Q4 2014
Financial
Results
March 16, 2015
This presentation contains forward-looking information under Canadian securities legislation. Forward-looking information includes, but is not limited to, statements with respect to the
development potential and timetable of the projects; the Company’s ability to raise additional funds as necessary or on commercially reasonable terms; the future price of gold; the
estimation of mineral resources and mineral reserves; conclusions of economic evaluation (including scoping studies); the realization of mineral resource and reserve estimates; the
timing and amount of estimated future production, development and exploration; costs of future activities; capital and operating expenditures; success of exploration activities; mining
or processing issues; currency exchange rates; government regulation of mining operations; and environmental risks. Generally, forward-looking information can be identified by the
use of forward-looking terminology such as “plans,” “expects” or “does not expect,” “is expected,” “budget,” “scheduled,” “estimates,” “forecasts,” “intends,” “anticipates” or “does not
anticipate,” or “believes,” or variations of such words and phrases or statements that certain actions, events or results “may,” “could,” “would,” “might,” or “will be taken,” “occur” or “be
achieved”. Forward-looking information is based on the opinions and estimates of management as of the date such statements are made. Estimates regarding the anticipated timing,
amount and cost of mining at the projects are based on assumptions underlying mineral resource estimates and the realization of such estimates; results of previous mining activities at
the projects, and detailed research and analysis completed by independent of the Company; research and estimates regarding the timing of delivery for long-lead items; knowledge
regarding the factors involved in building a mine and other factors described in the technical reports and Annual Information Form filed under the profile of the Company on SEDAR.
Capital and operating cost estimates are based on results of previous mining activities, research of the Company and independent consultants, recent estimates of construction and
mining costs and other factors that are set out in the scoping study. Production estimates are based on mine plans and production schedules, which have been developed by the
Company’s personnel and independent consultants. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual
results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not
limited to risks related to: timing and availability of external financing on acceptable terms; unexpected events and delays during construction, expansion and start-up; variations in ore
grade and recovery rates; receipt and revocation of government approvals; actual results of exploration and mining activities; changes in project parameters as plans continue to be
refined; future prices of gold; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry. Although management
of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other
factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events
could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not
undertake to update any forward-looking information except in accordance with applicable securities laws.
Investors are advised that National Instrument NI 43-101 of the Canadian Securities Administrators requires that each category of mineral reserves and mineral resources be reported
separately. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Due to the uncertainty of measured, indicated or inferred mineral resources,
these mineral resources may never be upgraded to proven and probable mineral reserves.
Mark Edwards MAIG MAusIMM (CP)., is a “qualified person” as such term is defined in National Instrument 43-101 and has reviewed and approved the technical information and data
included in this presentation.
Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated or Inferred Resources
The information presented uses the terms “measured”, “indicated” and “inferred” mineral resources. United States investors are advised that while such terms are recognized and
required by Canadian regulations, the United States Securities and Exchange Commission does not recognize these terms. “Inferred mineral resources” have a great amount of
uncertainty as to their existence, and as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a
higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies. United States investors are cautioned
not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. United States investors are also cautioned not to assume
that all or any part of an inferred mineral resource exists, or is economically or legally mineable.
