Recruiting Authority: Dhaka Power Distribution
Company Limited (DPDC)
Post: Assistant Engineer ( CE)
Exam Date: 07/11/2014
Exam venue: BUET
Exam Time: 10.00 AM
Duration: 1.5 hours
Total Marks: 100
Marks Distribution: 30 marks on General knowledge(60
objectives x 0.5= 30 marks) and 70 marks on Civil
Engineering
Questions on Civil Engineering:
1. Sedimentation tank design: Volume, discharge given,
detentiontime = ?
2. Rain water: Area of roof, rainfall intensity, runoff
coefficient given given, quantity=?
3. Chlorination curve with break point
4. FM
5. Column area, reinforcement given, tie rod spacing=?
6. SFD, BMD of a simply supportedbeam and a
flexure=?
7. pH given, [OH-] = ?
8. angle of friction, unit wt, height given, active
pressure=?
9. Surveying: length correction of engineering chain=?
10. Concretevolume, ratio given, cement bag = ?
11. Axle load on column determination (1636)

More Related Content

Viewers also liked

Environmental engg. pavel
Environmental engg. pavelEnvironmental engg. pavel
Environmental engg. pavel
Prionath Roy
 
Civil engineering suggestions for upcoming examination
Civil engineering suggestions for upcoming examinationCivil engineering suggestions for upcoming examination
Civil engineering suggestions for upcoming examination
Prionath Roy
 
Rcc suggestion for up coming govt recruitment
Rcc suggestion for up coming govt recruitmentRcc suggestion for up coming govt recruitment
Rcc suggestion for up coming govt recruitment
Prionath Roy
 
Pile capacity equations
Pile capacity equationsPile capacity equations
Pile capacity equations
Prionath Roy
 
Marshal mix design
Marshal mix designMarshal mix design
Marshal mix design
Prionath Roy
 
Soil question by me
Soil question by meSoil question by me
Soil question by me
Prionath Roy
 
Suggestion for govt. job recruitment exam
Suggestion for govt. job recruitment examSuggestion for govt. job recruitment exam
Suggestion for govt. job recruitment exam
Prionath Roy
 
Construction engineering formula sheet
Construction engineering formula sheetConstruction engineering formula sheet
Construction engineering formula sheet
Prionath Roy
 
Influence linebeams (ce 311)
Influence linebeams (ce 311)Influence linebeams (ce 311)
Influence linebeams (ce 311)
Prionath Roy
 
Civil engineering suggestions for upcoming examination
Civil engineering suggestions for upcoming examinationCivil engineering suggestions for upcoming examination
Civil engineering suggestions for upcoming examination
Prionath Roy
 
Civil engineering suggestions for wasa
Civil engineering suggestions for wasaCivil engineering suggestions for wasa
Civil engineering suggestions for wasa
Prionath Roy
 
Load reduction factor_ǿ
Load reduction factor_ǿLoad reduction factor_ǿ
Load reduction factor_ǿ
Prionath Roy
 
Portal and cantilever method
Portal and cantilever methodPortal and cantilever method
Portal and cantilever method
Prionath Roy
 
SAPM Lecture 6Analysis
SAPM Lecture 6AnalysisSAPM Lecture 6Analysis
SAPM Lecture 6Analysis
yogesh ingle
 
3 stock valuation_fundamental_analysis
3 stock valuation_fundamental_analysis3 stock valuation_fundamental_analysis
3 stock valuation_fundamental_analysis
Jasleen ChaWla
 

Viewers also liked (20)

Environmental engg. pavel
Environmental engg. pavelEnvironmental engg. pavel
Environmental engg. pavel
 
Civil engineering suggestions for upcoming examination
Civil engineering suggestions for upcoming examinationCivil engineering suggestions for upcoming examination
Civil engineering suggestions for upcoming examination
 
Rcc suggestion for up coming govt recruitment
Rcc suggestion for up coming govt recruitmentRcc suggestion for up coming govt recruitment
Rcc suggestion for up coming govt recruitment
 
Pile capacity equations
Pile capacity equationsPile capacity equations
Pile capacity equations
 
Marshal mix design
Marshal mix designMarshal mix design
Marshal mix design
 
Soil question by me
Soil question by meSoil question by me
Soil question by me
 
M.sc ques 2011(1)
M.sc ques 2011(1)M.sc ques 2011(1)
M.sc ques 2011(1)
 
Suggestion for govt. job recruitment exam
Suggestion for govt. job recruitment examSuggestion for govt. job recruitment exam
Suggestion for govt. job recruitment exam
 
Construction engineering formula sheet
Construction engineering formula sheetConstruction engineering formula sheet
Construction engineering formula sheet
 
Influence linebeams (ce 311)
Influence linebeams (ce 311)Influence linebeams (ce 311)
Influence linebeams (ce 311)
 
Civil engineering suggestions for upcoming examination
Civil engineering suggestions for upcoming examinationCivil engineering suggestions for upcoming examination
Civil engineering suggestions for upcoming examination
 
Civil engineering suggestions for wasa
Civil engineering suggestions for wasaCivil engineering suggestions for wasa
Civil engineering suggestions for wasa
 
