemplate”, “contingent”,
“encouraging”, “enhancing”, “estimate”, “expect”, “explore”, “feasibility”, “flexibility”, “focus”, “forecast”, “forward”, “future”, “guidance”, “initiative”, “indicate”, “likely”,
“objective”, “on track”, “opportunity”, “outlook”, “phased”, “plan”, “positioned”, “possible”, “potential”, “principles”, “priority”, “project”, “risk”, “schedule”, “scoping”,
“strategy”, “study”, “target”, “trend”, “tracking” or “upside”, or variations of or similar such words and phrases, or statements that certain actions, events or results may,
can, could, would, should, might, occur or will be taken or realized, and similar expressions identify forward looking statements. Forward-looking statements are
necessarily based upon a number of estimates and assumptions that, while considered reasonable by Kinross as of the date of such statements, are inherently
subject to significant business, economic and competitive uncertainties and contingencies. Statements representing management’s financial and other outlook have
been prepared solely for purposes of expressing their current views regarding the Company’s financial and other outlook and may not be appropriate for any other
purpose. Many of these uncertainties and contingencies can affect, and could cause, Kinross’ actual results to differ materially from those expressed or implied in any
forward looking statements made by, or on behalf of, Kinross. There can be no assurance that forward looking statements will prove to be accurate, as actual results
and future events could differ materially from those anticipated in such statements. All of the forward looking statements made in this presentation are qualified by
these cautionary statements, and those made in our filings with the securities regulators of Canada and the U.S., including but not limited to those cautionary
statements made in the “Risk Factors” section of our most recently filed Annual Information Form, the “Risk Analysis” section of our FYE 2015 and Q2 2016
Management’s Discussion and Analysis, and the “Cautionary Statement on Forward-Looking Information” in our news release dated July 27, 2016, to which readers
are referred and which are incorporated by reference in this presentation, all of which qualify any and all forward‐looking statements made in this presentation. These
factors are not intended to represent a complete list of the factors that could affect Kinross. Kinross disclaims any intention or obligation to update or revise any
forward‐looking statements or to explain any material difference between subsequent actual events and such forward‐looking statements, except to the extent
required by applicable law.
Other information
Where we say "we", "us", "our", the "Company", or "Kinross" in this presentation, we mean Kinross Gold Corporation and/or one or more or all of its subsidiaries, as
may be applicable.
The technical information about the Company’s mineral properties contained in this presentation (other than exploration activities) has been prepared under the
supervision of Mr. John Sims, an officer of the Company who is a “qualified person” within the meaning of National Instrument 43-101 (“NI 43-101”). The technical
information about the Company’s exploration activities contained in this presentation has been prepared under the supervision of Mr. Sylvain Guerard, an officer of
the Company who is a “qualified person” within the meaning of NI 43-101.
www.kinross.com
3
KINROSS VALUE PROPOSITION
EXCELLENT OPERATIONAL TRACK RECORD
• Continuing to meet or outperform our operational targets
STRONG BALANCE SHEET
• $2.2B in liquidity with net debt to EBITDA ratio of 1.0x
ATTRACTIVE FUTURE GROWTH OPPORTUNITIES
• Proceeding with TASIAST PHASE ONE; expected to reach
full production in Q2 2018
• Completed pre-feasibility for TASIAST PHASE TWO;
opportunity to further increase production and reduce costs
• Mineral reserve estimate conversion and exploration at
BALD MOUNTAIN North and South Zones
COMPELLING RELATIVE VALUE
• Attractive value opportunity relative to peers, considering
annual production, cost structure, track record and relatively
low-risk growth opportunities
SHARE INFORMATION
K – Toronto Stock Exchange
KGC – New York Stock Exchange
www.kinross.com
4
DELIVERING OPERATIONAL EXCELLENCE
4
www.kinross.com
5
OPERATIONAL EXCELLENCE
STRONG TRACK RECORD
2012 2013 2014 2015
MET or EXCEEDED annual
production guidance
MET or came in UNDER annual
cost of sales guidance
MET or came in UNDER annual
capital expenditures guidance



