Project Name
Objectives
Organizing Committee
Date Started
Date Ended
Tropical Orange
1. Give informal education to children in Bandung with various backgrounds and conditions.
2. Build awareness and develop children’s knowledge on world issues
3. Make interesting activities to stimulate children’s creativity
4. Build awareness of Bandung residents on children issues
5. .
OCP: Aprasya L
OC Comm: Novia M
OC Program: Cicilia W
OC Exchange: Nisfiani I
OC Finance: Audri M
OC Marketing: Racy N
02 July 2013
Evaluation Sheet
04 August 2013
OPENING EVENT
Venue
Number of Participant
Event:
Event Description
Fabrik, Jl Martadinata 107
120 (because join with other projects  grand opening)
To gather all EPs from all the projects in LC Bandung. Tropical Orange EPs involved in performing their yell-yell.
Content of the event was yell2 from projects, angklung performance from ITB EPs, cutting ribbon ceremony as
the symbolic event for opening.
The event was held in Fabrik, 12 July 2013 from 6pm until 8pm. All projects in LC Bandung participated in this
event so there were many attendants. This event helped in making our EPs get to know more about each
others.
Evaluation Sheet
LEARNING EVENT I
Venue
Number of Participant
Event:
Event Description
William Booth Girls Orphanage,/WB Putra Maranatha Boys Orphanage/PM, SOS Village – Kinderdorf/SOS
Range from 10 - 30
Every week EPs teach in orphanage. EPs are responsible to deliver the materials in a fun and educative way to the children.
EP buddies and Ocs act as the translator for them. EPs are divided into two groups: Team A is responsible for WB and Team
B is responsible for PM and SOS. Each session is led by one team leader (rolling  every EP get the chance to be team
leader) and they have to make report of the program to be submitted to OC Program.
Sessions of the class:
-Introduction about EPs countries
-World Issues: Environment
-World Issues: Health
-World Issues: Diversity
-Preparation for closing performance
Evaluation Sheet
LEARNING EVENT II
Venue
Number of Participant
Event:
Event Description
Brick and Wood, Jl Cihampelas  TFT/Training For Trainers with Beruang Matahari (BM)
10 EPs, 10 trainers from BM, 6 OCs
TFT starts at 10am until 12pm. The materials delivered by BM is about children characteristic and how to
approach them. TFT was interactive because the EPs had to do some physical exercise and simulation of class.
BM was very informational and giving details about orphans in Bandung.
Evaluation Sheet
LEARNING EVENT IIi
Venue
Number of Participant
Event:
Event Description
RSHS  NGO Visit to Happy Play
RMHR  NGO Visit
10 EPs, 6 Happy Play, 15 RMHR
Happy Play: Help the NGO to do social activity in entertaining sick children in RSHS waiting room for patient. EPs
approached the children and ask them to play together.
RMHR: EPs get information about street children and condition of unfortunate community in Bandung. EPs had
jamming session with them and visit their performance.
Evaluation Sheet
CLOSING EVENT
Venue
Number of Participant
Event:
Event Description
Kambingsoon, Jl Juanda 420
40 children, 10 EPs, 10 AIESECers, 20 Hostfam & EP buddies, 6 Ocs
The event starts at 3pm. Content of the event:
-Performance from WB and PM: both perform dance with EPs
-Saman performance from EP
-Balloon release: kids put wishes on balloon and fly them
-Global Village
-Performance from RMHR
-Games 17an
-EP time: video from OC, individual performance from 2 EPs, bye bye session
Evaluation Sheet
OC Evaluation:
OC Job Description (Detail)
OC Strength
OC Weaknesses
OCP: family & professional atmosphere, Ensure the planning of Project and preparation of OC done well, Ensure involvement of stakeholders in
PboX, Ensure the delivery of life changing experience to EP together with Ocs, Control sustainability of projects, Responsible for development
of team member
OC Exchange: Responsible in taking care of EPs needs, Finding an Indonesian Buddy for Eps, Making sure EPs have a good time in the
project, Ensure the delivery of life changing experience to EP together with Ocs, OC FINANCE: Responsible in making budget plan for every
project’s activitie, Responsible for managing fundraising activities, OC Marketing: Responsible in finding partner, responsible in maintain
