PIER "S"PIER "R"
SCAFFOLD TUBE 48X3,2
7551
599
2500160016001600 L PIER RCL PIER RC L PIER SC
7552
600
846
843
847
2600
500 1600 500
647
1300
900
1300
1300
900
900
900
845
500 1600 500
600
13411
18222
9111
9111
648
1302
900
1300
1300
900
900
900
37000
2500 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 2500
648
1302
900
1300
1300
900
900
900
7549
600
800 800
85
1125
3150
565
560
2940
210
170048004800480048004800480048001700
PIER "S"PIER "R"
SCAFFOLD TUBE 48X3,2
7551
599
2500160016001600 L PIER RCL PIER RC L PIER SC
7552
600
846
843
847
2600
500 1600 500
647
1300
900
1300
1300
900
900
900
845
500 1600 500
600
13411
PIER "S"PIER "R"
1700 4800 4800 4800 4800 4800 17004800
8493
350
2100
300
1697
250
50
MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A"
4800
150
150
MODULE "B"
4803
8640
800 1600 1600 800
150
281 272
262
MODULE "A"
MAX 300
2300
1000
1500
3000
MAX 45 CM Concrete blocks by site,
Cuplock ledger,
Cuplock Post,
L VIADUCTC
SECTION TYPE "E"
18220
300
1571
229
2100
4750 8720 4750
R7000 R7000
650130090013001300900900900 651 1300 900 1300 1300 900 900 900
11253150 170 1125 3150
Jack max 400 mm,
Concrete blocks by site,
Cuplock forkhead,
Jack max 300 mm
Railing post
SP_ Special Rib VD1
400 400 400 400 400 370 400 400 370
2440 1765 310 1765 2440
300
2300
1000
1500
3001
396
150
SOLDIER MK2,
298 298
PIER "S"PIER "R"
1700 4800 4800 4800 4800 4800 4800 4799
MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A"
PIER "R"
MODULE "B"
17004800
300
drawn:
Scale: Client:
NameDate
worked:
Drawing-No.:CAD-File:
Project:
remark:
checked:
Via Isonzo 9 , I - 22078 Turate ( CO )
Telefono +39.02.969731
BRAND ITALIA S.p.A.
Telefax +39.02.96754099
info@harsco-i.it
www.beis-italia.it
Filiale Centro - Sud
Via Volturno 7, int.15
00185 Roma (RM)
Telefono +39.06.4885276
Telefax +39.06.4828519
RIYAD METRO PROJECT
BRIDGE 3
CUPLOCK, MKII, SPECIAL
150250_062421213_101BE (1/4)
VARIES
UF21/04/2016
SIRNA21/04/2016
LANTICINA21/04/2016
150250_062421213_101B E_ BRIDGE 3.dwg
Shop drawing for construction
This drawing is valid only with the associated assembly instructions. Measurements have to be verified on site.
Index Revision Date
A
B
worked: checked:drawn:
0 EMISSIONE 24/03/2016 UF GL G.Maran
VARIAZIONE COMPOSIZIONE 21/04/2016 UF SIRNA LANTICINA
Bracing detail 1 G.Maran
Drawing Notes
1. Harsco Infrastructure Copyright
This drawing is the copyright of Harsco Infrastructure. No unauthorised use, copy or disclosure is to be made
and it is to be returned upon request.The drawing is supplied subject to the company's standard conditions as
applicable. Harsco Infrastructure reserves the right to amend drawing details and material components subject
to stock availability.
2. Basis of Design
This drawing has been prepared from information supplied to us by, or on behalf of the Customer, who should
check that we have correctly interpreted his requirements and that all loadings, dimensions, details, erection,
pouring and striking sequences etc. are as required and practicable.
The following documents have been used to prepare this scheme:-
Customer Drawings: ....................................................................................
Customer Drawings: ....................................................................................
Design Brief: ....................................................................................
Customer Method Statement: ....................................................................................
Other Information: ....................................................................................
This drawing has been prepared in accordance with Harsco Infrastructure Equipment Datasheets, Formwork,
A Guide to Good Practice (Concrete Society) 2nd Edition, CIRIA Report 108 Concrete Pressure on
Formwork, as well as the relevant statutory provisions and Codes of Practice.
To enable us to complete this drawing, we have allowed for the following:-
.......................................................................................................................................
.......................................................................................................................................
.......................................................................................................................................
.......................................................................................................................................
The Customer is to check and confirm that we have correctly interpreted his requirements.
The Customer is directed to the Members Area of our website where all the latest Product Datasheets, CAD
blocks, Animations, and other useful technical information is available to download. Please visit
www.harsco-i.com and follow the links for details.
3. Applied Loads
Applied loads (unless otherwise indicated) where applicable:-
Falsework Self Weight of Concrete
Self Weight of Formwork
Live Load varies
Formwork Maximum Concrete Pressure allowed
Concrete Type (CIRIA 108) ...............
Concrete Temperature
Rate of Rise ...............m/hr
Access Working Lifts
Additional Lifts
Hop-Up Brackets
Wind Wind loads where applicable, have been calculated in accordance with BS 6399. Max. Design
Wind
4. Timber
No timber is supplied by Harsco Infrastructure unless specifically stated. Where Harsco Infrastructure does not
