10 TACTICS WHEN NEGOTIATING
BONDS AND GUARANTEES
Guide
SARAH FOX
500 Words Ltd
(2018)
© 500 Words Ltd, 2018
Page 1
CAN YOU BRING A CLAIM?
Making Bonds and Guarantees Work for Your Clients
Use this guide to steer discussions and negotiations on a bond or guarantee
TACTIC 1 Know whether it is a
bond or a guarantee
(1) Different rules of interpretation apply.
(2) Different consequences for client and surety.
Cases: Trafalgar House, McAlpine, CIMC Raffles
TACTIC 2 Bond: check surety Employers should seek assurance that the surety is a
“sound, reliable and responsible corporate body and be
satisfied that if there is a need to call the [guarantee] the
[surety] will comply promptly” (HMT CUP 48)
Cases: Edward Owen, OTV Birwelco
TACTIC 3 Bond: check
construction partner
A surety under a bond is bound to pay when there is no
fraud. Any remedy for incorrect or abusive payment is
between employer and contractor.
Cases: Doosan v MABE, Themehelp, Tech-System v WYWY
TACTIC 4 Guarantee: check the
underlying contract
As a guarantee only gives secondary liability the underlying
contract acts to limit or exclude the surety’s liability. If there
is no contract when the guarantee is signed or no valid
contract then there is nothing to guarantee.
TACTIC 5 Guarantee: delete
wording relating to
primary liability
Your guarantee should not include: indemnify, primary
obligor, unconditionally, first written demand, without proof
TACTIC 6 Guarantee: delete
insolvency as a trigger
for making a claim
Insolvency does not lead to damages recoverable under the
bond – the failure to complete does.
Cases: Perar v general, Northwood v Aegon
TACTIC 7 Guarantee: use contract
to calculate damages
Most guarantees refer to recovering sums as ‘ascertained
under the contract’ and this is the correct determination for
a guarantee where there is secondary liability
Case: Paddington Churches v Technical
TACTIC 8 Guarantee: check
indulgence clause
The rule in Holme v Brunskill is overridden by including a
clause stating that the surety will not be discharged by
variations. It does not apply to variations permitted by the
contract
Cases: Topland v Smith, CIMC Raffles
TACTIC 9 Guarantee: check extent
of indulgence clause
Not all variation prejudice the surety but it is better to have
a wide indulgence clause than argue after the event
Cases: Hackney Empire
TACTIC 10 Both: check procedure
carefully to see it’s
practical
Whether it is a bond or guarantee, procedural requirements
in the document are applied strictly. Failure to follow means
your client’s claim may fail. For on-demand bonds provided
that the recipient complies with any procedural
requirements in the instrument as to the documents
required,1
then the surety is required to pay.
Case: East Ayrshire Council v Zurich
© 500 Words Ltd, 2018
Page 2
Alternatives
There are alternatives to using bonds and guarantees. You could:
1. Use tender process properly. Select a skilled contractor with financial capacity to complete the
project, irrespective of unforeseeable economic changes;
2. Use the main agreements effectively. The project should be encouraged to work together to
meet agreed objectives while providing fair payment for all. These agreements allocate the key
risks on the project;
3. Use insurance. Insurance policies eg project insurance can help cover some of the additional
costs from risks occurring. Insurance-backed bonds are merely another form of security.
This note provides only a brief flavour of the real difficulties, both practical and legal, with drafting,
revising and negotiating bonds and guarantees to protect a client’s interests on a project. For more
information about surety contracts see this video.
Author of the 500-Word Contract™
Sarah Fox is a construction contracts specialist, who has written, adapted and reviewed all manner
of construction contracts from 5-page letters of intent to over 50,000-word multi-million pound
construction contracts. What she thinks you need, particularly when time is tight, is a really simple
contract… a 500-Word version.
Footnotes
1
Where the instrument provides for a ‘bare demand’ without any accompanying information, this is
known as ‘clean’ or ‘suicide’ credit. Generally, the employer is required to provide a written
statement asserting the contractor’s default.

