2. OBJECTIVE
To check on status of Johnson’s screen
installed in well and to decide the next
course of action from OPTV images
3. FIELD OPERATIONS
The OPTV sonde was lowered down-
hole inside the PVC casing until it hit
the bottom @38m. On the up-hole
run, tool’s covered with sticky clay/silt
resulting in no casing images recorded.
16. Conclusion:
Based on the OPTV images acquired, it was
observed that the installed screen was buried
~3.7m in possible clay/silt formation @37.8m
though the expected bottom of well’s @41.5m.
Driller was instructed by consultant to continue
redeveloping the well.