CONSISTENTLY MEETING OR OUTPERFORMING
TARGETS









5
www.kinross.com
6
Forecasting increased production in 2016 of over 2.7M oz. Au eq.
OPERATIONAL EXCELLENCE
2016 PRODUCTION & COST OUTLOOK(4)
(1) Refer to endnote #1.
(2) Refer to endnote #2.
2015 2016E
Gold Equivalent Production(1)
(millions)
2015 2016E
$696
$675 to $735
Production Cost of Sales(2)
($ per ounce)
All-in Sustaining Cost(3)
($ per ounce)
2015 2016E
$975 $890 to $990
(3) Refer to endnote #3.
(4) Refer to endnote #4.
2.7 – 2.9
2.6
www.kinross.com
7
OPERATIONAL EXCELLENCE
2016 OUTLOOK(4)
Region
Gold Production
(000 Au eq. oz.)
% of Total
Production
Production Cost of Sales(2)
($/oz. Au eq.)
Americas 1,670 – 1,770 61% $730 - $790
West Africa
(attributable)
360 - 420 14% $850 - $920
Russia 670 – 710 25% $460 - $490
Total Kinross: 2.7 – 2.9 million 100% $675 - $735
(2) Refer to endnote #2.
(3) Refer to endnote #3.
(4) Refer to endnote #4.
2016E
All-in Sustaining Cost ($ per gold equivalent ounce)(3) $890 to $990
Total Capital Expenditures $755
Sustaining Capital ($M) $430
Non-Sustaining Capital ($M) $300
Capitalized Interest ($M) $25
2016 PRODUCTION & COST OF SALES OUTLOOK
2016 CAPITAL EXPENDITURES & ALL-IN SUSTAINING COST OUTLOOK
• Tracking below guidance for capital expenditures and reviewing timing of capital spend for the second
half of the year
www.kinross.com
8
2016E GOLD EQUIVALENT
PRODUCTION(1,4)
OPERATIONAL EXCELLENCE
DIVERSIFIED PORTFOLIO OF OPERATING MINES
GLOBAL PORTFOLIO
Operating mine
Development project
Round Mountain
Kettle River-Buckhorn
Fort Knox
La Coipa
Paracatu
Maricunga
Kupol
Dvoinoye
Chirano
Tasiast
AMERICASRUSSIA
WEST AFRICA
(3) Refer to endnote #3.
Over 60% of estimated 2016 gold equivalent production from mines located in the Americas
61%14%
25%
Americas West Africa Russia
2.7-2.9M
ounces
(1) Refer to endnote #1.
(4) Refer to endnote #4.
Bald Mountain
www.kinross.com
9
• Six mines located in the US, Brazil and Chile
• Over 60% of annual production is from the Americas in 2016
AMERICAS
9
www.kinross.com
10
SECOND QUARTER 2016 HIGHLIGHTS
AMERICAS
• PARACATU production increased due to
higher ore processed and benefits from the
tailings reprocessing initiative
 Region received lower than average
rainfall during 2015/2016 rainy season
 Expect to curtail Plant 1 operations in
the second half of Q3 2016
OPERATION
GOLD EQUIVALENT PRODUCTION PRODUCTION COST OF SALES ($/oz.)(2)
Q2 2016 H1 2016 Q2 2016 H1 2016
Fort Knox 97,221 185,021 $793 $753
Round Mountain 92,813 185,739 $778 $723
Bald Mountain 32,704 53,126 $1,217 $1,205
Kettle River - Buckhorn 25,031 53,343 $734 $761
Paracatu 126,774 246,150 $692 $688
Maricunga 44,304 103,380 $939 $874
AMERICAS TOTAL 418,847 826,759 $807 $768
• Strong performances at FORT KNOX, ROUND
MOUNTAIN, KETTLE-RIVER BUCKHORN and
PARACATU
• BALD MOUNTAIN production higher compared
to Q1 2016 due to higher ore mined and
processed
 Performance expected to continue to
improve in the second half of 2016
(2) Refer to endnote #2.
www.kinross.com
11
OPERATIONAL EXCELLENCE
BALD MOUNTAIN, NEVADA
Bald Mountain has the potential to be a long-life mine in Kinross’ portfolio
Multiple opportunities to add to proven and
probable mineral reserve estimates and extend
estimated mine life
• Near-Term: potential to double current
proven and probable reserve estimates by
end of Q1 2017
• Longer Tem: potential for a significant
portion of remaining mineral resource to
convert to mineral reserve with future infill
drilling and permitting
• Exploration: significant pipeline of high-
quality targets, with over 20 target areas
identified and additional brownfield and
greenfield opportunities
www.kinross.com
12
JV Zone
North Zone
South
Zone
Winrock
Top
Redbird
Saga
Vantage
Gator
Saddle
Luxe
BALD MOUNTAIN, NEVADA
NEAR-TERM OPPORTUNITIES
NORTH ZONE (100% Kinross)
• Drilling to focus on converting estimated mineral resources to
mineral reserves and extending delineation of known
orebodies – open in several directions
• 17,000 meters completed at Saga, Top and Redbird
 6,000 meters planned at Winrock this fall
• Encouraging results as team continues to gain a better
geological understanding of the property
SOUTH ZONE (100% Kinross)
• Drilling at Vantage Complex initiated upon receipt of permit
 96,500 m drill campaign progressing as planned
 3 drill rigs currently active; increasing to 6 by mid-
September
2016 Priority Exploration Targets
Focused on developing deposits in the North and South Zones which have potential to
double mineral reserve estimates by end of Q1 2017
40km
15km
www.kinross.com
13
OPERATIONAL EXCELLENCE
ROUND MOUNTAIN, NEVADA
Strong cash flow generator with opportunities to extend mine life
STRONG NEAR-TERM CASH FLOW CONTRIBUTOR
• Operation currently benefitting from previously-completed stripping campaign
• Incremental, high-margin ounces from Process Solution Management (PSM)
• Milling expected to continue until 2022 from stockpiled material, with heap leach
production expected to continue until 2027
ADDITIONAL UPSIDE OPPORTUNITIES
• Strong focus on improving performance and cost reduction through continuous
improvement initiatives
• Implementing initiatives to accelerate timing and increase number of PSM ounces
PHASE W LONGER-TERM OPTION TO EXTEND MINE LIFE
• Phase W has added an incremental 2.4Moz. of estimated inferred mineral resource(5,6)
• Encouraging results from scoping study for a Phase 1, which focused on a portion
(1.3Moz.) of the new mineral resource estimate
(5) Kinross’ inferred mineral resource estimates are based on a $1,400/oz. gold price assumption. Refer to Endnote #5.
(6) Refer to Endnote #6.
www.kinross.com
14
OPPORTUNITY TO UNLOCK VALUE FROM THE HEAP
LEACH PADS
• Significant amount of ore stacked on the pads since
heap leaching commenced in 1993
 ~800Mt of ore stacked on 450’ high heaps
• Estimated 7.8Moz ounces stacked, with ~5.7Moz.
recovered to date(i)
PROCESS SOLUTION MANAGEMENT
• Implemented a number of initiatives and operational
improvements aimed at:
 Improving heap leach operations
 Increasing recovery and recovery timing
LOW COST INCREMENTAL PRODUCTION
• PSM expected to add 200-230koz. Au eq. over the life
of mine at ~$200-$400/oz. (opex + capex)
ROUND MOUNTAIN, NEVADA
PROCESS SOLUTION MANAGEMENT
Achieving results from continuous improvement, with additional future opportunities
(i) Only a portion of the 2.1Moz. difference between ounces stacked and ounces recovered to date is expected to be recovered.
www.kinross.com
15
• Reached a decision to suspend operations in
Q4 2016 due to competing capital priorities
• Suspension implemented in August, earlier than
planned, due to operational restrictions imposed by
ongoing regulatory proceedings
• Will continue to explore further permitting efforts and
review the operation and its mineral resource model
to consider possible options for re-starting mining
DISCIPLINED CAPITAL ALLOCATION
MARICUNGA UPDATE
TONNES
(thousands)
GRADE
(g/t)
OUNCES
(thousands)
2P Reserves 40,641 0.8 1,042
M&I Resources 198,084 0.7 4,275
Inferred Resources 53,942 0.6 1,053
2015 GOLD RESERVE AND RESOURCE ESTIMATES(7)
Suspended mining and crushing operations at Maricunga in August
(7) Refer to endnote #7.
www.kinross.com
16
• Continued strong performance from the high-grade, low-cost Kupol and
Dvoinoye underground minesRUSSIA
16
www.kinross.com
17
SECOND QUARTER 2016 HIGHLIGHTS
RUSSIA
KUPOL-DVOINOYE
• Continued strong performance
• Q2 production cost of sales decreased to $417/oz.
 Lowest level since Q2 2011
 Benefiting from sustained favourable FX rates
and rigorous cost management
(2) Refer to endnote #2.
OPERATION
GOLD EQUIVALENT PRODUCTION PRODUCTION COST OF SALES ($/oz.)(2)
Q2 2016 H1 2016 Q2 2016 H1 2016
Kupol - Dvoinoye 183,638 376,088 $417 $430
RUSSIA TOTAL 183,638 376,088 $417 $430
www.kinross.com
18
EXPLORATION HIGHLIGHTS
KUPOL: MOROSHKA
(7) Refer to endnote #7.
Advancing development of the Moroshka satellite deposit located near Kupol mill
HIGH-GRADE DEPOSIT
• Located approximately 4km east of
Kupol and within the Kupol license
• Initial discovery in 2012
• Completed pre-feasibility study in
2015, adding ~180koz. to mineral
reserve estimates for Kupol(7)
• Expect to begin mining in 2018; ore
to be processed in the Kupol mill
DISTRICT EXPLORATION
• Several near-mine targets defined
between Kupol and Moroshka
• Advancing early stage exploration
within ~100km radius around Kupol
www.kinross.com
19
EXPLORATION HIGHLIGHTS
DVOINOYE: SEPTEMBER NORTH-EAST
SEPTEMBER NORTH-EAST
• Defined near-surface, high-grade
M&I mineral resource estimate of
68koz. Au grading 32 g/t(7)
• Material being fast-tracked to
production, expected in 2017
DVOINOYE ZONE 1
• Located on the current mining
lease
• Drilling confirmed continuity and
grade of a mineralized vein at the
bottom of a historically mined
open-pit
• Mineral resource estimate
expected in 2016
(7) Refer to endnote #7.
www.kinross.com
20
RUSSIA
FOREIGN INVESTMENT
The world’s leading companies continued to invest in Russia in 2016
www.kinross.com
21
RUSSIA
FOREIGN INVESTMENT ADVISORY COUNCIL
FIAC is chaired by the Russian Prime Minister and includes CEOs from
over 50 international companies
www.kinross.com
22
• Two operating mines located in a region with excellent growth and
exploration prospects
• Strong focus on optimizing efficiency and performance
WEST
AFRICA
22
www.kinross.com
23
OPERATIONAL EXCELLENCE
WEST AFRICA
• TASIAST Q2 production lower due to 18-day strike
and temporary suspension of mining and
processing
• Improved performance expected in H2 2016
• CHIRANO production decreased as site transitions
from mining in the Awkaaba underground to
Paboase
 Resulted in fewer tonnes mined and lower
grades
 Recovery plan implemented in March;
beginning to see improvements
 Expect higher production and lower costs in the
second half of the year
OPERATION
GOLD EQUIVALENT PRODUCTION(1) PRODUCTION COST OF SALES ($/oz.)(2)
Q2 2016 H1 2016 Q2 2016 H1 2016
Tasiast 29,577 76,655 $1,240 $1,073
Chirano (90%)(1) 39,205 79,228 $1,142 $1,061
WEST AFRICA TOTAL(1) 68,782 155,883 $1,184 $1,067
(1) Refer to endnote #1.
(2) Refer to endnote #2.
www.kinross.com
24
OPERATIONAL EXCELLENCE
TASIAST UPDATE
• Temporarily suspended mining and processing operations at
Tasiast on June 18, 2016 due to expatriate work permit issues
• Agreed on required “Mauritanization” plan to increase number
of skilled nationals working at Tasiast
• Normal mining and processing operations resumed mid-August
PHASE ONE EXPANSION
• Phase One’s ramp up to full production may be extended into
Q2 2018
• Government support for Tasiast and the expansion remains
strong
• Engineering is 70% complete
• Procurement of critical long lead packages now essentially
complete
• Recently awarded two major construction contracts for
earthworks and concrete works
Normal mining and processing operations resumed in mid-August
www.kinross.com
25
TAMAYA
El Gaicha license
Tasiast Sud license
Tmeimichat license
Imkebdene license
N’Daouas license
FENNEC
C67
C68
WEST BRANCH
Satellite deposit
Operating Mine
New deposit 2015
EXPLORATION HIGHLIGHTS
TASIAST DISTRICT
Prospective 80km trend with encouraging results on near-mine and step-out targets
For additional information, please see Kinross’ news release dated February 10, 2016 and Appendices A and B, which are available on our website at
www.kinross.com.
www.kinross.com
26
EXPLORATION HIGHLIGHTS
CHIRANO, GHANA
Exploration focused on 8 km mine trend to target open-pit and underground extensions
SURAW
• Significant gold mineralization was extended 200 m south of the existing M&I mineral resource
estimates and also 300 m down dip
• 2015 results demonstrate upside potential of the deposit
AKWAABA
• Drilling delineated potential extension of the mineralization ~100 m down dip below current
reserve limits
• Planning infill drilling in 2016 to better define the orebody extension and evaluate economic
viability
For additional information, please see Kinross’ news release dated February 10, 2016 and Appendices A and B, which are available on our website at
www.kinross.com.
www.kinross.com
27
STRONG FINANCIAL DISCIPLINE
27
www.kinross.com
28
STRONG BALANCE SHEET
SOLID FINANCIAL POSITION
$0.7
$1.5
Cash & cash equivalents Undrawn credit facilities
LIQUIDITY POSITION(i)
Maintaining balance sheet strength & financial flexibility remain priority objectives
MAINTAINING FINANCIAL FLEXIBILITY
• Robust cash flow generation added $218M to
cash balance in Q2 2016
NO DEBT MATURITIES PRIOR TO 2020
• Repaid $250 million of senior notes
September 1, 2016
• Extended maturity dates of the $500M term
loan and $1.5B credit facility by one year, to
2020 and 2021 respectively
• Strong financial position to fund the Tasiast
Phase One expansion with existing liquidity
$2.2B
(i) Kinross’ liquidity position as at June 30, 2016, adjusted to reflect repayment of $250 million of senior notes on September 1, 2016
www.kinross.com
29
2016 OUTLOOK
REDUCED OVERHEAD
$208
$165
2015 2016E
Overhead Expense
(US$ millions)
• 2016 overhead expense expected to be
US$165 million(4)
• 20% REDUCTION year-over-year reflects
savings from corporate headcount
reduction
• Benefits from lower Canadian dollar
reflected in guidance
(4) Overhead expense consists of general and administrative and business development expense. Refer to endnote #4.
www.kinross.com
30
FINANCIAL DISCIPLINE
FUEL & CURRENCY HEDGES
Managing exposure to fluctuations in foreign currency and input commodity prices
% of remaining 2016 exposure hedged Average Rate
Brazilian real 27% 3.84
Chilean peso 30% 657
Russian rouble - -
Canadian dollar 51% 1.32
Oil & Fuel 46%(i) (Refer to note ii)
(i) Consists of crude oil swap contracts (344,610 barrels at an average rate of $46.07) as at June 30, 2016.
(ii) As a result of pre-paid fuel purchases mainly relating to the Company’s Russian operations and fixed pricing in Ghana and Brazil, Kinross’ unhedged, free-
floating oil & fuel exposure for 2016 is ~50% of total consumption
Summary of 2016 foreign currency and energy hedges as at June 30, 2016
• Strategic decision to hedge 50% of the Tasiast Phase One project’s fuel oil
requirements at $46/bbl for next 36 months
 Will look for additional opportunities to hedge an additional 25% of fuel oil
requirements at attractive prices
www.kinross.com
31
2016 OUTLOOK
CURRENCY & OIL BENEFITS
Well-positioned to benefit from further currency and oil weakness
Change from
Assumptions
Impact to
cost of sales
FX 10% US$15/oz.
Rouble 10% US$14/oz.(ii)
Brazilian Real 10% US$24/oz.(ii)
Oil $10/bbl. US$3/oz.
Budget Spot(i)
Gold US$1,100 US$1,345
Oil US$55/bbl. US$45/bbl.
Russian Rouble 55 64
Brazilian Real 3.75 3.20
Chilean Peso 650 662
2016 Budget Assumptions & Sensitivities(4)
• Benefits of favourable FX and oil prices
partially offsetting lower gold prices
20
30
40
50
60
70
80
90
100
110
Jun-14 Dec-14 Jun-15 Dec-15 Jun-16
Performance(rebasedto100)
Brazilian Real Russian Rouble Canadian Dollar Oil Gold
(i) Source: Bloomberg – September 7, 2016.
(ii) Impact to production cost of sales of the Russian operations
(iii) Impact to production cost of sales of the Brazil operation
(4) Refer to endnote #4.
www.kinross.com
32
ATTRACTIVE GROWTH OPPORTUNITIES
32
www.kinross.com
33
TASIAST EXPANSION PROJECT
RESULTS OF THE TASIAST TWO-PHASED EXPANSION
STUDIES
• Two-phased approach offers an attractive path to Tasiast’s significant growth
potential at a significantly lower forecast capital cost than previously estimated
• Proceeding with Phase One of the expansion
33
www.kinross.com
34
ATTRACTIVE GROWTH OPPORTUNITIES
TASIAST, MAURITANIA
• Existing mine with an 8,000 t/d mill originally designed to process ore from
a series of small open pits
34
www.kinross.com
35
RELATIVELY LOW-RISK BROWNFIELDS EXPANSION PROJECT
• Have owned and operated the mine for over 5 years
• Highly trained local team
• Most infrastructure already in place
• Well-defined mineral resource estimate
TASIAST EXPANSION PROJECT
LARGE OREBODY WITH LOW EXECUTION RISK
Challenge is to right-size the processing capacity to capture the full value and potential of
Tasiast’s large mineral resource estimate
TASIAST OREBODY & MINERAL RESOURCE PIT(i)
(i) For additional information, please refer to the Tasiast Technical Report dated March 30, 2016 and to our news release dated March 30, 2016, available on
our website at www.kinross.com.
www.kinross.com
36
DISCIPLINED PROJECT DEVELOPMENT
PHASED APPROACH TO A TASIAST MILL
EXPANSION
• Phase One expansion offers a number of expected attractive attributes:
 Leverages existing infrastructure
 Relatively low execution risk
 Manageable capital expenditure
 Robust economics on a stand-alone basis
 Offers flexibility to potentially proceed with a larger Phase Two expansion
36
www.kinross.com
37
TASIAST EXPANSION PROJECT
TWO-PHASED EXPANSION CONCEPT
PHASE ONE FLOW SHEET
PHASE ONE: EXPANSION TO 12,000 t/d
• Leverages existing mill infrastructure to increase throughput to 12,000 t/d from 8,000 t/d
• Includes installation of an oversized 40’ SAG mill and gyratory crusher
• Enhances processing of the harder, higher grade West Branch ore
• Improves Tasiast’s forecast production and operating costs, while maintaining optionality
to potentially proceed with larger Phase 2 expansion in the future
Gyratory
crusher
Ore
stockpile
Oversized
SAG mill
Existing ball mills
Leaching Refining
www.kinross.com
38
Phase One expected to reduce cost per ounce by ~50% and to increase annual production by ~90%
Metric Estimates
Average annual production (2018-2027) 409,000 ounces
Production cost of sales (2018-2027) $535 per ounce
All-in sustaining cost (2018-2027) $760 per ounce
Initial capital $300 million
Capitalized pre-stripping (2016-2019) $428 million
Construction period 2 years
Mine life 2033 (18 years)
Internal rate of return (assuming $1,200 gold price) 20%
Net present value(i) $635 million
The initial capital expenditure estimate of
$300 million includes:
• Installation of an oversized SAG mill,
gyratory crusher and 3 leach tanks
• Maintenance improvements to other
components of the processing circuit
• Additional tailings capacity
Category ($ millions)
Direct cost (including freight) $175
Indirect and owner’s cost $60
Taxes / duties $20
Contingency $45
INITIAL CAPITAL ESTIMATE
TASIAST EXPANSION PROJECT
PHASE ONE FEASIBILITY STUDY RESULTS
(i) Calculated based on a 5% discount rate from April 1, 2016 and after tax.
www.kinross.com
39
PHASE TWO: EXPANSION TO 30,000 t/d
• Contemplates installation of an additional 18,000 t/d of throughput capacity for a total
combined capacity of 30,000 t/d
• Project would consist of:
• Replacing the two current ball mills with a larger, new ball mill
• Adding new leaching, thickening and refining capacity
• Construction of additional power generation capacity
• Additions to mining fleet
• Upgrades to water supply infrastructure
TASIAST EXPANSION PROJECT
TWO-PHASED EXPANSION CONCEPT
PHASE TWO FLOW SHEET
Gyratory
crusher
Ore
stockpile
Oversized
SAG mill
New, larger ball
mill
Additional leaching
capacity
Thickening
www.kinross.com
40
Combined Phase One and Two expansion expected to transform Tasiast into
Kinross’ largest mine with estimated costs amongst the lowest in our portfolio
Metric Estimates for Phase One and Two combined
Average annual production (2020-2026) 777,000 ounces
Production cost of sales (2020-2026) $460 per ounce
All-in sustaining cost (2020-2026) $665 per ounce
Mine life 2030 (15 years)
Initial capital cost $920 million
Capitalized pre-stripping (2016-2019) $547 million
Internal rate of return (assumes $1,200 gold price) 17%
Net present value(i) $885 million
TASIAST EXPANSION PROJECT
PHASE TWO PRE-FEASIBILITY STUDY RESULTS
Category ($ millions)
Direct cost (including freight) $380
Indirect and owner’s cost $100
Taxes / duties $40
Contingency $100
INITIAL CAPITAL ESTIMATE (PHASE TWO INCREMENTAL)
(i) Calculated based on a 5% discount rate from April 1, 2016 and after tax.
www.kinross.com
41
