10.038 TENTxx
Approval Date: 20 May 1998
Reviewed on : 23 October 2007 Version: 1
Equipment Specification: TENTxx Version 1 10.038-1/2
Purpose
The tent is to accommodate survey teams and equipment during short field campaigns
Conditions & Requirements
• The tent shall be of such a design that it can conveniently accommodate staff and
equipment under the prevailing environmental conditions.
• The tent shall be easy to set-up and maintain.
• The tent shall be supplied with the accessories as needed for effective use.
• All materials on the tent exterior shall be non-corrosive, wear and tear resistant.
• The tent shall have an expected technical lifetime of not less than 5 years.
• The tent shall be of rain proof material
• The tent material shall be UV and fungi resistant.
• The tent shall generally comply with IS 989-1990
Specifications
Size 3.5 x 3.5 x 2.5 m (l x w x h)
Accessories
• ground sheet
• ground fastenings at each corner.
• tent doors (for frame tents)
• window covers
• synthetic ropes
• metal tent pegs with bags (length approx. 0.22 m, diameter 25 mm)
• sleeping bags
10.038 TENTxx
As per HP-I
Approval Date: 20 May 1998 Version: 1
Equipment Specification: TENTxx Version 1 10.038-2/2
Purpose
The tent is to accommodate survey teams and equipment during short field campaigns
Conditions & Requirements
• The tent shall be of such a design that it can conveniently accommodate staff and
equipment under the prevailing environmental conditions.
• The tent shall be easy to set-up and maintain.
• The tent shall be supplied with the accessories as needed for effective use.
• All materials on the tent exterior shall be non-corrosive, wear and tear resistant.
• The tent shall have an expected technical lifetime of not less than 5 years.
• The tent shall be of rain proof material
• The tent material shall be UV and fungi resistant.
• The tent shall generally comply with IS 989-1990
Specifications
Size 3.5 x 3.5 x 2.5 m (l x w x h)
Accessories
• ground sheet
• ground fastenings at each corner.
• tent doors (for frame tents)
• window covers
• synthetic ropes
• metal tent pegs with bags (length approx. 0.22 m, diameter 25 mm)
• sleeping bags

More Related Content

Similar to Tent

Everhaus product guide
Everhaus product guideEverhaus product guide
Everhaus product guideMatis Velt
 
Clean room system tarkett
Clean room system tarkettClean room system tarkett
Clean room system tarkettCutting Corners
 
Akfix c920 easf chemical anchor (styrene free),354 ml
Akfix c920 easf chemical anchor (styrene free),354 mlAkfix c920 easf chemical anchor (styrene free),354 ml
Akfix c920 easf chemical anchor (styrene free),354 mlTechnicalbeacon
 
AKFIX C920 EASF CHEMICAL ANCHOR (STYRENE FREE),354 ML
AKFIX C920 EASF CHEMICAL ANCHOR (STYRENE FREE),354 MLAKFIX C920 EASF CHEMICAL ANCHOR (STYRENE FREE),354 ML
AKFIX C920 EASF CHEMICAL ANCHOR (STYRENE FREE),354 MLTechnicalbeacon
 
EJOT Flat Roofing Brochure
EJOT Flat Roofing BrochureEJOT Flat Roofing Brochure
EJOT Flat Roofing BrochureNathan Handley
 
Tornado 602 self cleaning filter datasheet
Tornado 602 self cleaning filter datasheetTornado 602 self cleaning filter datasheet
Tornado 602 self cleaning filter datasheeta1-cbiss
 
aproprate.pptx
aproprate.pptxaproprate.pptx
aproprate.pptxBossGold
 
Explo groupperu at-sinc presentation
Explo groupperu   at-sinc presentationExplo groupperu   at-sinc presentation
Explo groupperu at-sinc presentationRicardo Reaño
 
Tarkett Clean Air Room System
Tarkett Clean Air Room SystemTarkett Clean Air Room System
Tarkett Clean Air Room Systemcuttingcorners
 