supply, the design & supply of timber is the responsibility of the Customer. To enable us to complete this
drawing the following properties (based on Formwork, A Guide to Good Practice), have been allowed for as
the Customers
Timber(s):
Main bearers ...................................... Secondary bearers ......................................
Walings ...................................... Other(s) ......................................
Timber Grade allowed ......................................
Plywood ......................................with face grain orientated parallel to span.
5. Formwork
THE CUSTOMER IS RESPONSIBLE FOR ENSURING THAT ALL HARSCO INFRASTRUCTURE
COMPONENTS THAT COME INTO CONTACT WITH CONCRETE ARE TREATED WITH CHEMICAL
RELEASE AGENT PRIOR TO EACH USE.
6. Foundations/Support
Unless otherwise noted, no soleplates or other means of spreading the imposed loads are supplied by Harsco
Infrastructure. Where Harsco Infrastructure equipment is supported, suspended, anchored or tied to an
existing structure or the ground, the Customer must ensure that the structure or ground is adequate to safely
support the additional imposed loads.
7. Modification
This drawing has been prepared using the Safe Working Loads of the Harsco Infrastructure components
specified. No alteration to components, assembly, loading or any other aspect must be made without the
expressed written authority from Harsco Infrastructure.
8. Tying & Bracing
The Customer is responsible for ensuring all structures remain adequately tied and/or braced to carry the load
and ensure stability. No ties or braces are to be removed or altered in any way without the expressed written
authority from Harsco Infrastructure. Where Harsco Infrastructure is supplying equipment only, the supply &
fixing of all necessary ties is the responsibility of the Customer.
9. Temporary Working Platforms
Unless specifically stated it is considered that any other working platforms (for erection or dismantling
purposes), will be designed, supplied and fitted by the Customer.
10. Design Output
This drawing should be read in conjunction with :-
................................................................................................................................................................................
................................................................................................................................................................................
Unless indicated otherwise, all loads shown are not factored.
Maximum calculated Leg Load =...............kN
Lift positions and bracing frequency to be as shown.
Maximum calculated Tie Load =...............kN
Tie Type :-................................
Tie spacing to be as shown on drawing.
Note, method of assessment of loads in tie rods allows for elongation of ties and not continuity. Ref. Formwork,
A Guide to Good Practice 2nd Edition 3.8.2.
Unless a specification for tolerance has been provided, deflection has been limited to 1/270th of the maximum
span of each member.
Maximum weight of formwork unit = ................kg
Maximum weight of table unit = ................kg
12. Eccentricity
All legs are to be erected plumb and loaded concentrically to the general tolerances given in BS5975:2008
section 20 "Work on Site" (unless noted otherwise).
13. Obligation, Responsibilities & CDM
This drawing constitutes Harsco Infrastructures Risk Assessment in accordance with Regulation 11 of the
current CDM Regulations 2007. The elimination of general risk in the use of temporary works is by use of good
practice. Guidance can be found within relevant Codes, HSE publications and Guides. Wherever possible, risk
is designed out of this proposal during the design process.
************DO NOT TAKE RISK ! - IF IN DOUBT, ASK************
236491, 92,93 ,94,95,96
=
None Supplied
=
Read all notes
Customer must check and confirm all dimensions
All timber work to be designed, supplied and fixed by customer.
=
00
0
00
0
= =
= =
= =
=
=
=
=
=
=
pltwood (18mm.)
Read all relevant datasheets
=
0.0
Scale: 1:100
PLAN VIEW: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R": CUPLOK/MKII/SPECIAL
800 80
Scale: 1:100
PLAN VIEW: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R": BEAMS H20/PLYWOOD
Scale: 1:100
SECTION B-B: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R"
Scale: 1:30
BRIDGE NR. 3 - SPAN PIER R-S: MODULE A GENERAL ARRANGEMENT
Scale: 1:50
TYPICAL SECTION A-A
Scale: 1:100
SECTION C-C: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R"
1600 160
** NOTE :- All Scaffold Couplers must be tightened up to a
torque of 7 kg.m (50ft.lbs)
Base & Head Plate
with Universal Jack
Cuplok Standard
Cuplok Ledger
Cuplok
Ledger
Cuplok Std.
Cuplok Standard
Cuplok Ledger
Fixed Forkhead with
Universal Jack
Clamps to butt
against Forkhead
MKII Soldier to 186 Forkhead
(2No. Universal Clamp)
4751
872
475
SPECIAL RIB MARK VD1
SPECIAL RIB MARK VD1
SOLDIER MK2
SOLDIER MK2
CUPLOK
SEE DRAWING 150250_062421213-102A E SEE DRAWING 150250_062421213-103A E
SEE DRAWING 150250_062421213-102A E SEE DRAWING 150250_062421213-103A E
SOLDIER MK2 H20 BEAM PLYWOOD 18 MM WOOD BOARDS 48 MM
A
A
A
A
A
A
A
A
SEE DRAWING 150250_062421213-102A E SEE DRAWING 150250_062421213-103A E
BB
CC
B
Scale: 1:20
Detail 1
Orthogonal coupler
ForkHead coupler
Screw Jack

