Wind turbine towers
Simple. Unrestricted.
venur
The wall elements have major advantages when it comes to
handling and transport thanks to a combination of intelligible
and elegant shapes and low individual weights.
Our VENTUR hybrid tower system is currently used to produce
octagonal towers. The flexible wall geometry means that the sys-
tem is cost-effective for hub heights from 120 to 200 m.
Higher and higher, fast and reliably –
the VENTUR hybrid tower system
The adapter – the patented centrepiece
Simple. Limitless. VENTUR.
VENTUR means you can ex-
ploit wind energy at great
heights – thanks to an octa-
gonal tower system that uses
flat, trapezoidal, prestressed
and prefabricated concrete
elements.
The wall elements are approxi-
mately 10 metres high and are
placed on top of each other
with a 5-metre vertical offset,
as in a running bond. This cre-
ates a tower that tapers to-
wards the top. Tower geome-
tries from 120 m to 200 m are
possible, with great flexibility
in terms of height and rigidity.
From first developing the to-
wer in 2009, we have actively
focused on light construction.
The many advantages are not
limited to transport, handling
and assembly, but apply in
production as well, so that our
towers can also be produced
quickly and cost-effectively
abroad.
Light and practical
Under ideal conditions, a high-
quality coating is applied to the
flat wall elements in the factory.
However, the towers can also
be used without coating, such
as sites in forests. Using self-
compacting concrete (SCC)
in production ensures that the
surface of the exterior wall is
completely flat off the produc-
tion line. The joints between
the wall elements are injection-
filled with a special mortar to
create a monolithic structure.
The joint filling technology is
based on our 35 years of expe-
rience with water-tight tanks,
such as are used for drinking
water.
The patented adapter ma-
nages the transition to the
round steel tube tower for ef-
ficient hybrid construction. It is
also used to fix the prestressed
cables.
Modularity
The wall elements of the VEN-
TUR tower system do not re-
quire special transport. The
prefabricated parts are deli-
vered to the construction site
in horizontal or vertical posi-
tion on standard vehicles. The
simple design and the low
weight are also real benefits
when the tower is erected.
Cost-effective and readily
available cranes with lifting
capacities from 350 to 500
tonnes are all that is required
to build the tower. As the to-
wer does not have to be pre-
assembled on the ground, you
have more flexibility with the
space on your construction
site thanks to the space saved.
The climbing formwork system
with laterally offset installation
of the wall elements has the
advantage that the tower can
be erected directly from the
truck. Logistics when it comes
to the individual elements is
smooth and simple, as special
transport is only required for
the excess-width adapter.
Once the foundation is complete and the lowest level of the tower has been constructed, the wall
elements are installed from the outside alternately. Brackets in the upper section and recesses in
the lower section of each wall ensure reliable interlocking and connection between the elements.
Our employees can erect the tower from the mobile work platform inside the tower.
In our innovative design, the two-part adapter is braced securely to the concrete shaft. The adapter
ends with a traditional steel flange to fix the steel tube segments. The tower and adapter can there-
fore be erected pre-tensioned within a very short time.
Mobile work platform inside the towerFinal steps as hybrid
Raising the pre-tensioning
Attaching the adapter
Flexible transport
Simple. Limitless. VENTUR.
Innovation
and
experience
Headquarters and parent factory in Siegen
Producing wall elements
The wall elements of Ventur
wind power towers are manuf-
actured at our production sites
in flat, open formwork, so that
customer-specific sections can
be positioned very easily in
Ventur GmbH, based in Siegen,
Germany, is the wind power
tower division of the Dröss-
lerGroup. The pre-tensioned,
prefabricated concrete towers
are developed, produced and
erected within the group. The
group can look back on almost
85 years of company history.
Ventur GmbH exploits the ex-
perience of a family company
and combines it with the inno-
vative strength of the young
wind power division.
Besides wind power, the Dröss-
lerGroup is also active in tank
construction, as well as buil-
ding construction and civil en-
gineering. Projects throughout
Europe are served by facto-
ries in Siegen and Wankendorf
(near Kiel). The company‘s
core expertise lies in the deve-
lopment, production and as-
sembly of prefabricated con-
crete. Customer requests can
be implemented with ease and
new technical solutions are
constantly being found thanks
to our in-house development
department.
Wankendorf site
Siegen site
the inside of the constructed
tower wall. The system is also
available under licence abroad
thanks to the simplicity of the
production process.
Ventur wind power towers
have already been used suc-
cessfully in a large number of
products – from mountains to
the coast. Simple. Limitless.
Simple. Limitless. VENTUR.
VENTUR GmbH I Marienhütte 6 I 57080 Siegen, Germany
Phone +49 271 3189-290 I Fax +49 271/3189-180
Email: ventur@droessler.de I www.droessler-ventur.de
Wind turbine towers
Simple. Unrestricted.
venur

More Related Content

Viewers also liked (10)

Food security cansa december2013_ram
Food security cansa december2013_ramFood security cansa december2013_ram
Food security cansa december2013_ram
 
IPCC AR5 – Science on Climate Change and future projections for South Asia
IPCC AR5 – Science on Climate Change and future projections for South AsiaIPCC AR5 – Science on Climate Change and future projections for South Asia
IPCC AR5 – Science on Climate Change and future projections for South Asia
 
India and bangladesh
India and bangladeshIndia and bangladesh
India and bangladesh
 
Геофак БГУ
Геофак БГУГеофак БГУ
Геофак БГУ
 
International Frameworks for Adaptation and the Role of Civil Society
International Frameworks for Adaptation and the Role of Civil SocietyInternational Frameworks for Adaptation and the Role of Civil Society
International Frameworks for Adaptation and the Role of Civil Society
 