More Related Content

More from Sarah Fox

Never Sign on the Dotted Line
Never Sign on the Dotted LineNever Sign on the Dotted Line
Never Sign on the Dotted LineSarah Fox
 
Creating Smart(er) Construction Contracts
Creating Smart(er) Construction ContractsCreating Smart(er) Construction Contracts
Creating Smart(er) Construction ContractsSarah Fox
 
8 Habits of Highly Defective Contracts
8 Habits of Highly Defective Contracts8 Habits of Highly Defective Contracts
8 Habits of Highly Defective ContractsSarah Fox
 
Why Use 50,000 Words When 500 Will Do?
Why Use 50,000 Words When 500 Will Do? Why Use 50,000 Words When 500 Will Do?
Why Use 50,000 Words When 500 Will Do? Sarah Fox
 
Never Sign on the Dotted Line
Never Sign on the Dotted LineNever Sign on the Dotted Line
Never Sign on the Dotted LineSarah Fox
 
Guide to Tort in Construction
Guide to Tort in ConstructionGuide to Tort in Construction
Guide to Tort in ConstructionSarah Fox
 
Guide for Construction Contract Administrators
Guide for Construction Contract AdministratorsGuide for Construction Contract Administrators
Guide for Construction Contract AdministratorsSarah Fox
 
Excluding Liability for Latent Defects
Excluding Liability for Latent DefectsExcluding Liability for Latent Defects
Excluding Liability for Latent DefectsSarah Fox
 
What's So Great About Construction?
What's So Great About Construction?What's So Great About Construction?
What's So Great About Construction?Sarah Fox
 
10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction Contract10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction ContractSarah Fox
 
How Courts Decide Whose Terms Apply
How Courts Decide Whose Terms ApplyHow Courts Decide Whose Terms Apply
How Courts Decide Whose Terms ApplySarah Fox
 
Construction Contract Review Checklist
Construction Contract Review ChecklistConstruction Contract Review Checklist
Construction Contract Review ChecklistSarah Fox
 
Checklist for Trainers & Facilitators
Checklist for Trainers & FacilitatorsChecklist for Trainers & Facilitators
Checklist for Trainers & FacilitatorsSarah Fox
 
Summary of Construction Acts 1996 & 2009
Summary of Construction Acts 1996 & 2009Summary of Construction Acts 1996 & 2009
Summary of Construction Acts 1996 & 2009Sarah Fox
 
When Do Liquidated Damages Become an Irrecoverable Penalty?
When Do Liquidated Damages Become an Irrecoverable Penalty?When Do Liquidated Damages Become an Irrecoverable Penalty?
When Do Liquidated Damages Become an Irrecoverable Penalty?Sarah Fox
 
A Legal Checklist
A Legal Checklist A Legal Checklist
A Legal Checklist Sarah Fox
 
Guide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesGuide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesSarah Fox
 
SWOT template for Construction Projects
SWOT template for Construction ProjectsSWOT template for Construction Projects
SWOT template for Construction ProjectsSarah Fox
 
Guide to BS8534 British Standard on Procurement
Guide to BS8534 British Standard on ProcurementGuide to BS8534 British Standard on Procurement
Guide to BS8534 British Standard on ProcurementSarah Fox
 
Briefing Checklist for Advisers on Construction Projects
Briefing Checklist for Advisers on Construction ProjectsBriefing Checklist for Advisers on Construction Projects
Briefing Checklist for Advisers on Construction ProjectsSarah Fox
 

More from Sarah Fox (20)

Never Sign on the Dotted Line
Never Sign on the Dotted LineNever Sign on the Dotted Line
Never Sign on the Dotted Line
 
Creating Smart(er) Construction Contracts
Creating Smart(er) Construction ContractsCreating Smart(er) Construction Contracts
Creating Smart(er) Construction Contracts
 
8 Habits of Highly Defective Contracts
8 Habits of Highly Defective Contracts8 Habits of Highly Defective Contracts
8 Habits of Highly Defective Contracts
 
Why Use 50,000 Words When 500 Will Do?
Why Use 50,000 Words When 500 Will Do? Why Use 50,000 Words When 500 Will Do?
Why Use 50,000 Words When 500 Will Do?
 
Never Sign on the Dotted Line
Never Sign on the Dotted LineNever Sign on the Dotted Line
Never Sign on the Dotted Line
 
Guide to Tort in Construction
Guide to Tort in ConstructionGuide to Tort in Construction
Guide to Tort in Construction
 
Guide for Construction Contract Administrators
Guide for Construction Contract AdministratorsGuide for Construction Contract Administrators
Guide for Construction Contract Administrators
 
Excluding Liability for Latent Defects
Excluding Liability for Latent DefectsExcluding Liability for Latent Defects
Excluding Liability for Latent Defects
 
What's So Great About Construction?
What's So Great About Construction?What's So Great About Construction?
What's So Great About Construction?
 
