2. SUMMARY OF ON-PROCESS CP APPLICATIONS
Type of Project/Activity
Number of On-process CP
Application
Number of Inactive
CP Applications
Large-Scale Projects 8 6
Government Projects (Section 39,
40 & 41)
48 0
Other Small-Scale Projects (Section
24, 39, 42)
16 1
IKSP Researches/Documentation 2 0
TOTAL 74 7
3. Name of Proponent Project Location Status Action Taken and Ways Forward
AGUSAN DEL SUR
Global Sibagat Hydro Power
Corporation
13 Megawatt Wawa Hydro
Electric Power Plant Project
CADT 093 Sibagat
FPIC report
submitted to NCIP-
CO
The FPIC Team will convene a meeting on July to
discuss and finalize the compliance to LAO Legal
Opinion.
National Irrigation
Administration
NIA-Umayam River Irrigation
Project (URIP)
La Paz & Loreto,
ADS
FPIC Report
submitted to NCIP-
CO
The FPIC Team will convene a meeting on July to
discuss and finalize the compliance to ADO findings and
recommendations.
VPO Agro Industrial
Development Corporation
Reforestration Project (rubber
plantation)
CADT 078 Rosario
FPIC Team to
submit report
FPIC team reviewed the available documents for
finalization of report/Presentation of output to RD and
TMSD for information and possible guidance
SURIGAO DEL SUR
Department of Environment and
Natural Resources
Sanitary Landfill Project Surigao del Sur On-going
The 1st and 2nd Assembly was conducted on Dec. 20,
2021. The FPIC Team coordinated with the CENRO for
the allocation of budget for the Consensus Building
Activity and the succeeding activities.
Paragon Energy Development
Corporation
Proposed Carac-an Hydro
Electric Power Project
CADT 238 FPIC conducted
FPIC Process were already conducted and completed,
however the proponent failed to perform the provisions
reflected in the MOA entered by the company and the
community. Presently, the project remained dormant.
FPIC status report will be submitted to the NCIP-RO.
ON-PROCESS CP APPLICATIONS FOR LARGE-SCALE PROJECTS
4. Name of Proponent Project Location Status Action Taken and Ways Forward
SURIGAO DEL SUR
Marc Ventures Mining
Development Corporation
MPSA No.00016-1993-RXIII CADT 238
FPIC Report submitted
to NCIP-RO
The FPIC Team recommends that the proponent should
initiate a conduct of community assembly with
Cabangahan and will make a sincere appeal on the
adjustments of the targeted period of time in the
implementation of the provisions they failed to comply
through executing another Affidavit of Undertakings
which would be accepted by the IP Community, if they
are willing to be included in the schedule of CEB
Deliberation.
BrightGreen Resources
Corporation (BRC)
CADT 238
FPIC Report submitted
to NCIP-RO
BRC is recommended to set a schedule for another
separate Community Assembly with the IP Community of
Cabangahan to be held in Barangay Cabangahan,
Cantilan, Surigao del Sur in order to determine the
latterโs substantial and immediate reasons in terms of
sudden change of decision.
ON-PROCESS CP APPLICATIONS FOR LARGE-SCALE PROJECTS
5. Name of Proponent Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL NORTE
Surigao Integrated Resources
Corporation
EXPA -000101-XIII CADT 048
CEB deliberation was conducted last
Sept. 28, 2019 but was abruptly
suspended by CEB for some issues
and due to the written complaint at
that time by Sergio Pascual received
during the deliberation.
Proponent SIRC was already informed
several times of the subsequent schedules
for continuation of its deliberation before the
CEB but the company declined for some
reasons.
For issuance of a formal letter to SIRC as to
the next schedule of CEB Deliberation.
ON-PROCESS CP APPLICATIONS FOR LARGE-SCALE PROJECTS
6. Name of Proponent Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL SUR
Department of Agriculture
SAAD of the UBE Production
Project for NAKAMATA
Sitio Tabinas,
Hinapoyan, Carmen,
Surigao del Sur
FBI validation conducted FBI Team to submit FBI report
Department of Education
Tabon M. Estrella National
High School
Surigao del Sur On-going
The crafted Certificate of Usufruct is
still for review.
