CONCEPT
EVALUATION/SELECTION
CUPE 125
By Bamhare J
Engineering Design Principles
Journey So Far
■ Need/Mission statement/Design Brief
■ Stakeholder Identification – Active, Passive
■ Requirements capture, grouping & prioritization –
Stakeholder needs
■ Functional Decomposition
■ Concept Generation – Number of alternate solution concepts
attempting to satisfy the need
Next Step
■ Decide which conceptual solutions are good
potential candidates for further investigation/
product development
– ALL ?
– Some ?
– One ?
■ Concept Evaluation
– Evaluation criteria
– Compare generated concepts: strengths & weaknesses wrt
criteria
■ Concept Selection
– Decision making: Eliminate, Retain, Combine, Modify
– One Shot / Stages/ Iterative (?)
– Final Selection
Resources,Time, Risk, Policy,
Culture
Difficulties/Issues
■ Limited knowledge/data
■ Conceptual solutions - Rough/abstract ideas
■ Concensus among team members
■ Other ??
Some methods
■ External Decision – company chairman?, customer
■ Product Champion – personal preference
■ Voting – team concensus (subjective)
■ Intuition – feel good factor
■ Prototype & test – Expensive & time consuming
■ Decision Matrices – relatively more objective
Process overview
■ Initial filtering – qualitative, absolute comparison
■ Quantitative screening based on decision matrix –
Pugh Matrix
– Prepare matrix
– Rate concepts
– Rank concepts
– Combine/improve/retain promising concepts
– Select one or more concepts
■ Concept Scoring – similar steps, weighted scores,
more refinement and advancement over Pugh
matrix
Evaluation Criteria
■ Extracted from stakeholder requirements
■ Identify a few key requirements through
prioritization
– Primary, secondary, tertiary
■ Level of abstraction/refinement of requirements
must be consistent with concept abstraction/
refinement
There is No Sense in Being Exact About
Something if You Don’t Even Know What
You are Talking About
(John von Neuman, 1950)
Initial Filtering (absolute)
(In case of large number of concepts)
■ “Gut feel” feasibility judgment
– Comparison made with prior experience (“design knowledge”)
■ Concept will not work
– Too radical
– Not original
■ Conditional feasibility – something else required
■ Feasible -Worth considering
■ Go - No go screening
■ Customer requirements
■ Technology readiness/maturity/availability
Pugh Matrix
■ Select one concept as a reference or datum
– Familiar, straightforward concept
– Existing similar benchmark product in market
– Existing product in case of re-design/ modification problem
– Arbitrarily picked from the generated concepts
■ Pair-wise relative rating of each concept vs datum for each
criteria
– Better than datum: +
– Same as datum: 0
– Worse than datum: -
■ Count number of pluses and minuses for each concept.
Overall rating is difference between no. of pluses and no. of
minuses.
■ Rank the concepts based on overall rating
Pugh Matrix Structure
Concepts
Selection Criteria A B C D E F G
Handling ease 0 0 - 0 0 - -
Ease of use 0 - - 0 0 + 0
Readibility of settings 0 0 + 0 + 0 +
Metering accuracy 0 0 0 0 - 0 0
Durability 0 0 0 0 0 + 0
Ease of Manufacture + - - 0 0 - 0
Portability + + 0 0 + 0 0
Sum of +’s 2 1 1 0 2 2 1
Sum of –’s 0 2 3 0 1 2 1
Net rating 2 -1 -2 0 1 2 1
Rank 1 6 7 3 2 3 3
Continue? Yes No No Comb Yes Comb Rev
Concept Scoring Matrix
■ Select one concept as a reference or datum
– Best in Pugh Matrix
■ Select weights for each criteria
– Importance rating of each criterion: scale of 1 to 5 or %age with total = 100%
etc.
■ Relative rating of each concept vs datum for each criteria. Datum maybe
different for each criterion
– Much better than datum: 5
– Better than datum: 4
– Same as datum: 3
– Worse than datum: 2
– Much worse than datum: 1
– Finer scales (1 to 9) etc. may also be used.
■ Weighted score for each concept – criterion pair
■ Rank the concepts based on total score (sum of weighted scores)
■ Combine/ Improve/ Retain concepts
■ Select one or more concepts
Concept Scoring Matrix Structure
Concepts
Selection Criteria A DF E G+ Weights
R Scor R Scor R Scor R Scor
Handling ease 3 0.15 3 0.15 4 0.2 4 0.2 5%
Ease of use 3 0.45 4 0.6 4 0.6 3 0.45 15%
Readibility of settings 2 0.2 3 0.3 5 0.5 5 0.5 10%
Metering accuracy 3 0.75 3 0.75 2 0.5 3 0.75 25%
Durability 2 0.3 5 0.75 4 0.6 3 0.45 15%
Ease of Manufacture 3 0.6 3 0.6 2 0.4 2 0.4 20%
Portability 3 0.3 3 0.3 3 0.3 3 0.3 10%
Total Score 2.75 3.45 3.10 3.05
Rank 4 1 2 3
Continue? No Develop No No
Selection process
Generation Screening Scoring Selected