relationship with partners OC Comm: Responsible in handling promotional activities of the project, Responsible to make booklet OC Event:
Create a clear description and planning for every event in the project and ensure the implementation,Responsible for logistic and
transportation related to project’s event OC
,
,
,Good synergy between OCs, always excited,workfast , flexible, friendly, have good synergy with ep buddies and
eps
Lack of leadership from OCP, lack of experience
Evaluation Sheet
Suggestion & Critics of OC Performance
OC Target (CSFs)
OC Measurement of Success (KPIs)
Improve the communication between Ocs to avoid misunderstanding
More bonding to make Ocs have sense of belonging
Ocs should be proactive to ask for coaching to functional related or previous OCs
Be on time
Attached: Attachment 1
Attached: Attachment 1
Evaluation Sheet
OCAction Steps &Timeline (planned):
Attached: Attachment 2
Evaluation Sheet
OCAction Steps & Timeline (Actual):
Attached : Attachment 3
Evaluation Sheet
OC Evaluation:
Actual Marketing List Contacted and Status
Actual Promotions of Projects
Unpredictable Things Occured
sahabat kota = wilma = accepted
kinderdorf = eka = accepted
happy play = dini = accepted
beruang matahari = Reza = accepted
listra = nadia – accepted
RMHR = yala = accepted
-Live updated from twitter, facebook, blog, instagram, and path.
-virtual poster for facebook
-cooperate with internal media from UNPAR such as: URS, ORANJE magazine, Warta Himahi, 911
-broadcast message in BBM
EP buddies were surprisingly cooperative, EPs were not too much complaining about the project, Ocs could do
well without much commandments from OCP, Some EPs want to have longer duration of work in orphanages,
EPs were not too excited about Listra and Happy Play sessions, EPs are so attached to RMHR and so are they,
Some EPs have initiative to visit other NGOs and hospital to do social work
Evaluation Sheet
OPENING EVENT
Event Rundown
Attached : Attachment 4
Evaluation Sheet
OPENING EVENT
Event Evaluation:
Weaknesses
Strengths
Critics and Suggestion
not well coordinated, EPs were staying in groups instead of mixed, sudden Change of venue one day before the
event, uncoordinated food distribution, have to pay more fee than planned, place was too small so the
attendance couldnt enjoy the event.
Eps can meet fellow eps from other projects, Tropical Orange EPs had a good quality time together with the Ocs
and EP buddies, performance from EP concept was well planned by OC Program of Tropical Orange who
alongside other OC Programs from other projects
There should be a MoU with the plaace/restaurant where the event will be held
Place should cover all attendants and make sure they are satisfied
If there will be a grand opening next time there should be a specialized OC team for the event, not take from
projects’ Ocs.
Evaluation Sheet
LEARNING EVENT I
Event Rundown
-Introduction & Get to Know:
1 hour for introduction, 1 hour for icebreaking games
-Get to know EP countries:
1,5 hours for country presentation from EPs, the rest is for drawing flags from EPs’ countries
-English time:
1.5 hours for teaching colors & numbers, the rest is for games
-World Issues: Environment:
1 hour for teaching them about recycling, 1 hour for garbage sorting game
-World Issues: Health
1 hour for videos of health, 1 hour for performance rehearsal & games
-World Issues: Diversity
1 hour for videos and presentation about race, continents, religions, 1 hour for performance rehearsal & games
Evaluation Sheet
LEARNING EVENT I
Event Evaluation:
Weaknesses
Strengths
Critics and Suggestion
Sessions were canceled a few times because William booth and putra maranatha didn’t have fixed schedule for
us
Sometimes the kids hard to be managed
Some OC or EP buddies do not always have the initiative to help translate or control the kids
Some EPs are busy playing with kids or gadgets that they don’t pay attention to the presenter
EPs love the children and the children love them too so both parties are excited about lessons
SOS village had their own utilities for their children (e.g crayon)
Place of the orphanage is so big
Every team leader has prepared the session well
William booth and putra maranatha should have a fixed schedule for us.
OC and EP buddies should have more initiative to help translation or control kids
