SlideShare a Scribd company logo
1 of 27
ON-PROCESS CP APPLICATIONS
AS OF JUNE 2022
Regional Office: __________________________
SUMMARY OF ON-PROCESS CP APPLICATIONS
Type of Project/Activity
Number of On-process CP
Application
Number of Inactive
CP Applications
Large-Scale Projects 8 6
Government Projects (Section 39,
40 & 41)
48 0
Other Small-Scale Projects (Section
24, 39, 42)
16 1
IKSP Researches/Documentation 2 0
TOTAL 74 7
Name of Proponent Project Location Status Action Taken and Ways Forward
AGUSAN DEL SUR
Global Sibagat Hydro Power
Corporation
13 Megawatt Wawa Hydro
Electric Power Plant Project
CADT 093 Sibagat
FPIC report
submitted to NCIP-
CO
The FPIC Team will convene a meeting on July to
discuss and finalize the compliance to LAO Legal
Opinion.
National Irrigation
Administration
NIA-Umayam River Irrigation
Project (URIP)
La Paz & Loreto,
ADS
FPIC Report
submitted to NCIP-
CO
The FPIC Team will convene a meeting on July to
discuss and finalize the compliance to ADO findings and
recommendations.
VPO Agro Industrial
Development Corporation
Reforestration Project (rubber
plantation)
CADT 078 Rosario
FPIC Team to
submit report
FPIC team reviewed the available documents for
finalization of report/Presentation of output to RD and
TMSD for information and possible guidance
SURIGAO DEL SUR
Department of Environment and
Natural Resources
Sanitary Landfill Project Surigao del Sur On-going
The 1st and 2nd Assembly was conducted on Dec. 20,
2021. The FPIC Team coordinated with the CENRO for
the allocation of budget for the Consensus Building
Activity and the succeeding activities.
Paragon Energy Development
Corporation
Proposed Carac-an Hydro
Electric Power Project
CADT 238 FPIC conducted
FPIC Process were already conducted and completed,
however the proponent failed to perform the provisions
reflected in the MOA entered by the company and the
community. Presently, the project remained dormant.
FPIC status report will be submitted to the NCIP-RO.
ON-PROCESS CP APPLICATIONS FOR LARGE-SCALE PROJECTS
Name of Proponent Project Location Status Action Taken and Ways Forward
SURIGAO DEL SUR
Marc Ventures Mining
Development Corporation
MPSA No.00016-1993-RXIII CADT 238
FPIC Report submitted
to NCIP-RO
The FPIC Team recommends that the proponent should
initiate a conduct of community assembly with
Cabangahan and will make a sincere appeal on the
adjustments of the targeted period of time in the
implementation of the provisions they failed to comply
through executing another Affidavit of Undertakings
which would be accepted by the IP Community, if they
are willing to be included in the schedule of CEB
Deliberation.
BrightGreen Resources
Corporation (BRC)
CADT 238
FPIC Report submitted
to NCIP-RO
BRC is recommended to set a schedule for another
separate Community Assembly with the IP Community of
Cabangahan to be held in Barangay Cabangahan,
Cantilan, Surigao del Sur in order to determine the
latterโ€™s substantial and immediate reasons in terms of
sudden change of decision.
ON-PROCESS CP APPLICATIONS FOR LARGE-SCALE PROJECTS
Name of Proponent Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL NORTE
Surigao Integrated Resources
Corporation
EXPA -000101-XIII CADT 048
CEB deliberation was conducted last
Sept. 28, 2019 but was abruptly
suspended by CEB for some issues
and due to the written complaint at
that time by Sergio Pascual received
during the deliberation.
Proponent SIRC was already informed
several times of the subsequent schedules
for continuation of its deliberation before the
CEB but the company declined for some
reasons.
For issuance of a formal letter to SIRC as to
the next schedule of CEB Deliberation.
ON-PROCESS CP APPLICATIONS FOR LARGE-SCALE PROJECTS
Name of Proponent Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL SUR
Department of Agriculture
SAAD of the UBE Production
Project for NAKAMATA
Sitio Tabinas,
Hinapoyan, Carmen,
Surigao del Sur
FBI validation conducted FBI Team to submit FBI report
Department of Education
Tabon M. Estrella National
High School
Surigao del Sur On-going
The crafted Certificate of Usufruct is
still for review.
Department of Agriculture
Establishment of One (1) Unit
Processing Facility for CY
2021 for NAKAMATA
Carmen,
Surigao del Sur
FBI validation conducted FBI Team to submit FBI report
DA-PRDP
Construction of One (1) Unit
Consolidation & Storage
Building in Support to Abaca
Fiber
Surigao del Sur FBI validation conducted FBI Team to submit FBI report
LGU-Lianga
Construction of Concrete
Road, Lianga-Marihatag
Road, Surigao del Sur
Lianga,
Surigao del Sur
FBI validation conducted FBI Team to submit FBI report
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
Name of Proponent Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL SUR
LGU-Madrid FMRDP of the DA
Union, Madrid,
Surigao del Sur
FBI validation conducted FBI Team to submit FBI report
LGU-Madrid LGSF-FA for CY 2021
San Antonio, Madrid,
Surigao del Sur
FBI validation conducted FBI Team to submit FBI report
Monica Delfina Penelope
Alvizo
Special Land Used Permit Surigao del Sur
The proponent did not push through
the application.
FBI Team to submit status report
Sheila Ilogon Tubod Elementary School
Bolhoon, San Miguel,
Surigao del Sur
Conducted preliminary activities but
the proponent diverted the project into
road project.
Follow-up the proponent regarding the
status of the project.
MAO-DA
Goat Raising Production for
CY 2021 for the NAKAMATA
Carmen, Surigao del
Sur
FBI validation conducted FBI Team to submit FBI report
Sta. Cruz FMRDP of the DA Surigao del Sur FBI validation conducted FBI Team to submit FBI report
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
Name of Proponent Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL SUR
Vice Mayor
Construction of Diversion
Dams of the NIA
Surigao del Sur FBI validation conducted FBI Team to submit FBI report
Vice Mayor
Construction of Irrigation
Projects of the NIA
Surigao del Sur FBI validation conducted FBI Team to submit FBI report
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT 153
Surigao del Sur FBI validation conducted FBI Team to submit FBI report
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT 002, 238 & 114
Surigao del Sur To be conducted
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT 115
Surigao del Sur FBI validation conducted FBI Team to submit FBI report
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
Name of Proponent Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL SUR
LGU-San Francisco Farm-to-Market Road Project Agusan del Sur To be conducted
Reconstitution of the FBI/Validation
Team due to resignation of the Team
Leader.
BLGU-Getsemane,
Bayugan City
SLUP Construction of
Multi Purpose Building
Brgy. Getsemane,
Bayugan City,
Agusan del Sur
The proponent did not push through
the application and converted to
GSUP.
FBI Team to submit status report
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT 090
Loreto,
Agusan del Sur
Endorsed to PO per initial review
and report will be return to the team
for enhancement.
For re-submission of compliance to
the review of the PO.
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT 255
Esperanza,
Agusan del Sur
FBI validation conducted
For submission of the validation report
and lacking of Community Resolution
in Brgy. Guibonon as one of the
attachment in the report.
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT 250 & 077
Agusan del Sur FBI validation conducted For submission of validation report
PENRO-ADS
Proposed Project in Partnership
with PLDT Inc.
