1. 1
BIM: A 2nd Introduction
www.shapoorji.in
SHAPOORJI PALLONJI MIDEAST
DESIGN STUDIO
Design Studio
Status Report – Q3/Q4
2016 / 2017
2. 2
Description Staff Roles
Manpower
Q3 Q4 (Projected)
Management General Manager 1
Design Management Design Managers 5
Design Management Support
Architects 3
Structural Engineer 1
Graphic Designer 1
Building Information Modelling
(BIM)
BIM Manager 1
Structural / Architectural 4
MEP 1
Technical Support
Design Coordinator 2
Technical Coordinator 1
Draughting - Structural /
Architectural
3
QS Function Quantity Surveyor 1
Administration Admin Staff 2
Total 25
Design Studio Resource - Status
3. 3
Design Management Function
S.No.
PROJECT DETAILS STATUS
NAME
COST
(Mill $)
CLIENT
LEAD
CONSULTANT
DATE
Q3 Q4
START FINISH
1
Makarem Riyadh
Hotel Extension
0.42 DUR
Perkins
Eastman
Mar-16
• Submitted Final SD
Design
• Awaiting Approval
on Final SD Desig
• Building Permit
from GACA
• Tender Queries
2
Transcorp Hilton
Ikoyi
3.683
(Amended
Contract
Value)
Transcorp
Perkins
Eastman
Nov-13
• Final coordination
among various sub-
consultants for the
delivery of the Final
DD Drawings
• Final coordination
among various
sub-consultants
for the delivery of
the Final DD
Drawings
• Tender Process for
award of
construction
3
Cape Sierra Hilton
Hotel
59.15 IDEA VI Architects Jul-14 Jul-17
• Design practically
complete
• Procurement support
ongoing.
• Design Closure
• Procurement
Support
• Technical Support
4 Al Sabah Hospital TRO-JB • Design Support • Design Support
5
Dubai Hills
Business Park
EMAAR RSP Oct-16 Sep-18
• Design Management
(Excavation Permit
obtained)
• Design
Management
(Structure Permit &
Building Permit)
4. 4
Design Management Function
S.No.
PROJECT DETAILS STATUS
NAME
COST
(Mill $)
CLIENT
LEAD
CONSULTANT
DATE
Q3 Q4
START FINISH
6
Kings College
Hospital
59.35
KCH
Healthcare
Perkins+ Will Sep-16 Nov-16
• Reviewing Design
Documentation
• Providing input to
post tender review /
clarification
meetings.
• Design
Management
7 Imperial Avenue 165.85 SPIPD Archgroup Sep-16
• Reviewed the SD
drawings and provided
our comments.
• Attended the workshop
and highlighted the
missing information
8 SP Warehouse 3.54 SPINT
• Design Complete
• Awaiting DM Approval
5. 5
Design Management Function - Sustainability
S No.
PROJECT DETAILS STATUS
NAME SCOPE
COST
(Million USD)
CLIENT
LEAD
CONSULTANT
Q3 Q4
1
Oman Convention Centre,
Muscat
Sustainability
216.00 OMRAN SSHI
LEED
AP
Role
(Green
Buildings)
2 Landmark Tower, Dubai 95.00
Landmark
Group
ArchGroup
3 UP villas - DIP 131.00 Union Properties Dewan
4
Marriott Hotel, Riyadh, S.
Arabia
70.00 DUR Hospitality Perkins + Will
5 OMAN (CityCentre Mall, SUR) 31.00 Majid Al Futtaim COWI
6. 6
S No.
PROJECT DETAILS STATUS
NAME OF THE
PROJECT
COST
(Mill $)
CLIENT
LEAD
CONSULTANT
DATE
Q3 Q4
START FINISH
1
OSCO Complex
Development
OSCO
SP Design
Studio
Jun-16
• Revised/ Updated
Concept Plans were
issued in Oct-2016
but no comments
were received.
• The Project is on
hold since last
submission.
2
ID Layout of New Office
for SP- KSA
SP-KSA
SP Design
Studio
Apr-16 Oct-16
3
52/42 Residential
Building Project (5JJ) -
Dubai
Emaar Dewan
• Value Engineering
• Finalization of Value
Engineering Items
and 100% DD
drawings.