EPs should respect each other and get the kids to pay attention to the presenter
Evaluation Sheet
LEARNING EVENT II
Event Rundown
LEARNING EVENT II
10.00-10.30: Introduction of EPs, Ocs, and Beruang Matahari team
10.30-11.00: Theory of children behavior from Beruang Matahari team
11.00-12.00: Simulation of games made by each EP team (Beruang Matahari team acted as the children)
12.00-13.00: Evaluation & lunchtime
Evaluation Sheet
Event Evaluation:
Weaknesses
Strengths
Critics and Suggestion
Some EPs showed their boredom when Beruang Matahari team explained about the theory
Material was well prepared and well delivered
Effective word and phrases to explain the theory so EPs understand what they said
Venue has adequate equipments (e.g big space, projector, screen)
EPs should respect partner by not showing their boredom
Beruang Matahari should be maintained to be a partner in the next projects
Evaluation Sheet
LEARNING EVENT III
Event Rundown
LEARNING EVENT III
NGO visit to Happy Play:
9.00-12.00: play with kids in the children clinic
NGO visit to RMHR:
4.00-6.00: Jamming with RMHR while waiting for breakfasting time
Evaluation Sheet
Event Evaluation:
Weaknesses
Strengths
Critics and Suggestion
Happy Play (children clinic RSHS):
place was too small for all EPs
not so many children to play with
EPs showing boredom when there are not so many children
Kids are shy to EPs so they just watch the EPs from a distance
Some EPs can interact with the kids
EPs get along well with RMHR
Make a clearer activity for example helping Happy Play create puppet show
We have to give them more benefit by involving them in our event
Evaluation Sheet
CLOSING EVENT
Event Rundown
13.00-13.30 OC+EP stan
13.30-14.30 Decoration & Preparation
14.30-15.00 Attendants coming & photo booth
15.00-15.02 Opening by MC
15.02-15.05 LCVP iGCDP Speech
15.05-15.08 OCP Speech
15.08-15.10 Video teaser
15.10-15.20 EP Yell2
15.20-15.30 Video SOS (with expl. From OCP)
15.30-15.40 Performance from WB+EP
15.40-15.50 Performance from PM+EP
15.50-16.00 Balloon time + Sugar Cube (put in)
16.00-16.10 Certificate for partners
16.10-16.15 Saman dance from EP
16.15-17.00 Enjoy Global Village
17.00-17.15 Performance from RMHR
17.15-17.45 Games 17an
17.45-18.15 Break fasting + Certificate & Best EP
18.15-20.00 EP Time
Evaluation Sheet
CLOSING EVENT
Event Evaluation:
Weaknesses
Strengths
Critics and Suggestion
Place was too small, Video from SOS was not played, Technical problem because the operator from
Kambingsoon came late, The electricity went out for a while, Some event went later than it supposed to be in
the rundown, children just grab everything out from Global Village without thinking, children are hard to be told
to sit down
70% partner attended and some participated in the event, The event started on time, EP buddies & hostfam
come & some even involved in the event, children participated as performers, Sugar cube was filled by
attendants, Global Village was conducted successfully, MCVP iGCDP Indonesia came and gave speech & symbolic
certificates, most attendants (except children) stayed until the end of the event, EPs involved in concepting &
execution of the event, ambience was warm, fun and friendly, the event ran smoothly and everything was
fulfilled even though there were some delays due to the childrens’ uncontrollable behavior
There should be a better coordination from Ocs and restaurant regarding technical matters
There should be a person in charge specifically for logistics
Evaluation Sheet
Income Statements
Evaluation Sheet
Attached :
-Tropical Orange Budget Proposal
-Tropical Orange Budget Realization
With the Reports above,
We, The OCs, also attach:
1. The Budget Proposal (planned)
2. The Realization of Budget (actual)
3. Documentation of events such as photos or videos
Invoices, MoU, Letters, and any other documents of the event
Date Project Report Submitted: 18August 2013
Good Case Practices
Bad Case Practices
CONTROLLER EVALUATION
Have a good coordination with the ep buddy
Involving partner in the closing events
Hostfamily engagement
Energetic oc even the project in the transition
Because the ocp is not an aiesecerso he sometimes cant managed the project well
Lack of tracking from the oc
The oc didn’t get any coaching for each functional
Partner changes the timeline in a sudden
Filled by
Controller