Agusan del Sur FPIC Process completed For submission of the FPIC report
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
Name of proponent Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL SUR
National Irrigation
Administration
Sayon Communal Irrigation
System (CIS)
Agusan del Sur FBI validation conducted FBI Team to submit FBI report
LGU-Prosperidad
Proposed Cemetery for
Suspected and Confirmed
COVID-19 Deaths
Agusan del Sur FBI validation conducted FBI Team to submit FBI report
Department of Public Works
and Highways
Circumferential Road along
Agusan Marsh
Agusan del Sur To be conducted
AGUSAN DEL NORTE
Mayor Lozada
Construction of Concrete
Road leading to Bikangkang
Falls
Santiago,
Agusan del Norte
No funds deposited. Pre-FBI
Conference was already conducted
but due to the unavailability of funds,
actual validation was not yet
conducted.
For funding
SRMI
Proposed Construction of
Light Vehicle Road
Tubay,
Agusan del Norte
No funds deposited. Pre-FBI
Conference was already conducted
but due to the unavailability of funds,
actual validation was not yet
conducted.
For funding
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
Name of
Proponent
Project Location Status
Action Taken and Ways Forward
AGUSAN DEL NORTE
BFAR
Pre-Feasibility Study & Site
Suitability Assessment of
LGUs Proposed Sites
Agusan del Norte FBI to be conducted. For Pre-FBI Conference
City Engineering of Butuan
Construction of Water
Supply System for Butuan
City Rural Barangays @
Brgy. Pianing
Agusan del Norte
The FBI Team has conducted the FBI
validation and up to this time, the FBI
Team has been waiting for the MOA to
be signed by the City Mayor of Butuan.
A resolution of consent and
acceptance has already given by our
Manobo IPs of CADT 135. The office
of the City Engineers (proponent) and
our Manobo IPs already agreed terms
and conditions for the said project.
The FBI Team follow-up the MOA and still
waiting to be submitted to the team for
submission.
Department of Public
Works and Highways
(DPWH)
Construction/Improvement
of Road, Hinandayan-
Minbahandi-Salaysayon
Road
Agusan del Norte
The FBI validation has already
conducted by the team.
The Higaonon IP Community has already gives
their resolution of consent and acceptance for
the said project. The IP Community also
informed the team that DPWH has already
provided them on the agreed terms of the said
project and stipulated in the MOA. The FBI
Team is still waiting on the MOA to be signed by
the proponent and to be given back to the FBI
Team and to be included in the validation report.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
Name of
Proponent
Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
CENRO-Tubay
CY 2021 ENGP of the Preparation
of a Five (5) Years Reforestation
Plan
Agusan del Norte
No funds deposited. Pre-FBI
Conference was already
conducted.
Upon the availability of funds, actual
validation will be conducted.
Department of Trade and
Industry (DTI)
STRIKE 100 Local MSME & IP Area
Development Partnership
Mayapay, Agusan del
Norte
The FBI validation was
conducted.
The FBI Team requested the DTI of
the final list of beneficiaries as it was
found out during the validation that
some of the beneficiaries was outside
the AD Claim and Non-IPs. We
requested the IP Leaders/IP
Community to assist in the selection
and crafting of policy and guidelines
for the beneficiaries in the said
project. Also, the team requested
DTI to submit the technical
description as basis on the scope of
the project as it will be overlaid to the
Mayapay AD Claim. Up to now, all
this data needed was never been
complied despite the coordination
rendered by the FBI Team.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
Name of Proponent Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
Provincial Governor
NRJ B.C-Malaybalay Road leading
to NRJ Buenavista-Bunaguit Road
Agusan del Norte FBI validation was conducted
On-going negotiation of terms
between the IP and the
proponent for the finalization of
MOA and issuance of the
Resolution of Consent.
Office of the City Engineer
Construction of Water Supply
System for Butuan City Rural
Barangays @ Brgy. Anticala
Agusan del Norte
The FBI Team has conducted the
FBI validation and up to this time,
the FBI Team has been waiting
for the MOA to be signed by the
City Mayor of Butuan. A
resolution of consent and
acceptance has already given by
our Manobo IPs of CADT 135.
The Office of the Engineers
(proponent) and our Manobo IPs
already agreed terms and
conditions for the said project.
The FBI Team follow-up the MOA
and still waiting to be submitted
to the team for submission.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
Name of Proponent Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
Provincial IPMR (Datu
Bawang)
Proposed Housing Project Agusan del Norte
The FBI validation has already conducted by
the FBI Team. The project was located in
Geographically Isolated & Disadvantage
Area (GIDA) where still infected by the
NPAs. It was found that the project was
within the AD of Higaonon. The community
has already given their resolution of consent
and acceptance on the project. The FBI
Team was waiting for the Deed of
Usufructuary to be finalized and signed both
the IP Community and PLGU. No follow-up
meetings and AD visitation conducted. The
team was being informed that the AFP has
already delivered the materials needed for
the construction but it was damaged
particularly the cements during Typhoon
Odette.
CSC-Buenavista Personnel will
conduct monitoring on the said
project this coming July 7-8, 2022.
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT RTR
Agusan del Norte
No funds deposited. Pre-FBI Conference
was already conducted.
Upon the availability of funds, actual
validation will be conducted.
Department of Social Welfare
and Development
KC PAMANA IP CDD B2C3
CADT 135
Agusan del Norte
No funds deposited. Pre-FBI Conference
was already conducted.
Upon the availability of funds, actual
validation will be conducted.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
Name of
Proponent
Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
National Irrigation
Adminsitration (NIA)
Proposed DIP Tagkiling
(Drip Irrigation Project)
Agusan del Norte
The FBI validation has already conducted last
October 7, 2021. The report was still for submission
and the team still waiting the MOA to be return by
NIA.
For submission of validation report
by the FBI Team.
District Engineering
Office
Construction/Improvement
of Butuan City Water
System, Main Bypass
Pipeline
Anticala, Butuan
City
The validation was already conducted but due to the
protest from some members of the direct affected
Clan (Pyaga Clan), it was being on hold. The Pyaga
Clan needs to resolve such protest from Clan
Members and the FBI Team will wait on their conflict
resolution.
The FBI Team conducting follow-up for
the said protest and will submit a status
report if their will be no conflict
resolution made by the Pyaga Clan this
month of July 2022.
Gov. Corvera 500 Hectares Nursery Camagong, Nasipit
No FBI validation in the field has been conducted.
The FBI Team and PLGU has agreed in many dates
for the said activity but it was postponed due to
conflict of schedules. Last schedule was on May
2022, but still not being pursued and being
cancelled by the proponent.
The FBI Team will conduct another
round of IEC on FPIC to Agusan Upโ€™s
Head of Office in order him to
understand the value of the process
and will make a last and final schedule
for the said project.
Gov. Corvera
Veterinary Quarantine
Stations
Lawan-lawan, Las
Nieves
The validation has already conducted. The
Usufructuary Rights was signed last June 2022 by
Gov. Dale Corvera.
For submission of validation report
by the FBI Team.
Romy Lasco Lasco Demo Crops Iyao, Butuan City The FBI validation has conducted.
The FBI report was still for submission
by the validating team.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
Name of
Proponent
Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
Roy Nabong Robrosas Strawberry Anticala, Butuan City The FBI validation has conducted.
The FBI report was still for
submission by the validating team.
MLGU
Construction of Circumferential
Road Leading to Lake Mainit
Jabonga,
Agusan del Norte
No funds deposited. FBI/Validation
activities were already conducted and
validation report was submitted to the
Regional Office.
For issuance of certification.