Objective was to achieve similar production and cost output as the 38k t/d case with
significantly lower initial and sustaining capital
TASIAST EXPANSION PROJECT
TWO-PHASED APPROACH: CAPITAL DISCIPLINE
Metric
Estimates for Phase One &
Two Combined 30k t/d
Estimates for Previous
38k t/d Scenario
Average annual production 777,000 ounces (2020-2026) 848,000 ounces (first 5 years)
Cash costs (per ounce) $460 (2020-2026) $501(first 5 years)
All-in Sustaining cost (per ounce) $665 (2020-2026) $792 (first 5 years)
Mine life 2030 2029
Initial capital cost(i) $920 million $1.6 billion
Sustaining capital (3-year post start-up) $234 million $376 million
Internal rate of return 17%(ii) 10%(iii)
Net present value $885 million(iv) $500 million(v)
(i) Excludes capitalized pre-stripping
(ii) Calculated April 1, 2016 forward.
(iii) Calculated January 1, 2014 forward.
(iii) After-tax and based on a $1,200/oz. gold price assumption, a $45/bbl oil price assumption and 5%
discount rate.
(iv) After-tax and based on a $1,200/oz. gold price assumption, a $100/bbl oil price assumption and 5%
discount rate.
www.kinross.com
42
FACTORS DRIVING THE LOWER ESTIMATED INITIAL CAPITAL COST
Phase One and Phase Two combined initial capital estimated to be $920 million(i)
TASIAST EXPANSION PROJECT
REDUCED CAPEX ESTIMATE
Smaller scale
• Most of the equipment is smaller (e.g. crusher)
• Fewer units required (e.g. few leach tanks, generators)
• Two-phased approach leverages more of the existing
infrastructure than the previous 38k t/d option
 E.g. ponds, piping, roads, power plant
• Planning for two smaller projects to be built in a series vs.
one large scale project
• Allows for a more nimble, efficient and leaner approach to
engineering and construction
• Overall market conditions have changed since 2014
• More favourable environment for procurement of equipment
and contracts
• Significant reductions in many areas
Smaller scale
Leverages existing
infrastructure
Efficient approach
to engineering &
construction
Market conditions
(i) Excludes capitalized pre-stripping
www.kinross.com
43
FACTORS DRIVING THE LOWER ESTIMATED
SUSTAINING CAPITAL
• Highly confident seawater pipeline no longer
required
 Results of hydrological and hydrogeological
studies increased confidence that an expansion
to 30k t/d would not require a seawater pipeline
 Will instead make upgrades to existing borefield
infrastructure
• Realizing savings from LOM tailings dam
construction costs
 Move towards downstream construction
methodology, using direct waste hauls from
the pit
 Similar to approach recently implemented at
Round Mountain
Expecting significant sustaining capital savings
TASIAST EXPANSION PROJECT
REDUCED SUSTAINING CAPITAL
www.kinross.com
44
TASIAST EXPANSION PROJECT
PHASE TWO: NEXT STEPS
• The timeline contemplated in the pre-
feasibility study assumes:
 Initiating a feasibility study in late 2016
 Being in a position to make a decision in
late 2017
 If a positive decision is made,
construction would begin in 2018
 Full production in the 30k t/d expanded
plant would commence in 2020
Phase Two pre-feasibility study envisions full production beginning in 2020
www.kinross.com
45
TASIAST EXPANSION PROJECT
SITE LAYOUT
Camp
West Branch Pit
Airstrip
Power Plant
Phase One
tailings facility
Current
tailings facility
ADR plant
Dump leach
Piment pits
New crusher
New stockpile
New SAG mill
Phase One and
Two expansions
Truck shop
45
www.kinross.com
46
PHASE ONE GOLD PRICE SENSITIVITY ESTIMATES
TASIAST EXPANSION PROJECT
SENSITIVITIES TABLE
$1,100 $1,200 $1,300 $1,400 $1,500
IRR 13% 20% 26% 33% 40%
NPV $345M $635M $910M $1.2B $1.5B
PHASE ONE AND PHASE TWO COMBINED GOLD PRICE SENSITIVITY ESTIMATES
$1,100 $1,200 $1,300 $1,400 $1,500
IRR 12% 17% 22% 27% 33%
NPV $485M $885M $1.3B $1.7B $2.1B
www.kinross.com
47
2016
2017
2016
2017
2018
2019
2017
2018
2019
2020
2019
2020
2021
2022
2023
2019
2020
2021
2022
2023
2024
2025
2026
TASIAST EXPANSION PROJECT
ILLUSTRATIVE MINE PLAN SCHEDULE (30k t/d)
For additional information, please refer to the Tasiast Technical Report dated March 30, 2016, available on our website at www.kinross.com.
www.kinross.com
48
• Phase W is a large zone of known mineralization
at depth and to the west of the open-pit
 Geological extension of the same deposit
that has been mined for past 38 years
• Declared an additional mineral resource of
2.4Moz. for Phase W(5,6)
• Project is essentially an additional pushback at an
existing pit
• Would require moving some existing
infrastructure
• Stripping could start as early as 2018, if a decision
to proceed is made
 Subject to further study and analysis, and
gold price environment
ROUND MOUNTAIN PHASE W
PHASE W - OVERVIEW
Phase W is an opportunity to potentially extend estimated mine life
(5) Refer to endnote #5.
(6) Refer to endnote #6.
www.kinross.com
49
• Focused on a 1.3Moz portion of the
new resource estimate (Phase 1)(5,6),
which could extend mine life
 51Mt with an average grade of
0.8 g/t
ROUND MOUNTAIN PHASE W
PHASE 1 SCOPING STUDY RESULTS
Section View of Existing LOM Pit and Phase 1
• Initial results of Phase 1 looks encouraging;
more work required
 Post-scoping optimization studies planned
for 2016 to examine a number of
opportunities identified during the scoping
study
 Infill drill campaign planned for H2 2016
 Potential to convert to mineral reserve in
2017
Grade Oz/ton Phase W Phase 1
Current LOM pit
Current mining surface
2016 resource
update
(5) Refer to Endnote #5.
(6) Refer to Endnote #6.
www.kinross.com
50
ORGANIC GROWTH OPPORTUNITIES
LA COIPA PROJECT
• Pre-feasibility study on La Coipa completed during Q3 2015
• Project offers a number of expected attractive attributes:
 Leverages existing infrastructure
 Relatively low execution risk
 Modest capital investment
 Exploration upside
 Located in an attractive jurisdiction
50
www.kinross.com
51
EXPLORATION HIGHLIGHTS
LA COIPA, CHILE
Encouraging results along a prospective 3 km trend
The Pompeya deposit is also referred to as La Coipa Phase 7.
For additional information, please see Kinross’ news release dated February 10, 2016 and Appendices A and B, which are available on our website at
www.kinross.com.
www.kinross.com
52
COMPELLING VALUATION
52
www.kinross.com
53
TRACK RECORD OVER THE PAST
FOUR YEARS
Produced over
10Moz.
gold equivalent
$950M
Debt repaid
$2.2 BILLION
Liquidity
position
balance
sheet
$1.9
$1.3
$0.6 $0.6
2012 2013 2014 2015
annual capex by
$1.3B
LOWERED
STRENGTHENED
4 MET
guidance
targetsConsecutive
years
10%
all-in
sustaining
cost
DECREASED
53
www.kinross.com
54
COMPELLING RELATIVE VALUE
NET DEBT TO EBITDA (LTM)
Source: Bloomberg, company reports.
Net debt to EBITDA ratio of 1.0x as of June 30, 2016
2.5
2.3
1.6
1.4
1.3
1.0
Yamana Barrick Goldcorp Newmont Agnico Kinross
www.kinross.com
55
COMPELLING RELATIVE VALUE
ENTERPRISE VALUE VERSUS PRODUCTION
2016E Gold
Production
(Moz.)(ii)
Delta with
Kinross
(US$B)
Multiple of
Kinross
Enterprise
Value
Barrick 5.3 22.9 4.8
Newmont 5.1 20.2 4.3
Goldcorp 3.0 10.0 2.6
Kinross 2.7 - -
Agnico 1.6 6.1 2.0
Yamana 1.3 (0.3) 1.0
(i) Source: Bloomberg – September 13, 2016
(ii) Source: Company reports. Represents mid-point of the respective company’s 2016 production guidance. Figures for Kinross reflect gold only production.
Kinross expects to produce 2.7 to 2.9 million ounces on a gold equivalent basis.
$29.0
$26.3
$16.1
$12.2
$6.1 $5.8
Barrick Newmont Goldcorp Agnico Kinross Yamana
Enterprisevalue(US$billions)(i)
Market capitalization
Enterprise value
www.kinross.com
56
Source: Bloomberg analyst consensus – September 13, 2016.
COMPELLING RELATIVE VALUE
2016E METRICS
Attractive value opportunity relative to peers, considering Kinross’ annual production,
cost structure, track record and growth opportunities
EV / 2016E EBITDA P / 2016E OPERATING CF
13.4
10.5
8.2
7.5 7.4
4.9
Agnico Goldcorp Newmont Yamana Barrick Kinross
14.5
11.0
8.0 7.8
6.5
4.8
Agnico Goldcorp Newmont Barrick Yamana Kinross
www.kinross.com
57
Expecting to
deliver HIGHER
production
2016E Stronger year
expected at
BALD MOUNTAIN
2017E
TASIAST PHASE
ONE expected to
ramp up to full
production
2018E
Start-up of potential
TASIAST PHASE
TWO
2020E
BUILDING MOMENTUM FOR THE FUTURE 57
www.kinross.com
58
APPENDIX
58
www.kinross.com
59
FINANCIAL DISCIPLINE
2016 CAPITAL EXPENDITURES OUTLOOK(4)
Region Sustaining Non-Sustaining Regional Total
Americas $220 $10 $230
West Africa $120 $280 $400
Russia $85 $10 $95
Corporate $5 $ - $5
TOTAL $430 $300 $730
OTHER EXPENDITURE OUTLOOK ($ millions)
2016E
Overhead expense $165
Exploration $70
Other operating costs* $95
Depreciation, depletion & amortization ($/oz.) $350
2016 capital expenditures are expected to be $755 million, including estimated
capitalized interest of $25 million
* Includes $15 million of care and maintenance for La Coipa and Kettle River-Buckhorn
(4) Refer to endnote #4.
www.kinross.com
60
• Impressive track record of operational excellence
• Achieved its 2nd highest production level in 2015, Fort
Knox’s 19th year in operation
• Estimated mine life: mill – 2018; mining – 2020*
AMERICAS
FORT KNOX, USA (100%)
TONNES
(thousands)
GRADE
(g/t)
OUNCES
(thousands)
2P Reserves 147,318 0.4 2,022
M&I Resources 95,822 0.5 1,423
Inferred Resources 14,824 0.5 221
OPERATING RESULTS(2)
2015 GOLD RESERVE AND RESOURCE ESTIMATES(7)
Among the world’s few cold climate heap leach facilities
2014 2015
Production (Au. Eq. oz.) 379,453 401,553
Production cost of sales ($/oz.) $712 $629
* Source: Kinross’ Annual Information Form(2) Refer to endnote #2.
(7) Refer to endnote #7.
www.kinross.com
61
• Acquired in January 2016 from Barrick
• ~600 km2 under-explored land package among the
largest in the United States
• Well-capitalized operation: previous owner invested
~$385M over the past 5 years
• Large estimated mineral resource base with multiple
sources of potential mineral reserve additions
AMERICAS
BALD MOUNTAIN, USA (100%)
Forecasting strong near-term cash flow with significant upside potential
(7) Refer to endnote #7.
TONNES
(thousands)
GRADE
(g/t)
OUNCES
(thousands)
2P Reserves 54,627 0.6 1,117
M&I Resources 188,971 0.6 3,933
Inferred Resources 24,396 0.5 378
2015 GOLD RESERVE AND RESOURCE ESTIMATES(7)
www.kinross.com
62
• Incremental, high-margin ounces from Process Solution
Management (PSM)
• Opportunity to extend mine life beyond current estimates
with Phase W project
AMERICAS
ROUND MOUNTAIN, USA (100%)
Strong cash flow generator with opportunities to extend mine life
(2) *Kinross acquired 100% of the Round Mountain mine on January 11, 2016.
Production and cost of sales figures for 2014 and 2015 reflect 50% ownership. Refer
to endnote #2.
(7) Refer to endnote #7.
TONNES
(thousands)
GRADE
(g/t)
OUNCES
(thousands)
2P Reserves 66,145 0.7 1,470
M&I Resources 42,158 0.5 683
Inferred Resources 16,205 0.4 233
2015 GOLD RESERVE AND RESOURCE ESTIMATES(7)
OPERATING RESULTS(2)
2014 2015
Production (Au. Eq. oz.) 169,839 197,818
Production cost of sales ($/oz.) $855 $750
* Source: Kinross’ Annual Information Form
16 17 18 19 20 21 22 23 - 27
Mining
Milling
Leaching
ESTIMATED MINE LIFE*
www.kinross.com
63
• Historically, a significant cash flow contributor with costs
among the lowest in the portfolio
• Estimated mine life: late 2016*
AMERICAS
KETTLE RIVER-BUCKHORN, USA (100%)
Low-cost, high-grade underground mine located in Washington state
TONNES
(thousands)
GRADE
(g/t)
OUNCES
(thousands)
2P Reserves 166 8.7 47
M&I Resources 72 5.1 12
Inferred Resources 36 6.7 8
2015 GOLD RESERVE AND RESOURCE ESTIMATES(7)
OPERATING RESULTS(2)
2014 2015
Production (Au. Eq. oz.) 123,382 97,368
Production cost of sales ($/oz.) $678 $836
* Source: Kinross’ Annual Information Form(2) Refer to endnote #2.
(7) Refer to endnote #7.
www.kinross.com
64
• Paracatu is among the world’s largest gold operations
with annual throughput of ~60Mt
• Realizing benefits from weakness in the Brazilian real
• Estimated mine life: 2030*
AMERICAS
PARACATU, BRAZIL (100%)
Large gold mine with a long mine life that extends to 2030
TONNES
(thousands)
GRADE
(g/t)
OUNCES
(thousands)
2P Reserves 687,990 0.4 9,645
M&I Resources 315,508 0.3 3,267
Inferred Resources 10,515 0.4 143
2014 2015
Production (Au. Eq. oz.) 521,026 477,662
Production cost of sales ($/oz.) $816 $772
OPERATING RESULTS(2)
2015 GOLD RESERVE AND RESOURCE ESTIMATES(7)
* Source: Kinross’ Annual Information Form(2) Refer to endnote #2.
(7) Refer to endnote #7.
www.kinross.com
65
• Operations suspended Q3 2016
• Will continue to explore further permitting efforts and
review the operation and its mineral resource model to
consider possible options for re-starting mining
AMERICAS
MARICUNGA, CHILE (100%)
High-altitude heap leach operation located in the highly prospective Maricunga District
TONNES
(thousands)
GRADE
(g/t)
OUNCES
(thousands)
2P Reserves 40,641 0.8 1,042
M&I Resources 198,084 0.7 4,275
Inferred Resources 53,942 0.6 1,053
2015 GOLD RESERVE AND RESOURCE ESTIMATES(7)
OPERATING RESULTS(2)
2014 2015
Production (Au. Eq. oz.) 247,216 212,155
Production cost of sales ($/oz.) $953 $1,010
* Source: Kinross’ Annual Information Form(2) Refer to endnote #2.
(7) Refer to endnote #7.
www.kinross.com
66
PRE-FEASIBILTY STUDY RESULTS
LA COIPA PROJECT
Life of Mine Estimates (100% basis)(i)
Life of Mine 5.5 years
Total ounces recovered 1.03 million gold equivalent ounces
Average annual production 207,000 gold equivalent ounces per year
Average cost of sales $674 per gold equivalent ounce
Average all-in sustaining cost(ii) $767 per gold equivalent ounce
Initial capital $94 million
Pre-Stripping $105 million
IRR (after-tax) 20%
NPV $120 million
• PFS based on using existing infrastructure to blend and process higher grade material
from the recently delineated Phase 7 deposit with oxide/transition material from the
existing Puren deposit
Project expected to generate a 20% IRR at an assumed gold price of $1,200 per ounce
(i) Summary results are shown on a 100% basis, however, Kinross has a 75% interest in Phase 7 and a 65% interest in Puren.
(ii) All-in sustaining cost includes operating costs, sustaining capital, and post start-up capitalized stripping and does not include estimated initial capital expenditures of $94 million and
estimated pre-stripping of $105 million, and any exploration, income taxes and non-cash items related to reclamation or allocation of regional or corporate overhead costs. This
differs from the World Gold Council definition of all-in sustaining cost.
www.kinross.com
67
PRE-FEASIBILTY STUDY RESULTS
LA COIPA PROJECT
Life of Mine Estimates
Mill throughput capacity 13,000 tonnes per day
Average mining rate 80,000 tonnes per day
Average gold grade 1.69 g/t
Average silver grade 61.5 g/t
Average gold recovery 76%
Average silver recovery 59%
Strip ratio (waste:ore) 5.0
• The pre-feasibility study estimates a 5.5 year mine life, following receipt of permits and commencement of
stripping
 Processing expected to commence 1.5 years after pre-stripping has been initiated and continue for 4
years
• Received project DIA approval in August 2016; additional permitting ongoing
Assumptions
Gold price $1,200 per oz.
Silver price $17 per oz.
Oil price $65 per barrel
Chilean Peso 600 to the US dollar
Discount rate 5%
KEY ASSUMPTIONSADDITIONAL OPERATING METRICS
$1,100 $1,200 $1,300
IRR 15% 20% 26%
GOLD PRICE SENSITIVITY
www.kinross.com
68
• High-grade, low-cost underground mines
• Estimated mine life: Kupol – 2020; Dvoinoye – 2018*
RUSSIA
KUPOL-DVOINOYE (100%)
KUPOL
TONNES
(thousands)
GRADE
(g/t)
OUNCES
(thousands)
2P Reserves 7,157 8.3 1,899
M&I Resources 1,164 7.2 271
Inferred Resources 404 8.3 108
DVOINOYE
2P Reserves 2,265 11.2 815
M&I Resources 136 17.9 78
Inferred Resources 78 9.8 25
2014 2015
Production (Au. Eq. oz.) 751,101 758,563
Production cost of sales ($/oz.) $507 $474
OPERATING RESULTS(2)
2015 GOLD RESERVE AND RESOURCE ESTIMATES(7)
Our Russian operations are a model for successfully operating in a remote location
* Source: Kinross’ Annual Information Form(2) Refer to endnote #2.
(7) Refer to endnote #7.
www.kinross.com
69
• Expecting higher production and lower costs in the second half of
the year
• Exploration focused on 8 km mine trend to target open-pit and
underground extensions
• Estimated mine life: 2021*
WEST AFRICA
CHIRANO, GHANA (90%)
Cost reductions achieved at Chirano by transitioning to self-perform mining
(1) Refer to endnote #1.
(2) Refer to endnote #2.
(7) Refer to endnote #7.
TONNES
(thousands)
GRADE
(g/t)
OUNCES
(thousands)
2P Reserves 14,669 2.4 1,135
M&I Resources 10,963 2.1 739
Inferred Resources 1,602 2.9 149
2014 2015
Production (Au. Eq. oz.) 257,888 230,488
Production cost of sales ($/oz.) $591 $691
OPERATING RESULTS(1,2)
2015 GOLD RESERVE AND RESOURCE ESTIMATES(7)
* Source: Kinross’ Annual Information Form
www.kinross.com
70
• Proceeding with Phase One of the expansion, with Phase
Two an option to further add significant production
• Estimated mine life: Phase One – 2033; if we proceed
with a Phase Two expansion, mine life would be 2030*
WEST AFRICA
TASIAST, MAURITANIA (100%)
Operating mine with a large gold resource located in a prospective district
TONNES
(thousands)
GRADE
(g/t)
OUNCES
(thousands)
2P Reserves 132,178 1.9 8,219
M&I Resources 74,847 1.3 3,210
Inferred Resources 5,596 1.9 346
2014 2015
Production (Au. Eq. oz.) 260,485 219,045
Production cost of sales ($/oz.) $998 $1,021
OPERATING RESULTS(2)
2015 GOLD RESERVE AND RESOURCE ESTIMATES(7)
(2) Refer to endnote #2.
(7) Refer to endnote #7.
* Source: Tasiast Technical Report dated March 30, 2016
www.kinross.com
71
ENDNOTES
1) Unless otherwise noted, gold equivalent production, gold equivalent ounces sold and production cost of sales figures
in this presentation are based on Kinross’ 90% share of Chirano production and sales.
2) Attributable production cost of sales per gold equivalent ounce sold and per gold ounce sold on a by-product basis are
non-GAAP measures. For more information and a reconciliation of this non-GAAP measure for the three and six
months ended June 30, 2016 and 2015, please refer to the news release dated July 27, 2016, under the heading
“Reconciliation of non-GAAP financial measures”, available on our website at www.kinross.com.
3) All-in sustaining cost is a non-GAAP measure. For more information and a reconciliation of this non-GAAP measure
for the three and six months ended June 30, 2016 and 2015, please refer to the news release dated July 27, 2016
under the heading “Reconciliation of non-GAAP financial measures”, available on our website at www.kinross.com.
4) For more information regarding Kinross’ production, cost and capital expenditures outlook for 2016, please refer to the
news releases dated February 10, 2016 and July 27, 2016, both of which are available on our website at
www.kinross.com. Kinross’ outlook for 2016 represents forward-looking information and users are cautioned that
actual results may vary. Please refer to the Cautionary Statement on Forward-Looking Information on slide 2 of this
presentation and in our news release dated July 27, 2016, available on our website at www.kinross.com.
5) For more information regarding the Round Mountain Phase W Scoping Study, please refer to the news release dated
June 29, 2016, which is available on our website at www.kinross.com.
6) Inferred mineral resource has been determined based on a scoping study completed in June 2016. A scoping study is
preliminary in nature and is based on inferred mineral resources that are considered too speculative geologically to
have the economic considerations applied to them that would enable them to be categorized as mineral reserves.
There is no certainty that the results of the scoping study will be realized.
7) For more information regarding Kinross’ 2015 mineral reserve and mineral resource estimates, please refer to our
Annual Mineral Reserve and Mineral Resource Statement as at December 31, 2015 contained in our Annual
Information Form filed March 30, 2016, which is available on our website at www.kinross.com.