More Related Content

Similar to Tropical orange project report

Impact of the First Comenius Project
Impact of the First Comenius Project Impact of the First Comenius Project
Impact of the First Comenius Project Baiba Lukasevica
 
AP2 Newsletter 12th June
AP2 Newsletter 12th JuneAP2 Newsletter 12th June
AP2 Newsletter 12th JuneBIS HCM
 
New stars' project narrative
New stars' project narrativeNew stars' project narrative
New stars' project narrativeLilee Sea
 
Dream catcher project booklet
Dream catcher project bookletDream catcher project booklet
Dream catcher project bookletHajeong Kim
 
Some ideas for video projects
Some ideas for video projectsSome ideas for video projects
Some ideas for video projectsLisa Campbell
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - JournalKai Yun Pang
 
30 june agenda presentation flow_photo doc report
30 june agenda presentation flow_photo doc report30 june agenda presentation flow_photo doc report
30 june agenda presentation flow_photo doc reportjalzona
 
Detail plan for Start Up - SLPs Company
Detail plan for Start Up - SLPs CompanyDetail plan for Start Up - SLPs Company
Detail plan for Start Up - SLPs CompanyYuki Hana
 
Detail plan for Start Up - SLPs Company
Detail plan for Start Up - SLPs CompanyDetail plan for Start Up - SLPs Company
Detail plan for Start Up - SLPs CompanyYuki Hana
 
Measured Drawing Full Report
Measured Drawing Full ReportMeasured Drawing Full Report
Measured Drawing Full ReportEuxuan Ong
 
Binder1.compressed
Binder1.compressedBinder1.compressed
Binder1.compressedSchani B
 
SCPA REPORT.compressed
SCPA REPORT.compressedSCPA REPORT.compressed
SCPA REPORT.compressedAndrew Law
 
Binder1.compressed
Binder1.compressedBinder1.compressed
Binder1.compressedAaronMing93
 

Similar to Tropical orange project report (20)

Rumah charis-finalize
Rumah charis-finalizeRumah charis-finalize
Rumah charis-finalize
 
Statement of purpose
Statement of purposeStatement of purpose
Statement of purpose
 
Socchuot.narritive
Socchuot.narritiveSocchuot.narritive
Socchuot.narritive
 
Impact of the First Comenius Project
Impact of the First Comenius Project Impact of the First Comenius Project
Impact of the First Comenius Project
 
CSI JOURNAL
CSI JOURNALCSI JOURNAL
CSI JOURNAL
 
MESC
MESCMESC
MESC
 
AP2 Newsletter 12th June
AP2 Newsletter 12th JuneAP2 Newsletter 12th June
AP2 Newsletter 12th June
 
New stars' project narrative
New stars' project narrativeNew stars' project narrative
New stars' project narrative
 
Dream catcher project booklet
Dream catcher project bookletDream catcher project booklet
Dream catcher project booklet
 
Some ideas for video projects
Some ideas for video projectsSome ideas for video projects
Some ideas for video projects
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - Journal
 
Save sea save turtle
Save sea save turtle Save sea save turtle
Save sea save turtle
 
30 june agenda presentation flow_photo doc report
30 june agenda presentation flow_photo doc report30 june agenda presentation flow_photo doc report
30 june agenda presentation flow_photo doc report
 
Detail plan for Start Up - SLPs Company
Detail plan for Start Up - SLPs CompanyDetail plan for Start Up - SLPs Company
Detail plan for Start Up - SLPs Company
 
Detail plan for Start Up - SLPs Company
Detail plan for Start Up - SLPs CompanyDetail plan for Start Up - SLPs Company
Detail plan for Start Up - SLPs Company
 
SCPA Report
SCPA ReportSCPA Report
SCPA Report
 
Measured Drawing Full Report
Measured Drawing Full ReportMeasured Drawing Full Report
Measured Drawing Full Report
 
Binder1.compressed
Binder1.compressedBinder1.compressed
Binder1.compressed
 
SCPA REPORT.compressed
SCPA REPORT.compressedSCPA REPORT.compressed
SCPA REPORT.compressed
 