LGU-Santiago
Construction of Concrete Road
leading to Bikangkang Falls
Santiago,
Agusan del Norte
Nasipit Water District Watershed Development Project Agusan del Norte FBI validation conducted FBI Team to submit FBI report
SURIGAO DEL NORTE
National Housing Authority NHA Claver Bago Tribal Village
Claver,
Surigao del Norte
There was no fund provided by the
proponent. Transportation expenses of
the validating team was came from
their own pocket however, the food of
the participants was provided by LGU-
Claver. (Team Leader - Veronica Lobo-
od and recently assumed by Gerlie
Tiambong)
The report of the validation is for
submission.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
Name of
Proponent
Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL NORTE
Schools Division of
Surigao del Norte
Palilihan, Tiltilan, Landing
& Bayobanwa Elem.
School
Surigao del Norte
No funds provided by DepEd however, the IPS of
CADT 048 provided vehicle for the validating team
since the beneficiaries of the school are all
Mamanwa pupils. (Team Leader - Gerlie
Tiambong)
The report of the validation is for
submission.
Usufruct agreement for signature
of the division supervisor as one
of the attachment of the report.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
Name of
Proponent
Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
PENRO-ADN CBFM Agusan del Norte
The FBI Team conducted series of
gathering for the said CBFM Application.
As a result, the CBFM Application has a
different Peoples Organization falls within
the AD Claim of Higaonon IPs of Mayapay
For now, the PENRO together with
Pos still on the negotiation of terms
between them and Mayapay AD
Claims for the said CBFM
Application.
GMA Network Inc.
Forest Land Use Agreement
application of GMA Network
Inc.
Bonbon, Butuan City
The FBI Team and the applicant agreed on
the said Pre-FBI via zoom but has never
been pursued.
Follow-up the proponent for the Pre-
FBI schedule.
ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
Name of
Proponent
Project Location Status
Action Taken and Ways Forward
AGUSAN DEL NORTE
Elbert Mesa
Commercial Sand and Gravel
Application
Guinabsan, Buenavista
The FBI validation was
conducted.
The applied area falls within the Ancestral Domain
of Higaonon in CADT 252. Pertinent documents
such as SPA from the proponentโ€™s representative
who attended and participated the validation was
still lacking. The proponent representative failed to
submit the SPA as it was requested prior the
conduct of the validation.
PDCFAI CBFMA Cabadbaran City
No funds deposited. Pre-FBI
Conference was already
conducted but the authorized
representative failed to
comply and submit project
proposal/activity design of
the said CBFMA Project.
Upon the availability of funds, actual validation
will be conducted.
Quennie Lanaja
Commercial Sand and Gravel
Application
Guinabsan, Buenavista
The FBI validation was
conducted.
The applied area falls within the Ancestral
Domain of Higaonon in CADT 252. Pertinent
documents such as SPA from the proponentโ€™s
representative who attended and participated the
validation was still lacking. The proponent
representative failed to submit SPA as it was
requested prior the conduct of the validation.
ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
Name of
Proponent
Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
Atty. Gil Cembrano Quarry (Earth fill) Alubihid, Buenavista
The FBI validation was conducted last
April 20, 2021 and recommended for the
issuance of Certificate of Non-Overlap
(CNO).
Follow-up the Deed of Undertakings has
not been signed and given by the
proponent. Also, resolutions of
endorsement from MLGU and other
pertinent documents needed as inclusion of
the validation report was never been
provided by the proponent.
Geraldine Cordova
Commercial Sand and
Gravel Application
Guinabsan,
Buenavista
The FBI validation was conducted and
the applied area falls within the
Ancestral Domain of Higaonon in CADT
252.
Follow-up the pertinent documents such as
SPA from the proponentโ€™s representative
who attended and participated the
validation was still lacking. The proponent
representative failed to submit the SPA as it
was requested prior the conduct of the
validation.
ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
Name of Proponent Project Location Status
Action Taken and
Ways Forward
AGUSAN DEL SUR
SIFSETRICA Agro-Forestry Project
CADT 093 Sibagat, Agusan
del Sur
FBI/FPIC completed
FPIC Team to submit FPIC
report.
Rodante David CSAG San Patricio, La Paz
The proponent did not push through
the application.
FBI Team to submit status
report.
Reji Feli Albarico CSAG Agusan del Sur FBI conducted
FBI Team to submit report and
awaiting for the lacking
documents from the proponent.
Michael Dennis Lim CSAG Agusan del Sur FBI to be conducted
Garyeth Plaza CSAG Agusan del Sur FBI to be conducted
Cesar D. Gacayan CSAG Agusan del Sur FBI to be conducted
ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
Name of Proponent Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL NORTE
MGB R13
Notice of Petition issued to
BLGU Rep by Engr. Almeda
for the Declaration of Mineral
Land
Surigao del Norte
On August 5, 2021, Pre-FBI
Conference was conducted but
proponent until now show no
interest to continue the process
despite several follow-ups (notices)
from the FBI Team headed by TAA
II Leoner Sanchez.
The FBI Team sent notice to the
proponent and until now there was no
reply. We will send another notice to
the proponent and if they will hesitant
to reply related to our notice, we will
prepare status report recommending
issuance by RD of suspension or
show cause order why the application
should not be deemed abandoned for
โ€œlack or loss interestโ€ pursuant to Sec.
11 of AO No. 3, series of 2012.
SURIGAO DEL SUR
SUDECOR IFMA No.06-2009
CADT 116, CADT 115,
CADT 114 & CADT 238
FBI validation conducted FBI Team to submit FBI report
CENRO Abrahan CBFMA of BUAFA Tago, Surigao del Sur FBI validation conducted FBI Team to submit FBI report
ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
Name of Proponent Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL SUR
Ma. Shella Millan Et.al
IKSP on Dances of Manobo
Indigenous Tribe
San Miguel, Surigao del
Sur
FPIC conducted
FPIC team for submission of FPIC
report.
Rolly Salvaleon
IKSP on Oral Literature
Among Cultural Communities
in SDS:Input for
Contextualized
Surigao del Sur
Activity was not push through due to
conflict schedule of the proponent.
No feedback as to the new schedule.
Follow-up the proponent
ON-PROCESS CP APPLICATIONS FOR IKSP RESEARCHES/DOCUMENTATION
SUMMARY: ISSUES AND CONCERNS AND WAYS FORWARD
FBI/FPIC Issues and Concerns Action Taken Ways Forward
1. Long process of WFP approval and
issuance of CP/CNO;
After the pre-FBI Conference the WFP will
be submitted immediately to the Regional
Office for the review and comment of the
Review Team.
Some of the proponent decided to shoulder
and disburse all the expenses on the conduct
of FBI activities to avoid delay.
2. The prescribed number of days in
conducting FBI/Validation couldnโ€™t
followed due to the multiple number of
issued memo for validation;
Conducted piggy-backing with other
activities.
Conduct of piggy-backing.
3. The proponent canโ€™t meet the
demand of the concerned ICCs/IPs;
Conducted negotiation between the
proponent and the concern ICCs/IPs.
To conduct an assembly to discuss the
demands of the ICCs/IPs in order to give time
to the proponent to give a counter proposal to
the demand of the concern ICCs/IPs.
4. Some of the government agencies
implemented projects within an AD
without conducting FPIC Process; and
Conducted IEC to the LGUs relative to the
Revised Guidelines on FPIC and Related
Processes of 2012.
To conduct IEC on Revised Guidelines on
FPIC and Related Processes of 2012 to the
LGUs within the Province of Agusan del
Norte.
5. Some of the LGUs did not recognize
the rights of the IPs and the need to
conduct FPIC Process.
