1. Mohammad Osama Hussain
CAREER OBJECTIVE:
To seek a challenging position within a reputed organization and invest all my
professional expertise and educational qualification to contribute to the success
and growth of the organization I work for and to develop my career to an optimum
level.
ACADEMIC QUALIFICATIONS:
Education Majors Completion Institution Grades
MS Manufacturing &
Engineering
Management
Expected
2016
National University of
Science and technology
(NUST)
BE Electronics 2012 Usman Institute of
technology (Hamdard
University)
2.83 CGPA
Intermediate Pre-Engineering 2008 Govt. Deg. College Gulistan-
e-Jauhar
B
O Levels Science 2006 Fahims School System B
Currently enrolled in MS program of NUST (National University of Science and
Technology) in Manufacturing and Engineering Management (discipline). Course
work is been finished and thesis is just been started.
EXPERIENCE:
Martin Dow Pharmaceuticals (Engineering Officer from 23rd July, 2014till date)
(Previously Trainee Engineer 22nd January, 2014-21st July, 2014)
Where I am involved in the following:
Plan and ensure implementation of routine and preventive maintenance activities of
machines, Air handling Units, Boiler (1.0 ton), De-ionize plant, HVAC system, Gas
fired absorption chillers, Air compressors.
Troubleshooting of machinery.
Inspect complete installations and observe maintenance operations to ensure
conformance to design and equipment specification and compliance with operational
and safety standards in GMP and non GMP areas.
Reviews the operations of production equipment and system constantly, to minimize
unplanned downtime, anticipate solve problems in a timely manner, and to identify
opportunities for improvement.
2. Develop feasibility, justifications and budgeting of projects, manage and oversee
efforts to ensure projects are completed satisfactorily within set timeline and budget.
Initiate new projects for improving/ upgrading existing system.
Responsible to develop procedures, execute safety, health and environment activities
in entire facility in accordance with ISO and cGMP.
Forecasting and planning spare requirement of the machines.
Development of Standard Operating Procedures (SOPs).
Ensuring compliance of safe work practices.
Liaise with contractors, vendors, utility companies and government agencies.
Currently involve in the Implementation of SAP ERP maintenance module in the
Engineering department.
Preparation of structural drawing of proposals & layouts of Utilities projects.
Inventory scheduling like of parts and accessories used in utilities equipment
Making of reports such as of air flow directions in production plant, preventive
maintenance and etc.
Hilton Pharma (Trainee engineer from 8th April 2013 till 18th October 2013)
Where I am involved in the following:
Heating, ventilating and air conditioning units (HVAC units) , involve in the operations and
maintenance, like air and water balancing, maintenance of air handling units (AHUS) and
package units etc.
Operations and maintenance of generators and boiler.
Involve in production area,which includes maintenance and troubleshooting of manufacturing,
packing and filling machines. Maintenance of weighing balances adapters etc.
Ali Gohar Pharmaceuticals (Internee from 12th December2012 to 22nd January 2013)
Involved in the engineering department
Designed electrical wiring diagrams of pharmaceutical machines, like autoclave, compression
machines ZP-19 & 27 using Microsoft Visio
Actively involved in the maintenance and troubleshooting of pharmaceuticals machines like
compression, granulation, packing machines etc.
Technology Links (Internee from 18th
January 2012 to 18th
February 2012)
Involved in the maintenance and troubleshooting of medical machines like X- ray, fluoroscopy
etc. in Liaquat National Hospital, Ziauddin Hospital & CMH Malir Cantt.
3. K-Electric (Internee from 2nd July 2011 to 30th July 2011)
Worked in instrumentation and control department Bin Qasim Power Station
Involved in the installation and maintenance of sensors,transmitters etc.
Attended 16 hours SAP PM module training workshop at K-Electric
SKILLS:
SAP
Eviews
Microsoft Office
Circuit Designing and Simulation
Matlab 7.0
Microsoft Visio
Logosoft
Major Projects:
Implementation of SAP Plant Maintenance Module and incorporating
Breakdown, Preventive and Predictive Maintenance of all manufacturing,
packaging and utility machinery. (In Progress).
Commissioning of Dearator Tank (in progress)
Commissioning of Hot Water Tank
PERSONAL DATA:
Date of Birth: January 30th
, 1990
Father Name: Ejaz Hussain
Residential Address: House# A-79, BLOCK10-A, Gulshan-e-Iqbal, Karachi
Contact Details: Residential #: 0213-4987590 Cell #: 0334-3690373
Email:osamahussain01@hotmail.com