More Related Content

Similar to 150250_062421213_101B E_ BRIDGE 3-1

software-eng.pdf
software-eng.pdfsoftware-eng.pdf
software-eng.pdffellahi1
 
Commercial Prod Catalog
Commercial Prod CatalogCommercial Prod Catalog
Commercial Prod Catalogrmcgraw01
 
Simplified design of reinforced concrete buildings
Simplified design of reinforced concrete buildings Simplified design of reinforced concrete buildings
Simplified design of reinforced concrete buildings Sarmed Shukur
 
LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking Panduit Noryl
LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking Panduit NorylLSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking Panduit Noryl
LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking Panduit NorylThorne & Derrick International
 
Base Transceiver Station Equipment
Base Transceiver Station EquipmentBase Transceiver Station Equipment
Base Transceiver Station EquipmentArash Soltani
 
Configuration Guide for ArcSight Express v4.0
Configuration Guide for ArcSight Express v4.0Configuration Guide for ArcSight Express v4.0
Configuration Guide for ArcSight Express v4.0Protect724v2
 
Panduit LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking
Panduit LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and TrunkingPanduit LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking
Panduit LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and TrunkingThorne & Derrick International
 
Precast carparks
Precast carparksPrecast carparks
Precast carparksMichal Bors
 
ESM 6.5c SP1 Installation and Configuration Guide
ESM 6.5c SP1 Installation and Configuration GuideESM 6.5c SP1 Installation and Configuration Guide
ESM 6.5c SP1 Installation and Configuration GuideProtect724mouni
 
