SlideShare a Scribd company logo
1 of 1
Waterway Information Table


   Route:                                                              Existing SN:
 Section:                                                            Proposed SN:
 County:                                                                Waterway:
     Date:                                                            Prepared by:

                                                  Existing Overtopping Elev.    =                   at Sta.
Drainage Area =                                  Proposed Overtopping Elev.     =                    at Sta.
                    Freq.     Q              Opening - ft2        Natural                Head – ft.          Headwater Elevation
         Flood
                     Yr.     Ft3/s      Existing    Proposed      H.W.E.        Existing      Proposed       Existing     Proposed

Design
Base
Overtop Existing
Overtop Proposed
Max. Calc.
10 YEAR VELOCITY THROUGH EXISTING BRIDGE =        ft/s           10 YEAR VELOCITY THROUGH PROPOSED BRIDGE =                    ft/s
ALL–TIME H.W.E. & DATE:
Scope of Work:

                   EXISTING STRUCTURE                                                 PROPOSED STRUCTURE
         TYPE:                                                        TYPE:
     LENGTH:                                                       LENGTH:
    # SPANS:                                                      # SPANS:
 LOW BEAM:                                                      LOW BEAM:
        SKEW:                                                        SKEW:
LOW E.O.P.:                                                     LOW E.O.P.:

  NOTE: PROPOSED STRUCTURE DETAILS ARE PRELIMINARY; SUBJECT TO REFINEMENT IN TSL STAGE.

Printed 6/7/12                                                                                                  BBS 2730 (Rev. 08/02/10)

More Related Content

Viewers also liked

First floor a2 sheet
First floor a2 sheetFirst floor a2 sheet
First floor a2 sheetsarah ralphs
 
Corporate Social Responsibility (CSR) And Arun Lakhani
Corporate Social Responsibility (CSR) And Arun LakhaniCorporate Social Responsibility (CSR) And Arun Lakhani
Corporate Social Responsibility (CSR) And Arun Lakhaniarunlakhani48
 
40_catalogo_wd_tech_10_2014
40_catalogo_wd_tech_10_201440_catalogo_wd_tech_10_2014
40_catalogo_wd_tech_10_2014eugeniotombola
 
Madfun - kids disco birthday party organizer
Madfun - kids disco birthday party organizerMadfun - kids disco birthday party organizer
Madfun - kids disco birthday party organizerDavid Michaels
 

Viewers also liked (8)

70.nota de prensa mercado central
70.nota de prensa mercado central70.nota de prensa mercado central
70.nota de prensa mercado central
 
Testi2
Testi2Testi2
Testi2
 
First floor a2 sheet
First floor a2 sheetFirst floor a2 sheet
First floor a2 sheet
 
Corporate Social Responsibility (CSR) And Arun Lakhani
Corporate Social Responsibility (CSR) And Arun LakhaniCorporate Social Responsibility (CSR) And Arun Lakhani
Corporate Social Responsibility (CSR) And Arun Lakhani
 
40_catalogo_wd_tech_10_2014
40_catalogo_wd_tech_10_201440_catalogo_wd_tech_10_2014
40_catalogo_wd_tech_10_2014
 
Madfun - kids disco birthday party organizer
Madfun - kids disco birthday party organizerMadfun - kids disco birthday party organizer
Madfun - kids disco birthday party organizer
 
Presentation_NEW.PPTX
Presentation_NEW.PPTXPresentation_NEW.PPTX
Presentation_NEW.PPTX
 
eCertificate
eCertificateeCertificate
eCertificate
 

More from Quickoffice Test (20)

call02
call02call02
call02
 
call03
call03call03
call03
 
call06
call06call06
call06
 
call07
call07call07
call07
 
test
testtest
test
 
EGNYTE
EGNYTEEGNYTE
EGNYTE
 
egnyte rename
egnyte renameegnyte rename
egnyte rename
 
A
AA
A
 
Quickword How To
Quickword How ToQuickword How To
Quickword How To
 
evi
evievi
evi
 
Docx test
Docx testDocx test
Docx test
 
Presentation
PresentationPresentation
Presentation
 
april
aprilapril
april
 
April
AprilApril
April
 
April
AprilApril
April
 
April
AprilApril
April
 
test
testtest
test
 
!!!zzz To
!!!zzz To!!!zzz To
!!!zzz To
 
!!!zzz itttest1
!!!zzz itttest1!!!zzz itttest1
!!!zzz itttest1
 
mac_pp_2011
mac_pp_2011mac_pp_2011
mac_pp_2011
 

BBS_2730

  • 1. Waterway Information Table Route: Existing SN: Section: Proposed SN: County: Waterway: Date: Prepared by: Existing Overtopping Elev. = at Sta. Drainage Area = Proposed Overtopping Elev. = at Sta. Freq. Q Opening - ft2 Natural Head – ft. Headwater Elevation Flood Yr. Ft3/s Existing Proposed H.W.E. Existing Proposed Existing Proposed Design Base Overtop Existing Overtop Proposed Max. Calc. 10 YEAR VELOCITY THROUGH EXISTING BRIDGE = ft/s 10 YEAR VELOCITY THROUGH PROPOSED BRIDGE = ft/s ALL–TIME H.W.E. & DATE: Scope of Work: EXISTING STRUCTURE PROPOSED STRUCTURE TYPE: TYPE: LENGTH: LENGTH: # SPANS: # SPANS: LOW BEAM: LOW BEAM: SKEW: SKEW: LOW E.O.P.: LOW E.O.P.: NOTE: PROPOSED STRUCTURE DETAILS ARE PRELIMINARY; SUBJECT TO REFINEMENT IN TSL STAGE. Printed 6/7/12 BBS 2730 (Rev. 08/02/10)