Berkeley Residential Curbside
EV Charging Pilot Program
ForthWebinar Series
April 7, 2020
Home Charging
• Allows residents without off-street parking
a means of charging at home
• New on-site space or curbside
• Launched Dec 2014
• Extended through Dec 2020
• Property owner finances (and controls use)
• 11th Hour Project grant originally covered
permit fees
• EV charging station, not outlet alone
• Street parking remains available to all
Curbside Residential Charging Pilot
61 Applications
• On-site charging
• 9 qualified, 4 installed
• Curbside charging
• 35 qualified, 7 installed
• Not eligible
• 16 didn’t qualify and 1 withdrawn
Pilot Applications
On-Site Charging Example (Before)
© 2015 Google
On-Site Charging Example (After)
Curbside Charging Example (Before)
© 2015 Google
Curbside Charging Example (After)
Curbside Charging Example (Before)
© 2015 Google© 2015 Google
Curbside Charging Example (After)
Curbside Charging Example
© 2015 Google
• Strong interest, but few installations
• Expense
• Access concerns
• Curbside station placement issues
• Street trees
• Conduit in the PROW
• ADA accessibility
• Assumes street parking will continue
• Berkeley Electric Mobility Roadmap
• Equity in Access to Electric Mobility
• Improve Alternatives to Driving
• Achieve Zero Net Carbon
• Demonstrate City Leadership
Pilot Findings and Next Steps
ThankYou!
Sarah Moore
Sustainability Program Manager
Office of Energy and Sustainable Development, City of Berkeley
smoore@CityofBerkeley.info
www.CityofBerkeley.info/evcurbside

Berkeley Residential Curbside EV Charging Pilot Program by Sarah Moore

  • 1.
    Place image herebelow red line. Berkeley Residential Curbside EV Charging Pilot Program ForthWebinar Series April 7, 2020
  • 2.
  • 3.
    • Allows residentswithout off-street parking a means of charging at home • New on-site space or curbside • Launched Dec 2014 • Extended through Dec 2020 • Property owner finances (and controls use) • 11th Hour Project grant originally covered permit fees • EV charging station, not outlet alone • Street parking remains available to all Curbside Residential Charging Pilot
  • 4.
    61 Applications • On-sitecharging • 9 qualified, 4 installed • Curbside charging • 35 qualified, 7 installed • Not eligible • 16 didn’t qualify and 1 withdrawn Pilot Applications
  • 5.
    On-Site Charging Example(Before) © 2015 Google
  • 6.
  • 7.
    Curbside Charging Example(Before) © 2015 Google
  • 8.
  • 9.
    Curbside Charging Example(Before) © 2015 Google© 2015 Google
  • 10.
  • 11.
  • 12.
    • Strong interest,but few installations • Expense • Access concerns • Curbside station placement issues • Street trees • Conduit in the PROW • ADA accessibility • Assumes street parking will continue • Berkeley Electric Mobility Roadmap • Equity in Access to Electric Mobility • Improve Alternatives to Driving • Achieve Zero Net Carbon • Demonstrate City Leadership Pilot Findings and Next Steps
  • 13.
    ThankYou! Sarah Moore Sustainability ProgramManager Office of Energy and Sustainable Development, City of Berkeley smoore@CityofBerkeley.info www.CityofBerkeley.info/evcurbside