2
Forward Looking Information
3
Management Participants
Rodney D. Lamond, President & Chief Executive Officer, Director
• Professional Mining Engineer
• Over 25 years of global operational experience in the mining industry
• Appointed President and Chief Executive Officer in July 2013
Robert Dufour, Chief Financial Officer
• Over 10 years of experience
• Joined Crocodile Gold in July 2012, appointed Chief Financial Officer in May 2013
• Previously with AuRico Gold and Northgate Minerals
4
2014 Highlights
Achieved Higher Sustainable Production from Current Assets
Record Production 222,312 ounces – Exceeded Inital Guidance
Significantly Decreased Operating Costs – Met Low End of Guidance
Record Operating Cash Flow of $74.2M
Strong Balance Sheet and Cash Position at Year End of ~$37M
Terminated Net Free Cash Flow Sharing Arrangement
1
2
3
4
5
6
Our Key Objectives
5
Sustainable Gold
Production
Maintain production from
current assets between
~200,000oz -220,000oz
Convert and replace resources
in a timely manner
Integrated company with
experienced & unified
Management Team
Growing Cash Flow
Excellent operational execution
Lower costs and capital
Requirements
Disciplined capital investment
& allocation – Achieve positive
cash flow each quarter
Maintain Balance
Sheet Strength
Strong cash position
Low debt level
Flexibility in a volatile gold
price environment
Strategic Growth
Opportunities
Unlock value from our current
land holdings
Strategic partnerships
M&A to increase production
6
Australia - A Stable & Proven Gold Jurisdiction with Opportunity
Australia recognized as a
stable and low risk jurisdiction
with access to infrastructure and skills
11% of the world’s Economic Demonstrated
Resources of gold
Future Asset Consolidation
Declining gold prices have impacted many companies,
there will be future asset consolidation in Australia –
We are well positioned to make strategic acquisitions
Potential for high
producing discoveries in the
same geographical regions where our assets are
located
Cosmo Mine
Union Reefs Mill
Stawell Fosterville
15M oz
Since 1870
5M oz
Since 1853 39M oz
Since 1851
7
Management Committee – A Unified Team
Rodney D. Lamond, P. Eng., President & Chief
Executive Officer, Director
Mr. Lamond joined Crocodile Gold as President and Chief
Executive Officer of Crocodile Gold in July 2013. Mr. Lamond
is a Professional Mining Engineer with over 25 years of
operational experience in the mining industry in North
Amercia and Internationally.
Robert Dufour, CPA, CA, Chief Financial Officer
Mr. Dufour is a Chartered Accountant with over 10 years of
finance and accounting experience. He started his career with
PricewaterhouseCoopers. He later joined Northgate Minerals
and was the Group Financial Controller for Northgate’s
Australian subsidiaries, based out of Victoria, Australia until
its acquisition by AuRico Gold.
Troy Cole, General Manager, Stawell Gold Mines
Mr. Cole joined Crocodile Gold in 2012 through the
acquisition of the Stawell Gold Mines from AuRico. Mr. Cole
has been Stawell Gold Mines General Manager since 2007
and has had the responsibilities of director, mine
management and engineering during his tenure.
Ian Holland, General Manager, Fosterville Gold
Mine
Mr. Holland joined Crocodile Gold through the acquisition of
the Fosterville Gold Mine in 2012 and has been in the role of
General Manager since 2007. Ian has over 17 years
experience across a number of gold and base metal mining
operations throughout Australia. He is a geologist by
background and has a strong track record in metalliferous
operations.
Jason Morin, General Manager, NT Operations
Mr. Morin joined Crocodile Gold in September 2013. He was
most recently the General Manager of the Langlois Mine in
Quebec for Nyrstar where he successfully guided the site
from care and maintenance to full plant capacity in 6 months.
Mark Edwards, General Manager, Exploration and
Business Development
Mr. Edwards has been part of the Crocodile Gold Northern
Territory Project since March 2010. Mr. Edwards is a
qualified geologist with approximately 16 years experience
working on Gold and Industrial Mineral deposits in the
Northern Territory, Queensland, Western Australia, Tasmania
and Botswana.
2015 Goals
Increase underground productivity
Follow up exploration development of the newly discovered
East Dipping and Kestral structures
2015 Production guidance: 100,000 – 105,000 oz
2015 Operational Cash Costs: US$670 – $750 per oz*
Fosterville Processing Facility
23,556 23,470
25,359 26,039 25,786
22,198
28,313 29,045
Q1/13 Q2/13 Q3/13 Q4/13 Q1/14 Q2/14 Q3/14 Q4/14
8
2014 Highlights
Record annual gold production up 7% to 105,342 oz
2% improvement in grade to 4.62 g/t Au
Increased total annual milled tonnes 2.9% to 814,837 tonnes
Improved blending practices of carbonaceous ore and
ongoing optimization of the leaching circuit
*See Non-IFRS Disclosures on page 30.