More Related Content

Similar to Eng design 5

software testing metrics do's - don'ts-XBOSoft-QAI Webinar
software testing metrics do's - don'ts-XBOSoft-QAI Webinarsoftware testing metrics do's - don'ts-XBOSoft-QAI Webinar
software testing metrics do's - don'ts-XBOSoft-QAI Webinar
XBOSoft
 
Etm551 lecture06
Etm551 lecture06Etm551 lecture06
Etm551 lecture06
Alex Chuê
 

Similar to Eng design 5 (20)

SPM 5 - Release Planning
SPM 5 - Release PlanningSPM 5 - Release Planning
SPM 5 - Release Planning
 
Anton Muzhailo - Practical Test Process Improvement using ISTQB
Anton Muzhailo - Practical Test Process Improvement using ISTQBAnton Muzhailo - Practical Test Process Improvement using ISTQB
Anton Muzhailo - Practical Test Process Improvement using ISTQB
 
Test Improvement - Any place, anytime, any where
Test Improvement - Any place, anytime, any whereTest Improvement - Any place, anytime, any where
Test Improvement - Any place, anytime, any where
 
UNIT III Concept Inception, Verification and selection.pptx
UNIT III Concept Inception, Verification and selection.pptxUNIT III Concept Inception, Verification and selection.pptx
UNIT III Concept Inception, Verification and selection.pptx
 
A/B Testing Best Practices - Do's and Don'ts
A/B Testing Best Practices - Do's and Don'tsA/B Testing Best Practices - Do's and Don'ts
A/B Testing Best Practices - Do's and Don'ts
 
20 product prioritization techniques for Product Managers. Presented at Bosto...
20 product prioritization techniques for Product Managers. Presented at Bosto...20 product prioritization techniques for Product Managers. Presented at Bosto...
20 product prioritization techniques for Product Managers. Presented at Bosto...
 
114 20 Product Prioritization Frameworks
114   20 Product Prioritization Frameworks114   20 Product Prioritization Frameworks
114 20 Product Prioritization Frameworks
 
Engineering Perspectives on Business
Engineering Perspectives on Business Engineering Perspectives on Business
Engineering Perspectives on Business
 
Modern Perspectives on Recommender Systems and their Applications in Mendeley
Modern Perspectives on Recommender Systems and their Applications in MendeleyModern Perspectives on Recommender Systems and their Applications in Mendeley
Modern Perspectives on Recommender Systems and their Applications in Mendeley
 
IM426 3A G5.ppt
IM426 3A G5.pptIM426 3A G5.ppt
IM426 3A G5.ppt
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
EST 200, Evaluating Design Alternatives
EST 200, Evaluating Design AlternativesEST 200, Evaluating Design Alternatives
EST 200, Evaluating Design Alternatives
 
360 Degree Apraisal.ppt
360 Degree Apraisal.ppt360 Degree Apraisal.ppt
360 Degree Apraisal.ppt
 
Modern Perspectives on Recommender Systems and their Applications in Mendeley
Modern Perspectives on Recommender Systems and their Applications in MendeleyModern Perspectives on Recommender Systems and their Applications in Mendeley
Modern Perspectives on Recommender Systems and their Applications in Mendeley
 
Software Quality Metrics Do's and Don'ts - XBOSoft-QAI Webinar
Software Quality Metrics Do's and Don'ts - XBOSoft-QAI WebinarSoftware Quality Metrics Do's and Don'ts - XBOSoft-QAI Webinar
Software Quality Metrics Do's and Don'ts - XBOSoft-QAI Webinar
 
software testing metrics do's - don'ts-XBOSoft-QAI Webinar
software testing metrics do's - don'ts-XBOSoft-QAI Webinarsoftware testing metrics do's - don'ts-XBOSoft-QAI Webinar
software testing metrics do's - don'ts-XBOSoft-QAI Webinar
 
Operations research
Operations researchOperations research
Operations research
 
1.measurement&scaling b.com
1.measurement&scaling b.com1.measurement&scaling b.com
1.measurement&scaling b.com
 