Artromick Nx10 Reference Manual August 2007 for Hospital Computing Solutions
Artromick Nx10 Reference Manual   August 2007 for Hospital Computing SolutionsArtromick Nx10 Reference Manual   August 2007 for Hospital Computing Solutions
Artromick Nx10 Reference Manual August 2007 for Hospital Computing SolutionsArtromick
 
Massey ferguson mf 6497 tractor service repair manual
Massey ferguson mf 6497 tractor service repair manualMassey ferguson mf 6497 tractor service repair manual
Massey ferguson mf 6497 tractor service repair manualkjsmmds jksemmd
 
Massey Ferguson MF 6465 Tractor Service Repair Manual
Massey Ferguson MF 6465 Tractor Service Repair ManualMassey Ferguson MF 6465 Tractor Service Repair Manual
Massey Ferguson MF 6465 Tractor Service Repair Manualyjmkem hkmsem
 
Massey Ferguson MF 6470 Tractor Service Repair Manual
Massey Ferguson MF 6470 Tractor Service Repair ManualMassey Ferguson MF 6470 Tractor Service Repair Manual
Massey Ferguson MF 6470 Tractor Service Repair Manualtygrtd iolpo
 
Massey Ferguson MF 6475 Tractor Service Repair Manual
Massey Ferguson MF 6475 Tractor Service Repair ManualMassey Ferguson MF 6475 Tractor Service Repair Manual
Massey Ferguson MF 6475 Tractor Service Repair Manualjkskemeedmm
 

Similar to 150250_062421213_101B E_ BRIDGE 3-1 (20)

software-eng.pdf
software-eng.pdfsoftware-eng.pdf
software-eng.pdf
 
Commercial Prod Catalog
Commercial Prod CatalogCommercial Prod Catalog
Commercial Prod Catalog
 
49529487 abis-interface
49529487 abis-interface49529487 abis-interface
49529487 abis-interface
 
Ls400 xi prg
Ls400 xi prgLs400 xi prg
Ls400 xi prg
 
Simplified design of reinforced concrete buildings
Simplified design of reinforced concrete buildings Simplified design of reinforced concrete buildings
Simplified design of reinforced concrete buildings
 
IBM BladeCenter Products and Technology
IBM BladeCenter Products and TechnologyIBM BladeCenter Products and Technology
IBM BladeCenter Products and Technology
 
LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking Panduit Noryl
LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking Panduit NorylLSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking Panduit Noryl
LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking Panduit Noryl
 
Base Transceiver Station Equipment
Base Transceiver Station EquipmentBase Transceiver Station Equipment
Base Transceiver Station Equipment
 
Configuration Guide for ArcSight Express v4.0
Configuration Guide for ArcSight Express v4.0Configuration Guide for ArcSight Express v4.0
Configuration Guide for ArcSight Express v4.0
 
Panduit LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking
Panduit LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and TrunkingPanduit LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking
Panduit LSF Halogen Free (Zero Halogen) Cable & Wiring Duct and Trunking
 
Asme b-319pdf
Asme b-319pdfAsme b-319pdf
Asme b-319pdf
 
IBM PowerVC Introduction and Configuration
IBM PowerVC Introduction and ConfigurationIBM PowerVC Introduction and Configuration
IBM PowerVC Introduction and Configuration
 
Precast carparks
Precast carparksPrecast carparks
Precast carparks
 
PCI parking structures recommended practices
PCI parking structures  recommended practicesPCI parking structures  recommended practices
PCI parking structures recommended practices
 
ESM 6.5c SP1 Installation and Configuration Guide
ESM 6.5c SP1 Installation and Configuration GuideESM 6.5c SP1 Installation and Configuration Guide
ESM 6.5c SP1 Installation and Configuration Guide
 