Features and benefits of chute liners in mining converted
Features and benefits of chute liners in mining convertedFeatures and benefits of chute liners in mining converted
Features and benefits of chute liners in mining convertedSubro Paul
 
Advanced Fabric Technologies
Advanced Fabric TechnologiesAdvanced Fabric Technologies
Advanced Fabric TechnologiesTammy Browne
 
Shock mounts & Vibration control - ANDRE HVAC INTERNATIONAL INC.
Shock mounts  & Vibration control - ANDRE HVAC INTERNATIONAL INC.Shock mounts  & Vibration control - ANDRE HVAC INTERNATIONAL INC.
Shock mounts & Vibration control - ANDRE HVAC INTERNATIONAL INC.andrehvac
 

Similar to Tent (20)

Truetzschler Card Clothing (TCC)
Truetzschler Card Clothing (TCC)Truetzschler Card Clothing (TCC)
Truetzschler Card Clothing (TCC)
 
Everhaus product guide
Everhaus product guideEverhaus product guide
Everhaus product guide
 
Rain gauge, non recording
Rain gauge, non recordingRain gauge, non recording
Rain gauge, non recording
 
Clean Room System
Clean Room System Clean Room System
Clean Room System
 
Clean room system tarkett
Clean room system tarkettClean room system tarkett
Clean room system tarkett
 
Elastomerhalterungen
ElastomerhalterungenElastomerhalterungen
Elastomerhalterungen
 
Akfix c920 easf chemical anchor (styrene free),354 ml
Akfix c920 easf chemical anchor (styrene free),354 mlAkfix c920 easf chemical anchor (styrene free),354 ml
Akfix c920 easf chemical anchor (styrene free),354 ml
 
AKFIX C920 EASF CHEMICAL ANCHOR (STYRENE FREE),354 ML
AKFIX C920 EASF CHEMICAL ANCHOR (STYRENE FREE),354 MLAKFIX C920 EASF CHEMICAL ANCHOR (STYRENE FREE),354 ML
AKFIX C920 EASF CHEMICAL ANCHOR (STYRENE FREE),354 ML
 
3M Interam Endothermic Mat E-5A-4
3M Interam Endothermic Mat E-5A-43M Interam Endothermic Mat E-5A-4
3M Interam Endothermic Mat E-5A-4
 
EJOT Flat Roofing Brochure
EJOT Flat Roofing BrochureEJOT Flat Roofing Brochure
EJOT Flat Roofing Brochure
 
Tornado 602 self cleaning filter datasheet
Tornado 602 self cleaning filter datasheetTornado 602 self cleaning filter datasheet
Tornado 602 self cleaning filter datasheet
 
aproprate.pptx
aproprate.pptxaproprate.pptx
aproprate.pptx
 
Explo groupperu at-sinc presentation
Explo groupperu   at-sinc presentationExplo groupperu   at-sinc presentation
Explo groupperu at-sinc presentation
 
Tarkett Clean Air Room System
Tarkett Clean Air Room SystemTarkett Clean Air Room System
Tarkett Clean Air Room System
 
Godown management
Godown managementGodown management
Godown management
 
Features and benefits of chute liners in mining converted
Features and benefits of chute liners in mining convertedFeatures and benefits of chute liners in mining converted
Features and benefits of chute liners in mining converted
 
Blast Mitigation
Blast MitigationBlast Mitigation
Blast Mitigation
 
Advanced Fabric Technologies
Advanced Fabric TechnologiesAdvanced Fabric Technologies
Advanced Fabric Technologies
 
Shock mounts & Vibration control - ANDRE HVAC INTERNATIONAL INC.
Shock mounts  & Vibration control - ANDRE HVAC INTERNATIONAL INC.Shock mounts  & Vibration control - ANDRE HVAC INTERNATIONAL INC.
Shock mounts & Vibration control - ANDRE HVAC INTERNATIONAL INC.
 