Fosterville 2014 Highlights
9
13,169
17,706
21,316 21,915
17,841
21,845
17,942
20,112
Q1/13 Q2/13 Q3/13 Q4/13 Q1/14 Q2/14 Q3/14 Q4/14
2015 Goals
Continue cost reduction activities
Further improve mill recovery levels
Expand Mineral Resource estimate through underground
drill programs
2015 Production guidance: 75,000 – 85,000 oz
2015 Operational Cash Costs: US$850 – $930 per oz*
2014 Highlights
Record annual gold production up 4.9% to 77,740 oz
Increased total annual milled tonnes up 20.7% to 868,399
tonnes
Underground ore production up 8.8% to 793,156 tonnes
Successful transition to new mining contractor resulted in
record monthly and quarterly stoping
Cosmo 2014 Highlights
Cosmo Access Portal
*See Non-IFRS Disclosures on page 30.
Fosterville Processing Facility
10
Stawell 2014 Highlights
12,228
7,085
8,531
10,322 9,956 9,981 9,654 9,639
Q1/13 Q2/13 Q3/13 Q4/13 Q1/14 Q2/14 Q3/14 Q4/14
2015 Goals
Big Hill Project plan modification and engagement with local
community
Continue to operate in a sustainable way, further streamline
operations, and continue cost reduction
2015 Production guidance: ~30,000 oz
2015 Operational Cash Costs: US$945 – $1,025 per oz*
2014 Highlights
Achieved full year results as it continues to focus on upper mine
levels
Strong annual gold production of 39,230 oz, a 2.8% increase vs.
2013
Underground ore production of 560,815 tonnes at 2.58 g/t Au
Achieved operational sustainability on streamlined operating
activities, reduced manpower, and infrastructure
Stawell Gold Mines
*See Non-IFRS Disclosures on page 30.
Achieving Sustainable Production: A 5-Year Strategy
56,294
68,020
155,523
210,696
2010 2011 2012 2013 2014
5 Year Strategy – One year at a time
Long life assets with small reserve base.
205,000oz – 220,000 oz
222,312oz
Production (OZ)
11
Resource
conversion to
Reserves
Crocodile Gold has achieved sustainable production by strategically executing its
sustainable mining model and by converting resources into reserves in a timely
manner.
Sustainable Ounces
Tonnes (MM) Au Grade (g/t) Au (Koz)
Measured and Indicated
Resources (incl. of Reserves)
Fosterville 16.6 3.9 2,069
Cosmo 4.5 3.6 500
Stawell 4.7 2.6 399
Maud Creek 7.7 3.5 871
Pine Creek 8.4 1.4 380
Burnside 7.6 1.4 336
Union Reefs 3.0 2.4 236
M&I Resources 52.5 2.83 4,791
Inferred Resources
Fosterville 6.3 3.8 777
Cosmo 1.2 2.9 109
Stawell 1.0 4.7 145
Burnside 11.8 1.6 602
Maud Creek 4.2 2.5 344
Union Reefs 4.3 2.2 305
Pine Creek 2.5 2.3 191
Inferred Resources 31.3 2.45 2,473
Crocodile Gold maintains significant
Measured & Indicated Resources* of 4.8M
and Inferred Resources of 2.5M ounces.
12
Mineral Resources and Reserves*
*Please refer to additional information on page 30 of this presentation.
Reserves Tonnes (MM) Au Grade (g/t) Au (Koz)
Proven & Probable Reserves
Fosterville 1.8 6.0 342
Cosmo 1.5 3.8 180
Stawell 1.0 3.4 107
Maud Creek 1.0 5.4 185
Pine Creek 1.3 1.6 62
Union Reefs 0.3 4.4 42
Burnside 0.2 1.9 10
Reserves 7.1 4.1 928
Crocodile Gold’s projects total approximately
0.928M ounces of Reserves*
$1,680
$1,386
$1,236(2)
AISC
Guidance
$1,020 –
$1,100
$1,167
$1,027
$905(2)
OCC
Guidance
$780 –
$860
2012 2013 2014 Consolidated 2015
(18%)
Decrease
YoY
Proven Ability to Decrease Costs
2014 Highlights
Consistent decrease in annual Operating cash
costs and AISC(1)
Operating cash costs per oz decreased 22.5%
from $1,167 in 2012 to $905 in 2014
AISC per oz decreased 26.6% from $1,680 in
2012 to $1,236 in 2014
Achieved Operating cash costs of $905/oz at
lower end of 2014 guidance
Q4/14 Operating cash costs were $793/oz
and AISC were $1,098/oz
Further cost reductions expected in 2015
due to continuous cost management and
operational efficiencies
DECREASING COSTS
(11%)
Decrease
YoY
(12%)
Decrease
YoY (12%)
Decrease
YoY
13
CostsPerOunce($US)
All-in sustaining cash costs per oz Operating cash costs per oz
*See Non-IFRS Disclosures on page 30 of this presentation.