Conducted IEC to the concern LGUs relative
to the rights of the ICCs/IPs stipulated on
the IPRA Law, NCIP Administrative Orders
and other related guidelines.
To conduct IEC on IPRA Law, NCIP
Administrative Orders and other related
guidelines to the LGUs within the Province of
Agusan del Norte.
AGUSAN DEL NORTE
SUMMARY: ISSUES AND CONCERNS AND WAYS FORWARD
Issues and Concerns Action Taken Ways Forward
There are government projects who
seek certification from our office,
however upon our actual conduct of
Field Based Investigation the projects
are already completed. In fact,
according to the Barangay Official they
only secure certification because it is
one of the requirements of DILG or
other concerned line agencies.
The FBI Team still conducted FBI activities
despite the projects are already completed.
To inform the concerned line agencies or
stakeholders that prior to the commencement
of any projects they will secure CP or CNO as
the case maybe.
There are cases of overlapping with
the schedule of GAA Projects versus
FBI Activities due to volume of CP or
CNO Applications.
For CSC-Bad-as headed by Gerlie
Tiambong, requested Regional FPIC Focal
Person to give other personnel the validation
of government projects entitled Installation
of Solar Streetlight in Municipality of Tagana-
an, Surigao del Norte.
For those focal persons of GAA Projects, we
recommend that they will not be Team Leader
of FBI or FPIC Project, might be a member of
the team.
SURIGAO DEL NORTE
SUMMARY: ISSUES AND CONCERNS AND WAYS FORWARD
Issues and Concerns Action Taken Ways Forward
Complaint of Agusan del Sur Sand and
Gravel Permittees Association
(ASSAGPA) to the concurrence of
Ethnographic Commissioner to the
issued Certificate of Non Overlap in
the Regional Office causing the
delayed issuance to the proponent eg.
CSAG application
Coordinated with the PMRB and IEC on
NCIP Administrative Order No. 3 series of
2012 Revised FPIC Guidelines and Related
Processes to the applicants
To expedite the process, said the concern
shall be raised to the CEB for information and
consideration.
Refusal to sign of the ADS DepEd
Schools Division Superintendent to the
Contract of Usufruct for the schools
established within an Ancestral
Domain for issuance of School ID
Coordinated Division Office through TICs
and follow up status of the Contract of
Usufuct
For endorsement of the FBI report to NCIP
Central Office for levelling off with the
Department of Education
AGUSAN DEL SUR
SUMMARY: ISSUES AND CONCERNS AND WAYS FORWARD
Issues and Concerns Action Taken Ways Forward
There are proponents who, after
sending application to the office, when
Work Order is issued, does not wish to
pursue the application.
The FBI Team still contacted the proponents
informing them that a Work Order is already
issued and the FBI Process can be started
anytime.
Demand a letter from the proponent regarding
their wish not to pursue stating the reason
thereof, and to be attached in the status
report.
Work Orders sometimes overlaps GAA
funded activities and schedules, thatโ€™s
why there are delays in validation and
report submission.
The team strategize to synchronize activities
and schedules but lacks manpower.
NCIP shall allocate funds or make proposal
for additional staff on field to focus on the said
activities.
SURIGAO DEL SUR

More Related Content

Similar to PPT-Template-List-of-Pending-CP-applications-July-9-Presentation.pptx

Day-3, Mr. Rajiv Yadav
Day-3, Mr. Rajiv YadavDay-3, Mr. Rajiv Yadav
Day-3, Mr. Rajiv YadavIPPAI
ย 
BBB-Bicol-River-Accomplishment-Nov-13-2022.pptx
BBB-Bicol-River-Accomplishment-Nov-13-2022.pptxBBB-Bicol-River-Accomplishment-Nov-13-2022.pptx
BBB-Bicol-River-Accomplishment-Nov-13-2022.pptxBerpOnrubia
ย 
Oremet Corporate Profile June 2016
Oremet Corporate Profile June 2016Oremet Corporate Profile June 2016
Oremet Corporate Profile June 2016Elias Nacario
ย 
Water Infrastructure Projects in Brazil 2012
Water Infrastructure Projects in Brazil 2012Water Infrastructure Projects in Brazil 2012
Water Infrastructure Projects in Brazil 2012ReportsnReports
ย 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014hydrologywebsite1
ย 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
ย 
Work Breakdown Structure (WBS).pptx
Work Breakdown Structure  (WBS).pptxWork Breakdown Structure  (WBS).pptx
Work Breakdown Structure (WBS).pptxJo Balucanag - Bitonio
ย 
amrapali-complaints(20130320122905-pm)
amrapali-complaints(20130320122905-pm)amrapali-complaints(20130320122905-pm)
amrapali-complaints(20130320122905-pm)amrapali-complaint
ย 
2nd qtr rpmes 2013
2nd qtr rpmes 20132nd qtr rpmes 2013
2nd qtr rpmes 2013Rdc Cordillera
ย 
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...Micheal Le Havre
ย 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014hydrologyproject0
ย 
3rd qtr rpmes report
3rd qtr rpmes report3rd qtr rpmes report
3rd qtr rpmes reportRdc Cordillera
ย 
EMCRP Draft ISR Mission_Presentation_August, 2022.pptx
EMCRP Draft   ISR  Mission_Presentation_August, 2022.pptxEMCRP Draft   ISR  Mission_Presentation_August, 2022.pptx
EMCRP Draft ISR Mission_Presentation_August, 2022.pptxappoloes971
ย 
Pod contents
Pod contentsPod contents
Pod contentsNatalia Camba
ย 
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfPreliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfBappy114
ย 
County Commissioners Discuss Uses For Homeline Grant
County Commissioners Discuss Uses For Homeline GrantCounty Commissioners Discuss Uses For Homeline Grant
County Commissioners Discuss Uses For Homeline GrantWriting Portfolio
ย 
QRM Q-2 2019.pptx
QRM Q-2 2019.pptxQRM Q-2 2019.pptx
QRM Q-2 2019.pptxssuser1d6ff4
ย 
presentation-2016-12-09
presentation-2016-12-09presentation-2016-12-09
presentation-2016-12-09Lindsay Nagle
ย 

Similar to PPT-Template-List-of-Pending-CP-applications-July-9-Presentation.pptx (20)

Day-3, Mr. Rajiv Yadav
Day-3, Mr. Rajiv YadavDay-3, Mr. Rajiv Yadav
Day-3, Mr. Rajiv Yadav
ย 
BBB-Bicol-River-Accomplishment-Nov-13-2022.pptx
BBB-Bicol-River-Accomplishment-Nov-13-2022.pptxBBB-Bicol-River-Accomplishment-Nov-13-2022.pptx
BBB-Bicol-River-Accomplishment-Nov-13-2022.pptx
ย 
Oremet Corporate Profile June 2016
Oremet Corporate Profile June 2016Oremet Corporate Profile June 2016
Oremet Corporate Profile June 2016
ย 
Water Infrastructure Projects in Brazil 2012
Water Infrastructure Projects in Brazil 2012Water Infrastructure Projects in Brazil 2012
Water Infrastructure Projects in Brazil 2012
ย 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014
ย 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
ย 
Work Breakdown Structure (WBS).pptx
Work Breakdown Structure  (WBS).pptxWork Breakdown Structure  (WBS).pptx
Work Breakdown Structure (WBS).pptx
ย 
amrapali-complaints(20130320122905-pm)
amrapali-complaints(20130320122905-pm)amrapali-complaints(20130320122905-pm)
amrapali-complaints(20130320122905-pm)
ย 
2nd qtr rpmes 2013
2nd qtr rpmes 20132nd qtr rpmes 2013
2nd qtr rpmes 2013
ย 
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
ย 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014
ย 
3rd qtr rpmes report
3rd qtr rpmes report3rd qtr rpmes report
3rd qtr rpmes report
ย 
EMCRP Draft ISR Mission_Presentation_August, 2022.pptx
EMCRP Draft   ISR  Mission_Presentation_August, 2022.pptxEMCRP Draft   ISR  Mission_Presentation_August, 2022.pptx
EMCRP Draft ISR Mission_Presentation_August, 2022.pptx
ย 
Puducherry
Puducherry Puducherry
Puducherry
ย 
Pod contents
Pod contentsPod contents
Pod contents
ย 
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfPreliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
ย 
DOPWIC Program Year 2018 Applicant Workshop
DOPWIC Program Year 2018 Applicant WorkshopDOPWIC Program Year 2018 Applicant Workshop
DOPWIC Program Year 2018 Applicant Workshop
ย 
County Commissioners Discuss Uses For Homeline Grant
County Commissioners Discuss Uses For Homeline GrantCounty Commissioners Discuss Uses For Homeline Grant
County Commissioners Discuss Uses For Homeline Grant
ย 
QRM Q-2 2019.pptx
QRM Q-2 2019.pptxQRM Q-2 2019.pptx
QRM Q-2 2019.pptx
ย 
presentation-2016-12-09
presentation-2016-12-09presentation-2016-12-09
presentation-2016-12-09
ย 

Recently uploaded

Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processNAP Global Network
ย 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
ย 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisChristina Parmionova
ย 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
ย 
Government e Marketplace GeM Presentation
Government e Marketplace GeM PresentationGovernment e Marketplace GeM Presentation
Government e Marketplace GeM Presentationgememarket11
ย 
Night 7k to 12k Call Girls Service In Navi Mumbai ๐Ÿ‘‰ BOOK NOW 9833363713 ๐Ÿ‘ˆ โ™€๏ธ...