Adaptation actions in bangadesh
Adaptation actions in bangadeshAdaptation actions in bangadesh
Adaptation actions in bangadesh
 
UNEP Emissions Gap Report
UNEP Emissions Gap Report UNEP Emissions Gap Report
UNEP Emissions Gap Report
 
Multi-stakeholder Engagement in NAPs
Multi-stakeholder Engagement in NAPsMulti-stakeholder Engagement in NAPs
Multi-stakeholder Engagement in NAPs
 
Case studies of SDGs & Climate Change inter linkages
Case studies of SDGs & Climate Change inter linkagesCase studies of SDGs & Climate Change inter linkages
Case studies of SDGs & Climate Change inter linkages
 
Low Carbon Case Study in Sri Lanka
Low Carbon Case Study in Sri Lanka  Low Carbon Case Study in Sri Lanka
Low Carbon Case Study in Sri Lanka
 

Recently uploaded

Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Recently uploaded (20)

Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Sistema Torre Eólica Ventur

  • 1. PERFECTED FORM THE VENTUR AESTHETIC. HIGHER AND HIGHER Wind turbine towers Simple. Unrestricted. venur
  • 2. The wall elements have major advantages when it comes to handling and transport thanks to a combination of intelligible and elegant shapes and low individual weights. Our VENTUR hybrid tower system is currently used to produce octagonal towers. The flexible wall geometry means that the sys- tem is cost-effective for hub heights from 120 to 200 m. Higher and higher, fast and reliably – the VENTUR hybrid tower system The adapter – the patented centrepiece Simple. Limitless. VENTUR. VENTUR means you can ex- ploit wind energy at great heights – thanks to an octa- gonal tower system that uses flat, trapezoidal, prestressed and prefabricated concrete elements. The wall elements are approxi- mately 10 metres high and are placed on top of each other with a 5-metre vertical offset, as in a running bond. This cre- ates a tower that tapers to- wards the top. Tower geome- tries from 120 m to 200 m are possible, with great flexibility in terms of height and rigidity. From first developing the to- wer in 2009, we have actively focused on light construction. The many advantages are not limited to transport, handling and assembly, but apply in production as well, so that our towers can also be produced quickly and cost-effectively abroad. Light and practical Under ideal conditions, a high- quality coating is applied to the flat wall elements in the factory. However, the towers can also be used without coating, such as sites in forests. Using self- compacting concrete (SCC) in production ensures that the surface of the exterior wall is completely flat off the produc- tion line. The joints between the wall elements are injection- filled with a special mortar to create a monolithic structure. The joint filling technology is based on our 35 years of expe- rience with water-tight tanks, such as are used for drinking water. The patented adapter ma- nages the transition to the round steel tube tower for ef- ficient hybrid construction. It is also used to fix the prestressed cables.
  • 3. Modularity The wall elements of the VEN- TUR tower system do not re- quire special transport. The prefabricated parts are deli- vered to the construction site in horizontal or vertical posi- tion on standard vehicles. The simple design and the low weight are also real benefits when the tower is erected. Cost-effective and readily available cranes with lifting capacities from 350 to 500 tonnes are all that is required to build the tower. As the to- wer does not have to be pre- assembled on the ground, you have more flexibility with the space on your construction site thanks to the space saved. The climbing formwork system with laterally offset installation of the wall elements has the advantage that the tower can be erected directly from the truck. Logistics when it comes to the individual elements is smooth and simple, as special transport is only required for the excess-width adapter. Once the foundation is complete and the lowest level of the tower has been constructed, the wall elements are installed from the outside alternately. Brackets in the upper section and recesses in the lower section of each wall ensure reliable interlocking and connection between the elements. Our employees can erect the tower from the mobile work platform inside the tower. In our innovative design, the two-part adapter is braced securely to the concrete shaft. The adapter ends with a traditional steel flange to fix the steel tube segments. The tower and adapter can there- fore be erected pre-tensioned within a very short time. Mobile work platform inside the towerFinal steps as hybrid Raising the pre-tensioning Attaching the adapter Flexible transport Simple. Limitless. VENTUR.
  • 4. Innovation and experience Headquarters and parent factory in Siegen Producing wall elements The wall elements of Ventur wind power towers are manuf- actured at our production sites in flat, open formwork, so that customer-specific sections can be positioned very easily in Ventur GmbH, based in Siegen, Germany, is the wind power tower division of the Dröss- lerGroup. The pre-tensioned, prefabricated concrete towers are developed, produced and erected within the group. The group can look back on almost 85 years of company history. Ventur GmbH exploits the ex- perience of a family company and combines it with the inno- vative strength of the young wind power division. Besides wind power, the Dröss- lerGroup is also active in tank construction, as well as buil- ding construction and civil en- gineering. Projects throughout Europe are served by facto- ries in Siegen and Wankendorf (near Kiel). The company‘s core expertise lies in the deve- lopment, production and as- sembly of prefabricated con- crete. Customer requests can be implemented with ease and new technical solutions are constantly being found thanks to our in-house development department. Wankendorf site Siegen site the inside of the constructed tower wall. The system is also available under licence abroad thanks to the simplicity of the production process. Ventur wind power towers have already been used suc- cessfully in a large number of products – from mountains to the coast. Simple. Limitless. Simple. Limitless. VENTUR.
  • 5. VENTUR GmbH I Marienhütte 6 I 57080 Siegen, Germany Phone +49 271 3189-290 I Fax +49 271/3189-180 Email: ventur@droessler.de I www.droessler-ventur.de Wind turbine towers Simple. Unrestricted. venur