Design & Technical Support
7. 7
S No.
PROJECT DETAILS STATUS
NAME
COST
(Mill $)
CLIENT
LEAD
CONSULTANT
DATE
Q3 Q4
START FINISH
4 SP Labor Camp 1 5.00 SPML Golden Square
5 SP Labor Camp 2 30.00 SPINT MAKS
6
SP Staff Quarters, Wadi
Al Safa 3
5.00 SPINT MAKS
7 Cape Sierra Hilton Hotel 59.15 IDEA VI Architects Jul-14 Jul-17
• Shop Drawings
• Design Support
8
Saudi Electric Company
Headquarters Buildings
Complex
369.6
Saudi
Electrical
Company
(SEC)
M/s Omrania
Associates
Jul-16 May-18
• Shop Drawings Preparation
• Shop Drawings Review
• Structural Design Support
Design & Technical Support
8. 8
S.No.
PROJECT DETAILS STATUS
NAME
COST
(Mill $)
CLIENT
LEAD
CONSULTANT
DATE
Q3 Q4
START FINISH
9 Al Obeikan Tower 60.85
Al Obeikan
Real Estate
DSA Jan-13 • Shop Drawings
10
AKH Office Building,
Dammam
61.65
Al AbdulKarim
Holding
Dewan Jan-14 • Structural Design Support
11
Dubai Inn Hotel,
Marina
43.42 Emaar Archgroup Jan-16 Nov-17
• Shop Drawings Review &
Structural Design Support
12
Springs Village Retail
Expansion
49.05 Emaar DAR Jul-16 Jan-18 • Shop Drawings Preparation
13 NSHMI Town Square 122.39 NSHAMA
AL GURG
CONSULTANTS
Sep-16May-18• Shop Drawings Preparation
14
Dubai Hills Business
Park
130.79 Emaar RSP Oct-16 Sep-18• Structural Design Support
15
Design, Construction
of Al Sabah Hospital,
Kuwait City
635.41 MOH TRO JB Aug-14Aug-18
• Design Drawings Preparation &
Design Coordination
Design & Technical Support
9. 9
TENDER SUPPORT & BUSINESS DEVELOPMENT ROLE
S
No
PROJECT DETAILS STATUS
NAME CLIENT Q3 Q4
1 Imperial Creek Park - Dubai SPIPD
• RFP Issued to consultant
2 The Avenues - KSA
Shomoul Holding
Company
3 Office Complex -Ghana Subah Holdings • Concept design
4 SSNIT Mixed-use Development - Malta SSNIT
• BD Presentation & Evaluation
of Structure
5 Damman Highway Housing - KSA
• Concept Design meeting
tunnel form
6 Kings College Hospital - Dubai KCH Healthcare
• Appointed Design Consultant
• LOA Received
7 Acacia 2 - Dubai Emaar
• Advice on program in respect
of design and permit
sequencing to de-risk project
8 W Hotel - Abudhabi Al Sharq
• Advice on specific permitting
obligations
9
Proposed Residential Tower (Plot - 5 A /
B) - Dubai
Emaar Properties
• RFP Issued to consultant &
Review of Drawings
10
Ramada Kuwait Hotel (5 Star) - 650 Keys
- Dubai
Ramada Kuwait Hotel
11
Tourism Development and Investment
Company (TDIC) - 830 Town Houses +
Insfrastructure - Abudhabi
TDIC
12
Waste to Energy Plant (Building +
Infrastructure) - Dubai CNIM & DULSCO
10. 10
S No.