Night 7k to 12k  Call Girls Service In Navi Mumbai ๐Ÿ‘‰ BOOK NOW 9833363713 ๐Ÿ‘ˆ โ™€๏ธ...Night 7k to 12k  Call Girls Service In Navi Mumbai ๐Ÿ‘‰ BOOK NOW 9833363713 ๐Ÿ‘ˆ โ™€๏ธ...
Night 7k to 12k Call Girls Service In Navi Mumbai ๐Ÿ‘‰ BOOK NOW 9833363713 ๐Ÿ‘ˆ โ™€๏ธ...aartirawatdelhi
ย 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
ย 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
ย 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
ย 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learningNAP Global Network
ย 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
ย 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
ย 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfSamirsinh Parmar
ย 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...tanu pandey
ย 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...nservice241
ย 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...SUHANI PANDEY
ย 
celebrity ๐Ÿ’‹ Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity ๐Ÿ’‹ Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity ๐Ÿ’‹ Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity ๐Ÿ’‹ Agra Escorts Just Dail 8250092165 service available anytime 24 hourCall Girls in Nagpur High Profile
ย 
Top Rated Pune Call Girls Dapodi โŸŸ 6297143586 โŸŸ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi โŸŸ 6297143586 โŸŸ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi โŸŸ 6297143586 โŸŸ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi โŸŸ 6297143586 โŸŸ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
ย 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
ย 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 

Recently uploaded (20)

Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
ย 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
ย 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
ย 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
ย 
Government e Marketplace GeM Presentation
Government e Marketplace GeM PresentationGovernment e Marketplace GeM Presentation
Government e Marketplace GeM Presentation
ย 
Night 7k to 12k Call Girls Service In Navi Mumbai ๐Ÿ‘‰ BOOK NOW 9833363713 ๐Ÿ‘ˆ โ™€๏ธ...
Night 7k to 12k  Call Girls Service In Navi Mumbai ๐Ÿ‘‰ BOOK NOW 9833363713 ๐Ÿ‘ˆ โ™€๏ธ...Night 7k to 12k  Call Girls Service In Navi Mumbai ๐Ÿ‘‰ BOOK NOW 9833363713 ๐Ÿ‘ˆ โ™€๏ธ...
Night 7k to 12k Call Girls Service In Navi Mumbai ๐Ÿ‘‰ BOOK NOW 9833363713 ๐Ÿ‘ˆ โ™€๏ธ...
ย 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
ย 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
ย 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
ย 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
ย 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
ย 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
ย 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
ย 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
ย 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
ย 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
ย 
celebrity ๐Ÿ’‹ Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity ๐Ÿ’‹ Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity ๐Ÿ’‹ Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity ๐Ÿ’‹ Agra Escorts Just Dail 8250092165 service available anytime 24 hour
ย 
Top Rated Pune Call Girls Dapodi โŸŸ 6297143586 โŸŸ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi โŸŸ 6297143586 โŸŸ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi โŸŸ 6297143586 โŸŸ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi โŸŸ 6297143586 โŸŸ Call Me For Genuine Sex Serv...
ย 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
ย 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
ย 

PPT-Template-List-of-Pending-CP-applications-July-9-Presentation.pptx

  • 1. ON-PROCESS CP APPLICATIONS AS OF JUNE 2022 Regional Office: __________________________
  • 2. SUMMARY OF ON-PROCESS CP APPLICATIONS Type of Project/Activity Number of On-process CP Application Number of Inactive CP Applications Large-Scale Projects 8 6 Government Projects (Section 39, 40 & 41) 48 0 Other Small-Scale Projects (Section 24, 39, 42) 16 1 IKSP Researches/Documentation 2 0 TOTAL 74 7
  • 3. Name of Proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL SUR Global Sibagat Hydro Power Corporation 13 Megawatt Wawa Hydro Electric Power Plant Project CADT 093 Sibagat FPIC report submitted to NCIP- CO The FPIC Team will convene a meeting on July to discuss and finalize the compliance to LAO Legal Opinion. National Irrigation Administration NIA-Umayam River Irrigation Project (URIP) La Paz & Loreto, ADS FPIC Report submitted to NCIP- CO The FPIC Team will convene a meeting on July to discuss and finalize the compliance to ADO findings and recommendations. VPO Agro Industrial Development Corporation Reforestration Project (rubber plantation) CADT 078 Rosario FPIC Team to submit report FPIC team reviewed the available documents for finalization of report/Presentation of output to RD and TMSD for information and possible guidance SURIGAO DEL SUR Department of Environment and Natural Resources Sanitary Landfill Project Surigao del Sur On-going The 1st and 2nd Assembly was conducted on Dec. 20, 2021. The FPIC Team coordinated with the CENRO for the allocation of budget for the Consensus Building Activity and the succeeding activities. Paragon Energy Development Corporation Proposed Carac-an Hydro Electric Power Project CADT 238 FPIC conducted FPIC Process were already conducted and completed, however the proponent failed to perform the provisions reflected in the MOA entered by the company and the community. Presently, the project remained dormant. FPIC status report will be submitted to the NCIP-RO. ON-PROCESS CP APPLICATIONS FOR LARGE-SCALE PROJECTS
  • 4. Name of Proponent Project Location Status Action Taken and Ways Forward SURIGAO DEL SUR Marc Ventures Mining Development Corporation MPSA No.00016-1993-RXIII CADT 238 FPIC Report submitted to NCIP-RO The FPIC Team recommends that the proponent should initiate a conduct of community assembly with Cabangahan and will make a sincere appeal on the adjustments of the targeted period of time in the implementation of the provisions they failed to comply through executing another Affidavit of Undertakings which would be accepted by the IP Community, if they are willing to be included in the schedule of CEB Deliberation. BrightGreen Resources Corporation (BRC) CADT 238 FPIC Report submitted to NCIP-RO BRC is recommended to set a schedule for another separate Community Assembly with the IP Community of Cabangahan to be held in Barangay Cabangahan, Cantilan, Surigao del Sur in order to determine the latterโ€™s substantial and immediate reasons in terms of sudden change of decision. ON-PROCESS CP APPLICATIONS FOR LARGE-SCALE PROJECTS
  • 5. Name of Proponent Project Location Status Action Taken and Ways Forward SURIGAO DEL NORTE Surigao Integrated Resources Corporation EXPA -000101-XIII CADT 048 CEB deliberation was conducted last Sept. 28, 2019 but was abruptly suspended by CEB for some issues and due to the written complaint at that time by Sergio Pascual received during the deliberation. Proponent SIRC was already informed several times of the subsequent schedules for continuation of its deliberation before the CEB but the company declined for some reasons. For issuance of a formal letter to SIRC as to the next schedule of CEB Deliberation. ON-PROCESS CP APPLICATIONS FOR LARGE-SCALE PROJECTS
