The fast tracked storypoint-oracle (talk from AgileEE 2011)

  1. 1. The fast-tracked storypoint oracle AgileEE 2011 Kiev, 23.09.2011 Sven Röpstorff @oedel
  2. 2. Planning Poker
  3. 3. Round 1 Planning just 2? 13 Poker 8 5 why 13? 5 User Story 8 8 2 Let’s take 8! 8
  4. 4. Round 2 Planning 8 Poker 8 5 5 User Story 8 5 5 8
  5. 5. Round 3 Planning 8 Poker 8 8 8 User Story 8 8 8 8
  6. 6. Booooooring ...
  7. 7. ... Database ... ... Architecture ... let me have a look ... wait, I’ll just ask ...
  8. 8. But ...
  9. 9. Team Estimation Game
  10. 10. Team Estimation S3 2 Game S1 Round 1
  11. 11. Team Estimation S3 Game S1 S2 Round 1
  12. 12. Team Estimation S3 Game S2 S1 Round 1
  13. 13. Team Estimation S3 Game S1 S2 Round 1
  14. 14. Team Estimation Game S3 S1 S2 Round 1
  15. 15. Team Estimation S3 Game S2 S1 Round 1
  16. 16. Team Estimation Game S2 S1 S3 Round 1
  17. 17. Team Estimation Game S2 S1 S3 Round 1
  18. 18. Team Estimation Game S2 S1 S3 Round 2
  19. 19. Team Estimation 13 Game 8 5 S2 3 S1 2 S3 1 Round 2
  20. 20. How much time do these animals need to move 100m in their natural environment? (no more than 6 categories, please)
  21. 21. Rules Round 1 All backlog items are available on a heap First participant puts the top item on the table Second participant puts the second item above/below/next to the first one From now on an item may be moved instead of placing a new one Round 2 All participants look at the result. Each participant is entitled to move items with a short explanation
  22. 22. Debrief Team Estimation Game •Estimate stories in relation to each other •At the beginning there are no story points involved •Find a base first, then go from there •Discuss afterwards •Much faster than Planning Poker
  23. 23. Magic Estimation (based on Affinity Estimation by Lowell Lindstrom)
  24. 24. Magic XS Estimation L S XL Round 1 (silencio) M XXL
  25. 25. Magic XS Estimation L S XL Round 1 (silencio) M XXL
  26. 26. Magic XS Estimation L S XL Round 2 M XXL
  27. 27. How much time do these animals need to move 100m in their natural environment? (no more than 6 categories, please)
  28. 28. Rules Round 1 (Silencio) Each participant gets a few items from the backlog and puts them next to the provided sizes Round 2 All participants look at the result. Each participant is entitled to move items with a short explanation
  29. 29. Debrief Magic Estimation •Estimate in parallel, not sequentially •Find a base first, then go from there •Discuss afterwards •Much faster than Planning Poker
  30. 30. ‘Whenever there is a hard job to be done I assign it to a lazy man; he is sure to find an easy way of doing it.’ Walter Chrysler
  31. 31. Get in touch Sven Röpstorff Agile Project Manager & Coach sven@agiletransparency.com Twitter: @oedel LinkedIn: http://www.linkedin.com/in/svenroepstorff Xing: https://www.xing.com/profile/Sven_Roepstorff Team Estimation Game http://www.projekt-log.de/en/allgemein/team-estimation-game/ Team Estimation Game with distributed Teams http://www.projekt-log.de/en/allgemein/team-estimation-game-mit- verteilten-teams/

×