10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction Contract10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction Contract
 
How Courts Decide Whose Terms Apply
How Courts Decide Whose Terms ApplyHow Courts Decide Whose Terms Apply
How Courts Decide Whose Terms Apply
 
Construction Contract Review Checklist
Construction Contract Review ChecklistConstruction Contract Review Checklist
Construction Contract Review Checklist
 
Checklist for Trainers & Facilitators
Checklist for Trainers & FacilitatorsChecklist for Trainers & Facilitators
Checklist for Trainers & Facilitators
 
Summary of Construction Acts 1996 & 2009
Summary of Construction Acts 1996 & 2009Summary of Construction Acts 1996 & 2009
Summary of Construction Acts 1996 & 2009
 
When Do Liquidated Damages Become an Irrecoverable Penalty?
When Do Liquidated Damages Become an Irrecoverable Penalty?When Do Liquidated Damages Become an Irrecoverable Penalty?
When Do Liquidated Damages Become an Irrecoverable Penalty?
 
A Legal Checklist
A Legal Checklist A Legal Checklist
A Legal Checklist
 
Guide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesGuide to Construction Procurement Strategies
Guide to Construction Procurement Strategies
 
SWOT template for Construction Projects
SWOT template for Construction ProjectsSWOT template for Construction Projects
SWOT template for Construction Projects
 
Guide to BS8534 British Standard on Procurement
Guide to BS8534 British Standard on ProcurementGuide to BS8534 British Standard on Procurement
Guide to BS8534 British Standard on Procurement
 
Briefing Checklist for Advisers on Construction Projects
Briefing Checklist for Advisers on Construction ProjectsBriefing Checklist for Advisers on Construction Projects
Briefing Checklist for Advisers on Construction Projects
 

Recently uploaded

BPA GROUP 7 - DARIO VS. MISON REPORTING.pdf
BPA GROUP 7 - DARIO VS. MISON REPORTING.pdfBPA GROUP 7 - DARIO VS. MISON REPORTING.pdf
BPA GROUP 7 - DARIO VS. MISON REPORTING.pdflaysamaeguardiano
 
LITERAL RULE OF INTERPRETATION - PRIMARY RULE
LITERAL RULE OF INTERPRETATION - PRIMARY RULELITERAL RULE OF INTERPRETATION - PRIMARY RULE
LITERAL RULE OF INTERPRETATION - PRIMARY RULEsreeramsaipranitha
 
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.pptFINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.pptjudeplata
 
589308994-interpretation-of-statutes-notes-law-college.pdf
589308994-interpretation-of-statutes-notes-law-college.pdf589308994-interpretation-of-statutes-notes-law-college.pdf
589308994-interpretation-of-statutes-notes-law-college.pdfSUSHMITAPOTHAL
 
Introduction to Corruption, definition, types, impact and conclusion
Introduction to Corruption, definition, types, impact and conclusionIntroduction to Corruption, definition, types, impact and conclusion
Introduction to Corruption, definition, types, impact and conclusionAnuragMishra811030
 
Indemnity Guarantee Section 124 125 and 126
Indemnity Guarantee Section 124 125 and 126Indemnity Guarantee Section 124 125 and 126
Indemnity Guarantee Section 124 125 and 126Oishi8
 
如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书Fir L
 
INVOLUNTARY TRANSFERS Kenya school of law.pptx
INVOLUNTARY TRANSFERS Kenya school of law.pptxINVOLUNTARY TRANSFERS Kenya school of law.pptx
INVOLUNTARY TRANSFERS Kenya school of law.pptxnyabatejosphat1
 
Arbitration, mediation and conciliation in India
Arbitration, mediation and conciliation in IndiaArbitration, mediation and conciliation in India
Arbitration, mediation and conciliation in IndiaNafiaNazim
 
Transferable and Non-Transferable Property.pptx
Transferable and Non-Transferable Property.pptxTransferable and Non-Transferable Property.pptx
Transferable and Non-Transferable Property.pptx2020000445musaib
 