(1) All-In Sustaining cash costs per ounce (“AISC”) includes Corporate General and Administrative Expenses.
14
Long-Term Growth Opportunities
Strategic projects
Unlock value of current land holdings
Strategic partnerships
Acquisitions
1
2
3
Good pipeline of projects, several which
have been approved by Management
Committee to date including:
Big Hill Development Project
Maud Creek
Regional exploration mapping at Esmeralda
Cosmo Structural mapping
Underground exploration drilling at Fosterville,
Cosmo and Stawell
Surface exploration drilling at Stawell
4
Achieving Growth: A 5-Year Strategy
56,294
68,020
155,523
210,696
2010 2011 2012 2013 2014 5 Year Strategy – Maintaining production from current
assets & growing production through acquisition
205,000oz – 220,000 oz
222,312oz
Production (OZ)
15
Acquisition
(M&A Growth)
• Crocodile Gold’s 5-Year Strategy will continue to achieve sustainable production from current
assets through its sustainable mining model and also grow production by acquisitions.
• We look to acquire producing assets in low-risk jurisdictions where we can apply our disciplined
strategy and quickly see results.
Growth
Ounces
Growth
Ounces
Growth
Ounces
Q4 2014
Financial Review
17
Operating Results
Operating Results Q4 2014 Q4 2013 FY 2014 FY 2013
Consolidated Gold Produced (oz) 58,796 58,276 222,312 210,696
Consolidated Gold Sold (oz) 58,070 57,503 222,903 212,723
Fosterville Gold Mine
Ore Milled (Tonnes) 190,823 200,140 814,837 792,166
Average Grade (g/t Au) 5.26 4.63 4.62 4.53
Recovery (%) 88.5 87.4 86.4 85.2
Gold Produced (Ounces) 29,045 26,039 105,342 98,424
Cosmo Gold Mine
Ore Milled (Tonnes) 225,601 202,743 868,399 719,337
Average Grade (g/t Au) 3.05 3.74 3.14 3.57
Recovery (%) 90.9 89.9 88.9 89.6
Gold Produced (Ounces) 20,112 21,915 77,740 74,106
Stawell Gold Mines
Ore Milled (Tonnes) 232,157 215,062 926,987 888,860
Average Grade (g/t Au) 1.67 1.81 1.67 1.66
Recovery (%) 77.6 82.3 78.8 79.5
Gold Produced (Ounces) 9,639 10,322 39,230 38,166
Fosterville
98,424
Fosterville
105,342
Cosmo
74,106
Cosmo
77,740
Stawell
38,166
Stawell
39,230
0
50,000
100,000
150,000
200,000
250,000
2013 2014
222,312 oz
Production
(Au ounces)
5.5%+
210,696 oz
18
Financial Results
Financial Results ($US)
000’s
Q4 2014 Q4 2013 FY 2014 FY 2013
Revenue 69,783 73,277 282,739 300,825
Cost of operations, including
depletion and depreciation
(56,511) (70,149) (241,458) (295,757)
Mine operating income 13,272 3,128 41,281 5,068
Net income (loss) 10,759 (23,305) 19,952 (92,766)
EPS (loss) (per share) 0.02 (0.06) 0.04 (0.23)
Cash generated from
operating activities
25,281 20,533 74,157 67,463
Investment in mine
development, property,
plant and equipment
15,288 15,049 66,743 72,761
Gold ounces produced 58,796 58,276 222,312 210,696
Gold ounces sold 58,070 57,503 222,903 212,723
Average realized gold price 1,202 1,273 1,268 1,407
Average quoted gold price 1,201 1,275 1,266 1,410
Operating cash costs per
ounce sold
793 963 905 1,027
All-in sustaining cash costs
per ounce sold
1,098 1,257 1,236 1,386
67,463
74,157
50,000
55,000
60,000
65,000
70,000
75,000
2013 2014
Operating Cash Flow
($ 000’s)
10%+
Generating Positive Operational Cash Flow
20,532
12,459
18,184 18,232
25,281
Q4/13 Q1/14 Q2/14 Q3/14 Q4/14
19
*See Non-IFRS Disclosures on page 30 of this presentation.
