SlideShare a Scribd company logo
1 of 2
Download to read offline
Success story
Consulting engagement
and solution deployment
Move to
Real-Time
Enterprise
with
Background
The following points below offer a high level
view of their situation before considering a
change.
 Multiple service providers at different
locations
 Schedules sent by employees on excel sheets
once a week
 Manual clubbing of employees and allocation
of vehicles
 Manual charting of who has used the services
 Billing based on all these manual entries
Key challenges
 Scheduling in itself was a challenging exercise
with a department administrator consolidating
based on individual projects and preferences
 Clubbing and allocation of vehicles were done
by service providers’ representatives
considering all interests other than the
companies. Personal relationships and short
sighted benefits dominated such decisions.
 Absolutely no control over no shows and
capacity utilization – All decisions were a
postmortem
 Multiple levels of leakages & pilferage because
of multiple check and balance points – E.g.
Paper duty slip signed by employees, cross
checked against a security register, cross
checked against the roster created etc..
Our engagement with them:
We started with interviewing all stake holders
like employees, administrators, numerous car
rental service providers. The technical and
management teams both spent a lot of time on
the field to understand ground realities. After
gathering deep insights on their existing prac-
tices and key challenges the team met with the
client decision makers and worked out a final set
of objectives to be achieved as part of this
initiative.
With such critical input guided with ground
realities the first prototype of ODOCON was
implemented and went for real life testing in
June 2014. This pilot was carried out for two
months going through the complex and critical
testing of GPS enablement. GPS was a relatively
new technology at that point of time and the
criticality came from the fact that it was embed-
ded in business processes other than just track-
ing a fleet. In those two months there were
efforts to adapt the product to the core business
objectives of the client organization.
Later in 2015 after achieving a full proof end to
end implementation ODOCON was further
integrated with client’s core systems like HRMS
and more specifically their attendance system.
Continuous efforts went in to upgrade the
product to make it user friendly for all communi-
ties. Currently ODOCON is used for different
business models and environments making it a
platform.
More than
2000 employees,
ODOCON Every Day
500 trips and 9 locations use
with an average utilization of 60%
Client: A $900m company with more than
27000 employees and part of a $15billion group.

More Related Content

Similar to ODOCON EMS Success Story

Application sourcing focused on value, not cost alone
Application sourcing focused on value, not cost aloneApplication sourcing focused on value, not cost alone
Application sourcing focused on value, not cost aloneWGroup
 
The Power of Workday Extend
The Power of Workday ExtendThe Power of Workday Extend
The Power of Workday ExtendWorkday, Inc.
 
Linda_SonHing_Resume
Linda_SonHing_ResumeLinda_SonHing_Resume
Linda_SonHing_ResumeLinda SonHing
 
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT .docx
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT                   .docxRUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT                   .docx
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT .docxsusanschei
 
16. Process: ocp cfops delivery support
16. Process: ocp cfops delivery support16. Process: ocp cfops delivery support
16. Process: ocp cfops delivery supportssusereb347d
 
Laura Arber Pm Docment 1st
Laura Arber Pm Docment 1stLaura Arber Pm Docment 1st
Laura Arber Pm Docment 1stLaura Arber, PMP
 
Srinithya_Software Testing resume
Srinithya_Software Testing resumeSrinithya_Software Testing resume
Srinithya_Software Testing resumeSrinithya Kumar
 
Rapid Assessment for Professional Services
Rapid Assessment for Professional ServicesRapid Assessment for Professional Services
Rapid Assessment for Professional ServicesArpin Consulting
 
Simon Hall CV May 2014
Simon Hall CV May 2014Simon Hall CV May 2014
Simon Hall CV May 2014Simon Hall
 
Case Study 2_Motoring and Insurance
Case Study 2_Motoring and InsuranceCase Study 2_Motoring and Insurance
Case Study 2_Motoring and InsuranceMatt Campbell
 
Project Proposal Template Powerpoint Presentation Slides
Project Proposal Template Powerpoint Presentation SlidesProject Proposal Template Powerpoint Presentation Slides
Project Proposal Template Powerpoint Presentation SlidesSlideTeam
 
Project Proposal Template PowerPoint Presentation Slides
Project Proposal Template PowerPoint Presentation SlidesProject Proposal Template PowerPoint Presentation Slides
Project Proposal Template PowerPoint Presentation SlidesSlideTeam
 
Leonard Smith Resume.docxGE only
Leonard Smith Resume.docxGE onlyLeonard Smith Resume.docxGE only
Leonard Smith Resume.docxGE onlyLeonard Smith
 
Sumegh Parab - Resume V1
Sumegh Parab - Resume V1Sumegh Parab - Resume V1
Sumegh Parab - Resume V1Sumegh Parab
 
Ww idc report the business value of concur invoice (fdm)
Ww idc report  the business value of concur invoice (fdm)Ww idc report  the business value of concur invoice (fdm)
Ww idc report the business value of concur invoice (fdm)Shannon Blackwell
 
How to Make Change Management a Reality
How to Make Change Management a RealityHow to Make Change Management a Reality
How to Make Change Management a Realitydreamforce2006
 