Artromick Nx10 Reference Manual August 2007 for Hospital Computing Solutions
Artromick Nx10 Reference Manual   August 2007 for Hospital Computing SolutionsArtromick Nx10 Reference Manual   August 2007 for Hospital Computing Solutions
Artromick Nx10 Reference Manual August 2007 for Hospital Computing Solutions
 
Massey ferguson mf 6497 tractor service repair manual
Massey ferguson mf 6497 tractor service repair manualMassey ferguson mf 6497 tractor service repair manual
Massey ferguson mf 6497 tractor service repair manual
 
Massey Ferguson MF 6465 Tractor Service Repair Manual
Massey Ferguson MF 6465 Tractor Service Repair ManualMassey Ferguson MF 6465 Tractor Service Repair Manual
Massey Ferguson MF 6465 Tractor Service Repair Manual
 
Massey Ferguson MF 6470 Tractor Service Repair Manual
Massey Ferguson MF 6470 Tractor Service Repair ManualMassey Ferguson MF 6470 Tractor Service Repair Manual
Massey Ferguson MF 6470 Tractor Service Repair Manual
 
Massey Ferguson MF 6475 Tractor Service Repair Manual
Massey Ferguson MF 6475 Tractor Service Repair ManualMassey Ferguson MF 6475 Tractor Service Repair Manual
Massey Ferguson MF 6475 Tractor Service Repair Manual
 