PROJECT DETAILS STATUS
NAME OF THE PROJECT CLIENT Q3 Q4
13 New El Haraj Souq Project - Qatar
Triple A Trading &
Contracting
• Value Engineering
• Structural Design Calculations
14 SAUDI (Sabic Project @ Jubail) - KSA SABIC
• Provided Green Building Support
15 CityCentre Mall, Sharjah MAF
16 CityCentre Mall, Muscat MAF
17 Dilmunia Mall - BAHRAIN DMDC
18 Housing 5,000 Apt - KSA Ministry Of Housing
• Provided Concept Design using
Tunnel Form Technology
19 Twin Towers - KSA HALJ
20 LULU Staff Accommodation, Abu Dhabi LULU
21 AL NOOR Hospital, Abu Dhabi
Sheikh Mohd Bin
Butti
22 LULU Mall, Sharjah LULU
23 Sports Club for Police, Dubai Dubai Police
24 Hotel Apartments - Dubai Khamas Group
25 BAHRAIN (Housing 4,000 Villas) Eskan Properties
TENDER SUPPORT & BUSINESS DEVELOPMENT ROLE
11. 11
SL No
Project
Name
Scope of Works
BIM Project
Value (USD)
Start Date End Date Client
Status
Q3 Q4
1
Oman
Museum
Across Ages
LOD 400, Shop Drawings
& As built Modelling
including BIM Project
Management
925,674 Dec -16 Sep-20 SPOS Mobilization
Substructure
& Structure
Package
2
Imperial
Avenue
BIM Project Management 918,867 Dec - 15 Oct -19 SPIPD BIM Project Management
3 Rove Hotels BIM Project Management - On going - SPML BIM Project Management
BIM – Current Status
12. 12
Sl No Project Name Scope of Works
BIM Project
Value (USD)
(Approx.)
Start Date Client
1 Imperial Creek
BIM Project Management including LOD
400, Shop Drawings & As built Modelling
including
1,361,285 Mar / Apr - 17 SPID
2 Ex Medical School - Malta Sample Scanning & LOD 200 Modelling 26,619 Jan / Feb - 17 SPML - Malta
3 St Barts - Malta
LOD 300 / 400 Modelling including
sheets
106,477 Feb - 17 SPML - Malta
4 St. Lukes Hospital - Malta
Laser Scanning / LOD 400 / 500
Modelling including sheets
344,678 Mar / Apr - 17 SPML - Malta
5
BIM Project Management &
Implementation – 5JJ / 52/42
Towers
LOD 400 / 500 Modelling including
sheets
- - SPML
BIM – Expected Projects – Q4
13. 13
Shapoorji Pallonji Technical Services Private Limited - Chennai
Current Projects in BIM – Modelling
• OMAN Museum – LOD 400 Modelling
Up to As built
Upcoming Projects in BIM – Chennai Delivery
• Imperial Creek
• St Barts Hospital
• St Lukes Hospital
• 5JJ – 52 /42 Towers
Description Staff Roles
Manpower
Q3 Q4
(Projected)
Admin Staff 5 -
Draughting
Structural 8 -
Architectural 4 -
BIM
Structural / Architectural 8 6
MEP 6 4
Total 31 10
Shop Drawing Production – Chennai (Status Vs Forecast)
Description Q3 Q4
Shop Drawing Production 180 580
14. 14
• BIM Support for the following projects:
• New Student Affairs Building, Qatar University
• Kings College – Dubai (BIM Presentation)
• BIM Project Management & Implementation – 5JJ /
52/42 Towers – Design Phase
• BIM Inputs for Imperial Creek
• Ssangyong Trojan JV – Deira Waterfront
Development
• BIM LOD 300 / 400 Modelling & Shop
Drawings
BIM Business Development
15. 15
BIM Challenges
• New team in Chennai, learning curve for new team
• Setting up of SPML BIM Standards and processes
• OMAA – Meeting immediate site requirements
• Managing third party off site vendor for Imperial Avenue
Innovation – Design Studio
• Roll out and training for BIM 360 field
• Use of point cloud for development of as built model and
drawings
• BSI Kitemark for BIM @ Level 2
• Staff training and road shows
16. 16
• Vico Trimble software Demo for Estimation team
• BIM Roadshow for Senior Management staff – SPML –
17th December 2016
• Design Studio training – Level 2 BIM Implementation
• Design Studio training – FARO Scanner site & Data
processing
• Training for BIM 360 Glue – 08 January 2017
BIM Training & Future Roadshows
Future Roadshows & Trainings
• Qatar Roadshow – Feb 17
• Saudi Roadshow – Feb 17
• BIM 360 Glue roll out on new projects for BIM