Department of Agriculture
Establishment of One (1) Unit
Processing Facility for CY
2021 for NAKAMATA
Carmen,
Surigao del Sur
FBI validation conducted FBI Team to submit FBI report
DA-PRDP
Construction of One (1) Unit
Consolidation & Storage
Building in Support to Abaca
Fiber
Surigao del Sur FBI validation conducted FBI Team to submit FBI report
LGU-Lianga
Construction of Concrete
Road, Lianga-Marihatag
Road, Surigao del Sur
Lianga,
Surigao del Sur
FBI validation conducted FBI Team to submit FBI report
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
7. Name of Proponent Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL SUR
LGU-Madrid FMRDP of the DA
Union, Madrid,
Surigao del Sur
FBI validation conducted FBI Team to submit FBI report
LGU-Madrid LGSF-FA for CY 2021
San Antonio, Madrid,
Surigao del Sur
FBI validation conducted FBI Team to submit FBI report
Monica Delfina Penelope
Alvizo
Special Land Used Permit Surigao del Sur
The proponent did not push through
the application.
FBI Team to submit status report
Sheila Ilogon Tubod Elementary School
Bolhoon, San Miguel,
Surigao del Sur
Conducted preliminary activities but
the proponent diverted the project into
road project.
Follow-up the proponent regarding the
status of the project.
MAO-DA
Goat Raising Production for
CY 2021 for the NAKAMATA
Carmen, Surigao del
Sur
FBI validation conducted FBI Team to submit FBI report
Sta. Cruz FMRDP of the DA Surigao del Sur FBI validation conducted FBI Team to submit FBI report
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
8. Name of Proponent Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL SUR
Vice Mayor
Construction of Diversion
Dams of the NIA
Surigao del Sur FBI validation conducted FBI Team to submit FBI report
Vice Mayor
Construction of Irrigation
Projects of the NIA
Surigao del Sur FBI validation conducted FBI Team to submit FBI report
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT 153
Surigao del Sur FBI validation conducted FBI Team to submit FBI report
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT 002, 238 & 114
Surigao del Sur To be conducted
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT 115
Surigao del Sur FBI validation conducted FBI Team to submit FBI report
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
9. Name of Proponent Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL SUR
LGU-San Francisco Farm-to-Market Road Project Agusan del Sur To be conducted
Reconstitution of the FBI/Validation
Team due to resignation of the Team
Leader.
BLGU-Getsemane,
Bayugan City
SLUP Construction of
Multi Purpose Building
Brgy. Getsemane,
Bayugan City,
Agusan del Sur
The proponent did not push through
the application and converted to
GSUP.
FBI Team to submit status report
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT 090
Loreto,
Agusan del Sur
Endorsed to PO per initial review
and report will be return to the team
for enhancement.
For re-submission of compliance to
the review of the PO.
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT 255
Esperanza,
Agusan del Sur
FBI validation conducted
For submission of the validation report
and lacking of Community Resolution
in Brgy. Guibonon as one of the
attachment in the report.
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT 250 & 077
Agusan del Sur FBI validation conducted For submission of validation report
PENRO-ADS
Proposed Project in Partnership
with PLDT Inc.
Agusan del Sur FPIC Process completed For submission of the FPIC report
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
10. Name of proponent Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL SUR
National Irrigation
Administration
Sayon Communal Irrigation
System (CIS)
Agusan del Sur FBI validation conducted FBI Team to submit FBI report
LGU-Prosperidad
Proposed Cemetery for
Suspected and Confirmed
COVID-19 Deaths
Agusan del Sur FBI validation conducted FBI Team to submit FBI report
Department of Public Works
and Highways
Circumferential Road along
Agusan Marsh
Agusan del Sur To be conducted
AGUSAN DEL NORTE
Mayor Lozada
Construction of Concrete
Road leading to Bikangkang
Falls
Santiago,
Agusan del Norte
No funds deposited. Pre-FBI
Conference was already conducted
but due to the unavailability of funds,
actual validation was not yet
conducted.
For funding
SRMI
Proposed Construction of
Light Vehicle Road
Tubay,
Agusan del Norte
No funds deposited. Pre-FBI
Conference was already conducted
but due to the unavailability of funds,
actual validation was not yet
conducted.
For funding
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
11. Name of
Proponent
Project Location Status
Action Taken and Ways Forward
AGUSAN DEL NORTE
BFAR
Pre-Feasibility Study & Site
Suitability Assessment of
LGUs Proposed Sites
Agusan del Norte FBI to be conducted. For Pre-FBI Conference
City Engineering of Butuan
Construction of Water
Supply System for Butuan
City Rural Barangays @
Brgy. Pianing
Agusan del Norte
The FBI Team has conducted the FBI
validation and up to this time, the FBI
Team has been waiting for the MOA to
be signed by the City Mayor of Butuan.
