Mobile stations      configurator IonitaGeorge-Catalin An IV, CTI
The aim The aim of this project is to create a tool that could provide an offer based on diferent configurators for mobile stations and after that you could export it in xls format. This will be done in order to simplify the work for creating the diferent configurations for  mobile stations The tool will be used by telecom engineers
Resources The team will contain only 4 members, but they will work together at all the tasks and subtasks for analyses, design, develop and testing as well. The team leader is Daniel.
Constraint The project have to be done until 22.04.2011, according with the specifications provided by the CC team (competence center). This date is an approximation of the date of finishing of the project. This date could be overcome in special conditions, discussed with CC team.
Project phases Analysis software requirements Design Development Testing Deployment
Analysis software requirementsphase
Design phase
Development phase
Testing phase
Deployment phase
Task usage
Conclusions There are tasks that are done in parallel Give you an overview of the whole project The tasks of all the members of the team is planned better A finish date of the project could be approximated

More Related Content

Viewers also liked

Different type of_software_testing - copy
Different type of_software_testing - copyDifferent type of_software_testing - copy
Different type of_software_testing - copyYogita patil
 
Software testing methods, levels and types
Software testing methods, levels and typesSoftware testing methods, levels and types
Software testing methods, levels and typesConfiz
 
Reviews checklists
Reviews checklistsReviews checklists
Reviews checklistsOana Feidi
 
Testing Types And Models
Testing Types And ModelsTesting Types And Models
Testing Types And Modelsnazeer pasha
 

Viewers also liked (6)

Different type of_software_testing - copy
Different type of_software_testing - copyDifferent type of_software_testing - copy
Different type of_software_testing - copy
 
Types of testing
Types of testingTypes of testing
Types of testing
 
Software testing methods, levels and types
Software testing methods, levels and typesSoftware testing methods, levels and types
Software testing methods, levels and types
 
Reviews checklists
Reviews checklistsReviews checklists
Reviews checklists
 
Dynamic Testing
Dynamic TestingDynamic Testing
Dynamic Testing
 
Testing Types And Models
Testing Types And ModelsTesting Types And Models
Testing Types And Models
 

Similar to Mps project (20)

Kumar kunal
Kumar kunalKumar kunal
Kumar kunal
 
Mandar_Kamate_Resume _DotNet
Mandar_Kamate_Resume _DotNetMandar_Kamate_Resume _DotNet
Mandar_Kamate_Resume _DotNet
 
project_details
project_detailsproject_details
project_details
 
Prasanth_CV
Prasanth_CVPrasanth_CV
Prasanth_CV
 
Resume
ResumeResume
Resume
 
Vivek_MK
Vivek_MKVivek_MK
Vivek_MK
 
Raghavendra Gupta Resume
Raghavendra  Gupta  ResumeRaghavendra  Gupta  Resume
Raghavendra Gupta Resume
 
Resume _ios
Resume _iosResume _ios
Resume _ios
 
Rashmi_TL
Rashmi_TLRashmi_TL
Rashmi_TL
 
SathishKumar Natarajan
SathishKumar NatarajanSathishKumar Natarajan
SathishKumar Natarajan
 
Alpana_Srivastava
Alpana_SrivastavaAlpana_Srivastava
Alpana_Srivastava
 
Rahul_Resume_2106
Rahul_Resume_2106Rahul_Resume_2106
Rahul_Resume_2106
 
AlekyaNyalakonda_Resume
AlekyaNyalakonda_ResumeAlekyaNyalakonda_Resume
AlekyaNyalakonda_Resume
 
Lect9
Lect9Lect9
Lect9
 
Bhanu_Pottipareddy_CV
Bhanu_Pottipareddy_CVBhanu_Pottipareddy_CV
Bhanu_Pottipareddy_CV
 
Hitendra_Singh
Hitendra_SinghHitendra_Singh
Hitendra_Singh
 
Anastasios_Fakas
Anastasios_FakasAnastasios_Fakas
Anastasios_Fakas
 
RajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_InfosysRajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_Infosys
 
design of g building.pdf
design of g building.pdfdesign of g building.pdf
design of g building.pdf
 
Code campiasi scm-project-gabriel-cristescu-ditech
Code campiasi scm-project-gabriel-cristescu-ditechCode campiasi scm-project-gabriel-cristescu-ditech
Code campiasi scm-project-gabriel-cristescu-ditech
 

Mps project

  • 1. Mobile stations configurator IonitaGeorge-Catalin An IV, CTI
  • 2. The aim The aim of this project is to create a tool that could provide an offer based on diferent configurators for mobile stations and after that you could export it in xls format. This will be done in order to simplify the work for creating the diferent configurations for mobile stations The tool will be used by telecom engineers
  • 3. Resources The team will contain only 4 members, but they will work together at all the tasks and subtasks for analyses, design, develop and testing as well. The team leader is Daniel.
  • 4. Constraint The project have to be done until 22.04.2011, according with the specifications provided by the CC team (competence center). This date is an approximation of the date of finishing of the project. This date could be overcome in special conditions, discussed with CC team.
  • 5. Project phases Analysis software requirements Design Development Testing Deployment
  • 12. Conclusions There are tasks that are done in parallel Give you an overview of the whole project The tasks of all the members of the team is planned better A finish date of the project could be approximated