More Related Content

What's hot

021617 q4 fy 2017 webcast
021617 q4 fy 2017 webcast021617 q4 fy 2017 webcast
021617 q4 fy 2017 webcastKinrossGold
 
Fourth Quarter 2016 and Full Year Results Presentation
Fourth Quarter 2016 and Full Year Results PresentationFourth Quarter 2016 and Full Year Results Presentation
Fourth Quarter 2016 and Full Year Results Presentationyamanagold2016
 
Mine Tour Chile Minera Florida Site Visit
Mine Tour  Chile  Minera Florida Site VisitMine Tour  Chile  Minera Florida Site Visit
Mine Tour Chile Minera Florida Site Visityamanagold2016
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining ConferenceBMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conferenceyamanagold2016
 
Corporate presentation may 2016 (baml)
Corporate presentation   may 2016 (baml)Corporate presentation   may 2016 (baml)
Corporate presentation may 2016 (baml)newgold2011
 
Guy april-2017-ir-presentation
Guy april-2017-ir-presentationGuy april-2017-ir-presentation
Guy april-2017-ir-presentationguygold2016
 
2016 TD Conference Toronto
2016 TD Conference Toronto2016 TD Conference Toronto
2016 TD Conference TorontoKinrossGold
 
Third Quarter 2016 Results Presentation
Third Quarter 2016 Results PresentationThird Quarter 2016 Results Presentation
Third Quarter 2016 Results Presentationyamanagold2016
 
BMO Global Metals and Mining Conference
BMO Global Metals and Mining ConferenceBMO Global Metals and Mining Conference
BMO Global Metals and Mining ConferenceAgnico Eagle Mines
 
033016 tasiast expansion studies
033016 tasiast expansion studies033016 tasiast expansion studies
033016 tasiast expansion studiesLaura Hildred
 
Kinross Gold Corp European Gold Forum Presentation
Kinross Gold Corp European Gold Forum PresentationKinross Gold Corp European Gold Forum Presentation
Kinross Gold Corp European Gold Forum PresentationKinrossGold
 
Corporate presentation january 2016
Corporate presentation   january 2016Corporate presentation   january 2016
Corporate presentation january 2016newgold2011
 
Alamos corp presentation june 22 2017 final
Alamos corp presentation june 22 2017 finalAlamos corp presentation june 22 2017 final
Alamos corp presentation june 22 2017 finalalamosgoldinc
 
Alamos Corp Presentation_May 11 2017_FINAL
Alamos Corp Presentation_May 11 2017_FINALAlamos Corp Presentation_May 11 2017_FINAL
Alamos Corp Presentation_May 11 2017_FINALalamosgoldinc
 
Baml presentation may 2016 final (4)
Baml presentation may 2016   final (4)Baml presentation may 2016   final (4)
Baml presentation may 2016 final (4)RoyalGold
 
Llg corporate presentation december 2016
Llg   corporate presentation december 2016Llg   corporate presentation december 2016
Llg corporate presentation december 2016masongraphite
 
Raymond James Institutional Investors Conference Orlando
Raymond James Institutional Investors Conference OrlandoRaymond James Institutional Investors Conference Orlando
Raymond James Institutional Investors Conference OrlandoAgnico Eagle Mines
 
European Gold Forum 2017
European Gold Forum 2017European Gold Forum 2017
European Gold Forum 2017yamanagold2016
 

What's hot (20)

021617 q4 fy 2017 webcast
021617 q4 fy 2017 webcast021617 q4 fy 2017 webcast
021617 q4 fy 2017 webcast
 
Fourth Quarter 2016 and Full Year Results Presentation
Fourth Quarter 2016 and Full Year Results PresentationFourth Quarter 2016 and Full Year Results Presentation
Fourth Quarter 2016 and Full Year Results Presentation
 
Mine Tour Chile Minera Florida Site Visit
Mine Tour  Chile  Minera Florida Site VisitMine Tour  Chile  Minera Florida Site Visit
Mine Tour Chile Minera Florida Site Visit
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining ConferenceBMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference
 
Corporate presentation may 2016 (baml)
Corporate presentation   may 2016 (baml)Corporate presentation   may 2016 (baml)
Corporate presentation may 2016 (baml)
 
Guy april-2017-ir-presentation
Guy april-2017-ir-presentationGuy april-2017-ir-presentation
Guy april-2017-ir-presentation
 
2016 TD Conference Toronto
2016 TD Conference Toronto2016 TD Conference Toronto
2016 TD Conference Toronto
 
Third Quarter 2016 Results Presentation
Third Quarter 2016 Results PresentationThird Quarter 2016 Results Presentation
Third Quarter 2016 Results Presentation
 
BMO Global Metals and Mining Conference
BMO Global Metals and Mining ConferenceBMO Global Metals and Mining Conference
BMO Global Metals and Mining Conference
 
033016 tasiast expansion studies
033016 tasiast expansion studies033016 tasiast expansion studies
033016 tasiast expansion studies
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 
Kinross Gold Corp European Gold Forum Presentation
Kinross Gold Corp European Gold Forum PresentationKinross Gold Corp European Gold Forum Presentation
Kinross Gold Corp European Gold Forum Presentation
 
Corporate presentation january 2016
Corporate presentation   january 2016Corporate presentation   january 2016
Corporate presentation january 2016
 
13 december 2016 investor deck final
13 december 2016 investor deck final13 december 2016 investor deck final
13 december 2016 investor deck final
 
Alamos corp presentation june 22 2017 final
Alamos corp presentation june 22 2017 finalAlamos corp presentation june 22 2017 final
Alamos corp presentation june 22 2017 final
 
Alamos Corp Presentation_May 11 2017_FINAL
Alamos Corp Presentation_May 11 2017_FINALAlamos Corp Presentation_May 11 2017_FINAL
Alamos Corp Presentation_May 11 2017_FINAL
 
Baml presentation may 2016 final (4)
Baml presentation may 2016   final (4)Baml presentation may 2016   final (4)
Baml presentation may 2016 final (4)
 
Llg corporate presentation december 2016
Llg   corporate presentation december 2016Llg   corporate presentation december 2016
Llg corporate presentation december 2016
 
Raymond James Institutional Investors Conference Orlando
Raymond James Institutional Investors Conference OrlandoRaymond James Institutional Investors Conference Orlando
Raymond James Institutional Investors Conference Orlando
 