Similar to ODOCON EMS Success Story (20)

Shuchi kumar resume
Shuchi kumar resumeShuchi kumar resume
Shuchi kumar resume
 
Application sourcing focused on value, not cost alone
Application sourcing focused on value, not cost aloneApplication sourcing focused on value, not cost alone
Application sourcing focused on value, not cost alone
 
The Power of Workday Extend
The Power of Workday ExtendThe Power of Workday Extend
The Power of Workday Extend
 
Quality Management Practice in IT Projects
Quality Management Practice in IT ProjectsQuality Management Practice in IT Projects
Quality Management Practice in IT Projects
 
Linda_SonHing_Resume
Linda_SonHing_ResumeLinda_SonHing_Resume
Linda_SonHing_Resume
 
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT .docx
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT                   .docxRUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT                   .docx
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT .docx
 
16. Process: ocp cfops delivery support
16. Process: ocp cfops delivery support16. Process: ocp cfops delivery support
16. Process: ocp cfops delivery support
 
Laura Arber Pm Docment 1st
Laura Arber Pm Docment 1stLaura Arber Pm Docment 1st
Laura Arber Pm Docment 1st
 
Srinithya_Software Testing resume
Srinithya_Software Testing resumeSrinithya_Software Testing resume
Srinithya_Software Testing resume
 
Rapid Assessment for Professional Services
Rapid Assessment for Professional ServicesRapid Assessment for Professional Services
Rapid Assessment for Professional Services
 
Simon Hall CV May 2014
Simon Hall CV May 2014Simon Hall CV May 2014
Simon Hall CV May 2014
 
UX_Web to Mobile
UX_Web to MobileUX_Web to Mobile
UX_Web to Mobile
 
Case Study 2_Motoring and Insurance
Case Study 2_Motoring and InsuranceCase Study 2_Motoring and Insurance
Case Study 2_Motoring and Insurance
 
Project Proposal Template Powerpoint Presentation Slides
Project Proposal Template Powerpoint Presentation SlidesProject Proposal Template Powerpoint Presentation Slides
Project Proposal Template Powerpoint Presentation Slides
 
Project Proposal Template PowerPoint Presentation Slides
Project Proposal Template PowerPoint Presentation SlidesProject Proposal Template PowerPoint Presentation Slides
Project Proposal Template PowerPoint Presentation Slides
 
Leonard Smith Resume.docxGE only
Leonard Smith Resume.docxGE onlyLeonard Smith Resume.docxGE only
Leonard Smith Resume.docxGE only
 
Sankar CV STD
Sankar CV STDSankar CV STD
Sankar CV STD
 
Sumegh Parab - Resume V1
Sumegh Parab - Resume V1Sumegh Parab - Resume V1
Sumegh Parab - Resume V1
 
Ww idc report the business value of concur invoice (fdm)
Ww idc report  the business value of concur invoice (fdm)Ww idc report  the business value of concur invoice (fdm)
Ww idc report the business value of concur invoice (fdm)
 
How to Make Change Management a Reality
How to Make Change Management a RealityHow to Make Change Management a Reality
How to Make Change Management a Reality
 

ODOCON EMS Success Story

  • 2. Move to Real-Time Enterprise with Background The following points below offer a high level view of their situation before considering a change.  Multiple service providers at different locations  Schedules sent by employees on excel sheets once a week  Manual clubbing of employees and allocation of vehicles  Manual charting of who has used the services  Billing based on all these manual entries Key challenges  Scheduling in itself was a challenging exercise with a department administrator consolidating based on individual projects and preferences  Clubbing and allocation of vehicles were done by service providers’ representatives considering all interests other than the companies. Personal relationships and short sighted benefits dominated such decisions.  Absolutely no control over no shows and capacity utilization – All decisions were a postmortem  Multiple levels of leakages & pilferage because of multiple check and balance points – E.g. Paper duty slip signed by employees, cross checked against a security register, cross checked against the roster created etc.. Our engagement with them: We started with interviewing all stake holders like employees, administrators, numerous car rental service providers. The technical and management teams both spent a lot of time on the field to understand ground realities. After gathering deep insights on their existing prac- tices and key challenges the team met with the client decision makers and worked out a final set of objectives to be achieved as part of this initiative. With such critical input guided with ground realities the first prototype of ODOCON was implemented and went for real life testing in June 2014. This pilot was carried out for two months going through the complex and critical testing of GPS enablement. GPS was a relatively new technology at that point of time and the criticality came from the fact that it was embed- ded in business processes other than just track- ing a fleet. In those two months there were efforts to adapt the product to the core business objectives of the client organization. Later in 2015 after achieving a full proof end to end implementation ODOCON was further integrated with client’s core systems like HRMS and more specifically their attendance system. Continuous efforts went in to upgrade the product to make it user friendly for all communi- ties. Currently ODOCON is used for different business models and environments making it a platform. More than 2000 employees, ODOCON Every Day 500 trips and 9 locations use with an average utilization of 60% Client: A $900m company with more than 27000 employees and part of a $15billion group.