A resolution of consent and
acceptance has already given by our
Manobo IPs of CADT 135. The office
of the City Engineers (proponent) and
our Manobo IPs already agreed terms
and conditions for the said project.
The FBI Team follow-up the MOA and still
waiting to be submitted to the team for
submission.
Department of Public
Works and Highways
(DPWH)
Construction/Improvement
of Road, Hinandayan-
Minbahandi-Salaysayon
Road
Agusan del Norte
The FBI validation has already
conducted by the team.
The Higaonon IP Community has already gives
their resolution of consent and acceptance for
the said project. The IP Community also
informed the team that DPWH has already
provided them on the agreed terms of the said
project and stipulated in the MOA. The FBI
Team is still waiting on the MOA to be signed by
the proponent and to be given back to the FBI
Team and to be included in the validation report.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
12. Name of
Proponent
Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
CENRO-Tubay
CY 2021 ENGP of the Preparation
of a Five (5) Years Reforestation
Plan
Agusan del Norte
No funds deposited. Pre-FBI
Conference was already
conducted.
Upon the availability of funds, actual
validation will be conducted.
Department of Trade and
Industry (DTI)
STRIKE 100 Local MSME & IP Area
Development Partnership
Mayapay, Agusan del
Norte
The FBI validation was
conducted.
The FBI Team requested the DTI of
the final list of beneficiaries as it was
found out during the validation that
some of the beneficiaries was outside
the AD Claim and Non-IPs. We
requested the IP Leaders/IP
Community to assist in the selection
and crafting of policy and guidelines
for the beneficiaries in the said
project. Also, the team requested
DTI to submit the technical
description as basis on the scope of
the project as it will be overlaid to the
Mayapay AD Claim. Up to now, all
this data needed was never been
complied despite the coordination
rendered by the FBI Team.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
13. Name of Proponent Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
Provincial Governor
NRJ B.C-Malaybalay Road leading
to NRJ Buenavista-Bunaguit Road
Agusan del Norte FBI validation was conducted
On-going negotiation of terms
between the IP and the
proponent for the finalization of
MOA and issuance of the
Resolution of Consent.
Office of the City Engineer
Construction of Water Supply
System for Butuan City Rural
Barangays @ Brgy. Anticala
Agusan del Norte
The FBI Team has conducted the
FBI validation and up to this time,
the FBI Team has been waiting
for the MOA to be signed by the
City Mayor of Butuan. A
resolution of consent and
acceptance has already given by
our Manobo IPs of CADT 135.
The Office of the Engineers
(proponent) and our Manobo IPs
already agreed terms and
conditions for the said project.
The FBI Team follow-up the MOA
and still waiting to be submitted
to the team for submission.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
14. Name of Proponent Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
Provincial IPMR (Datu
Bawang)
Proposed Housing Project Agusan del Norte
The FBI validation has already conducted by
the FBI Team. The project was located in
Geographically Isolated & Disadvantage
Area (GIDA) where still infected by the
NPAs. It was found that the project was
within the AD of Higaonon. The community
has already given their resolution of consent
and acceptance on the project. The FBI
Team was waiting for the Deed of
Usufructuary to be finalized and signed both
the IP Community and PLGU. No follow-up
meetings and AD visitation conducted. The
team was being informed that the AFP has
already delivered the materials needed for
the construction but it was damaged
particularly the cements during Typhoon
Odette.
CSC-Buenavista Personnel will
conduct monitoring on the said
project this coming July 7-8, 2022.
Department of Social Welfare
and Development
KC PAMANA IP CDD B3C1
CADT RTR
Agusan del Norte
No funds deposited. Pre-FBI Conference
was already conducted.
Upon the availability of funds, actual
validation will be conducted.
Department of Social Welfare
and Development
KC PAMANA IP CDD B2C3
CADT 135
Agusan del Norte
No funds deposited. Pre-FBI Conference
was already conducted.
Upon the availability of funds, actual
validation will be conducted.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
15. Name of
Proponent
Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
National Irrigation
Adminsitration (NIA)
Proposed DIP Tagkiling
(Drip Irrigation Project)
Agusan del Norte
The FBI validation has already conducted last
October 7, 2021. The report was still for submission
and the team still waiting the MOA to be return by
NIA.