Binder1.compressed
Binder1.compressedBinder1.compressed
Binder1.compressed
 

Tropical orange project report

  • 1. Project Name Objectives Organizing Committee Date Started Date Ended Tropical Orange 1. Give informal education to children in Bandung with various backgrounds and conditions. 2. Build awareness and develop children’s knowledge on world issues 3. Make interesting activities to stimulate children’s creativity 4. Build awareness of Bandung residents on children issues 5. . OCP: Aprasya L OC Comm: Novia M OC Program: Cicilia W OC Exchange: Nisfiani I OC Finance: Audri M OC Marketing: Racy N 02 July 2013 Evaluation Sheet 04 August 2013
  • 2. OPENING EVENT Venue Number of Participant Event: Event Description Fabrik, Jl Martadinata 107 120 (because join with other projects  grand opening) To gather all EPs from all the projects in LC Bandung. Tropical Orange EPs involved in performing their yell-yell. Content of the event was yell2 from projects, angklung performance from ITB EPs, cutting ribbon ceremony as the symbolic event for opening. The event was held in Fabrik, 12 July 2013 from 6pm until 8pm. All projects in LC Bandung participated in this event so there were many attendants. This event helped in making our EPs get to know more about each others. Evaluation Sheet
  • 3. LEARNING EVENT I Venue Number of Participant Event: Event Description William Booth Girls Orphanage,/WB Putra Maranatha Boys Orphanage/PM, SOS Village – Kinderdorf/SOS Range from 10 - 30 Every week EPs teach in orphanage. EPs are responsible to deliver the materials in a fun and educative way to the children. EP buddies and Ocs act as the translator for them. EPs are divided into two groups: Team A is responsible for WB and Team B is responsible for PM and SOS. Each session is led by one team leader (rolling  every EP get the chance to be team leader) and they have to make report of the program to be submitted to OC Program. Sessions of the class: -Introduction about EPs countries -World Issues: Environment -World Issues: Health -World Issues: Diversity -Preparation for closing performance Evaluation Sheet
  • 4. LEARNING EVENT II Venue Number of Participant Event: Event Description Brick and Wood, Jl Cihampelas  TFT/Training For Trainers with Beruang Matahari (BM) 10 EPs, 10 trainers from BM, 6 OCs TFT starts at 10am until 12pm. The materials delivered by BM is about children characteristic and how to approach them. TFT was interactive because the EPs had to do some physical exercise and simulation of class. BM was very informational and giving details about orphans in Bandung. Evaluation Sheet
  • 5. LEARNING EVENT IIi Venue Number of Participant Event: Event Description RSHS  NGO Visit to Happy Play RMHR  NGO Visit 10 EPs, 6 Happy Play, 15 RMHR Happy Play: Help the NGO to do social activity in entertaining sick children in RSHS waiting room for patient. EPs approached the children and ask them to play together. RMHR: EPs get information about street children and condition of unfortunate community in Bandung. EPs had jamming session with them and visit their performance. Evaluation Sheet
  • 6. CLOSING EVENT Venue Number of Participant Event: Event Description Kambingsoon, Jl Juanda 420 40 children, 10 EPs, 10 AIESECers, 20 Hostfam & EP buddies, 6 Ocs The event starts at 3pm. Content of the event: -Performance from WB and PM: both perform dance with EPs -Saman performance from EP -Balloon release: kids put wishes on balloon and fly them -Global Village -Performance from RMHR -Games 17an -EP time: video from OC, individual performance from 2 EPs, bye bye session Evaluation Sheet
  • 7. OC Evaluation: OC Job Description (Detail) OC Strength OC Weaknesses OCP: family & professional atmosphere, Ensure the planning of Project and preparation of OC done well, Ensure involvement of stakeholders in PboX, Ensure the delivery of life changing experience to EP together with Ocs, Control sustainability of projects, Responsible for development of team member OC Exchange: Responsible in taking care of EPs needs, Finding an Indonesian Buddy for Eps, Making sure EPs have a good time in the project, Ensure the delivery of life changing experience to EP together with Ocs, OC FINANCE: Responsible in making budget plan for every project’s activitie, Responsible for managing fundraising activities, OC Marketing: Responsible in finding partner, responsible in maintain relationship with partners OC Comm: Responsible in handling promotional activities of the project, Responsible to make booklet OC Event: Create a clear description and planning for every event in the project and ensure the implementation,Responsible for logistic and transportation related to project’s event OC , , ,Good synergy between OCs, always excited,workfast , flexible, friendly, have good synergy with ep buddies and eps Lack of leadership from OCP, lack of experience Evaluation Sheet