Shotcrete
ShotcreteShotcrete
Shotcrete
 

More from hydrologyproject0

More from hydrologyproject0 (20)

Specification purewater
Specification purewaterSpecification purewater
Specification purewater
 
Water purifier ion exchange resin column
Water purifier ion exchange resin columnWater purifier ion exchange resin column
Water purifier ion exchange resin column
 
Water purifier, double distillation unit
Water purifier, double distillation unitWater purifier, double distillation unit
Water purifier, double distillation unit
 
Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)
 
Water geyser (heater)
Water geyser (heater)Water geyser (heater)
Water geyser (heater)
 
Water bath, general purpose
Water bath, general purposeWater bath, general purpose
Water bath, general purpose
 
Water bath, bacteriological
Water bath, bacteriologicalWater bath, bacteriological
Water bath, bacteriological
 
Wash bottle
Wash bottleWash bottle
Wash bottle
 
Volumetric flask
Volumetric flaskVolumetric flask
Volumetric flask
 
Visual accumulation tube
Visual accumulation tubeVisual accumulation tube
Visual accumulation tube
 
Vacuum pump
Vacuum pumpVacuum pump
Vacuum pump
 
Turbidity meter (nephelometer)
Turbidity meter (nephelometer)Turbidity meter (nephelometer)
Turbidity meter (nephelometer)
 
Tool kit
Tool kitTool kit
Tool kit
 
Toc analyser, microprocessor controlled
Toc analyser, microprocessor controlledToc analyser, microprocessor controlled
Toc analyser, microprocessor controlled
 
Tissue grinder
Tissue grinderTissue grinder
Tissue grinder
 
Thermometers, set of
Thermometers, set ofThermometers, set of
Thermometers, set of
 
Test tubes
Test tubesTest tubes
Test tubes
 
Test sieves with shaker
Test sieves with shakerTest sieves with shaker
Test sieves with shaker
 
Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)
 
Sterliser, autoclave
Sterliser, autoclaveSterliser, autoclave
Sterliser, autoclave
 

Tent

  • 1. 10.038 TENTxx Approval Date: 20 May 1998 Reviewed on : 23 October 2007 Version: 1 Equipment Specification: TENTxx Version 1 10.038-1/2 Purpose The tent is to accommodate survey teams and equipment during short field campaigns Conditions & Requirements • The tent shall be of such a design that it can conveniently accommodate staff and equipment under the prevailing environmental conditions. • The tent shall be easy to set-up and maintain. • The tent shall be supplied with the accessories as needed for effective use. • All materials on the tent exterior shall be non-corrosive, wear and tear resistant. • The tent shall have an expected technical lifetime of not less than 5 years. • The tent shall be of rain proof material • The tent material shall be UV and fungi resistant. • The tent shall generally comply with IS 989-1990 Specifications Size 3.5 x 3.5 x 2.5 m (l x w x h) Accessories • ground sheet • ground fastenings at each corner. • tent doors (for frame tents) • window covers • synthetic ropes • metal tent pegs with bags (length approx. 0.22 m, diameter 25 mm) • sleeping bags
  • 2. 10.038 TENTxx As per HP-I Approval Date: 20 May 1998 Version: 1 Equipment Specification: TENTxx Version 1 10.038-2/2 Purpose The tent is to accommodate survey teams and equipment during short field campaigns Conditions & Requirements • The tent shall be of such a design that it can conveniently accommodate staff and equipment under the prevailing environmental conditions. • The tent shall be easy to set-up and maintain. • The tent shall be supplied with the accessories as needed for effective use. • All materials on the tent exterior shall be non-corrosive, wear and tear resistant. • The tent shall have an expected technical lifetime of not less than 5 years. • The tent shall be of rain proof material • The tent material shall be UV and fungi resistant. • The tent shall generally comply with IS 989-1990 Specifications Size 3.5 x 3.5 x 2.5 m (l x w x h) Accessories • ground sheet • ground fastenings at each corner. • tent doors (for frame tents) • window covers • synthetic ropes • metal tent pegs with bags (length approx. 0.22 m, diameter 25 mm) • sleeping bags