SlideShare a Scribd company logo
1 of 1
Download to read offline
YAMUNA EXPRESSWAY 
CONSTRUCTION LINKED PLAN 
Apartment Type 
Area (Sqr Ft) 1150 1350 
BSP @ Rs. 3000/- per sqr ft 3450000 4050000 
Maintenance Deposit 50000 50000 
Power backup 5 K.V.A 100000 100000 
One Basement Parking 300000 300000 
Total 3900000 4500000 
INSTALLMENT PLAN 
DATE 1150 SQ FT 1350 SQ FT 
On Booking 1035000 1215000 
Slab 1 105000 123261 
Slab 2 105000 123261 
Slab 3 105000 123261 
Slab 4 105000 123261 
Slab 5 105000 123261 
Slab 6 105000 123261 
Slab 7 105000 123261 
Slab 8 105000 123261 
Slab 9 105000 123261 
Slab 10 105000 123261 
Slab 11 105000 123261 
Slab 12 105000 123261 
Slab 13 105000 123261 
Slab 14 105000 123261 
Slab 15 105000 123261 
Slab 16 105000 123261 
Slab 17 105000 123261 
Slab 18 105000 123261 
Slab 19 105000 123261 
Slab 20 105000 123261 
Slab 21 105000 123260 
Slab 22 105000 123260 
Slab 23 105000 123260 
on Possession 450000 450000 
TOTAL 3900000 4500000 
Note: 
1. Regsitry is done on possession, as per the rate prevailing at the time of registry. 
2. Parking,Maintenance & power back is payble on possession. 
3. Lease Rent as applicable. 
4. Service Tax will be charged on BSP@3,09%, PLC @12.36%, Power Back-up@12.36%, 
Parking@3.09%, Running Manintenance @12.36%. 
5.Price Revision is subject to sole discretion of the company.

More Related Content

Viewers also liked (9)

Production of Biodiesel from Jatropha Curcas Oil by using Pilot Biodiesel Pla...
Production of Biodiesel from Jatropha Curcas Oil by using Pilot Biodiesel Pla...Production of Biodiesel from Jatropha Curcas Oil by using Pilot Biodiesel Pla...
Production of Biodiesel from Jatropha Curcas Oil by using Pilot Biodiesel Pla...
 
Forest Food
Forest FoodForest Food
Forest Food
 
Production process and technology selection_EDIBLE OIL
Production process and technology selection_EDIBLE OILProduction process and technology selection_EDIBLE OIL
Production process and technology selection_EDIBLE OIL
 
ENTREPRENEURSHIP PRESENTATION ON BISCUIT FACTORY
ENTREPRENEURSHIP PRESENTATION ON BISCUIT FACTORYENTREPRENEURSHIP PRESENTATION ON BISCUIT FACTORY
ENTREPRENEURSHIP PRESENTATION ON BISCUIT FACTORY
 
Pvc pipes past present and future 6 Slide handouts in PDF Format
Pvc pipes past present and future 6 Slide handouts in PDF FormatPvc pipes past present and future 6 Slide handouts in PDF Format
Pvc pipes past present and future 6 Slide handouts in PDF Format
 
Industrial Training at Parle Biscuits
Industrial Training at Parle BiscuitsIndustrial Training at Parle Biscuits
Industrial Training at Parle Biscuits
 
Deodorization
DeodorizationDeodorization
Deodorization
 
Biscuit manufacturing process
Biscuit manufacturing processBiscuit manufacturing process
Biscuit manufacturing process
 
Plant molecular farming for recombinant therapeutic proteins
Plant molecular farming for recombinant therapeutic proteinsPlant molecular farming for recombinant therapeutic proteins
Plant molecular farming for recombinant therapeutic proteins
 

More from Landtrade Consultancy

Ats allure brochure
Ats allure brochureAts allure brochure
Ats allure brochure
Landtrade Consultancy
 

More from Landtrade Consultancy (6)

Ats allure brochure
Ats allure brochureAts allure brochure
Ats allure brochure
 
Construction update construction update September -2014
Construction update construction update September -2014Construction update construction update September -2014
Construction update construction update September -2014
 
ATS ALLURE Location map
ATS ALLURE Location mapATS ALLURE Location map
ATS ALLURE Location map
 
ATS ALLURE MASTER PLAN
ATS ALLURE MASTER PLAN ATS ALLURE MASTER PLAN
ATS ALLURE MASTER PLAN
 
ATS ALLURE Price list yamuna_expressway
ATS ALLURE Price list yamuna_expresswayATS ALLURE Price list yamuna_expressway
ATS ALLURE Price list yamuna_expressway
 
Allure brochure
Allure brochureAllure brochure
Allure brochure
 

Price list yamuna_expressway

  • 1. YAMUNA EXPRESSWAY CONSTRUCTION LINKED PLAN Apartment Type Area (Sqr Ft) 1150 1350 BSP @ Rs. 3000/- per sqr ft 3450000 4050000 Maintenance Deposit 50000 50000 Power backup 5 K.V.A 100000 100000 One Basement Parking 300000 300000 Total 3900000 4500000 INSTALLMENT PLAN DATE 1150 SQ FT 1350 SQ FT On Booking 1035000 1215000 Slab 1 105000 123261 Slab 2 105000 123261 Slab 3 105000 123261 Slab 4 105000 123261 Slab 5 105000 123261 Slab 6 105000 123261 Slab 7 105000 123261 Slab 8 105000 123261 Slab 9 105000 123261 Slab 10 105000 123261 Slab 11 105000 123261 Slab 12 105000 123261 Slab 13 105000 123261 Slab 14 105000 123261 Slab 15 105000 123261 Slab 16 105000 123261 Slab 17 105000 123261 Slab 18 105000 123261 Slab 19 105000 123261 Slab 20 105000 123261 Slab 21 105000 123260 Slab 22 105000 123260 Slab 23 105000 123260 on Possession 450000 450000 TOTAL 3900000 4500000 Note: 1. Regsitry is done on possession, as per the rate prevailing at the time of registry. 2. Parking,Maintenance & power back is payble on possession. 3. Lease Rent as applicable. 4. Service Tax will be charged on BSP@3,09%, PLC @12.36%, Power Back-up@12.36%, Parking@3.09%, Running Manintenance @12.36%. 5.Price Revision is subject to sole discretion of the company.