European Gold Forum 2017
European Gold Forum 2017European Gold Forum 2017
European Gold Forum 2017
 

Similar to 091916 denver gold forum pitchbook

Q2 2016 Results Conference Call & Webcast
Q2 2016 Results Conference Call & WebcastQ2 2016 Results Conference Call & Webcast
Q2 2016 Results Conference Call & WebcastKinrossGold
 
BMO Capital Markets 25th Global Metals & Mining Conference Presentation
BMO Capital Markets 25th Global Metals & Mining Conference PresentationBMO Capital Markets 25th Global Metals & Mining Conference Presentation
BMO Capital Markets 25th Global Metals & Mining Conference PresentationKinrossGold
 
022916 bmo conference
022916 bmo conference022916 bmo conference
022916 bmo conferenceLaura Hildred
 
012216 Cibc Whistler
012216 Cibc Whistler012216 Cibc Whistler
012216 Cibc WhistlerKinrossGold
 
110316 q3 webcast website
110316 q3 webcast website110316 q3 webcast website
110316 q3 webcast websiteKinrossGold
 
Q1 2016 Results Conference Call & Webcast
Q1 2016 Results Conference Call & WebcastQ1 2016 Results Conference Call & Webcast
Q1 2016 Results Conference Call & WebcastKinrossGold
 
Kinross Gold Corp Q4 2015 Earnings Webcast Presentation
Kinross Gold Corp Q4 2015 Earnings Webcast PresentationKinross Gold Corp Q4 2015 Earnings Webcast Presentation
Kinross Gold Corp Q4 2015 Earnings Webcast PresentationKinrossGold
 
ACQUISITION OF TWO QUALITY MINES IN NEVADA
ACQUISITION OF TWO QUALITY MINES IN NEVADAACQUISITION OF TWO QUALITY MINES IN NEVADA
ACQUISITION OF TWO QUALITY MINES IN NEVADAKinrossGold
 
080217 q2 webcast
080217 q2 webcast080217 q2 webcast
080217 q2 webcastKinrossGold
 
Kinross minex 2016
Kinross minex 2016Kinross minex 2016
Kinross minex 2016Chibezova
 
100317 tasiast mine tour presentation final
100317 tasiast mine tour presentation final100317 tasiast mine tour presentation final
100317 tasiast mine tour presentation finalKinrossGold
 
062916 nevada-mine-tour-presentation-final-printed
062916 nevada-mine-tour-presentation-final-printed062916 nevada-mine-tour-presentation-final-printed
062916 nevada-mine-tour-presentation-final-printedKinrossGold
 
062916 nevada mine tour presentation final printed
062916 nevada mine tour presentation   final printed062916 nevada mine tour presentation   final printed
062916 nevada mine tour presentation final printedKinrossGold
 
Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...
Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...
Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...KinrossGold
 
Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...
Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...
Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...KinrossGold
 
033016 tasiast expansion studies website
033016 tasiast expansion studies   website033016 tasiast expansion studies   website
033016 tasiast expansion studies websiteKinrossGold
 
050317 q1 2017 webcast
050317 q1 2017 webcast050317 q1 2017 webcast
050317 q1 2017 webcastKinrossGold
 
022617 bmo conference
022617 bmo conference022617 bmo conference
022617 bmo conferenceKinrossGold
 
110917 q3 webcast website
110917 q3 webcast website110917 q3 webcast website
110917 q3 webcast websiteKinrossGold
 
021617 q4 fy 2017 webcast
021617 q4 fy 2017 webcast021617 q4 fy 2017 webcast
021617 q4 fy 2017 webcastKinrossGold
 

Similar to 091916 denver gold forum pitchbook (20)

Q2 2016 Results Conference Call & Webcast
Q2 2016 Results Conference Call & WebcastQ2 2016 Results Conference Call & Webcast
Q2 2016 Results Conference Call & Webcast
 
BMO Capital Markets 25th Global Metals & Mining Conference Presentation
BMO Capital Markets 25th Global Metals & Mining Conference PresentationBMO Capital Markets 25th Global Metals & Mining Conference Presentation
BMO Capital Markets 25th Global Metals & Mining Conference Presentation
 
022916 bmo conference
022916 bmo conference022916 bmo conference
022916 bmo conference
 
012216 Cibc Whistler
012216 Cibc Whistler012216 Cibc Whistler
012216 Cibc Whistler
 
110316 q3 webcast website
110316 q3 webcast website110316 q3 webcast website
110316 q3 webcast website
 
Q1 2016 Results Conference Call & Webcast
Q1 2016 Results Conference Call & WebcastQ1 2016 Results Conference Call & Webcast
Q1 2016 Results Conference Call & Webcast
 
Kinross Gold Corp Q4 2015 Earnings Webcast Presentation
Kinross Gold Corp Q4 2015 Earnings Webcast PresentationKinross Gold Corp Q4 2015 Earnings Webcast Presentation
Kinross Gold Corp Q4 2015 Earnings Webcast Presentation
 
ACQUISITION OF TWO QUALITY MINES IN NEVADA
ACQUISITION OF TWO QUALITY MINES IN NEVADAACQUISITION OF TWO QUALITY MINES IN NEVADA
ACQUISITION OF TWO QUALITY MINES IN NEVADA
 
080217 q2 webcast
080217 q2 webcast080217 q2 webcast
080217 q2 webcast
 
Kinross minex 2016
Kinross minex 2016Kinross minex 2016
Kinross minex 2016
 
100317 tasiast mine tour presentation final
100317 tasiast mine tour presentation final100317 tasiast mine tour presentation final
100317 tasiast mine tour presentation final
 
062916 nevada-mine-tour-presentation-final-printed
062916 nevada-mine-tour-presentation-final-printed062916 nevada-mine-tour-presentation-final-printed
062916 nevada-mine-tour-presentation-final-printed
 
062916 nevada mine tour presentation final printed
062916 nevada mine tour presentation   final printed062916 nevada mine tour presentation   final printed
062916 nevada mine tour presentation final printed
 
Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...
Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...
Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...
 
Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...
Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...
Results of the Tasiast Phase Two and Round Mountain Phase W Feasibility Studi...
 
033016 tasiast expansion studies website
033016 tasiast expansion studies   website033016 tasiast expansion studies   website
033016 tasiast expansion studies website
 
050317 q1 2017 webcast
050317 q1 2017 webcast050317 q1 2017 webcast
050317 q1 2017 webcast
 
022617 bmo conference
022617 bmo conference022617 bmo conference
022617 bmo conference
 
110917 q3 webcast website
110917 q3 webcast website110917 q3 webcast website
110917 q3 webcast website
 
021617 q4 fy 2017 webcast
021617 q4 fy 2017 webcast021617 q4 fy 2017 webcast
021617 q4 fy 2017 webcast
 

Recently uploaded

Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...First NO1 World Amil baba in Faisalabad
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxHenryBriggs2
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Roomrran7532
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberAgent, Inc.
 

Recently uploaded (20)

Falcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best PlatformFalcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best Platform
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptx
 