Lean UX principles
Lean UX principlesLean UX principles
Lean UX principles
 
Etm551 lecture06
Etm551 lecture06Etm551 lecture06
Etm551 lecture06
 

Recently uploaded

如何办理(UoB毕业证书)伯明翰大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UoB毕业证书)伯明翰大学毕业证成绩单本科硕士学位证留信学历认证如何办理(UoB毕业证书)伯明翰大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UoB毕业证书)伯明翰大学毕业证成绩单本科硕士学位证留信学历认证
ugzga
 
如何办理(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单本科硕士学位证留信学历认证如何办理(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单本科硕士学位证留信学历认证
ugzga
 
Week 11 Mini-Tasks.pptxjjjjjjjjjjjjjjjjjjjj
Week 11 Mini-Tasks.pptxjjjjjjjjjjjjjjjjjjjjWeek 11 Mini-Tasks.pptxjjjjjjjjjjjjjjjjjjjj
Week 11 Mini-Tasks.pptxjjjjjjjjjjjjjjjjjjjj
joshuaclack73
 
Abortion Clinic in Springs +27791653574 Springs WhatsApp Abortion Clinic Serv...
Abortion Clinic in Springs +27791653574 Springs WhatsApp Abortion Clinic Serv...Abortion Clinic in Springs +27791653574 Springs WhatsApp Abortion Clinic Serv...
Abortion Clinic in Springs +27791653574 Springs WhatsApp Abortion Clinic Serv...
mikehavy0
 
如何办理(RUG毕业证书)格罗宁根大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(RUG毕业证书)格罗宁根大学毕业证成绩单本科硕士学位证留信学历认证如何办理(RUG毕业证书)格罗宁根大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(RUG毕业证书)格罗宁根大学毕业证成绩单本科硕士学位证留信学历认证
ugzga
 
100^%)( KATLEHONG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Doha, D...
100^%)( KATLEHONG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Doha, D...100^%)( KATLEHONG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Doha, D...
100^%)( KATLEHONG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Doha, D...
pillahdonald
 
如何办理(UCL毕业证书)伦敦大学学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(UCL毕业证书)伦敦大学学院毕业证成绩单本科硕士学位证留信学历认证如何办理(UCL毕业证书)伦敦大学学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(UCL毕业证书)伦敦大学学院毕业证成绩单本科硕士学位证留信学历认证
ugzga
 
NO1 Best Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona karne w...
NO1 Best Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona karne w...NO1 Best Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona karne w...
NO1 Best Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona karne w...
Amil baba
 
如何办理(UAL毕业证书)伦敦艺术大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UAL毕业证书)伦敦艺术大学毕业证成绩单本科硕士学位证留信学历认证如何办理(UAL毕业证书)伦敦艺术大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UAL毕业证书)伦敦艺术大学毕业证成绩单本科硕士学位证留信学历认证
ugzga
 
如何办理(UMN毕业证书)明尼苏达大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UMN毕业证书)明尼苏达大学毕业证成绩单本科硕士学位证留信学历认证如何办理(UMN毕业证书)明尼苏达大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UMN毕业证书)明尼苏达大学毕业证成绩单本科硕士学位证留信学历认证
ugzga
 
如何办理(Birmingham毕业证书)伯明翰大学学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(Birmingham毕业证书)伯明翰大学学院毕业证成绩单本科硕士学位证留信学历认证如何办理(Birmingham毕业证书)伯明翰大学学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(Birmingham毕业证书)伯明翰大学学院毕业证成绩单本科硕士学位证留信学历认证
ugzga
 

Recently uploaded (20)

Onyx Tiles Where Elegance Meets Durability
Onyx Tiles Where Elegance Meets DurabilityOnyx Tiles Where Elegance Meets Durability
Onyx Tiles Where Elegance Meets Durability
 
如何办理(UoB毕业证书)伯明翰大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UoB毕业证书)伯明翰大学毕业证成绩单本科硕士学位证留信学历认证如何办理(UoB毕业证书)伯明翰大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UoB毕业证书)伯明翰大学毕业证成绩单本科硕士学位证留信学历认证
 
iF_Design_Trend_Report_twentytwenrythree
iF_Design_Trend_Report_twentytwenrythreeiF_Design_Trend_Report_twentytwenrythree
iF_Design_Trend_Report_twentytwenrythree
 
BIT Khushi gandhi project.pdf graphic design
BIT Khushi gandhi project.pdf graphic designBIT Khushi gandhi project.pdf graphic design
BIT Khushi gandhi project.pdf graphic design
 
如何办理(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单本科硕士学位证留信学历认证如何办理(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单本科硕士学位证留信学历认证
 