Chp 1- Contract and its kinds-business law .ppt
Chp 1- Contract and its kinds-business law .pptChp 1- Contract and its kinds-business law .ppt
Chp 1- Contract and its kinds-business law .pptzainabbkhaleeq123
 
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书Fir L
 
一比一原版利兹大学毕业证学位证书
一比一原版利兹大学毕业证学位证书一比一原版利兹大学毕业证学位证书
一比一原版利兹大学毕业证学位证书E LSS
 
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书Fs Las
 
如何办理(USF文凭证书)美国旧金山大学毕业证学位证书
如何办理(USF文凭证书)美国旧金山大学毕业证学位证书如何办理(USF文凭证书)美国旧金山大学毕业证学位证书
如何办理(USF文凭证书)美国旧金山大学毕业证学位证书Fs Las
 
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书FS LS
 
一比一原版旧金山州立大学毕业证学位证书
 一比一原版旧金山州立大学毕业证学位证书 一比一原版旧金山州立大学毕业证学位证书
一比一原版旧金山州立大学毕业证学位证书SS A
 
CALL ON ➥8923113531 🔝Call Girls Singar Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Singar Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Singar Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Singar Nagar Lucknow best sexual serviceanilsa9823
 

Recently uploaded (20)

BPA GROUP 7 - DARIO VS. MISON REPORTING.pdf
BPA GROUP 7 - DARIO VS. MISON REPORTING.pdfBPA GROUP 7 - DARIO VS. MISON REPORTING.pdf
BPA GROUP 7 - DARIO VS. MISON REPORTING.pdf
 
LITERAL RULE OF INTERPRETATION - PRIMARY RULE
LITERAL RULE OF INTERPRETATION - PRIMARY RULELITERAL RULE OF INTERPRETATION - PRIMARY RULE
LITERAL RULE OF INTERPRETATION - PRIMARY RULE
 
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.pptFINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
 
589308994-interpretation-of-statutes-notes-law-college.pdf
589308994-interpretation-of-statutes-notes-law-college.pdf589308994-interpretation-of-statutes-notes-law-college.pdf
589308994-interpretation-of-statutes-notes-law-college.pdf
 
Introduction to Corruption, definition, types, impact and conclusion
Introduction to Corruption, definition, types, impact and conclusionIntroduction to Corruption, definition, types, impact and conclusion
Introduction to Corruption, definition, types, impact and conclusion
 
Indemnity Guarantee Section 124 125 and 126
Indemnity Guarantee Section 124 125 and 126Indemnity Guarantee Section 124 125 and 126
Indemnity Guarantee Section 124 125 and 126
 
如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书
 
INVOLUNTARY TRANSFERS Kenya school of law.pptx
INVOLUNTARY TRANSFERS Kenya school of law.pptxINVOLUNTARY TRANSFERS Kenya school of law.pptx
INVOLUNTARY TRANSFERS Kenya school of law.pptx
 
Arbitration, mediation and conciliation in India
Arbitration, mediation and conciliation in IndiaArbitration, mediation and conciliation in India
Arbitration, mediation and conciliation in India
 
Transferable and Non-Transferable Property.pptx
Transferable and Non-Transferable Property.pptxTransferable and Non-Transferable Property.pptx
Transferable and Non-Transferable Property.pptx
 
Chp 1- Contract and its kinds-business law .ppt
Chp 1- Contract and its kinds-business law .pptChp 1- Contract and its kinds-business law .ppt
Chp 1- Contract and its kinds-business law .ppt
 
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
 
一比一原版利兹大学毕业证学位证书
一比一原版利兹大学毕业证学位证书一比一原版利兹大学毕业证学位证书
一比一原版利兹大学毕业证学位证书
 
Russian Call Girls Rohini Sector 7 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 7 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...Russian Call Girls Rohini Sector 7 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 7 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
 
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
 
Russian Call Girls Service Gomti Nagar \ 9548273370 Indian Call Girls Service...
Russian Call Girls Service Gomti Nagar \ 9548273370 Indian Call Girls Service...Russian Call Girls Service Gomti Nagar \ 9548273370 Indian Call Girls Service...
Russian Call Girls Service Gomti Nagar \ 9548273370 Indian Call Girls Service...
 