  • 6. Name of Proponent Project Location Status Action Taken and Ways Forward SURIGAO DEL SUR Department of Agriculture SAAD of the UBE Production Project for NAKAMATA Sitio Tabinas, Hinapoyan, Carmen, Surigao del Sur FBI validation conducted FBI Team to submit FBI report Department of Education Tabon M. Estrella National High School Surigao del Sur On-going The crafted Certificate of Usufruct is still for review. Department of Agriculture Establishment of One (1) Unit Processing Facility for CY 2021 for NAKAMATA Carmen, Surigao del Sur FBI validation conducted FBI Team to submit FBI report DA-PRDP Construction of One (1) Unit Consolidation & Storage Building in Support to Abaca Fiber Surigao del Sur FBI validation conducted FBI Team to submit FBI report LGU-Lianga Construction of Concrete Road, Lianga-Marihatag Road, Surigao del Sur Lianga, Surigao del Sur FBI validation conducted FBI Team to submit FBI report ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
  • 7. Name of Proponent Project Location Status Action Taken and Ways Forward SURIGAO DEL SUR LGU-Madrid FMRDP of the DA Union, Madrid, Surigao del Sur FBI validation conducted FBI Team to submit FBI report LGU-Madrid LGSF-FA for CY 2021 San Antonio, Madrid, Surigao del Sur FBI validation conducted FBI Team to submit FBI report Monica Delfina Penelope Alvizo Special Land Used Permit Surigao del Sur The proponent did not push through the application. FBI Team to submit status report Sheila Ilogon Tubod Elementary School Bolhoon, San Miguel, Surigao del Sur Conducted preliminary activities but the proponent diverted the project into road project. Follow-up the proponent regarding the status of the project. MAO-DA Goat Raising Production for CY 2021 for the NAKAMATA Carmen, Surigao del Sur FBI validation conducted FBI Team to submit FBI report Sta. Cruz FMRDP of the DA Surigao del Sur FBI validation conducted FBI Team to submit FBI report ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
  • 8. Name of Proponent Project Location Status Action Taken and Ways Forward SURIGAO DEL SUR Vice Mayor Construction of Diversion Dams of the NIA Surigao del Sur FBI validation conducted FBI Team to submit FBI report Vice Mayor Construction of Irrigation Projects of the NIA Surigao del Sur FBI validation conducted FBI Team to submit FBI report Department of Social Welfare and Development KC PAMANA IP CDD B3C1 CADT 153 Surigao del Sur FBI validation conducted FBI Team to submit FBI report Department of Social Welfare and Development KC PAMANA IP CDD B3C1 CADT 002, 238 & 114 Surigao del Sur To be conducted Department of Social Welfare and Development KC PAMANA IP CDD B3C1 CADT 115 Surigao del Sur FBI validation conducted FBI Team to submit FBI report ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
  • 9. Name of Proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL SUR LGU-San Francisco Farm-to-Market Road Project Agusan del Sur To be conducted Reconstitution of the FBI/Validation Team due to resignation of the Team Leader. BLGU-Getsemane, Bayugan City SLUP Construction of Multi Purpose Building Brgy. Getsemane, Bayugan City, Agusan del Sur The proponent did not push through the application and converted to GSUP. FBI Team to submit status report Department of Social Welfare and Development KC PAMANA IP CDD B3C1 CADT 090 Loreto, Agusan del Sur Endorsed to PO per initial review and report will be return to the team for enhancement. For re-submission of compliance to the review of the PO. Department of Social Welfare and Development KC PAMANA IP CDD B3C1 CADT 255 Esperanza, Agusan del Sur FBI validation conducted For submission of the validation report and lacking of Community Resolution in Brgy. Guibonon as one of the attachment in the report. Department of Social Welfare and Development KC PAMANA IP CDD B3C1 CADT 250 & 077 Agusan del Sur FBI validation conducted For submission of validation report PENRO-ADS Proposed Project in Partnership with PLDT Inc. Agusan del Sur FPIC Process completed For submission of the FPIC report ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
  • 10. Name of proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL SUR National Irrigation Administration Sayon Communal Irrigation System (CIS) Agusan del Sur FBI validation conducted FBI Team to submit FBI report LGU-Prosperidad Proposed Cemetery for Suspected and Confirmed COVID-19 Deaths Agusan del Sur FBI validation conducted FBI Team to submit FBI report Department of Public Works and Highways Circumferential Road along Agusan Marsh Agusan del Sur To be conducted AGUSAN DEL NORTE Mayor Lozada Construction of Concrete Road leading to Bikangkang Falls Santiago, Agusan del Norte No funds deposited. Pre-FBI Conference was already conducted but due to the unavailability of funds, actual validation was not yet conducted. For funding SRMI Proposed Construction of Light Vehicle Road Tubay, Agusan del Norte No funds deposited. Pre-FBI Conference was already conducted but due to the unavailability of funds, actual validation was not yet conducted. For funding ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
  • 11. Name of Proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL NORTE BFAR Pre-Feasibility Study & Site Suitability Assessment of LGUs Proposed Sites Agusan del Norte FBI to be conducted. For Pre-FBI Conference City Engineering of Butuan Construction of Water Supply System for Butuan City Rural Barangays @ Brgy. Pianing Agusan del Norte The FBI Team has conducted the FBI validation and up to this time, the FBI Team has been waiting for the MOA to be signed by the City Mayor of Butuan. A resolution of consent and acceptance has already given by our Manobo IPs of CADT 135. The office of the City Engineers (proponent) and our Manobo IPs already agreed terms and conditions for the said project. The FBI Team follow-up the MOA and still waiting to be submitted to the team for submission. Department of Public Works and Highways (DPWH) Construction/Improvement of Road, Hinandayan- Minbahandi-Salaysayon Road Agusan del Norte The FBI validation has already conducted by the team. The Higaonon IP Community has already gives their resolution of consent and acceptance for the said project. The IP Community also informed the team that DPWH has already provided them on the agreed terms of the said project and stipulated in the MOA. The FBI Team is still waiting on the MOA to be signed by the proponent and to be given back to the FBI Team and to be included in the validation report. ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
  • 12. Name of Proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL NORTE CENRO-Tubay CY 2021 ENGP of the Preparation of a Five (5) Years Reforestation Plan Agusan del Norte No funds deposited. Pre-FBI Conference was already conducted. Upon the availability of funds, actual validation will be conducted. Department of Trade and Industry (DTI) STRIKE 100 Local MSME & IP Area Development Partnership Mayapay, Agusan del Norte The FBI validation was conducted. The FBI Team requested the DTI of the final list of beneficiaries as it was found out during the validation that some of the beneficiaries was outside the AD Claim and Non-IPs. We requested the IP Leaders/IP Community to assist in the selection and crafting of policy and guidelines for the beneficiaries in the said project. Also, the team requested DTI to submit the technical description as basis on the scope of the project as it will be overlaid to the Mayapay AD Claim. Up to now, all this data needed was never been complied despite the coordination rendered by the FBI Team. ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
  • 13. Name of Proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL NORTE Provincial Governor NRJ B.C-Malaybalay Road leading to NRJ Buenavista-Bunaguit Road Agusan del Norte FBI validation was conducted On-going negotiation of terms between the IP and the proponent for the finalization of MOA and issuance of the Resolution of Consent. Office of the City Engineer Construction of Water Supply System for Butuan City Rural Barangays @ Brgy. Anticala Agusan del Norte The FBI Team has conducted the FBI validation and up to this time, the FBI Team has been waiting for the MOA to be signed by the City Mayor of Butuan. A resolution of consent and acceptance has already given by our Manobo IPs of CADT 135. The Office of the Engineers (proponent) and our Manobo IPs already agreed terms and conditions for the said project. The FBI Team follow-up the MOA and still waiting to be submitted to the team for submission. ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