(1) All-In Sustaining Cash Costs per Ounce (“AISC”) includes Corporate General and Administrative Expenses.
2014 Highlights
Generating positive operational cash flow
despite decrease in gold prices
Average realized gold price decreased (9.9%)
from $1,407 per ounce in 2013 to US$1,268
per ounce in 2014
Achieved record annual operating cash flow
of $74.2 million in 2014, a 9.9%
improvement from $67.5 million in 2013
Operational cash flowof $25.3 million in
Q4/14
Operationalcashflow(thousandsof$US)
CAPEX
20
• Q4 2014 mine development was $13.6M, invested largely at Fosterville and Cosmo, with an additional $1.7
million invested into plant and equipment
• 2014 mine development decreased to $59.4M versus $67.6M in 2013 and focused on sustainable mine
development and resource definition drilling at Fosterville and Cosmo
• The decrease in 2014 is mainly due to 32% less in capital expenditures at Cosmo, compared to the prior year,
when Cosmo was ramping up operations
• Total growth capital for the year was $3.1M
Cash and Debt Positions
21
Unaudited Cash Position and Working Capital as at December 31, 2014
Cash Position: US$37.1M cash and gold bullion
Working Capital: US$12.6M
Debt—Convertible Debenture
Fulfilled debt position requirements in cash prior to due date
Successfully completed a private placement in Q1/14 to raise money and pay out a credit facility with Credit Suisse
Convertible debentures of C$34.5M due April 30, 2018, with an 8% coupon and C$0.25 conversion price. Under the agreement,
interest payments may be settled in cash or in shares. A total of three interest payments have been made to date on the debentures,
all on time, all settled in cash
Total Debt to LTM EBITDA was 0.41x as at December 31, 2014
2015 Production and Cash Cost Guidance
22
(US) $ Fosterville Cosmo Stawell Consolidated 2015
Gold Production ounces 100,000 – 105,000 75,000 – 85,000 ~30,000 205,000 – 220,000
Operational Cash Costs per ounce* $670 - $750 $850 - $930 $945 - $1,025 $780 - $860
AISC per ounce*(1)
$1,020 - $1,100
• Current 2015 consolidated production guidance of 205,000 – 220,000 ounces
• Current 2015 operating cash costs per ounce are expected between $780 - $860, down from
2014 operating cash costs of $905 per ounce
• Focused on maintaining predictable and sustainable levels of production
• Delivering cost efficiencies to drive down operating costs throughout our business
*See Non-IFRS Disclosures on page 30 of this presentation.
(1) All-In Sustaining Cash Costs per Ounce (“AISC”) includes Corporate General and Administrative Expenses.
Q&A
Appendix
25
Crocodile Gold Today
Capital Structure & Financial Details
Basic: 476.0 Million
Options: 22.69 Million
Fully Diluted: (includes
138M shares for full
conversion of convertible
debentures)*
636.7 Million
Market Capitalization:
(As of March 13, 2015)
$100 Million
52 Week Trading Range $0.13 – $0.35
*Excludes OTM warrants with a strike of $2.25
SUSTAINABLE MID-TIER GOLD PRODUCER WITH
A STRATEGY FOR LONG-TERM GROWTH
Top 20
gold producers listed on the TSX with
gold production of 222,312oz in 2014
4.8Moz of M&I
Large resource base with strong track
record of converting resources to
production and replacing depleting
resources
2.5Moz Inferred
$37M (US)
cash and gold bullion and generating
positive cash flow at December 31, 2014
TSX:CRK
Listed on the Toronto stock exchange
Crocodile Gold is a strong mid-tier gold
producer. We have three operating mines
and significant land holdings in high
producing jurisdictions in Australia.