For submission of validation report
by the FBI Team.
District Engineering
Office
Construction/Improvement
of Butuan City Water
System, Main Bypass
Pipeline
Anticala, Butuan
City
The validation was already conducted but due to the
protest from some members of the direct affected
Clan (Pyaga Clan), it was being on hold. The Pyaga
Clan needs to resolve such protest from Clan
Members and the FBI Team will wait on their conflict
resolution.
The FBI Team conducting follow-up for
the said protest and will submit a status
report if their will be no conflict
resolution made by the Pyaga Clan this
month of July 2022.
Gov. Corvera 500 Hectares Nursery Camagong, Nasipit
No FBI validation in the field has been conducted.
The FBI Team and PLGU has agreed in many dates
for the said activity but it was postponed due to
conflict of schedules. Last schedule was on May
2022, but still not being pursued and being
cancelled by the proponent.
The FBI Team will conduct another
round of IEC on FPIC to Agusan Upโs
Head of Office in order him to
understand the value of the process
and will make a last and final schedule
for the said project.
Gov. Corvera
Veterinary Quarantine
Stations
Lawan-lawan, Las
Nieves
The validation has already conducted. The
Usufructuary Rights was signed last June 2022 by
Gov. Dale Corvera.
For submission of validation report
by the FBI Team.
Romy Lasco Lasco Demo Crops Iyao, Butuan City The FBI validation has conducted.
The FBI report was still for submission
by the validating team.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
16. Name of
Proponent
Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
Roy Nabong Robrosas Strawberry Anticala, Butuan City The FBI validation has conducted.
The FBI report was still for
submission by the validating team.
MLGU
Construction of Circumferential
Road Leading to Lake Mainit
Jabonga,
Agusan del Norte
No funds deposited. FBI/Validation
activities were already conducted and
validation report was submitted to the
Regional Office.
For issuance of certification.
LGU-Santiago
Construction of Concrete Road
leading to Bikangkang Falls
Santiago,
Agusan del Norte
Nasipit Water District Watershed Development Project Agusan del Norte FBI validation conducted FBI Team to submit FBI report
SURIGAO DEL NORTE
National Housing Authority NHA Claver Bago Tribal Village
Claver,
Surigao del Norte
There was no fund provided by the
proponent. Transportation expenses of
the validating team was came from
their own pocket however, the food of
the participants was provided by LGU-
Claver. (Team Leader - Veronica Lobo-
od and recently assumed by Gerlie
Tiambong)
The report of the validation is for
submission.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
17. Name of
Proponent
Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL NORTE
Schools Division of
Surigao del Norte
Palilihan, Tiltilan, Landing
& Bayobanwa Elem.
School
Surigao del Norte
No funds provided by DepEd however, the IPS of
CADT 048 provided vehicle for the validating team
since the beneficiaries of the school are all
Mamanwa pupils. (Team Leader - Gerlie
Tiambong)
The report of the validation is for
submission.
Usufruct agreement for signature
of the division supervisor as one
of the attachment of the report.
ON-PROCESS CP APPLICATIONS FOR GOVERNMENT PROJECTS
18. Name of
Proponent
Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
PENRO-ADN CBFM Agusan del Norte
The FBI Team conducted series of
gathering for the said CBFM Application.
As a result, the CBFM Application has a
different Peoples Organization falls within
the AD Claim of Higaonon IPs of Mayapay
For now, the PENRO together with
Pos still on the negotiation of terms
between them and Mayapay AD
Claims for the said CBFM
Application.
GMA Network Inc.
Forest Land Use Agreement
application of GMA Network
Inc.
Bonbon, Butuan City
The FBI Team and the applicant agreed on
the said Pre-FBI via zoom but has never
been pursued.
Follow-up the proponent for the Pre-
FBI schedule.
ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
19. Name of
Proponent
Project Location Status
Action Taken and Ways Forward
AGUSAN DEL NORTE
Elbert Mesa
Commercial Sand and Gravel
Application
Guinabsan, Buenavista
The FBI validation was
conducted.
The applied area falls within the Ancestral Domain
of Higaonon in CADT 252. Pertinent documents
such as SPA from the proponentโs representative
who attended and participated the validation was
still lacking. The proponent representative failed to
submit the SPA as it was requested prior the
conduct of the validation.
