10. • Owner/ Developer
Federal Land Inc.
• Architect of Record
Rchitects Inc. (Arch. Jose Pedro Recio)
• Interior Designer
Getty’s (Chicago), Ltd.
• Structural Consultant
G.E Origenes Consulting Engineers
• Mechanical, Electrical, Plumbing & Fire Protection Consultant
I.M Martinez Consulting Engineers
• Electrical Consultant
EP Dabao Electrical Engineers
18. OTHER AMENITIES
• Function Room
• Changing Room
• Outdoor Garden
• Al Fresco
• Multi-purpose Room
• Jogging Path
• Play Area
19.
20. • Automatic Fire Suppression System
• Fire Detection Alarm System
• Elevators
Four (4) for residential use
Two (2) for commercial use
• Emergency Power Generator
100% Back-up for common areas
10% - 15% Back-up for residential
units
• Mail Box Area
34. 1 BR ( 36 sq.m )
WING A
- Units B, C, F, G, H, I, J, K
WING B
- Units L, M, N, O, P, S, T, U, V,
W, X, Y, Z
Living 9.40 sq.m
Dining 6.80 sq.m
Kitchen 4.34 sq.m
T&B 3.96 sq.m
Bedroom 9.30 sq.m
Balcony 2.20 sq.m
35. 2 BR ( 55 sq.m )
WING A
- Units D
WING B
- Units Q
Living 6.87 sq.m
Dining 6.14 sq.m
Kitchen 7.59 sq.m
T&B 4.43 sq.m
(Common)
Bedroom 1 16.14 sq.m
Bedroom 2 11.41 sq.m
Balcony 2.52 sq.m
36. 2BR ( 70 sq.m )
WING A
- Units E
WING B
- Units R
Living 11.19 sq.m
Dining 8.97 sq.m
Kitchen 7.86 sq.m
T&B 5.25 sq.m
Bedroom 1 18.72 sq.m
Bedroom 2 13.41 sq.m
Balcony 4.50 sq.m
46. WindowWindow
• Powder coated aluminum framePowder coated aluminum frame
• Glass pane, 6mm thickGlass pane, 6mm thick
Provisions providedProvisions provided
• Telephone linesTelephone lines
• Cable TVCable TV
• Mechanical vent in kitchen area and T&BMechanical vent in kitchen area and T&B
• Window type Air-condition UnitWindow type Air-condition Unit
• Multi-point water heaterMulti-point water heater
FixturesFixtures
• House entry communication phoneHouse entry communication phone
47.
48. SRP
Discount
C2 CASH in 30 Days 15%
C1 50% DP (less RF) - 50% (48) 7.5%
B3 30% DP (in 30 days) - 70% BF 13%
A1 10% DP, 20(48), 70% LS or BF 2%
A3 (1BR)
15T (12), 18T(12), 22T(12),
27T(12), balance LS or BF
A3 (2BR)
5(12), 5.5(12), 6.5(12), 8(12), 75%
LS or BF
52. Project TimetableProject Timetable
Start of ConstructionStart of Construction 4Q 20124Q 2012
Target CompletionTarget Completion 4Q 20154Q 2015
and Turnoverand Turnover
53. 1. Issue a dated check in the amount of Php 25,000.00
payable to: Federal Land, Inc.
2. Sign a Reservation Application (RA).
3. Sign a completely filled out Buyer’s Information Sheet
(BIS).
4. Sign a one (1) time TIN, BIR 1904 form (Individual)
5. Submit all the above documents with photocopy of
two (2) valid ID’s to your servicing agent.
6. Proof of billing