150250_062421213_101B E_ BRIDGE 3-1

  • 1. 18222 9111 9111 648 1302 900 1300 1300 900 900 900 37000 2500 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 2500 648 1302 900 1300 1300 900 900 900 7549 600 800 800 85 1125 3150 565 560 2940 210 170048004800480048004800480048001700 PIER "S"PIER "R" SCAFFOLD TUBE 48X3,2 7551 599 2500160016001600 L PIER RCL PIER RC L PIER SC 7552 600 846 843 847 2600 500 1600 500 647 1300 900 1300 1300 900 900 900 845 500 1600 500 600 13411 18222 9111 9111 648 1302 900 1300 1300 900 900 900 37000 2500 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 2500 648 1302 900 1300 1300 900 900 900 7549 600 800 800 85 1125 3150 565 560 2940 210 170048004800480048004800480048001700 PIER "S"PIER "R" SCAFFOLD TUBE 48X3,2 7551 599 2500160016001600 L PIER RCL PIER RC L PIER SC 7552 600 846 843 847 2600 500 1600 500 647 1300 900 1300 1300 900 900 900 845 500 1600 500 600 13411 PIER "S"PIER "R" 1700 4800 4800 4800 4800 4800 17004800 8493 350 2100 300 1697 250 50 MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" 4800 150 150 MODULE "B" 4803 8640 800 1600 1600 800 150 281 272 262 MODULE "A" MAX 300 2300 1000 1500 3000 MAX 45 CM Concrete blocks by site, Cuplock ledger, Cuplock Post, L VIADUCTC SECTION TYPE "E" 18220 300 1571 229 2100 4750 8720 4750 R7000 R7000 650130090013001300900900900 651 1300 900 1300 1300 900 900 900 11253150 170 1125 3150 Jack max 400 mm, Concrete blocks by site, Cuplock forkhead, Jack max 300 mm Railing post SP_ Special Rib VD1 400 400 400 400 400 370 400 400 370 2440 1765 310 1765 2440 300 2300 1000 1500 3001 396 150 SOLDIER MK2, 298 298 PIER "S"PIER "R" 1700 4800 4800 4800 4800 4800 4800 4799 MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" MODULE "A" PIER "R" MODULE "B" 17004800 300 drawn: Scale: Client: NameDate worked: Drawing-No.:CAD-File: Project: remark: checked: Via Isonzo 9 , I - 22078 Turate ( CO ) Telefono +39.02.969731 BRAND ITALIA S.p.A. Telefax +39.02.96754099 info@harsco-i.it www.beis-italia.it Filiale Centro - Sud Via Volturno 7, int.15 00185 Roma (RM) Telefono +39.06.4885276 Telefax +39.06.4828519 RIYAD METRO PROJECT BRIDGE 3 CUPLOCK, MKII, SPECIAL 150250_062421213_101BE (1/4) VARIES UF21/04/2016 SIRNA21/04/2016 LANTICINA21/04/2016 150250_062421213_101B E_ BRIDGE 3.dwg Shop drawing for construction This drawing is valid only with the associated assembly instructions. Measurements have to be verified on site. Index Revision Date A B worked: checked:drawn: 0 EMISSIONE 24/03/2016 UF GL G.Maran VARIAZIONE COMPOSIZIONE 21/04/2016 UF SIRNA LANTICINA Bracing detail 1 G.Maran Drawing Notes 1. Harsco Infrastructure Copyright This drawing is the copyright of Harsco Infrastructure. No unauthorised use, copy or disclosure is to be made and it is to be returned upon request.The drawing is supplied subject to the company's standard conditions as applicable. Harsco Infrastructure reserves the right to amend drawing details and material components subject to stock availability. 2. Basis of Design This drawing has been prepared from information supplied to us by, or on behalf of the Customer, who should check that we have correctly interpreted his requirements and that all loadings, dimensions, details, erection, pouring and striking sequences etc. are as required and practicable. The following documents have been used to prepare this scheme:- Customer Drawings: .................................................................................... Customer Drawings: .................................................................................... Design Brief: .................................................................................... Customer Method Statement: .................................................................................... Other Information: .................................................................................... This drawing has been prepared in accordance with Harsco Infrastructure Equipment Datasheets, Formwork, A Guide to Good Practice (Concrete Society) 2nd Edition, CIRIA Report 108 Concrete Pressure on Formwork, as well as the relevant statutory provisions and Codes of Practice. To enable us to complete this drawing, we have allowed for the following:- ....................................................................................................................................... ....................................................................................................................................... ....................................................................................................................................... ....................................................................................................................................... The Customer is to check and confirm that we have correctly interpreted his requirements. The Customer is directed to the Members Area of our website where all the latest Product Datasheets, CAD blocks, Animations, and other useful technical information is available to download. Please visit www.harsco-i.com and follow the links for details. 