Levi's Advertisement and camapign design
Levi's Advertisement and camapign designLevi's Advertisement and camapign design
Levi's Advertisement and camapign design
 
Bit Dhrumi shah Graphic Designer portfolio
Bit Dhrumi shah Graphic Designer portfolioBit Dhrumi shah Graphic Designer portfolio
Bit Dhrumi shah Graphic Designer portfolio
 
Week 11 Mini-Tasks.pptxjjjjjjjjjjjjjjjjjjjj
Week 11 Mini-Tasks.pptxjjjjjjjjjjjjjjjjjjjjWeek 11 Mini-Tasks.pptxjjjjjjjjjjjjjjjjjjjj
Week 11 Mini-Tasks.pptxjjjjjjjjjjjjjjjjjjjj
 
Abortion Clinic in Springs +27791653574 Springs WhatsApp Abortion Clinic Serv...
Abortion Clinic in Springs +27791653574 Springs WhatsApp Abortion Clinic Serv...Abortion Clinic in Springs +27791653574 Springs WhatsApp Abortion Clinic Serv...
Abortion Clinic in Springs +27791653574 Springs WhatsApp Abortion Clinic Serv...
 
And that's about to change! (Service Design Drinks Berlin May 2024)
And that's about to change! (Service Design Drinks Berlin May 2024)And that's about to change! (Service Design Drinks Berlin May 2024)
And that's about to change! (Service Design Drinks Berlin May 2024)
 
Latest Trends in Home and Building Design
Latest Trends in Home and Building DesignLatest Trends in Home and Building Design
Latest Trends in Home and Building Design
 
如何办理(RUG毕业证书)格罗宁根大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(RUG毕业证书)格罗宁根大学毕业证成绩单本科硕士学位证留信学历认证如何办理(RUG毕业证书)格罗宁根大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(RUG毕业证书)格罗宁根大学毕业证成绩单本科硕士学位证留信学历认证
 
100^%)( KATLEHONG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Doha, D...
100^%)( KATLEHONG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Doha, D...100^%)( KATLEHONG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Doha, D...
100^%)( KATLEHONG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Doha, D...
 
Spring Summer 26 Colors Trend Book Peclers Paris
Spring Summer 26 Colors Trend Book Peclers ParisSpring Summer 26 Colors Trend Book Peclers Paris
Spring Summer 26 Colors Trend Book Peclers Paris
 
如何办理(UCL毕业证书)伦敦大学学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(UCL毕业证书)伦敦大学学院毕业证成绩单本科硕士学位证留信学历认证如何办理(UCL毕业证书)伦敦大学学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(UCL毕业证书)伦敦大学学院毕业证成绩单本科硕士学位证留信学历认证
 
Eric Parein CV. Parein in English is best pronounced as PARE-IN
Eric Parein CV. Parein in English is best pronounced as PARE-INEric Parein CV. Parein in English is best pronounced as PARE-IN
Eric Parein CV. Parein in English is best pronounced as PARE-IN
 
NO1 Best Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona karne w...
NO1 Best Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona karne w...NO1 Best Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona karne w...
NO1 Best Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona karne w...
 
如何办理(UAL毕业证书)伦敦艺术大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UAL毕业证书)伦敦艺术大学毕业证成绩单本科硕士学位证留信学历认证如何办理(UAL毕业证书)伦敦艺术大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UAL毕业证书)伦敦艺术大学毕业证成绩单本科硕士学位证留信学历认证
 
如何办理(UMN毕业证书)明尼苏达大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UMN毕业证书)明尼苏达大学毕业证成绩单本科硕士学位证留信学历认证如何办理(UMN毕业证书)明尼苏达大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UMN毕业证书)明尼苏达大学毕业证成绩单本科硕士学位证留信学历认证
 
如何办理(Birmingham毕业证书)伯明翰大学学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(Birmingham毕业证书)伯明翰大学学院毕业证成绩单本科硕士学位证留信学历认证如何办理(Birmingham毕业证书)伯明翰大学学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(Birmingham毕业证书)伯明翰大学学院毕业证成绩单本科硕士学位证留信学历认证
 

