What is First Fix and Second Fix Electrical Construction?
1. What is First Fix and Second
Fix Electrical Construction?
First fix and second fix are construction terms that are used in Britain for describing the two
stages of infrastructural construction work such as laying the foundation and main plumbing and
electrical work, and decorative or final stages including work on interior decorations, plastering
and final plumbing and electrical finishes and etc.
2. First Fix stage in construction of
buildings
It’s the preliminary stage of construction including foundation laying, wall and
floor installation and other infrastructural work. First fix electrical tasks include
cabling and concealed wiring and connecting the building’s main circuits to the
consumer unit. first fix includes plumbing work for main gas and water
pipework as well. It’s a time-consuming stage where plans for the
infrastructure are drawn up, evaluated and carried out.
Electric Works London can ensure observance of all existing and applicable UK
regulations for building construction safety and higher standards of safety in
the first and second fix electrical work and plumbing operations for building in
London.
3. First fix electrical work, setting up a safe
property from the foundations
The first stage of electrical work includes design and set-up of the house’s main electrical
circuit, which determines the limits of both design and function. If you are planning future
upgrades for your electrical equipment, or need more outlets in a certain room, you can
speak to EWL contractors to take your suggestions into account and make adjustments in
circuit plans.
Setting up the actual circuit and wiring the building may take up to 10 days for conventional
private properties, and it may take even longer for larger buildings and structures.
4. What’s the main difference between first fix and
second fix electrical work?
In principle, installation and work on any object that will not be visible by the time construction
is completed is considered first fix work. Second fix naturally includes work on exterior design
elements and facilities. The first fix stage usually costs more because of the raw material and
volume of work that is required to set up infrastructure. by spending more on first fix
installations, you can’t add much to the property’s value but the safety conditions of the
building will dramatically improve. On the other hand, adding more luxury elements in the
second fix stage can increase the perceived value of the property for potential buyers or renters.
5. Second fix tasks are more delicate, and can
add to the property’s value
The second stage of construction revolves around finalizing the property for use by occupants. It
includes setting up and testing all electrical devices and fixtures, bathroom installations and
kitchen components. Also on the agenda in second fix stage are decorative plasterwork and
fitting interior installations such as doors and outlets and cladding or floorboard installation.
6. What is a third fix?
Electrical installations need protection from fluctuations in the city’s electrical grid, and
installing such protective devices and accessories is called third fix electrical work and is optional
for clients.