  • 14. Name of Proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL NORTE Provincial IPMR (Datu Bawang) Proposed Housing Project Agusan del Norte The FBI validation has already conducted by the FBI Team. The project was located in Geographically Isolated & Disadvantage Area (GIDA) where still infected by the NPAs. It was found that the project was within the AD of Higaonon. The community has already given their resolution of consent and acceptance on the project. The FBI Team was waiting for the Deed of Usufructuary to be finalized and signed both the IP Community and PLGU. No follow-up meetings and AD visitation conducted. The team was being informed that the AFP has already delivered the materials needed for the construction but it was damaged particularly the cements during Typhoon Odette. CSC-Buenavista Personnel will conduct monitoring on the said project this coming July 7-8, 2022. Department of Social Welfare and Development KC PAMANA IP CDD B3C1 CADT RTR Agusan del Norte No funds deposited. Pre-FBI Conference was already conducted. Upon the availability of funds, actual validation will be conducted. Department of Social Welfare and Development KC PAMANA IP CDD B2C3 CADT 135 Agusan del Norte No funds deposited. Pre-FBI Conference was already conducted. Upon the availability of funds, actual validation will be conducted. ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
  • 15. Name of Proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL NORTE National Irrigation Adminsitration (NIA) Proposed DIP Tagkiling (Drip Irrigation Project) Agusan del Norte The FBI validation has already conducted last October 7, 2021. The report was still for submission and the team still waiting the MOA to be return by NIA. For submission of validation report by the FBI Team. District Engineering Office Construction/Improvement of Butuan City Water System, Main Bypass Pipeline Anticala, Butuan City The validation was already conducted but due to the protest from some members of the direct affected Clan (Pyaga Clan), it was being on hold. The Pyaga Clan needs to resolve such protest from Clan Members and the FBI Team will wait on their conflict resolution. The FBI Team conducting follow-up for the said protest and will submit a status report if their will be no conflict resolution made by the Pyaga Clan this month of July 2022. Gov. Corvera 500 Hectares Nursery Camagong, Nasipit No FBI validation in the field has been conducted. The FBI Team and PLGU has agreed in many dates for the said activity but it was postponed due to conflict of schedules. Last schedule was on May 2022, but still not being pursued and being cancelled by the proponent. The FBI Team will conduct another round of IEC on FPIC to Agusan Upโ€™s Head of Office in order him to understand the value of the process and will make a last and final schedule for the said project. Gov. Corvera Veterinary Quarantine Stations Lawan-lawan, Las Nieves The validation has already conducted. The Usufructuary Rights was signed last June 2022 by Gov. Dale Corvera. For submission of validation report by the FBI Team. Romy Lasco Lasco Demo Crops Iyao, Butuan City The FBI validation has conducted. The FBI report was still for submission by the validating team. ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
  • 16. Name of Proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL NORTE Roy Nabong Robrosas Strawberry Anticala, Butuan City The FBI validation has conducted. The FBI report was still for submission by the validating team. MLGU Construction of Circumferential Road Leading to Lake Mainit Jabonga, Agusan del Norte No funds deposited. FBI/Validation activities were already conducted and validation report was submitted to the Regional Office. For issuance of certification. LGU-Santiago Construction of Concrete Road leading to Bikangkang Falls Santiago, Agusan del Norte Nasipit Water District Watershed Development Project Agusan del Norte FBI validation conducted FBI Team to submit FBI report SURIGAO DEL NORTE National Housing Authority NHA Claver Bago Tribal Village Claver, Surigao del Norte There was no fund provided by the proponent. Transportation expenses of the validating team was came from their own pocket however, the food of the participants was provided by LGU- Claver. (Team Leader - Veronica Lobo- od and recently assumed by Gerlie Tiambong) The report of the validation is for submission. ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
  • 17. Name of Proponent Project Location Status Action Taken and Ways Forward SURIGAO DEL NORTE Schools Division of Surigao del Norte Palilihan, Tiltilan, Landing & Bayobanwa Elem. School Surigao del Norte No funds provided by DepEd however, the IPS of CADT 048 provided vehicle for the validating team since the beneficiaries of the school are all Mamanwa pupils. (Team Leader - Gerlie Tiambong) The report of the validation is for submission. Usufruct agreement for signature of the division supervisor as one of the attachment of the report. ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
  • 18. Name of Proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL NORTE PENRO-ADN CBFM Agusan del Norte The FBI Team conducted series of gathering for the said CBFM Application. As a result, the CBFM Application has a different Peoples Organization falls within the AD Claim of Higaonon IPs of Mayapay For now, the PENRO together with Pos still on the negotiation of terms between them and Mayapay AD Claims for the said CBFM Application. GMA Network Inc. Forest Land Use Agreement application of GMA Network Inc. Bonbon, Butuan City The FBI Team and the applicant agreed on the said Pre-FBI via zoom but has never been pursued. Follow-up the proponent for the Pre- FBI schedule. ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
  • 19. Name of Proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL NORTE Elbert Mesa Commercial Sand and Gravel Application Guinabsan, Buenavista The FBI validation was conducted. The applied area falls within the Ancestral Domain of Higaonon in CADT 252. Pertinent documents such as SPA from the proponentโ€™s representative who attended and participated the validation was still lacking. The proponent representative failed to submit the SPA as it was requested prior the conduct of the validation. PDCFAI CBFMA Cabadbaran City No funds deposited. Pre-FBI Conference was already conducted but the authorized representative failed to comply and submit project proposal/activity design of the said CBFMA Project. Upon the availability of funds, actual validation will be conducted. Quennie Lanaja Commercial Sand and Gravel Application Guinabsan, Buenavista The FBI validation was conducted. The applied area falls within the Ancestral Domain of Higaonon in CADT 252. Pertinent documents such as SPA from the proponentโ€™s representative who attended and participated the validation was still lacking. The proponent representative failed to submit SPA as it was requested prior the conduct of the validation. ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