PDCFAI CBFMA Cabadbaran City
No funds deposited. Pre-FBI
Conference was already
conducted but the authorized
representative failed to
comply and submit project
proposal/activity design of
the said CBFMA Project.
Upon the availability of funds, actual validation
will be conducted.
Quennie Lanaja
Commercial Sand and Gravel
Application
Guinabsan, Buenavista
The FBI validation was
conducted.
The applied area falls within the Ancestral
Domain of Higaonon in CADT 252. Pertinent
documents such as SPA from the proponentโs
representative who attended and participated the
validation was still lacking. The proponent
representative failed to submit SPA as it was
requested prior the conduct of the validation.
ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
20. Name of
Proponent
Project Location Status
Action Taken and Ways
Forward
AGUSAN DEL NORTE
Atty. Gil Cembrano Quarry (Earth fill) Alubihid, Buenavista
The FBI validation was conducted last
April 20, 2021 and recommended for the
issuance of Certificate of Non-Overlap
(CNO).
Follow-up the Deed of Undertakings has
not been signed and given by the
proponent. Also, resolutions of
endorsement from MLGU and other
pertinent documents needed as inclusion of
the validation report was never been
provided by the proponent.
Geraldine Cordova
Commercial Sand and
Gravel Application
Guinabsan,
Buenavista
The FBI validation was conducted and
the applied area falls within the
Ancestral Domain of Higaonon in CADT
252.
Follow-up the pertinent documents such as
SPA from the proponentโs representative
who attended and participated the
validation was still lacking. The proponent
representative failed to submit the SPA as it
was requested prior the conduct of the
validation.
ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
21. Name of Proponent Project Location Status
Action Taken and
Ways Forward
AGUSAN DEL SUR
SIFSETRICA Agro-Forestry Project
CADT 093 Sibagat, Agusan
del Sur
FBI/FPIC completed
FPIC Team to submit FPIC
report.
Rodante David CSAG San Patricio, La Paz
The proponent did not push through
the application.
FBI Team to submit status
report.
Reji Feli Albarico CSAG Agusan del Sur FBI conducted
FBI Team to submit report and
awaiting for the lacking
documents from the proponent.
Michael Dennis Lim CSAG Agusan del Sur FBI to be conducted
Garyeth Plaza CSAG Agusan del Sur FBI to be conducted
Cesar D. Gacayan CSAG Agusan del Sur FBI to be conducted
ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
22. Name of Proponent Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL NORTE
MGB R13
Notice of Petition issued to
BLGU Rep by Engr. Almeda
for the Declaration of Mineral
Land
Surigao del Norte
On August 5, 2021, Pre-FBI
Conference was conducted but
proponent until now show no
interest to continue the process
despite several follow-ups (notices)
from the FBI Team headed by TAA
II Leoner Sanchez.
The FBI Team sent notice to the
proponent and until now there was no
reply. We will send another notice to
the proponent and if they will hesitant
to reply related to our notice, we will
prepare status report recommending
issuance by RD of suspension or
show cause order why the application
should not be deemed abandoned for
โlack or loss interestโ pursuant to Sec.
11 of AO No. 3, series of 2012.
SURIGAO DEL SUR
SUDECOR IFMA No.06-2009
CADT 116, CADT 115,
CADT 114 & CADT 238
FBI validation conducted FBI Team to submit FBI report
CENRO Abrahan CBFMA of BUAFA Tago, Surigao del Sur FBI validation conducted FBI Team to submit FBI report
ON-PROCESS CP APPLICATIONS FOR OTHER SMALL-SCALE PROJECTS
23. Name of Proponent Project Location Status
Action Taken and Ways
Forward
SURIGAO DEL SUR
Ma. Shella Millan Et.al
IKSP on Dances of Manobo
Indigenous Tribe
San Miguel, Surigao del
Sur
FPIC conducted
FPIC team for submission of FPIC
report.
Rolly Salvaleon
IKSP on Oral Literature
Among Cultural Communities
in SDS:Input for
Contextualized
Surigao del Sur
Activity was not push through due to
conflict schedule of the proponent.
No feedback as to the new schedule.
Follow-up the proponent
ON-PROCESS CP APPLICATIONS FOR IKSP RESEARCHES/DOCUMENTATION
24. SUMMARY: ISSUES AND CONCERNS AND WAYS FORWARD
FBI/FPIC Issues and Concerns Action Taken Ways Forward
1. Long process of WFP approval and
issuance of CP/CNO;
After the pre-FBI Conference the WFP will
be submitted immediately to the Regional
Office for the review and comment of the
Review Team.