  • 8. Suggestion & Critics of OC Performance OC Target (CSFs) OC Measurement of Success (KPIs) Improve the communication between Ocs to avoid misunderstanding More bonding to make Ocs have sense of belonging Ocs should be proactive to ask for coaching to functional related or previous OCs Be on time Attached: Attachment 1 Attached: Attachment 1 Evaluation Sheet
  • 9. OCAction Steps &Timeline (planned): Attached: Attachment 2 Evaluation Sheet
  • 10. OCAction Steps & Timeline (Actual): Attached : Attachment 3 Evaluation Sheet
  • 11. OC Evaluation: Actual Marketing List Contacted and Status Actual Promotions of Projects Unpredictable Things Occured sahabat kota = wilma = accepted kinderdorf = eka = accepted happy play = dini = accepted beruang matahari = Reza = accepted listra = nadia – accepted RMHR = yala = accepted -Live updated from twitter, facebook, blog, instagram, and path. -virtual poster for facebook -cooperate with internal media from UNPAR such as: URS, ORANJE magazine, Warta Himahi, 911 -broadcast message in BBM EP buddies were surprisingly cooperative, EPs were not too much complaining about the project, Ocs could do well without much commandments from OCP, Some EPs want to have longer duration of work in orphanages, EPs were not too excited about Listra and Happy Play sessions, EPs are so attached to RMHR and so are they, Some EPs have initiative to visit other NGOs and hospital to do social work Evaluation Sheet
  • 12. OPENING EVENT Event Rundown Attached : Attachment 4 Evaluation Sheet
  • 13.
  • 14. OPENING EVENT Event Evaluation: Weaknesses Strengths Critics and Suggestion not well coordinated, EPs were staying in groups instead of mixed, sudden Change of venue one day before the event, uncoordinated food distribution, have to pay more fee than planned, place was too small so the attendance couldnt enjoy the event. Eps can meet fellow eps from other projects, Tropical Orange EPs had a good quality time together with the Ocs and EP buddies, performance from EP concept was well planned by OC Program of Tropical Orange who alongside other OC Programs from other projects There should be a MoU with the plaace/restaurant where the event will be held Place should cover all attendants and make sure they are satisfied If there will be a grand opening next time there should be a specialized OC team for the event, not take from projects’ Ocs. Evaluation Sheet
  • 15. LEARNING EVENT I Event Rundown -Introduction & Get to Know: 1 hour for introduction, 1 hour for icebreaking games -Get to know EP countries: 1,5 hours for country presentation from EPs, the rest is for drawing flags from EPs’ countries -English time: 1.5 hours for teaching colors & numbers, the rest is for games -World Issues: Environment: 1 hour for teaching them about recycling, 1 hour for garbage sorting game -World Issues: Health 1 hour for videos of health, 1 hour for performance rehearsal & games -World Issues: Diversity 1 hour for videos and presentation about race, continents, religions, 1 hour for performance rehearsal & games Evaluation Sheet
  • 16. LEARNING EVENT I Event Evaluation: Weaknesses Strengths Critics and Suggestion Sessions were canceled a few times because William booth and putra maranatha didn’t have fixed schedule for us Sometimes the kids hard to be managed Some OC or EP buddies do not always have the initiative to help translate or control the kids Some EPs are busy playing with kids or gadgets that they don’t pay attention to the presenter EPs love the children and the children love them too so both parties are excited about lessons SOS village had their own utilities for their children (e.g crayon) Place of the orphanage is so big Every team leader has prepared the session well William booth and putra maranatha should have a fixed schedule for us. OC and EP buddies should have more initiative to help translation or control kids EPs should respect each other and get the kids to pay attention to the presenter Evaluation Sheet
