Milestone #3 breakdown

427 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
427
On SlideShare
0
From Embeds
0
Number of Embeds
13
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Milestone #3 breakdown

  1. 1. Milestone #3 Information Packet<br />Milestone #3 is due <br />February 11, 2010<br />
  2. 2. Milestone#3<br />All previous milestones have to be completed before the next one is due.<br />Requirements: Visual Aid – Interest Project<br />Must be completely finished on that day<br />Neat work<br />Should be student’s work, not parents<br />Do NOT bring pieces of paper that will become the visual aid<br />
  3. 3. What is a Visual Aid?<br />Enhance the presentation<br />Should be relevant to the exhibition<br />Large enough to be seen from the back of the room<br />Something written on an 8 ½ x 11 piece of paper is NOT a visual aid.<br />Be Creative!!<br />Does NOT have to be a poster board<br />
  4. 4. Examples of Interest ProjectVisual Aids<br />Poster Board<br />Power Point Presentation<br />Diorama<br />Mobile<br />Video clip<br />Specific demonstration<br />
  5. 5. Additional Information<br />Attendance Matters – Students must be in school both:<br />the day before a milestone is due<br />AND<br />the day of the milestone<br />Passing a milestone = Fun Friday!<br />

×