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 

091916 denver gold forum pitchbook

  • 1. www.kinross.com 1 KINROSS GOLD CORPORATION Denver Gold Forum September 18-21 2016
  • 2. www.kinross.com 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained or incorporated by reference in or made in giving this presentation and responses to questions, including but not limited to any information as to the future performance of Kinross, constitute “forward looking statements” within the meaning of applicable securities laws, including the provisions of the Securities Act (Ontario) and the provisions for “safe harbor” under the United States Private Securities Litigation Reform Act of 1995 and are based on expectations, estimates and projections as of the date of this presentation. Forward-looking statements contained in this presentation include those statements on slides with, and statements made under, the headings “2016 Production & Cost Outlook”, “Tasiast Update”, “Attractive Growth Opportunities”, “Strong Balance Sheet”, and “Principles for Building Value”, and include without limitation statements with respect to our guidance for production, production costs of sales, all-in sustaining cost and capital expenditures, project schedules, mine life, continuous improvement and other cost savings opportunities, as well as references and other statements with respect to other possible events and opportunities, including, without limitation, estimates and the realization of such estimates (such as mineral or gold reserves and resources, and mine life); future development, mining activities, production and growth (including but not limited to cost and timing); success of exploration or development of operations; the future price of gold and silver; currency fluctuations; expected capital requirements; government regulation; and environmental risks and proceedings. The words “2016E”, “ahead”, “anticipate”, “assumption”, “believe”, “budget”, “contemplate”, “contingent”, “encouraging”, “enhancing”, “estimate”, “expect”, “explore”, “feasibility”, “flexibility”, “focus”, “forecast”, “forward”, “future”, “guidance”, “initiative”, “indicate”, “likely”, “objective”, “on track”, “opportunity”, “outlook”, “phased”, “plan”, “positioned”, “possible”, “potential”, “principles”, “priority”, “project”, “risk”, “schedule”, “scoping”, “strategy”, “study”, “target”, “trend”, “tracking” or “upside”, or variations of or similar such words and phrases, or statements that certain actions, events or results may, can, could, would, should, might, occur or will be taken or realized, and similar expressions identify forward looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Kinross as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Statements representing management’s financial and other outlook have been prepared solely for purposes of expressing their current views regarding the Company’s financial and other outlook and may not be appropriate for any other purpose. Many of these uncertainties and contingencies can affect, and could cause, Kinross’ actual results to differ materially from those expressed or implied in any forward looking statements made by, or on behalf of, Kinross. There can be no assurance that forward looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. All of the forward looking statements made in this presentation are qualified by these cautionary statements, and those made in our filings with the securities regulators of Canada and the U.S., including but not limited to those cautionary statements made in the “Risk Factors” section of our most recently filed Annual Information Form, the “Risk Analysis” section of our FYE 2015 and Q2 2016 Management’s Discussion and Analysis, and the “Cautionary Statement on Forward-Looking Information” in our news release dated July 27, 2016, to which readers are referred and which are incorporated by reference in this presentation, all of which qualify any and all forward‐looking statements made in this presentation. These factors are not intended to represent a complete list of the factors that could affect Kinross. Kinross disclaims any intention or obligation to update or revise any forward‐looking statements or to explain any material difference between subsequent actual events and such forward‐looking statements, except to the extent required by applicable law. Other information Where we say "we", "us", "our", the "Company", or "Kinross" in this presentation, we mean Kinross Gold Corporation and/or one or more or all of its subsidiaries, as may be applicable. The technical information about the Company’s mineral properties contained in this presentation (other than exploration activities) has been prepared under the supervision of Mr. John Sims, an officer of the Company who is a “qualified person” within the meaning of National Instrument 43-101 (“NI 43-101”). The technical information about the Company’s exploration activities contained in this presentation has been prepared under the supervision of Mr. Sylvain Guerard, an officer of the Company who is a “qualified person” within the meaning of NI 43-101.
  • 3. www.kinross.com 3 KINROSS VALUE PROPOSITION EXCELLENT OPERATIONAL TRACK RECORD • Continuing to meet or outperform our operational targets STRONG BALANCE SHEET • $2.2B in liquidity with net debt to EBITDA ratio of 1.0x ATTRACTIVE FUTURE GROWTH OPPORTUNITIES • Proceeding with TASIAST PHASE ONE; expected to reach full production in Q2 2018 • Completed pre-feasibility for TASIAST PHASE TWO; opportunity to further increase production and reduce costs • Mineral reserve estimate conversion and exploration at BALD MOUNTAIN North and South Zones COMPELLING RELATIVE VALUE • Attractive value opportunity relative to peers, considering annual production, cost structure, track record and relatively low-risk growth opportunities SHARE INFORMATION K – Toronto Stock Exchange KGC – New York Stock Exchange
  • 5. www.kinross.com 5 OPERATIONAL EXCELLENCE STRONG TRACK RECORD 2012 2013 2014 2015 MET or EXCEEDED annual production guidance MET or came in UNDER annual cost of sales guidance MET or came in UNDER annual capital expenditures guidance    CONSISTENTLY MEETING OR OUTPERFORMING TARGETS          5
  • 6. www.kinross.com 6 Forecasting increased production in 2016 of over 2.7M oz. Au eq. OPERATIONAL EXCELLENCE 2016 PRODUCTION & COST OUTLOOK(4) (1) Refer to endnote #1. (2) Refer to endnote #2. 2015 2016E Gold Equivalent Production(1) (millions) 2015 2016E $696 $675 to $735 Production Cost of Sales(2) ($ per ounce) All-in Sustaining Cost(3) ($ per ounce) 2015 2016E $975 $890 to $990 (3) Refer to endnote #3. (4) Refer to endnote #4. 2.7 – 2.9 2.6
  • 7. www.kinross.com 7 OPERATIONAL EXCELLENCE 2016 OUTLOOK(4) Region Gold Production (000 Au eq. oz.) % of Total Production Production Cost of Sales(2) ($/oz. Au eq.) Americas 1,670 – 1,770 61% $730 - $790 West Africa (attributable) 360 - 420 14% $850 - $920 Russia 670 – 710 25% $460 - $490 Total Kinross: 2.7 – 2.9 million 100% $675 - $735 (2) Refer to endnote #2. (3) Refer to endnote #3. (4) Refer to endnote #4. 2016E All-in Sustaining Cost ($ per gold equivalent ounce)(3) $890 to $990 Total Capital Expenditures $755 Sustaining Capital ($M) $430 Non-Sustaining Capital ($M) $300 Capitalized Interest ($M) $25 2016 PRODUCTION & COST OF SALES OUTLOOK 2016 CAPITAL EXPENDITURES & ALL-IN SUSTAINING COST OUTLOOK • Tracking below guidance for capital expenditures and reviewing timing of capital spend for the second half of the year
  • 8. www.kinross.com 8 2016E GOLD EQUIVALENT PRODUCTION(1,4) OPERATIONAL EXCELLENCE DIVERSIFIED PORTFOLIO OF OPERATING MINES GLOBAL PORTFOLIO Operating mine Development project Round Mountain Kettle River-Buckhorn Fort Knox La Coipa Paracatu Maricunga Kupol Dvoinoye Chirano Tasiast AMERICASRUSSIA WEST AFRICA (3) Refer to endnote #3. Over 60% of estimated 2016 gold equivalent production from mines located in the Americas 61%14% 25% Americas West Africa Russia 2.7-2.9M ounces (1) Refer to endnote #1. (4) Refer to endnote #4. Bald Mountain
  • 9. www.kinross.com 9 • Six mines located in the US, Brazil and Chile • Over 60% of annual production is from the Americas in 2016 AMERICAS 9
  • 10. www.kinross.com 10 SECOND QUARTER 2016 HIGHLIGHTS AMERICAS • PARACATU production increased due to higher ore processed and benefits from the tailings reprocessing initiative  Region received lower than average rainfall during 2015/2016 rainy season  Expect to curtail Plant 1 operations in the second half of Q3 2016 OPERATION GOLD EQUIVALENT PRODUCTION PRODUCTION COST OF SALES ($/oz.)(2) Q2 2016 H1 2016 Q2 2016 H1 2016 Fort Knox 97,221 185,021 $793 $753 Round Mountain 92,813 185,739 $778 $723 Bald Mountain 32,704 53,126 $1,217 $1,205 Kettle River - Buckhorn 25,031 53,343 $734 $761 Paracatu 126,774 246,150 $692 $688 Maricunga 44,304 103,380 $939 $874 AMERICAS TOTAL 418,847 826,759 $807 $768 • Strong performances at FORT KNOX, ROUND MOUNTAIN, KETTLE-RIVER BUCKHORN and PARACATU • BALD MOUNTAIN production higher compared to Q1 2016 due to higher ore mined and processed  Performance expected to continue to improve in the second half of 2016 (2) Refer to endnote #2.
  • 11. www.kinross.com 11 OPERATIONAL EXCELLENCE BALD MOUNTAIN, NEVADA Bald Mountain has the potential to be a long-life mine in Kinross’ portfolio Multiple opportunities to add to proven and probable mineral reserve estimates and extend estimated mine life • Near-Term: potential to double current proven and probable reserve estimates by end of Q1 2017 • Longer Tem: potential for a significant portion of remaining mineral resource to convert to mineral reserve with future infill drilling and permitting • Exploration: significant pipeline of high- quality targets, with over 20 target areas identified and additional brownfield and greenfield opportunities
  • 12. www.kinross.com 12 JV Zone North Zone South Zone Winrock Top Redbird Saga Vantage Gator Saddle Luxe BALD MOUNTAIN, NEVADA NEAR-TERM OPPORTUNITIES NORTH ZONE (100% Kinross) • Drilling to focus on converting estimated mineral resources to mineral reserves and extending delineation of known orebodies – open in several directions • 17,000 meters completed at Saga, Top and Redbird  6,000 meters planned at Winrock this fall • Encouraging results as team continues to gain a better geological understanding of the property SOUTH ZONE (100% Kinross) • Drilling at Vantage Complex initiated upon receipt of permit  96,500 m drill campaign progressing as planned  3 drill rigs currently active; increasing to 6 by mid- September 2016 Priority Exploration Targets Focused on developing deposits in the North and South Zones which have potential to double mineral reserve estimates by end of Q1 2017 40km 15km
  • 13. www.kinross.com 13 OPERATIONAL EXCELLENCE ROUND MOUNTAIN, NEVADA Strong cash flow generator with opportunities to extend mine life STRONG NEAR-TERM CASH FLOW CONTRIBUTOR • Operation currently benefitting from previously-completed stripping campaign • Incremental, high-margin ounces from Process Solution Management (PSM) • Milling expected to continue until 2022 from stockpiled material, with heap leach production expected to continue until 2027 ADDITIONAL UPSIDE OPPORTUNITIES • Strong focus on improving performance and cost reduction through continuous improvement initiatives • Implementing initiatives to accelerate timing and increase number of PSM ounces PHASE W LONGER-TERM OPTION TO EXTEND MINE LIFE • Phase W has added an incremental 2.4Moz. of estimated inferred mineral resource(5,6) • Encouraging results from scoping study for a Phase 1, which focused on a portion (1.3Moz.) of the new mineral resource estimate (5) Kinross’ inferred mineral resource estimates are based on a $1,400/oz. gold price assumption. Refer to Endnote #5. (6) Refer to Endnote #6.
  • 14. www.kinross.com 14 OPPORTUNITY TO UNLOCK VALUE FROM THE HEAP LEACH PADS • Significant amount of ore stacked on the pads since heap leaching commenced in 1993  ~800Mt of ore stacked on 450’ high heaps • Estimated 7.8Moz ounces stacked, with ~5.7Moz. recovered to date(i) PROCESS SOLUTION MANAGEMENT • Implemented a number of initiatives and operational improvements aimed at:  Improving heap leach operations  Increasing recovery and recovery timing LOW COST INCREMENTAL PRODUCTION • PSM expected to add 200-230koz. Au eq. over the life of mine at ~$200-$400/oz. (opex + capex) ROUND MOUNTAIN, NEVADA PROCESS SOLUTION MANAGEMENT Achieving results from continuous improvement, with additional future opportunities (i) Only a portion of the 2.1Moz. difference between ounces stacked and ounces recovered to date is expected to be recovered.
  • 15. www.kinross.com 15 • Reached a decision to suspend operations in Q4 2016 due to competing capital priorities • Suspension implemented in August, earlier than planned, due to operational restrictions imposed by ongoing regulatory proceedings • Will continue to explore further permitting efforts and review the operation and its mineral resource model to consider possible options for re-starting mining DISCIPLINED CAPITAL ALLOCATION MARICUNGA UPDATE TONNES (thousands) GRADE (g/t) OUNCES (thousands) 2P Reserves 40,641 0.8 1,042 M&I Resources 198,084 0.7 4,275 Inferred Resources 53,942 0.6 1,053 2015 GOLD RESERVE AND RESOURCE ESTIMATES(7) Suspended mining and crushing operations at Maricunga in August (7) Refer to endnote #7.
  • 16. www.kinross.com 16 • Continued strong performance from the high-grade, low-cost Kupol and Dvoinoye underground minesRUSSIA 16
  • 17. www.kinross.com 17 SECOND QUARTER 2016 HIGHLIGHTS RUSSIA KUPOL-DVOINOYE • Continued strong performance • Q2 production cost of sales decreased to $417/oz.  Lowest level since Q2 2011  Benefiting from sustained favourable FX rates and rigorous cost management (2) Refer to endnote #2. OPERATION GOLD EQUIVALENT PRODUCTION PRODUCTION COST OF SALES ($/oz.)(2) Q2 2016 H1 2016 Q2 2016 H1 2016 Kupol - Dvoinoye 183,638 376,088 $417 $430 RUSSIA TOTAL 183,638 376,088 $417 $430
  • 18. www.kinross.com 18 EXPLORATION HIGHLIGHTS KUPOL: MOROSHKA (7) Refer to endnote #7. Advancing development of the Moroshka satellite deposit located near Kupol mill HIGH-GRADE DEPOSIT • Located approximately 4km east of Kupol and within the Kupol license • Initial discovery in 2012 • Completed pre-feasibility study in 2015, adding ~180koz. to mineral reserve estimates for Kupol(7) • Expect to begin mining in 2018; ore to be processed in the Kupol mill DISTRICT EXPLORATION • Several near-mine targets defined between Kupol and Moroshka • Advancing early stage exploration within ~100km radius around Kupol
  • 19. www.kinross.com 19 EXPLORATION HIGHLIGHTS DVOINOYE: SEPTEMBER NORTH-EAST SEPTEMBER NORTH-EAST • Defined near-surface, high-grade M&I mineral resource estimate of 68koz. Au grading 32 g/t(7) • Material being fast-tracked to production, expected in 2017 DVOINOYE ZONE 1 • Located on the current mining lease • Drilling confirmed continuity and grade of a mineralized vein at the bottom of a historically mined open-pit • Mineral resource estimate expected in 2016 (7) Refer to endnote #7.
  • 20. www.kinross.com 20 RUSSIA FOREIGN INVESTMENT The world’s leading companies continued to invest in Russia in 2016
  • 21. www.kinross.com 21 RUSSIA FOREIGN INVESTMENT ADVISORY COUNCIL FIAC is chaired by the Russian Prime Minister and includes CEOs from over 50 international companies