如何办理(USF文凭证书)美国旧金山大学毕业证学位证书
如何办理(USF文凭证书)美国旧金山大学毕业证学位证书如何办理(USF文凭证书)美国旧金山大学毕业证学位证书
如何办理(USF文凭证书)美国旧金山大学毕业证学位证书
 
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
 
一比一原版旧金山州立大学毕业证学位证书
 一比一原版旧金山州立大学毕业证学位证书 一比一原版旧金山州立大学毕业证学位证书
一比一原版旧金山州立大学毕业证学位证书
 
CALL ON ➥8923113531 🔝Call Girls Singar Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Singar Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Singar Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Singar Nagar Lucknow best sexual service
 

10 tactics when negotiating bonds and guarantees

  • 1. 10 TACTICS WHEN NEGOTIATING BONDS AND GUARANTEES Guide SARAH FOX 500 Words Ltd (2018)
  • 2. © 500 Words Ltd, 2018 Page 1 CAN YOU BRING A CLAIM? Making Bonds and Guarantees Work for Your Clients Use this guide to steer discussions and negotiations on a bond or guarantee TACTIC 1 Know whether it is a bond or a guarantee (1) Different rules of interpretation apply. (2) Different consequences for client and surety. Cases: Trafalgar House, McAlpine, CIMC Raffles TACTIC 2 Bond: check surety Employers should seek assurance that the surety is a “sound, reliable and responsible corporate body and be satisfied that if there is a need to call the [guarantee] the [surety] will comply promptly” (HMT CUP 48) Cases: Edward Owen, OTV Birwelco TACTIC 3 Bond: check construction partner A surety under a bond is bound to pay when there is no fraud. Any remedy for incorrect or abusive payment is between employer and contractor. Cases: Doosan v MABE, Themehelp, Tech-System v WYWY TACTIC 4 Guarantee: check the underlying contract As a guarantee only gives secondary liability the underlying contract acts to limit or exclude the surety’s liability. If there is no contract when the guarantee is signed or no valid contract then there is nothing to guarantee. TACTIC 5 Guarantee: delete wording relating to primary liability Your guarantee should not include: indemnify, primary obligor, unconditionally, first written demand, without proof TACTIC 6 Guarantee: delete insolvency as a trigger for making a claim Insolvency does not lead to damages recoverable under the bond – the failure to complete does. Cases: Perar v general, Northwood v Aegon TACTIC 7 Guarantee: use contract to calculate damages Most guarantees refer to recovering sums as ‘ascertained under the contract’ and this is the correct determination for a guarantee where there is secondary liability Case: Paddington Churches v Technical TACTIC 8 Guarantee: check indulgence clause The rule in Holme v Brunskill is overridden by including a clause stating that the surety will not be discharged by variations. It does not apply to variations permitted by the contract Cases: Topland v Smith, CIMC Raffles TACTIC 9 Guarantee: check extent of indulgence clause Not all variation prejudice the surety but it is better to have a wide indulgence clause than argue after the event Cases: Hackney Empire TACTIC 10 Both: check procedure carefully to see it’s practical Whether it is a bond or guarantee, procedural requirements in the document are applied strictly. Failure to follow means your client’s claim may fail. For on-demand bonds provided that the recipient complies with any procedural requirements in the instrument as to the documents required,1 then the surety is required to pay. Case: East Ayrshire Council v Zurich
  • 3. © 500 Words Ltd, 2018 Page 2 Alternatives There are alternatives to using bonds and guarantees. You could: 1. Use tender process properly. Select a skilled contractor with financial capacity to complete the project, irrespective of unforeseeable economic changes; 2. Use the main agreements effectively. The project should be encouraged to work together to meet agreed objectives while providing fair payment for all. These agreements allocate the key risks on the project; 3. Use insurance. Insurance policies eg project insurance can help cover some of the additional costs from risks occurring. Insurance-backed bonds are merely another form of security. This note provides only a brief flavour of the real difficulties, both practical and legal, with drafting, revising and negotiating bonds and guarantees to protect a client’s interests on a project. For more information about surety contracts see this video. Author of the 500-Word Contract™ Sarah Fox is a construction contracts specialist, who has written, adapted and reviewed all manner of construction contracts from 5-page letters of intent to over 50,000-word multi-million pound construction contracts. What she thinks you need, particularly when time is tight, is a really simple contract… a 500-Word version. Footnotes 1 Where the instrument provides for a ‘bare demand’ without any accompanying information, this is known as ‘clean’ or ‘suicide’ credit. Generally, the employer is required to provide a written statement asserting the contractor’s default.