  • 20. Name of Proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL NORTE Atty. Gil Cembrano Quarry (Earth fill) Alubihid, Buenavista The FBI validation was conducted last April 20, 2021 and recommended for the issuance of Certificate of Non-Overlap (CNO). Follow-up the Deed of Undertakings has not been signed and given by the proponent. Also, resolutions of endorsement from MLGU and other pertinent documents needed as inclusion of the validation report was never been provided by the proponent. Geraldine Cordova Commercial Sand and Gravel Application Guinabsan, Buenavista The FBI validation was conducted and the applied area falls within the Ancestral Domain of Higaonon in CADT 252. Follow-up the pertinent documents such as SPA from the proponentโ€™s representative who attended and participated the validation was still lacking. The proponent representative failed to submit the SPA as it was requested prior the conduct of the validation. ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
  • 21. Name of Proponent Project Location Status Action Taken and Ways Forward AGUSAN DEL SUR SIFSETRICA Agro-Forestry Project CADT 093 Sibagat, Agusan del Sur FBI/FPIC completed FPIC Team to submit FPIC report. Rodante David CSAG San Patricio, La Paz The proponent did not push through the application. FBI Team to submit status report. Reji Feli Albarico CSAG Agusan del Sur FBI conducted FBI Team to submit report and awaiting for the lacking documents from the proponent. Michael Dennis Lim CSAG Agusan del Sur FBI to be conducted Garyeth Plaza CSAG Agusan del Sur FBI to be conducted Cesar D. Gacayan CSAG Agusan del Sur FBI to be conducted ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
  • 22. Name of Proponent Project Location Status Action Taken and Ways Forward SURIGAO DEL NORTE MGB R13 Notice of Petition issued to BLGU Rep by Engr. Almeda for the Declaration of Mineral Land Surigao del Norte On August 5, 2021, Pre-FBI Conference was conducted but proponent until now show no interest to continue the process despite several follow-ups (notices) from the FBI Team headed by TAA II Leoner Sanchez. The FBI Team sent notice to the proponent and until now there was no reply. We will send another notice to the proponent and if they will hesitant to reply related to our notice, we will prepare status report recommending issuance by RD of suspension or show cause order why the application should not be deemed abandoned for โ€œlack or loss interestโ€ pursuant to Sec. 11 of AO No. 3, series of 2012. SURIGAO DEL SUR SUDECOR IFMA No.06-2009 CADT 116, CADT 115, CADT 114 & CADT 238 FBI validation conducted FBI Team to submit FBI report CENRO Abrahan CBFMA of BUAFA Tago, Surigao del Sur FBI validation conducted FBI Team to submit FBI report ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
  • 23. Name of Proponent Project Location Status Action Taken and Ways Forward SURIGAO DEL SUR Ma. Shella Millan Et.al IKSP on Dances of Manobo Indigenous Tribe San Miguel, Surigao del Sur FPIC conducted FPIC team for submission of FPIC report. Rolly Salvaleon IKSP on Oral Literature Among Cultural Communities in SDS:Input for Contextualized Surigao del Sur Activity was not push through due to conflict schedule of the proponent. No feedback as to the new schedule. Follow-up the proponent ON-PROCESS CP APPLICATIONS FOR IKSP RESEARCHES/DOCUMENTATION
  • 24. SUMMARY: ISSUES AND CONCERNS AND WAYS FORWARD FBI/FPIC Issues and Concerns Action Taken Ways Forward 1. Long process of WFP approval and issuance of CP/CNO; After the pre-FBI Conference the WFP will be submitted immediately to the Regional Office for the review and comment of the Review Team. Some of the proponent decided to shoulder and disburse all the expenses on the conduct of FBI activities to avoid delay. 2. The prescribed number of days in conducting FBI/Validation couldnโ€™t followed due to the multiple number of issued memo for validation; Conducted piggy-backing with other activities. Conduct of piggy-backing. 3. The proponent canโ€™t meet the demand of the concerned ICCs/IPs; Conducted negotiation between the proponent and the concern ICCs/IPs. To conduct an assembly to discuss the demands of the ICCs/IPs in order to give time to the proponent to give a counter proposal to the demand of the concern ICCs/IPs. 4. Some of the government agencies implemented projects within an AD without conducting FPIC Process; and Conducted IEC to the LGUs relative to the Revised Guidelines on FPIC and Related Processes of 2012. To conduct IEC on Revised Guidelines on FPIC and Related Processes of 2012 to the LGUs within the Province of Agusan del Norte. 5. Some of the LGUs did not recognize the rights of the IPs and the need to conduct FPIC Process. Conducted IEC to the concern LGUs relative to the rights of the ICCs/IPs stipulated on the IPRA Law, NCIP Administrative Orders and other related guidelines. To conduct IEC on IPRA Law, NCIP Administrative Orders and other related guidelines to the LGUs within the Province of Agusan del Norte. AGUSAN DEL NORTE
  • 25. SUMMARY: ISSUES AND CONCERNS AND WAYS FORWARD Issues and Concerns Action Taken Ways Forward There are government projects who seek certification from our office, however upon our actual conduct of Field Based Investigation the projects are already completed. In fact, according to the Barangay Official they only secure certification because it is one of the requirements of DILG or other concerned line agencies. The FBI Team still conducted FBI activities despite the projects are already completed. To inform the concerned line agencies or stakeholders that prior to the commencement of any projects they will secure CP or CNO as the case maybe. There are cases of overlapping with the schedule of GAA Projects versus FBI Activities due to volume of CP or CNO Applications. For CSC-Bad-as headed by Gerlie Tiambong, requested Regional FPIC Focal Person to give other personnel the validation of government projects entitled Installation of Solar Streetlight in Municipality of Tagana- an, Surigao del Norte. For those focal persons of GAA Projects, we recommend that they will not be Team Leader of FBI or FPIC Project, might be a member of the team. SURIGAO DEL NORTE
  • 26. SUMMARY: ISSUES AND CONCERNS AND WAYS FORWARD Issues and Concerns Action Taken Ways Forward Complaint of Agusan del Sur Sand and Gravel Permittees Association (ASSAGPA) to the concurrence of Ethnographic Commissioner to the issued Certificate of Non Overlap in the Regional Office causing the delayed issuance to the proponent eg. CSAG application Coordinated with the PMRB and IEC on NCIP Administrative Order No. 3 series of 2012 Revised FPIC Guidelines and Related Processes to the applicants To expedite the process, said the concern shall be raised to the CEB for information and consideration. Refusal to sign of the ADS DepEd Schools Division Superintendent to the Contract of Usufruct for the schools established within an Ancestral Domain for issuance of School ID Coordinated Division Office through TICs and follow up status of the Contract of Usufuct For endorsement of the FBI report to NCIP Central Office for levelling off with the Department of Education AGUSAN DEL SUR
  • 27. SUMMARY: ISSUES AND CONCERNS AND WAYS FORWARD Issues and Concerns Action Taken Ways Forward There are proponents who, after sending application to the office, when Work Order is issued, does not wish to pursue the application. The FBI Team still contacted the proponents informing them that a Work Order is already issued and the FBI Process can be started anytime. Demand a letter from the proponent regarding their wish not to pursue stating the reason thereof, and to be attached in the status report. Work Orders sometimes overlaps GAA funded activities and schedules, thatโ€™s why there are delays in validation and report submission. The team strategize to synchronize activities and schedules but lacks manpower. NCIP shall allocate funds or make proposal for additional staff on field to focus on the said activities. SURIGAO DEL SUR