Ques of mes
Ques of mesQues of mes
Ques of mes
 
StaadPro Manual by yousuf dinar
StaadPro Manual by yousuf dinarStaadPro Manual by yousuf dinar
StaadPro Manual by yousuf dinar
 
Load reduction factor_ǿ
Load reduction factor_ǿLoad reduction factor_ǿ
Load reduction factor_ǿ
 
Portal and cantilever method
Portal and cantilever methodPortal and cantilever method
Portal and cantilever method
 
Ies 2013 civil engineering objective paper ii solved question paper
Ies 2013 civil engineering objective paper ii solved question paperIes 2013 civil engineering objective paper ii solved question paper
Ies 2013 civil engineering objective paper ii solved question paper
 
SAPM Lecture 6Analysis
SAPM Lecture 6AnalysisSAPM Lecture 6Analysis
SAPM Lecture 6Analysis
 
3 stock valuation_fundamental_analysis
3 stock valuation_fundamental_analysis3 stock valuation_fundamental_analysis
3 stock valuation_fundamental_analysis
 
Dpdc xm ques
Dpdc xm quesDpdc xm ques
Dpdc xm ques
 

More from Prionath Roy

Borrow pit-volumes
Borrow pit-volumesBorrow pit-volumes
Borrow pit-volumes
Prionath Roy
 
Bearing capaciy equations
Bearing capaciy equationsBearing capaciy equations
Bearing capaciy equations
Prionath Roy
 
সেনাবাহিনী
সেনাবাহিনীসেনাবাহিনী
সেনাবাহিনী
Prionath Roy
 
~$Aring capaciy equations
~$Aring capaciy equations~$Aring capaciy equations
~$Aring capaciy equations
Prionath Roy
 
Why cod is greater than bod
Why cod is greater than bodWhy cod is greater than bod
Why cod is greater than bod
Prionath Roy
 
Structur e very helpfull
Structur e very helpfullStructur e very helpfull
Structur e very helpfull
Prionath Roy
 
Rcc suggestion for up coming govt recruitment
Rcc suggestion for up coming govt recruitmentRcc suggestion for up coming govt recruitment
Rcc suggestion for up coming govt recruitment
Prionath Roy
 
Water resource engineering question for gov
Water resource engineering question for govWater resource engineering question for gov
Water resource engineering question for gov
Prionath Roy
 
Titas question of mist
Titas question of mistTitas question of mist
Titas question of mist
Prionath Roy
 

More from Prionath Roy (15)

Document1
Document1Document1
Document1
 
Borrow pit-volumes
Borrow pit-volumesBorrow pit-volumes
Borrow pit-volumes
 
Bearing capaciy equations
Bearing capaciy equationsBearing capaciy equations
Bearing capaciy equations
 
Ad exam
Ad examAd exam
Ad exam
 
Active tab
Active tabActive tab
Active tab
 
Active tab
Active tabActive tab
Active tab
 
সেনাবাহিনী
সেনাবাহিনীসেনাবাহিনী
সেনাবাহিনী
 
~$Aring capaciy equations
~$Aring capaciy equations~$Aring capaciy equations
~$Aring capaciy equations
 
Why cod is greater than bod
Why cod is greater than bodWhy cod is greater than bod
Why cod is greater than bod
 
Structur e very helpfull
Structur e very helpfullStructur e very helpfull
Structur e very helpfull
 
Slope stability
Slope stabilitySlope stability
Slope stability
 
Settlement
SettlementSettlement
Settlement
 
Rcc suggestion for up coming govt recruitment
Rcc suggestion for up coming govt recruitmentRcc suggestion for up coming govt recruitment
Rcc suggestion for up coming govt recruitment
 
Water resource engineering question for gov
Water resource engineering question for govWater resource engineering question for gov
Water resource engineering question for gov
 
Titas question of mist
Titas question of mistTitas question of mist
Titas question of mist
 

Dhaka power distribution company assistant engineer

  • 1. DHAKA POWERDISTRIBUTION COMPANY ASSISTANT ENGINEER(CE) RECRUITMENT QUESTION November 16, 2014 khaled Recruiting Authority: Dhaka Power Distribution Company Limited (DPDC) Post: Assistant Engineer ( CE) Exam Date: 07/11/2014 Exam venue: BUET Exam Time: 10.00 AM Duration: 1.5 hours Total Marks: 100 Marks Distribution: 30 marks on General knowledge(60 objectives x 0.5= 30 marks) and 70 marks on Civil Engineering Questions on Civil Engineering: 1. Sedimentation tank design: Volume, discharge given, detentiontime = ? 2. Rain water: Area of roof, rainfall intensity, runoff coefficient given given, quantity=? 3. Chlorination curve with break point 4. FM 5. Column area, reinforcement given, tie rod spacing=? 6. SFD, BMD of a simply supportedbeam and a
  • 2. flexure=? 7. pH given, [OH-] = ? 8. angle of friction, unit wt, height given, active pressure=? 9. Surveying: length correction of engineering chain=? 10. Concretevolume, ratio given, cement bag = ? 11. Axle load on column determination (1636)