Some of the proponent decided to shoulder
and disburse all the expenses on the conduct
of FBI activities to avoid delay.
2. The prescribed number of days in
conducting FBI/Validation couldnโt
followed due to the multiple number of
issued memo for validation;
Conducted piggy-backing with other
activities.
Conduct of piggy-backing.
3. The proponent canโt meet the
demand of the concerned ICCs/IPs;
Conducted negotiation between the
proponent and the concern ICCs/IPs.
To conduct an assembly to discuss the
demands of the ICCs/IPs in order to give time
to the proponent to give a counter proposal to
the demand of the concern ICCs/IPs.
4. Some of the government agencies
implemented projects within an AD
without conducting FPIC Process; and
Conducted IEC to the LGUs relative to the
Revised Guidelines on FPIC and Related
Processes of 2012.
To conduct IEC on Revised Guidelines on
FPIC and Related Processes of 2012 to the
LGUs within the Province of Agusan del
Norte.
5. Some of the LGUs did not recognize
the rights of the IPs and the need to
conduct FPIC Process.
Conducted IEC to the concern LGUs relative
to the rights of the ICCs/IPs stipulated on
the IPRA Law, NCIP Administrative Orders
and other related guidelines.
To conduct IEC on IPRA Law, NCIP
Administrative Orders and other related
guidelines to the LGUs within the Province of
Agusan del Norte.
AGUSAN DEL NORTE
25. SUMMARY: ISSUES AND CONCERNS AND WAYS FORWARD
Issues and Concerns Action Taken Ways Forward
There are government projects who
seek certification from our office,
however upon our actual conduct of
Field Based Investigation the projects
are already completed. In fact,
according to the Barangay Official they
only secure certification because it is
one of the requirements of DILG or
other concerned line agencies.
The FBI Team still conducted FBI activities
despite the projects are already completed.
To inform the concerned line agencies or
stakeholders that prior to the commencement
of any projects they will secure CP or CNO as
the case maybe.
There are cases of overlapping with
the schedule of GAA Projects versus
FBI Activities due to volume of CP or
CNO Applications.
For CSC-Bad-as headed by Gerlie
Tiambong, requested Regional FPIC Focal
Person to give other personnel the validation
of government projects entitled Installation
of Solar Streetlight in Municipality of Tagana-
an, Surigao del Norte.
For those focal persons of GAA Projects, we
recommend that they will not be Team Leader
of FBI or FPIC Project, might be a member of
the team.
SURIGAO DEL NORTE
26. SUMMARY: ISSUES AND CONCERNS AND WAYS FORWARD
Issues and Concerns Action Taken Ways Forward
Complaint of Agusan del Sur Sand and
Gravel Permittees Association
(ASSAGPA) to the concurrence of
Ethnographic Commissioner to the
issued Certificate of Non Overlap in
the Regional Office causing the
delayed issuance to the proponent eg.
CSAG application
Coordinated with the PMRB and IEC on
NCIP Administrative Order No. 3 series of
2012 Revised FPIC Guidelines and Related
Processes to the applicants
To expedite the process, said the concern
shall be raised to the CEB for information and
consideration.
Refusal to sign of the ADS DepEd
Schools Division Superintendent to the
Contract of Usufruct for the schools
established within an Ancestral
Domain for issuance of School ID
Coordinated Division Office through TICs
and follow up status of the Contract of
Usufuct
For endorsement of the FBI report to NCIP
Central Office for levelling off with the
Department of Education
AGUSAN DEL SUR
27. SUMMARY: ISSUES AND CONCERNS AND WAYS FORWARD
Issues and Concerns Action Taken Ways Forward
There are proponents who, after
sending application to the office, when
Work Order is issued, does not wish to
pursue the application.
The FBI Team still contacted the proponents
informing them that a Work Order is already
issued and the FBI Process can be started
anytime.
Demand a letter from the proponent regarding
their wish not to pursue stating the reason
thereof, and to be attached in the status
report.
Work Orders sometimes overlaps GAA
funded activities and schedules, thatโs
why there are delays in validation and
report submission.
The team strategize to synchronize activities
and schedules but lacks manpower.
NCIP shall allocate funds or make proposal
for additional staff on field to focus on the said
activities.
SURIGAO DEL SUR