7.pdf This presentation captures many uses and the significance of the number...
Azeem cv
1. RESUME
ABDUL AZEEM
G-12 RAFE-AAM SOCIETY,
MALIR HALT, KARACHI-43
CONTACT # 0092-021-4599816/ 0334-3055322
E-mail:azeempk_2001@yahoo.com
Father’s name Muhammad Abdul Rehman
Date of birth 28th July 1971
Marital status married
N.I.C 4201-5421515-7
Passport # CY1855151
Driving license 1049448
CAREER GOAL:
To obtain a potential position within a diverse environment where my knowledge,
skills and experience are aptly utilized and challenged to meet the needs
of a growing organization.
Educational Qualification
Secondary school certificate exam passed from KULSOOM BAI VALIKA AIRPORT
MODEL SCHOOL Karachi 1990
Intermediate exam passed from Govt SUPERIOR SCIENCE COLLEGE Karachi 1992
Qualification
Diploma of Associate Engineering in Power Technology in First Division from Govt
College of Technology 1994
One Year Diploma in industrial instrument passed in Grade "C" from Petroman
Training Institute 1995
B-tech passed in Electronic Technology from PIMSAT(Preston institute of
management science and technology) 2008
Computer knowledge
Windows 2000 Xp & MS Word
2. Language
I Have been pass English language course from Pak American culture centre
Experience Fifteen years
Training
Two month training At Korangi Thermal Power Plant through Government college of
Technology
Two month training industrial instrumentation At National Refinery through Petromen
Karachi
Two weeks training of siemens PLC software programming S7 & PCS7 at siemens
(Karachi)
Ten days abroad training of siemens PCS 7& MMD software programming at
Siemens(Germany)
Employment record
(Company Name) (City, state)
6thJan-2003 to till date Security Paper Limited Karachi. Pak
I am working this company as an instrument technician
and giving the responsibility
as follows
I am working on PCS 7 DCS system and also working
siemens drives system micro master 420 & 440 which is
control a process
Daily inspection of the plant instrument
Maintenance, overhauling, calibration of different
instrument / control system of PM2,
winder, sheeter
To maintain shift log book
To comply fulfill all given target as per quality and / or
environmental objectives/ target)
To follow all specified disciplinary and security corporate
guide line
To follow the quality and environmental policy and
related procedure
3. (Company name) (City, state)
5thOct 2000 to 26thsept 2002 Fauji Jordan fertilizer company Karachi, Pak
I worked as an instrument technician and I have been
given responsibility as follows
Calibration flow, level, pressure, temperature
instruments
Calibration ammonia detection and H2 and CO2
analyzers analyzers
Loop checked vibration system( Bentley Nevada series
7200,3300,3000)
Making a instrument maintenance sheet according to
ISO 9000
Perform worked DCS system INF90 and PLC(HIMA)
Checked the Woodward governor instruments for CO2
compressor
(Company name) (City, state)
th th
10 June 2000 to 5 sept 2000
Team Automation Ruwais, U.A.E
I worked as instrument technician at Ruwais
Refinery with Snamprogetty Company and I
did work as follows
Calibration plant instruments flow, level, pressure and
temperature
Ionic Calibration Flash point analyzer, oxygen analyzer,
sulphur analyzer, PH analyzer,
conductivity analyzer, ionic and Nitric analyzer
Calibrate the level of storage tanks instruments(Enraf)
Checked the loops from field to DCS INF90 system
Checked the Fast loops for analyzers
Laid the fiber optic trasmmition cable
Maked the calibration sheets as per company required
(Company name) (City, state)
st th
1 April1999 to 6 June 2000
Pakistan Oil Refinery Karachi, Pak
I worked as an instrument technician through
contractor and my job responsibility
as follows
Calibration the pneumatic and electronic smart series
instruments
Calibration the flue gas analyzers
4. Maintenance the all instruments which are used in
refinery
Pneumatic and electronics loops checked from field to
control room
Made a temperature indicator loops of the oil furnace
Trouble shoots of all instruments
Calibrate the interface level of crude oil
(Company name) (City, state)
th th
18 sept1997to24 march1999
Descon Pvt. Ltd Karachi, Pak
I worked as an instrument technician on erection
period at Fauji Jordan Fertilizer
(FJFC) and my job responsibility as follows
Installation and calibration of Urea, Utility, DAP and gas
turbine instruments under
the supervision of krebs-speichim (France)
Pre-commissioning of instruments
Loop checked from field to DCS INF90 and
PLC(HIMA)
Calibration and maintenance of all instruments
Proper laid the cable of infi net
Trouble shoots of instruments and analyzers
Calibrate the gas turbine instrument especially Bently
Nevada series 7200
3300,3000
Made the instruments calibration sheets as per ISO
9000 requirement
Install a radioactive source for urea reactor level
(Company name) (City, state)
27thJan 1996 to10thsept1997
Zelin Pvt.Ltd Balouchistan, Pak
I worked as an instrument technician (site Hub co
power plant 4X323 MW
my job responsibility as follows
Instrument’s installation and calibration of boiler and
utility area
Loop checked for field to DCS INF90
Calibration maintenance of all instruments especially
boiler drum level transmitter
5. Trouble shoots of all instruments
To verify the instrument’s calibration of my client I H I
(Ishikawajima- Harima Heavy
industries co., Ltd) and Hub co managers
To verify a instruments calibration sheets as per
instrument behavior
Calibration of damper setting of flue gases