This document provides instructions for removing and installing a boom cylinder on an excavator. The key steps include: 1. Relieving hydraulic pressure and removing bolts and assemblies to access the cylinder. 2. Attaching a lifting device and removing additional bolts and pins to separate the cylinder. 3. Reinstalling the cylinder by attaching a lifting device, inserting pins and bolts, and torquing fasteners to specifications.