3 Gold Mines
Fosterville
64,427 oz
Fosterville
98,424 oz
Fosterville
105,342 oz
NT
NT
Cosmo
40,731 oz
Cosmo
74,106 oz
Cosmo
77,740 ozStawell
50,366 oz
Stawell
38,166 oz
Stawell
39,230 oz
2010 2011 2012 2013 2014
155,524 oz
210,696 oz
222,312 oz
56,294 oz
41%
4-Year
Production
CAGR
Historical Growth and Sustainable Production
68,020 oz
GoldProductionounces(oz)
26
* Crocodile Gold acquired the Fosterville and Stawell Gold Mines with effect from May 5, 2012. Information presented prior to this date is for comparative purposes only.
Record production in 2014 of 222,312 oz, up 5.5% from 2013
Achieved second consecutive year of production above 210,000 ounces.
Free Cash Flow Agreement Completed
27
Crocodile Gold continues to generate strong free cash flow
and now retains 100% of free cash flow generated from the
Fosterville and Stawell Gold Mines
On January 14, 2015, Crocodile Gold closed its Agreement with AuRico
Gold Inc. (“AuRico”) to terminate a cash flow sharing arrangement
previously established between the two companies when Crocodile Gold
acquired the Fosterville and Stawell Gold Mines from AuRico in 2012.
As part of the Agreement, Crocodile Gold has paid AuRico C$20.0M
(US$16.7M) in cash and has granted AuRico a net smelter return royalty of
2% from the Fosterville Gold Mine, effective as of January 14, 2015, and a
1% royalty from Stawell Gold Mines commencing January 1, 2016.
Strong Q4/14 performance resulted in a solid cash balance at year-end
that enabled Crocodile Gold to fund the one-time payment without the
addition of debt.
As a result, Crocodile Gold is released from its obligation to pay AuRico
any further net free cash flow generated from the Fosterville and Stawell
Gold Mines.
Crocodile Gold will now fully benefit and retain 100% of its strong free
cash flows. This Agreement was a critical step in supporting the future
growth toward the 5 Year Strategy of Crocodile Gold.
Terms of the Net Free Cash Flow Sharing
Arrangement on Fosterville and Stawell
Gold Mines – Terminated January 14,
2015
1. First $60M of cumulative NFCF is paid 100%
to Crocodile
2. Next $30M of cumulative NFCF is paid 100%
to AuRico
3. Next $30M of cumulative NFCF is shared
50/50 between Crocodile and AuRico
4. Beyond the initial $120M, NFCF is shared
80/20 between Crocodile and AuRico
Strategic Projects
28
Crocodile Gold continues to look for opportunities to invest in attractive projects in low-risk jurisdictions.
Significant land holdings in the Northern Territory and also in the State of Victoria
2,061km2 in Northern Territory and 2,154km2 in Victoria
JDS Silver: Silvertip Project, Northern British Columbia
In early 2014, the company identified JDS Silver as a strategic opportunity given our extensive knowledge of the project. The
Company completed its due diligence process and in Q3/14 invested $5.1M for a 19.9% minority interest
The Silvertip project is a highly attractive near-production, high grade silver and polymetallic resource in a stable mining jurisdiction
in North America. Indicated Resources are 2.7Mt @ 341g/t Ag, 6.53% Pb and 9.12% Zn*
Capital requirements are low
The mine includes a developed access decline, full camp facilities, and an access road. JDS Silver also owns a full processing plant
with power generating capabilities that is in excellent condition.
JDS Silver underscores our core mining principals as we are highly familiar with the project’s site location and geological setting.
*Please refer to cautionary language on page 30 of this presentation.
Crocodile Gold is open to entering into Joint Ventures (JVs) of non-core assets primarily in the Northern
Territory and discussions are ongoing. Potential benefits include:
• Return upside in the form of earn-in rights, royalties and other similar arrangements
• Carrying cost savings
• Sharper focus on core producing assets
Crocodile Gold looks for opportunities to divest non-core assets and has completed a number of divestments in
2014 which include:
Phoenix Copper Option and Sale Agreement
• Crocodile Gold entered into a sale agreement with Phoenix Copper (“Phoenix”) for 100% of the Company’s Iron Blow and Mt.