  • 22. www.kinross.com 22 • Two operating mines located in a region with excellent growth and exploration prospects • Strong focus on optimizing efficiency and performance WEST AFRICA 22
  • 23. www.kinross.com 23 OPERATIONAL EXCELLENCE WEST AFRICA • TASIAST Q2 production lower due to 18-day strike and temporary suspension of mining and processing • Improved performance expected in H2 2016 • CHIRANO production decreased as site transitions from mining in the Awkaaba underground to Paboase  Resulted in fewer tonnes mined and lower grades  Recovery plan implemented in March; beginning to see improvements  Expect higher production and lower costs in the second half of the year OPERATION GOLD EQUIVALENT PRODUCTION(1) PRODUCTION COST OF SALES ($/oz.)(2) Q2 2016 H1 2016 Q2 2016 H1 2016 Tasiast 29,577 76,655 $1,240 $1,073 Chirano (90%)(1) 39,205 79,228 $1,142 $1,061 WEST AFRICA TOTAL(1) 68,782 155,883 $1,184 $1,067 (1) Refer to endnote #1. (2) Refer to endnote #2.
  • 24. www.kinross.com 24 OPERATIONAL EXCELLENCE TASIAST UPDATE • Temporarily suspended mining and processing operations at Tasiast on June 18, 2016 due to expatriate work permit issues • Agreed on required “Mauritanization” plan to increase number of skilled nationals working at Tasiast • Normal mining and processing operations resumed mid-August PHASE ONE EXPANSION • Phase One’s ramp up to full production may be extended into Q2 2018 • Government support for Tasiast and the expansion remains strong • Engineering is 70% complete • Procurement of critical long lead packages now essentially complete • Recently awarded two major construction contracts for earthworks and concrete works Normal mining and processing operations resumed in mid-August
  • 25. www.kinross.com 25 TAMAYA El Gaicha license Tasiast Sud license Tmeimichat license Imkebdene license N’Daouas license FENNEC C67 C68 WEST BRANCH Satellite deposit Operating Mine New deposit 2015 EXPLORATION HIGHLIGHTS TASIAST DISTRICT Prospective 80km trend with encouraging results on near-mine and step-out targets For additional information, please see Kinross’ news release dated February 10, 2016 and Appendices A and B, which are available on our website at www.kinross.com.
  • 26. www.kinross.com 26 EXPLORATION HIGHLIGHTS CHIRANO, GHANA Exploration focused on 8 km mine trend to target open-pit and underground extensions SURAW • Significant gold mineralization was extended 200 m south of the existing M&I mineral resource estimates and also 300 m down dip • 2015 results demonstrate upside potential of the deposit AKWAABA • Drilling delineated potential extension of the mineralization ~100 m down dip below current reserve limits • Planning infill drilling in 2016 to better define the orebody extension and evaluate economic viability For additional information, please see Kinross’ news release dated February 10, 2016 and Appendices A and B, which are available on our website at www.kinross.com.
  • 28. www.kinross.com 28 STRONG BALANCE SHEET SOLID FINANCIAL POSITION $0.7 $1.5 Cash & cash equivalents Undrawn credit facilities LIQUIDITY POSITION(i) Maintaining balance sheet strength & financial flexibility remain priority objectives MAINTAINING FINANCIAL FLEXIBILITY • Robust cash flow generation added $218M to cash balance in Q2 2016 NO DEBT MATURITIES PRIOR TO 2020 • Repaid $250 million of senior notes September 1, 2016 • Extended maturity dates of the $500M term loan and $1.5B credit facility by one year, to 2020 and 2021 respectively • Strong financial position to fund the Tasiast Phase One expansion with existing liquidity $2.2B (i) Kinross’ liquidity position as at June 30, 2016, adjusted to reflect repayment of $250 million of senior notes on September 1, 2016
  • 29. www.kinross.com 29 2016 OUTLOOK REDUCED OVERHEAD $208 $165 2015 2016E Overhead Expense (US$ millions) • 2016 overhead expense expected to be US$165 million(4) • 20% REDUCTION year-over-year reflects savings from corporate headcount reduction • Benefits from lower Canadian dollar reflected in guidance (4) Overhead expense consists of general and administrative and business development expense. Refer to endnote #4.
  • 30. www.kinross.com 30 FINANCIAL DISCIPLINE FUEL & CURRENCY HEDGES Managing exposure to fluctuations in foreign currency and input commodity prices % of remaining 2016 exposure hedged Average Rate Brazilian real 27% 3.84 Chilean peso 30% 657 Russian rouble - - Canadian dollar 51% 1.32 Oil & Fuel 46%(i) (Refer to note ii) (i) Consists of crude oil swap contracts (344,610 barrels at an average rate of $46.07) as at June 30, 2016. (ii) As a result of pre-paid fuel purchases mainly relating to the Company’s Russian operations and fixed pricing in Ghana and Brazil, Kinross’ unhedged, free- floating oil & fuel exposure for 2016 is ~50% of total consumption Summary of 2016 foreign currency and energy hedges as at June 30, 2016 • Strategic decision to hedge 50% of the Tasiast Phase One project’s fuel oil requirements at $46/bbl for next 36 months  Will look for additional opportunities to hedge an additional 25% of fuel oil requirements at attractive prices
  • 31. www.kinross.com 31 2016 OUTLOOK CURRENCY & OIL BENEFITS Well-positioned to benefit from further currency and oil weakness Change from Assumptions Impact to cost of sales FX 10% US$15/oz. Rouble 10% US$14/oz.(ii) Brazilian Real 10% US$24/oz.(ii) Oil $10/bbl. US$3/oz. Budget Spot(i) Gold US$1,100 US$1,345 Oil US$55/bbl. US$45/bbl. Russian Rouble 55 64 Brazilian Real 3.75 3.20 Chilean Peso 650 662 2016 Budget Assumptions & Sensitivities(4) • Benefits of favourable FX and oil prices partially offsetting lower gold prices 20 30 40 50 60 70 80 90 100 110 Jun-14 Dec-14 Jun-15 Dec-15 Jun-16 Performance(rebasedto100) Brazilian Real Russian Rouble Canadian Dollar Oil Gold (i) Source: Bloomberg – September 7, 2016. (ii) Impact to production cost of sales of the Russian operations (iii) Impact to production cost of sales of the Brazil operation (4) Refer to endnote #4.
  • 33. www.kinross.com 33 TASIAST EXPANSION PROJECT RESULTS OF THE TASIAST TWO-PHASED EXPANSION STUDIES • Two-phased approach offers an attractive path to Tasiast’s significant growth potential at a significantly lower forecast capital cost than previously estimated • Proceeding with Phase One of the expansion 33
  • 34. www.kinross.com 34 ATTRACTIVE GROWTH OPPORTUNITIES TASIAST, MAURITANIA • Existing mine with an 8,000 t/d mill originally designed to process ore from a series of small open pits 34
  • 35. www.kinross.com 35 RELATIVELY LOW-RISK BROWNFIELDS EXPANSION PROJECT • Have owned and operated the mine for over 5 years • Highly trained local team • Most infrastructure already in place • Well-defined mineral resource estimate TASIAST EXPANSION PROJECT LARGE OREBODY WITH LOW EXECUTION RISK Challenge is to right-size the processing capacity to capture the full value and potential of Tasiast’s large mineral resource estimate TASIAST OREBODY & MINERAL RESOURCE PIT(i) (i) For additional information, please refer to the Tasiast Technical Report dated March 30, 2016 and to our news release dated March 30, 2016, available on our website at www.kinross.com.
  • 36. www.kinross.com 36 DISCIPLINED PROJECT DEVELOPMENT PHASED APPROACH TO A TASIAST MILL EXPANSION • Phase One expansion offers a number of expected attractive attributes:  Leverages existing infrastructure  Relatively low execution risk  Manageable capital expenditure  Robust economics on a stand-alone basis  Offers flexibility to potentially proceed with a larger Phase Two expansion 36
  • 37. www.kinross.com 37 TASIAST EXPANSION PROJECT TWO-PHASED EXPANSION CONCEPT PHASE ONE FLOW SHEET PHASE ONE: EXPANSION TO 12,000 t/d • Leverages existing mill infrastructure to increase throughput to 12,000 t/d from 8,000 t/d • Includes installation of an oversized 40’ SAG mill and gyratory crusher • Enhances processing of the harder, higher grade West Branch ore • Improves Tasiast’s forecast production and operating costs, while maintaining optionality to potentially proceed with larger Phase 2 expansion in the future Gyratory crusher Ore stockpile Oversized SAG mill Existing ball mills Leaching Refining
  • 38. www.kinross.com 38 Phase One expected to reduce cost per ounce by ~50% and to increase annual production by ~90% Metric Estimates Average annual production (2018-2027) 409,000 ounces Production cost of sales (2018-2027) $535 per ounce All-in sustaining cost (2018-2027) $760 per ounce Initial capital $300 million Capitalized pre-stripping (2016-2019) $428 million Construction period 2 years Mine life 2033 (18 years) Internal rate of return (assuming $1,200 gold price) 20% Net present value(i) $635 million The initial capital expenditure estimate of $300 million includes: • Installation of an oversized SAG mill, gyratory crusher and 3 leach tanks • Maintenance improvements to other components of the processing circuit • Additional tailings capacity Category ($ millions) Direct cost (including freight) $175 Indirect and owner’s cost $60 Taxes / duties $20 Contingency $45 INITIAL CAPITAL ESTIMATE TASIAST EXPANSION PROJECT PHASE ONE FEASIBILITY STUDY RESULTS (i) Calculated based on a 5% discount rate from April 1, 2016 and after tax.
  • 39. www.kinross.com 39 PHASE TWO: EXPANSION TO 30,000 t/d • Contemplates installation of an additional 18,000 t/d of throughput capacity for a total combined capacity of 30,000 t/d • Project would consist of: • Replacing the two current ball mills with a larger, new ball mill • Adding new leaching, thickening and refining capacity • Construction of additional power generation capacity • Additions to mining fleet • Upgrades to water supply infrastructure TASIAST EXPANSION PROJECT TWO-PHASED EXPANSION CONCEPT PHASE TWO FLOW SHEET Gyratory crusher Ore stockpile Oversized SAG mill New, larger ball mill Additional leaching capacity Thickening
  • 40. www.kinross.com 40 Combined Phase One and Two expansion expected to transform Tasiast into Kinross’ largest mine with estimated costs amongst the lowest in our portfolio Metric Estimates for Phase One and Two combined Average annual production (2020-2026) 777,000 ounces Production cost of sales (2020-2026) $460 per ounce All-in sustaining cost (2020-2026) $665 per ounce Mine life 2030 (15 years) Initial capital cost $920 million Capitalized pre-stripping (2016-2019) $547 million Internal rate of return (assumes $1,200 gold price) 17% Net present value(i) $885 million TASIAST EXPANSION PROJECT PHASE TWO PRE-FEASIBILITY STUDY RESULTS Category ($ millions) Direct cost (including freight) $380 Indirect and owner’s cost $100 Taxes / duties $40 Contingency $100 INITIAL CAPITAL ESTIMATE (PHASE TWO INCREMENTAL) (i) Calculated based on a 5% discount rate from April 1, 2016 and after tax.
  • 41. www.kinross.com 41 Objective was to achieve similar production and cost output as the 38k t/d case with significantly lower initial and sustaining capital TASIAST EXPANSION PROJECT TWO-PHASED APPROACH: CAPITAL DISCIPLINE Metric Estimates for Phase One & Two Combined 30k t/d Estimates for Previous 38k t/d Scenario Average annual production 777,000 ounces (2020-2026) 848,000 ounces (first 5 years) Cash costs (per ounce) $460 (2020-2026) $501(first 5 years) All-in Sustaining cost (per ounce) $665 (2020-2026) $792 (first 5 years) Mine life 2030 2029 Initial capital cost(i) $920 million $1.6 billion Sustaining capital (3-year post start-up) $234 million $376 million Internal rate of return 17%(ii) 10%(iii) Net present value $885 million(iv) $500 million(v) (i) Excludes capitalized pre-stripping (ii) Calculated April 1, 2016 forward. (iii) Calculated January 1, 2014 forward. (iii) After-tax and based on a $1,200/oz. gold price assumption, a $45/bbl oil price assumption and 5% discount rate. (iv) After-tax and based on a $1,200/oz. gold price assumption, a $100/bbl oil price assumption and 5% discount rate.
  • 42. www.kinross.com 42 FACTORS DRIVING THE LOWER ESTIMATED INITIAL CAPITAL COST Phase One and Phase Two combined initial capital estimated to be $920 million(i) TASIAST EXPANSION PROJECT REDUCED CAPEX ESTIMATE Smaller scale • Most of the equipment is smaller (e.g. crusher) • Fewer units required (e.g. few leach tanks, generators) • Two-phased approach leverages more of the existing infrastructure than the previous 38k t/d option  E.g. ponds, piping, roads, power plant • Planning for two smaller projects to be built in a series vs. one large scale project • Allows for a more nimble, efficient and leaner approach to engineering and construction • Overall market conditions have changed since 2014 • More favourable environment for procurement of equipment and contracts • Significant reductions in many areas Smaller scale Leverages existing infrastructure Efficient approach to engineering & construction Market conditions (i) Excludes capitalized pre-stripping
  • 43. www.kinross.com 43 FACTORS DRIVING THE LOWER ESTIMATED SUSTAINING CAPITAL • Highly confident seawater pipeline no longer required  Results of hydrological and hydrogeological studies increased confidence that an expansion to 30k t/d would not require a seawater pipeline  Will instead make upgrades to existing borefield infrastructure • Realizing savings from LOM tailings dam construction costs  Move towards downstream construction methodology, using direct waste hauls from the pit  Similar to approach recently implemented at Round Mountain Expecting significant sustaining capital savings TASIAST EXPANSION PROJECT REDUCED SUSTAINING CAPITAL
  • 44. www.kinross.com 44 TASIAST EXPANSION PROJECT PHASE TWO: NEXT STEPS • The timeline contemplated in the pre- feasibility study assumes:  Initiating a feasibility study in late 2016  Being in a position to make a decision in late 2017  If a positive decision is made, construction would begin in 2018  Full production in the 30k t/d expanded plant would commence in 2020 Phase Two pre-feasibility study envisions full production beginning in 2020
  • 45. www.kinross.com 45 TASIAST EXPANSION PROJECT SITE LAYOUT Camp West Branch Pit Airstrip Power Plant Phase One tailings facility Current tailings facility ADR plant Dump leach Piment pits New crusher New stockpile New SAG mill Phase One and Two expansions Truck shop 45
  • 46. www.kinross.com 46 PHASE ONE GOLD PRICE SENSITIVITY ESTIMATES TASIAST EXPANSION PROJECT SENSITIVITIES TABLE $1,100 $1,200 $1,300 $1,400 $1,500 IRR 13% 20% 26% 33% 40% NPV $345M $635M $910M $1.2B $1.5B PHASE ONE AND PHASE TWO COMBINED GOLD PRICE SENSITIVITY ESTIMATES $1,100 $1,200 $1,300 $1,400 $1,500 IRR 12% 17% 22% 27% 33% NPV $485M $885M $1.3B $1.7B $2.1B
  • 47. www.kinross.com 47 2016 2017 2016 2017 2018 2019 2017 2018 2019 2020 2019 2020 2021 2022 2023 2019 2020 2021 2022 2023 2024 2025 2026 TASIAST EXPANSION PROJECT ILLUSTRATIVE MINE PLAN SCHEDULE (30k t/d) For additional information, please refer to the Tasiast Technical Report dated March 30, 2016, available on our website at www.kinross.com.
  • 48. www.kinross.com 48 • Phase W is a large zone of known mineralization at depth and to the west of the open-pit  Geological extension of the same deposit that has been mined for past 38 years • Declared an additional mineral resource of 2.4Moz. for Phase W(5,6) • Project is essentially an additional pushback at an existing pit • Would require moving some existing infrastructure • Stripping could start as early as 2018, if a decision to proceed is made  Subject to further study and analysis, and gold price environment ROUND MOUNTAIN PHASE W PHASE W - OVERVIEW Phase W is an opportunity to potentially extend estimated mine life (5) Refer to endnote #5. (6) Refer to endnote #6.