3. Applied Loads Applied loads (unless otherwise indicated) where applicable:- Falsework Self Weight of Concrete Self Weight of Formwork Live Load varies Formwork Maximum Concrete Pressure allowed Concrete Type (CIRIA 108) ............... Concrete Temperature Rate of Rise ...............m/hr Access Working Lifts Additional Lifts Hop-Up Brackets Wind Wind loads where applicable, have been calculated in accordance with BS 6399. Max. Design Wind 4. Timber No timber is supplied by Harsco Infrastructure unless specifically stated. Where Harsco Infrastructure does not supply, the design & supply of timber is the responsibility of the Customer. To enable us to complete this drawing the following properties (based on Formwork, A Guide to Good Practice), have been allowed for as the Customers Timber(s): Main bearers ...................................... Secondary bearers ...................................... Walings ...................................... Other(s) ...................................... Timber Grade allowed ...................................... Plywood ......................................with face grain orientated parallel to span. 5. Formwork THE CUSTOMER IS RESPONSIBLE FOR ENSURING THAT ALL HARSCO INFRASTRUCTURE COMPONENTS THAT COME INTO CONTACT WITH CONCRETE ARE TREATED WITH CHEMICAL RELEASE AGENT PRIOR TO EACH USE. 6. Foundations/Support Unless otherwise noted, no soleplates or other means of spreading the imposed loads are supplied by Harsco Infrastructure. Where Harsco Infrastructure equipment is supported, suspended, anchored or tied to an existing structure or the ground, the Customer must ensure that the structure or ground is adequate to safely support the additional imposed loads. 7. Modification This drawing has been prepared using the Safe Working Loads of the Harsco Infrastructure components specified. No alteration to components, assembly, loading or any other aspect must be made without the expressed written authority from Harsco Infrastructure. 8. Tying & Bracing The Customer is responsible for ensuring all structures remain adequately tied and/or braced to carry the load and ensure stability. No ties or braces are to be removed or altered in any way without the expressed written authority from Harsco Infrastructure. Where Harsco Infrastructure is supplying equipment only, the supply & fixing of all necessary ties is the responsibility of the Customer. 9. Temporary Working Platforms Unless specifically stated it is considered that any other working platforms (for erection or dismantling purposes), will be designed, supplied and fitted by the Customer. 10. Design Output This drawing should be read in conjunction with :- ................................................................................................................................................................................ ................................................................................................................................................................................ Unless indicated otherwise, all loads shown are not factored. Maximum calculated Leg Load =...............kN Lift positions and bracing frequency to be as shown. Maximum calculated Tie Load =...............kN Tie Type :-................................ Tie spacing to be as shown on drawing. Note, method of assessment of loads in tie rods allows for elongation of ties and not continuity. Ref. Formwork, A Guide to Good Practice 2nd Edition 3.8.2. Unless a specification for tolerance has been provided, deflection has been limited to 1/270th of the maximum span of each member. Maximum weight of formwork unit = ................kg Maximum weight of table unit = ................kg 12. Eccentricity All legs are to be erected plumb and loaded concentrically to the general tolerances given in BS5975:2008 section 20 "Work on Site" (unless noted otherwise). 13. Obligation, Responsibilities & CDM This drawing constitutes Harsco Infrastructures Risk Assessment in accordance with Regulation 11 of the current CDM Regulations 2007. The elimination of general risk in the use of temporary works is by use of good practice. Guidance can be found within relevant Codes, HSE publications and Guides. Wherever possible, risk is designed out of this proposal during the design process. ************DO NOT TAKE RISK ! - IF IN DOUBT, ASK************ 236491, 92,93 ,94,95,96 = None Supplied = Read all notes Customer must check and confirm all dimensions All timber work to be designed, supplied and fixed by customer. = 00 0 00 0 = = = = = = = = = = = = pltwood (18mm.) Read all relevant datasheets = 0.0 Scale: 1:100 PLAN VIEW: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R": CUPLOK/MKII/SPECIAL 800 80 Scale: 1:100 PLAN VIEW: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R": BEAMS H20/PLYWOOD Scale: 1:100 SECTION B-B: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R" Scale: 1:30 BRIDGE NR. 3 - SPAN PIER R-S: MODULE A GENERAL ARRANGEMENT Scale: 1:50 TYPICAL SECTION A-A Scale: 1:100 SECTION C-C: GENERAL ARRANGEMENT SPAN PIER "S"- PIER "R" 1600 160 ** NOTE :- All Scaffold Couplers must be tightened up to a torque of 7 kg.m (50ft.lbs) Base & Head Plate with Universal Jack Cuplok Standard Cuplok Ledger Cuplok Ledger Cuplok Std. Cuplok Standard Cuplok Ledger Fixed Forkhead with Universal Jack Clamps to butt against Forkhead MKII Soldier to 186 Forkhead (2No. Universal Clamp) 4751 872 475 SPECIAL RIB MARK VD1 SPECIAL RIB MARK VD1 SOLDIER MK2 SOLDIER MK2 CUPLOK SEE DRAWING 150250_062421213-102A E SEE DRAWING 150250_062421213-103A E SEE DRAWING 150250_062421213-102A E SEE DRAWING 150250_062421213-103A E SOLDIER MK2 H20 BEAM PLYWOOD 18 MM WOOD BOARDS 48 MM A A A A A A A A SEE DRAWING 150250_062421213-102A E SEE DRAWING 150250_062421213-103A E BB CC B Scale: 1:20 Detail 1 Orthogonal coupler ForkHead coupler Screw Jack