Eng design 5

  • 1. CONCEPT EVALUATION/SELECTION CUPE 125 By Bamhare J Engineering Design Principles
  • 2. Journey So Far ■ Need/Mission statement/Design Brief ■ Stakeholder Identification – Active, Passive ■ Requirements capture, grouping & prioritization – Stakeholder needs ■ Functional Decomposition ■ Concept Generation – Number of alternate solution concepts attempting to satisfy the need
  • 3. Next Step ■ Decide which conceptual solutions are good potential candidates for further investigation/ product development – ALL ? – Some ? – One ? ■ Concept Evaluation – Evaluation criteria – Compare generated concepts: strengths & weaknesses wrt criteria ■ Concept Selection – Decision making: Eliminate, Retain, Combine, Modify – One Shot / Stages/ Iterative (?) – Final Selection Resources,Time, Risk, Policy, Culture
  • 4. Difficulties/Issues ■ Limited knowledge/data ■ Conceptual solutions - Rough/abstract ideas ■ Concensus among team members ■ Other ??
  • 5. Some methods ■ External Decision – company chairman?, customer ■ Product Champion – personal preference ■ Voting – team concensus (subjective) ■ Intuition – feel good factor ■ Prototype & test – Expensive & time consuming ■ Decision Matrices – relatively more objective
  • 6. Process overview ■ Initial filtering – qualitative, absolute comparison ■ Quantitative screening based on decision matrix – Pugh Matrix – Prepare matrix – Rate concepts – Rank concepts – Combine/improve/retain promising concepts – Select one or more concepts ■ Concept Scoring – similar steps, weighted scores, more refinement and advancement over Pugh matrix
  • 7. Evaluation Criteria ■ Extracted from stakeholder requirements ■ Identify a few key requirements through prioritization – Primary, secondary, tertiary ■ Level of abstraction/refinement of requirements must be consistent with concept abstraction/ refinement There is No Sense in Being Exact About Something if You Don’t Even Know What You are Talking About (John von Neuman, 1950)
  • 8. Initial Filtering (absolute) (In case of large number of concepts) ■ “Gut feel” feasibility judgment – Comparison made with prior experience (“design knowledge”) ■ Concept will not work – Too radical – Not original ■ Conditional feasibility – something else required ■ Feasible -Worth considering ■ Go - No go screening ■ Customer requirements ■ Technology readiness/maturity/availability
  • 9. Pugh Matrix ■ Select one concept as a reference or datum – Familiar, straightforward concept – Existing similar benchmark product in market – Existing product in case of re-design/ modification problem – Arbitrarily picked from the generated concepts ■ Pair-wise relative rating of each concept vs datum for each criteria – Better than datum: + – Same as datum: 0 – Worse than datum: - ■ Count number of pluses and minuses for each concept. Overall rating is difference between no. of pluses and no. of minuses. ■ Rank the concepts based on overall rating
  • 10. Pugh Matrix Structure Concepts Selection Criteria A B C D E F G Handling ease 0 0 - 0 0 - - Ease of use 0 - - 0 0 + 0 Readibility of settings 0 0 + 0 + 0 + Metering accuracy 0 0 0 0 - 0 0 Durability 0 0 0 0 0 + 0 Ease of Manufacture + - - 0 0 - 0 Portability + + 0 0 + 0 0 Sum of +’s 2 1 1 0 2 2 1 Sum of –’s 0 2 3 0 1 2 1 Net rating 2 -1 -2 0 1 2 1 Rank 1 6 7 3 2 3 3 Continue? Yes No No Comb Yes Comb Rev
  • 11. Concept Scoring Matrix ■ Select one concept as a reference or datum – Best in Pugh Matrix ■ Select weights for each criteria – Importance rating of each criterion: scale of 1 to 5 or %age with total = 100% etc. ■ Relative rating of each concept vs datum for each criteria. Datum maybe different for each criterion – Much better than datum: 5 – Better than datum: 4 – Same as datum: 3 – Worse than datum: 2 – Much worse than datum: 1 – Finer scales (1 to 9) etc. may also be used. ■ Weighted score for each concept – criterion pair ■ Rank the concepts based on total score (sum of weighted scores) ■ Combine/ Improve/ Retain concepts ■ Select one or more concepts
  • 12. Concept Scoring Matrix Structure Concepts Selection Criteria A DF E G+ Weights R Scor R Scor R Scor R Scor Handling ease 3 0.15 3 0.15 4 0.2 4 0.2 5% Ease of use 3 0.45 4 0.6 4 0.6 3 0.45 15% Readibility of settings 2 0.2 3 0.3 5 0.5 5 0.5 10% Metering accuracy 3 0.75 3 0.75 2 0.5 3 0.75 25% Durability 2 0.3 5 0.75 4 0.6 3 0.45 15% Ease of Manufacture 3 0.6 3 0.6 2 0.4 2 0.4 20% Portability 3 0.3 3 0.3 3 0.3 3 0.3 10% Total Score 2.75 3.45 3.10 3.05 Rank 4 1 2 3 Continue? No Develop No No