  • 49. www.kinross.com 49 • Focused on a 1.3Moz portion of the new resource estimate (Phase 1)(5,6), which could extend mine life  51Mt with an average grade of 0.8 g/t ROUND MOUNTAIN PHASE W PHASE 1 SCOPING STUDY RESULTS Section View of Existing LOM Pit and Phase 1 • Initial results of Phase 1 looks encouraging; more work required  Post-scoping optimization studies planned for 2016 to examine a number of opportunities identified during the scoping study  Infill drill campaign planned for H2 2016  Potential to convert to mineral reserve in 2017 Grade Oz/ton Phase W Phase 1 Current LOM pit Current mining surface 2016 resource update (5) Refer to Endnote #5. (6) Refer to Endnote #6.
  • 50. www.kinross.com 50 ORGANIC GROWTH OPPORTUNITIES LA COIPA PROJECT • Pre-feasibility study on La Coipa completed during Q3 2015 • Project offers a number of expected attractive attributes:  Leverages existing infrastructure  Relatively low execution risk  Modest capital investment  Exploration upside  Located in an attractive jurisdiction 50
  • 51. www.kinross.com 51 EXPLORATION HIGHLIGHTS LA COIPA, CHILE Encouraging results along a prospective 3 km trend The Pompeya deposit is also referred to as La Coipa Phase 7. For additional information, please see Kinross’ news release dated February 10, 2016 and Appendices A and B, which are available on our website at www.kinross.com.
  • 53. www.kinross.com 53 TRACK RECORD OVER THE PAST FOUR YEARS Produced over 10Moz. gold equivalent $950M Debt repaid $2.2 BILLION Liquidity position balance sheet $1.9 $1.3 $0.6 $0.6 2012 2013 2014 2015 annual capex by $1.3B LOWERED STRENGTHENED 4 MET guidance targetsConsecutive years 10% all-in sustaining cost DECREASED 53
  • 54. www.kinross.com 54 COMPELLING RELATIVE VALUE NET DEBT TO EBITDA (LTM) Source: Bloomberg, company reports. Net debt to EBITDA ratio of 1.0x as of June 30, 2016 2.5 2.3 1.6 1.4 1.3 1.0 Yamana Barrick Goldcorp Newmont Agnico Kinross
  • 55. www.kinross.com 55 COMPELLING RELATIVE VALUE ENTERPRISE VALUE VERSUS PRODUCTION 2016E Gold Production (Moz.)(ii) Delta with Kinross (US$B) Multiple of Kinross Enterprise Value Barrick 5.3 22.9 4.8 Newmont 5.1 20.2 4.3 Goldcorp 3.0 10.0 2.6 Kinross 2.7 - - Agnico 1.6 6.1 2.0 Yamana 1.3 (0.3) 1.0 (i) Source: Bloomberg – September 13, 2016 (ii) Source: Company reports. Represents mid-point of the respective company’s 2016 production guidance. Figures for Kinross reflect gold only production. Kinross expects to produce 2.7 to 2.9 million ounces on a gold equivalent basis. $29.0 $26.3 $16.1 $12.2 $6.1 $5.8 Barrick Newmont Goldcorp Agnico Kinross Yamana Enterprisevalue(US$billions)(i) Market capitalization Enterprise value
  • 56. www.kinross.com 56 Source: Bloomberg analyst consensus – September 13, 2016. COMPELLING RELATIVE VALUE 2016E METRICS Attractive value opportunity relative to peers, considering Kinross’ annual production, cost structure, track record and growth opportunities EV / 2016E EBITDA P / 2016E OPERATING CF 13.4 10.5 8.2 7.5 7.4 4.9 Agnico Goldcorp Newmont Yamana Barrick Kinross 14.5 11.0 8.0 7.8 6.5 4.8 Agnico Goldcorp Newmont Barrick Yamana Kinross
  • 57. www.kinross.com 57 Expecting to deliver HIGHER production 2016E Stronger year expected at BALD MOUNTAIN 2017E TASIAST PHASE ONE expected to ramp up to full production 2018E Start-up of potential TASIAST PHASE TWO 2020E BUILDING MOMENTUM FOR THE FUTURE 57
  • 59. www.kinross.com 59 FINANCIAL DISCIPLINE 2016 CAPITAL EXPENDITURES OUTLOOK(4) Region Sustaining Non-Sustaining Regional Total Americas $220 $10 $230 West Africa $120 $280 $400 Russia $85 $10 $95 Corporate $5 $ - $5 TOTAL $430 $300 $730 OTHER EXPENDITURE OUTLOOK ($ millions) 2016E Overhead expense $165 Exploration $70 Other operating costs* $95 Depreciation, depletion & amortization ($/oz.) $350 2016 capital expenditures are expected to be $755 million, including estimated capitalized interest of $25 million * Includes $15 million of care and maintenance for La Coipa and Kettle River-Buckhorn (4) Refer to endnote #4.
  • 60. www.kinross.com 60 • Impressive track record of operational excellence • Achieved its 2nd highest production level in 2015, Fort Knox’s 19th year in operation • Estimated mine life: mill – 2018; mining – 2020* AMERICAS FORT KNOX, USA (100%) TONNES (thousands) GRADE (g/t) OUNCES (thousands) 2P Reserves 147,318 0.4 2,022 M&I Resources 95,822 0.5 1,423 Inferred Resources 14,824 0.5 221 OPERATING RESULTS(2) 2015 GOLD RESERVE AND RESOURCE ESTIMATES(7) Among the world’s few cold climate heap leach facilities 2014 2015 Production (Au. Eq. oz.) 379,453 401,553 Production cost of sales ($/oz.) $712 $629 * Source: Kinross’ Annual Information Form(2) Refer to endnote #2. (7) Refer to endnote #7.
  • 61. www.kinross.com 61 • Acquired in January 2016 from Barrick • ~600 km2 under-explored land package among the largest in the United States • Well-capitalized operation: previous owner invested ~$385M over the past 5 years • Large estimated mineral resource base with multiple sources of potential mineral reserve additions AMERICAS BALD MOUNTAIN, USA (100%) Forecasting strong near-term cash flow with significant upside potential (7) Refer to endnote #7. TONNES (thousands) GRADE (g/t) OUNCES (thousands) 2P Reserves 54,627 0.6 1,117 M&I Resources 188,971 0.6 3,933 Inferred Resources 24,396 0.5 378 2015 GOLD RESERVE AND RESOURCE ESTIMATES(7)
  • 62. www.kinross.com 62 • Incremental, high-margin ounces from Process Solution Management (PSM) • Opportunity to extend mine life beyond current estimates with Phase W project AMERICAS ROUND MOUNTAIN, USA (100%) Strong cash flow generator with opportunities to extend mine life (2) *Kinross acquired 100% of the Round Mountain mine on January 11, 2016. Production and cost of sales figures for 2014 and 2015 reflect 50% ownership. Refer to endnote #2. (7) Refer to endnote #7. TONNES (thousands) GRADE (g/t) OUNCES (thousands) 2P Reserves 66,145 0.7 1,470 M&I Resources 42,158 0.5 683 Inferred Resources 16,205 0.4 233 2015 GOLD RESERVE AND RESOURCE ESTIMATES(7) OPERATING RESULTS(2) 2014 2015 Production (Au. Eq. oz.) 169,839 197,818 Production cost of sales ($/oz.) $855 $750 * Source: Kinross’ Annual Information Form 16 17 18 19 20 21 22 23 - 27 Mining Milling Leaching ESTIMATED MINE LIFE*
  • 63. www.kinross.com 63 • Historically, a significant cash flow contributor with costs among the lowest in the portfolio • Estimated mine life: late 2016* AMERICAS KETTLE RIVER-BUCKHORN, USA (100%) Low-cost, high-grade underground mine located in Washington state TONNES (thousands) GRADE (g/t) OUNCES (thousands) 2P Reserves 166 8.7 47 M&I Resources 72 5.1 12 Inferred Resources 36 6.7 8 2015 GOLD RESERVE AND RESOURCE ESTIMATES(7) OPERATING RESULTS(2) 2014 2015 Production (Au. Eq. oz.) 123,382 97,368 Production cost of sales ($/oz.) $678 $836 * Source: Kinross’ Annual Information Form(2) Refer to endnote #2. (7) Refer to endnote #7.
  • 64. www.kinross.com 64 • Paracatu is among the world’s largest gold operations with annual throughput of ~60Mt • Realizing benefits from weakness in the Brazilian real • Estimated mine life: 2030* AMERICAS PARACATU, BRAZIL (100%) Large gold mine with a long mine life that extends to 2030 TONNES (thousands) GRADE (g/t) OUNCES (thousands) 2P Reserves 687,990 0.4 9,645 M&I Resources 315,508 0.3 3,267 Inferred Resources 10,515 0.4 143 2014 2015 Production (Au. Eq. oz.) 521,026 477,662 Production cost of sales ($/oz.) $816 $772 OPERATING RESULTS(2) 2015 GOLD RESERVE AND RESOURCE ESTIMATES(7) * Source: Kinross’ Annual Information Form(2) Refer to endnote #2. (7) Refer to endnote #7.
  • 65. www.kinross.com 65 • Operations suspended Q3 2016 • Will continue to explore further permitting efforts and review the operation and its mineral resource model to consider possible options for re-starting mining AMERICAS MARICUNGA, CHILE (100%) High-altitude heap leach operation located in the highly prospective Maricunga District TONNES (thousands) GRADE (g/t) OUNCES (thousands) 2P Reserves 40,641 0.8 1,042 M&I Resources 198,084 0.7 4,275 Inferred Resources 53,942 0.6 1,053 2015 GOLD RESERVE AND RESOURCE ESTIMATES(7) OPERATING RESULTS(2) 2014 2015 Production (Au. Eq. oz.) 247,216 212,155 Production cost of sales ($/oz.) $953 $1,010 * Source: Kinross’ Annual Information Form(2) Refer to endnote #2. (7) Refer to endnote #7.
  • 66. www.kinross.com 66 PRE-FEASIBILTY STUDY RESULTS LA COIPA PROJECT Life of Mine Estimates (100% basis)(i) Life of Mine 5.5 years Total ounces recovered 1.03 million gold equivalent ounces Average annual production 207,000 gold equivalent ounces per year Average cost of sales $674 per gold equivalent ounce Average all-in sustaining cost(ii) $767 per gold equivalent ounce Initial capital $94 million Pre-Stripping $105 million IRR (after-tax) 20% NPV $120 million • PFS based on using existing infrastructure to blend and process higher grade material from the recently delineated Phase 7 deposit with oxide/transition material from the existing Puren deposit Project expected to generate a 20% IRR at an assumed gold price of $1,200 per ounce (i) Summary results are shown on a 100% basis, however, Kinross has a 75% interest in Phase 7 and a 65% interest in Puren. (ii) All-in sustaining cost includes operating costs, sustaining capital, and post start-up capitalized stripping and does not include estimated initial capital expenditures of $94 million and estimated pre-stripping of $105 million, and any exploration, income taxes and non-cash items related to reclamation or allocation of regional or corporate overhead costs. This differs from the World Gold Council definition of all-in sustaining cost.
  • 67. www.kinross.com 67 PRE-FEASIBILTY STUDY RESULTS LA COIPA PROJECT Life of Mine Estimates Mill throughput capacity 13,000 tonnes per day Average mining rate 80,000 tonnes per day Average gold grade 1.69 g/t Average silver grade 61.5 g/t Average gold recovery 76% Average silver recovery 59% Strip ratio (waste:ore) 5.0 • The pre-feasibility study estimates a 5.5 year mine life, following receipt of permits and commencement of stripping  Processing expected to commence 1.5 years after pre-stripping has been initiated and continue for 4 years • Received project DIA approval in August 2016; additional permitting ongoing Assumptions Gold price $1,200 per oz. Silver price $17 per oz. Oil price $65 per barrel Chilean Peso 600 to the US dollar Discount rate 5% KEY ASSUMPTIONSADDITIONAL OPERATING METRICS $1,100 $1,200 $1,300 IRR 15% 20% 26% GOLD PRICE SENSITIVITY
  • 68. www.kinross.com 68 • High-grade, low-cost underground mines • Estimated mine life: Kupol – 2020; Dvoinoye – 2018* RUSSIA KUPOL-DVOINOYE (100%) KUPOL TONNES (thousands) GRADE (g/t) OUNCES (thousands) 2P Reserves 7,157 8.3 1,899 M&I Resources 1,164 7.2 271 Inferred Resources 404 8.3 108 DVOINOYE 2P Reserves 2,265 11.2 815 M&I Resources 136 17.9 78 Inferred Resources 78 9.8 25 2014 2015 Production (Au. Eq. oz.) 751,101 758,563 Production cost of sales ($/oz.) $507 $474 OPERATING RESULTS(2) 2015 GOLD RESERVE AND RESOURCE ESTIMATES(7) Our Russian operations are a model for successfully operating in a remote location * Source: Kinross’ Annual Information Form(2) Refer to endnote #2. (7) Refer to endnote #7.
  • 69. www.kinross.com 69 • Expecting higher production and lower costs in the second half of the year • Exploration focused on 8 km mine trend to target open-pit and underground extensions • Estimated mine life: 2021* WEST AFRICA CHIRANO, GHANA (90%) Cost reductions achieved at Chirano by transitioning to self-perform mining (1) Refer to endnote #1. (2) Refer to endnote #2. (7) Refer to endnote #7. TONNES (thousands) GRADE (g/t) OUNCES (thousands) 2P Reserves 14,669 2.4 1,135 M&I Resources 10,963 2.1 739 Inferred Resources 1,602 2.9 149 2014 2015 Production (Au. Eq. oz.) 257,888 230,488 Production cost of sales ($/oz.) $591 $691 OPERATING RESULTS(1,2) 2015 GOLD RESERVE AND RESOURCE ESTIMATES(7) * Source: Kinross’ Annual Information Form
  • 70. www.kinross.com 70 • Proceeding with Phase One of the expansion, with Phase Two an option to further add significant production • Estimated mine life: Phase One – 2033; if we proceed with a Phase Two expansion, mine life would be 2030* WEST AFRICA TASIAST, MAURITANIA (100%) Operating mine with a large gold resource located in a prospective district TONNES (thousands) GRADE (g/t) OUNCES (thousands) 2P Reserves 132,178 1.9 8,219 M&I Resources 74,847 1.3 3,210 Inferred Resources 5,596 1.9 346 2014 2015 Production (Au. Eq. oz.) 260,485 219,045 Production cost of sales ($/oz.) $998 $1,021 OPERATING RESULTS(2) 2015 GOLD RESERVE AND RESOURCE ESTIMATES(7) (2) Refer to endnote #2. (7) Refer to endnote #7. * Source: Tasiast Technical Report dated March 30, 2016
  • 71. www.kinross.com 71 ENDNOTES 1) Unless otherwise noted, gold equivalent production, gold equivalent ounces sold and production cost of sales figures in this presentation are based on Kinross’ 90% share of Chirano production and sales. 2) Attributable production cost of sales per gold equivalent ounce sold and per gold ounce sold on a by-product basis are non-GAAP measures. For more information and a reconciliation of this non-GAAP measure for the three and six months ended June 30, 2016 and 2015, please refer to the news release dated July 27, 2016, under the heading “Reconciliation of non-GAAP financial measures”, available on our website at www.kinross.com. 3) All-in sustaining cost is a non-GAAP measure. For more information and a reconciliation of this non-GAAP measure for the three and six months ended June 30, 2016 and 2015, please refer to the news release dated July 27, 2016 under the heading “Reconciliation of non-GAAP financial measures”, available on our website at www.kinross.com. 4) For more information regarding Kinross’ production, cost and capital expenditures outlook for 2016, please refer to the news releases dated February 10, 2016 and July 27, 2016, both of which are available on our website at www.kinross.com. Kinross’ outlook for 2016 represents forward-looking information and users are cautioned that actual results may vary. Please refer to the Cautionary Statement on Forward-Looking Information on slide 2 of this presentation and in our news release dated July 27, 2016, available on our website at www.kinross.com. 5) For more information regarding the Round Mountain Phase W Scoping Study, please refer to the news release dated June 29, 2016, which is available on our website at www.kinross.com. 6) Inferred mineral resource has been determined based on a scoping study completed in June 2016. A scoping study is preliminary in nature and is based on inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the results of the scoping study will be realized. 7) For more information regarding Kinross’ 2015 mineral reserve and mineral resource estimates, please refer to our Annual Mineral Reserve and Mineral Resource Statement as at December 31, 2015 contained in our Annual Information Form filed March 30, 2016, which is available on our website at www.kinross.com.