  • 17.
  • 18. LEARNING EVENT II Event Rundown LEARNING EVENT II 10.00-10.30: Introduction of EPs, Ocs, and Beruang Matahari team 10.30-11.00: Theory of children behavior from Beruang Matahari team 11.00-12.00: Simulation of games made by each EP team (Beruang Matahari team acted as the children) 12.00-13.00: Evaluation & lunchtime Evaluation Sheet
  • 19. Event Evaluation: Weaknesses Strengths Critics and Suggestion Some EPs showed their boredom when Beruang Matahari team explained about the theory Material was well prepared and well delivered Effective word and phrases to explain the theory so EPs understand what they said Venue has adequate equipments (e.g big space, projector, screen) EPs should respect partner by not showing their boredom Beruang Matahari should be maintained to be a partner in the next projects Evaluation Sheet
  • 20. LEARNING EVENT III Event Rundown LEARNING EVENT III NGO visit to Happy Play: 9.00-12.00: play with kids in the children clinic NGO visit to RMHR: 4.00-6.00: Jamming with RMHR while waiting for breakfasting time Evaluation Sheet
  • 21. Event Evaluation: Weaknesses Strengths Critics and Suggestion Happy Play (children clinic RSHS): place was too small for all EPs not so many children to play with EPs showing boredom when there are not so many children Kids are shy to EPs so they just watch the EPs from a distance Some EPs can interact with the kids EPs get along well with RMHR Make a clearer activity for example helping Happy Play create puppet show We have to give them more benefit by involving them in our event Evaluation Sheet
  • 22. CLOSING EVENT Event Rundown 13.00-13.30 OC+EP stan 13.30-14.30 Decoration & Preparation 14.30-15.00 Attendants coming & photo booth 15.00-15.02 Opening by MC 15.02-15.05 LCVP iGCDP Speech 15.05-15.08 OCP Speech 15.08-15.10 Video teaser 15.10-15.20 EP Yell2 15.20-15.30 Video SOS (with expl. From OCP) 15.30-15.40 Performance from WB+EP 15.40-15.50 Performance from PM+EP 15.50-16.00 Balloon time + Sugar Cube (put in) 16.00-16.10 Certificate for partners 16.10-16.15 Saman dance from EP 16.15-17.00 Enjoy Global Village 17.00-17.15 Performance from RMHR 17.15-17.45 Games 17an 17.45-18.15 Break fasting + Certificate & Best EP 18.15-20.00 EP Time Evaluation Sheet
  • 23. CLOSING EVENT Event Evaluation: Weaknesses Strengths Critics and Suggestion Place was too small, Video from SOS was not played, Technical problem because the operator from Kambingsoon came late, The electricity went out for a while, Some event went later than it supposed to be in the rundown, children just grab everything out from Global Village without thinking, children are hard to be told to sit down 70% partner attended and some participated in the event, The event started on time, EP buddies & hostfam come & some even involved in the event, children participated as performers, Sugar cube was filled by attendants, Global Village was conducted successfully, MCVP iGCDP Indonesia came and gave speech & symbolic certificates, most attendants (except children) stayed until the end of the event, EPs involved in concepting & execution of the event, ambience was warm, fun and friendly, the event ran smoothly and everything was fulfilled even though there were some delays due to the childrens’ uncontrollable behavior There should be a better coordination from Ocs and restaurant regarding technical matters There should be a person in charge specifically for logistics Evaluation Sheet
  • 24.
  • 25. Income Statements Evaluation Sheet Attached : -Tropical Orange Budget Proposal -Tropical Orange Budget Realization
  • 26. With the Reports above, We, The OCs, also attach: 1. The Budget Proposal (planned) 2. The Realization of Budget (actual) 3. Documentation of events such as photos or videos Invoices, MoU, Letters, and any other documents of the event Date Project Report Submitted: 18August 2013
  • 27. Good Case Practices Bad Case Practices CONTROLLER EVALUATION Have a good coordination with the ep buddy Involving partner in the closing events Hostfamily engagement Energetic oc even the project in the transition Because the ocp is not an aiesecerso he sometimes cant managed the project well Lack of tracking from the oc The oc didn’t get any coaching for each functional Partner changes the timeline in a sudden Filled by Controller