Bonnie massive sulphide deposits for a 2% royalty on precious metals and claw back rights
• The Company also entered into an option agreement which allows Phoenix to earn up to a 90% interest in the nearby Burnside
and Moline gold projects and the Chessman base metals project. Terms of the agreement include Phoenix's commitment to
spend AUD$4M in exploration expenditures over the next four years
Rockland Option Agreement
• Crocodile Gold entered into a uranium exploration agreement with Rockland Resources, where Rockland received 100% uranium
interest on the Company’s property for a AUD$1M exploration commitment over four years. A 1.0% net smelter royalty is capped
at AUD$2.5M
Non-Core Asset Divestment
29
Non-IFRS Measures
Crocodile Gold believes that investors use certain indicators to assess gold mining companies. The indicators are intended to provide additional information and should not be
considered in isolation or as a substitute for measures of performance in accordance with the International Financial Reporting Standards.
“Operational Cash Costs per Ounce” is a non-IFRS performance measure which could provide an indication of the mining and processing efficiency at the operations.
The Company calculates operating cash costs per ounce by deducting silver sales revenue as a by-product from operating expenses per the consolidated statement of operations,
then dividing by the gold ounces sold during the applicable period. Operating expenses include mine site operating costs such as mining, processing and administration as well as
royalties, however excludes depletion and depreciation, share-based payments and rehabilitation costs. There are variations in the method of computation of “operational cash
costs per ounce” as determined by the Company compared with other mining companies. For more detail on the operational cash costs per ounce determination for Crocodile Gold,
please visit www.sedar.com or www.crocgold.com and review the latest Annual Financial Statements issued on March 19, 2014.
“All-In Sustaining Costs per Ounce of Gold (“AISC”)” Effective December 31, 2013, the Company has adopted an all-in sustaining cost (“AISC”) performance measure that
reflects all of the expenditures that are required to produce an ounce of gold from current operations. While there is no standardized meaning of the measure across the industry,
the Company’s definition conforms to the AISC definition as set out by the World Gold Council in its guidance dated June 27, 2013. The World Gold Council is a non-regulatory,
non-profit organization established in 1987 whose members include global senior mining companies. The Company believes that this measure will be useful to external users in
assessing operating performance and the ability to generate free cash flow from current operations. The Company defines AISC as the sum of operating cash costs (per above),
sustaining capital (capital required to maintain current operations at existing levels), capital lease repayments, corporate general and administrative expenses, in-mine exploration
expenses and rehabilitation accretion and amortization related to current operations. AISC excludes capital expenditures for significant improvements at existing operations deemed
to be expansionary in nature, exploration and evaluation related to growth projects, rehabilitation accretion and amortization not related to current operations, financing costs, debt
repayments, share-based compensation not related to operations, and taxes.
Additional Information
Notes for Page 12: For information regarding mineral resource and reserve estimates, including parameters used to generate the estimates and depletion, please see the technical
reports titled: NI43-101 TECHNICAL REPORT FOSTERVILLE GOLD MINE, VICTORIA, AUSTRALIA PREPARED FOR CROCODILE GOLD CORP dated May 27, 2014 and;
NI43-101 TECHNICAL REPORT – BIG HILL ENHANCED DEVELOPMENT PROJECT AT STAWELL GOLD MINE MINERAL RESOURCES & RESERVES PREPARED FOR
CROCODILE GOLD CORP dated June 6, 2014. For the Northern Territory Mineral Reserve Estimates please refer to the technical reports titled: REPORT ON THE MINERAL
RESOURCES & MINERAL RESERVES OF THE COSMO DEEPS GOLD PROJECT dated May 27, 2014;
REPORT ON THE MINERAL RESOURCES & MINERAL RESERVES OF THE UNION REEFS GOLD PROJECT dated December 31, 2012; REPORT ON THE MINERAL
RESOURCES & MINERAL RESERVES OF THE PINE CREEK GOLD PROJECT dated December 31, 2012; REPORT ON THE MINERAL RESOURCES & MINERAL RESERVES
OF THE MAUD CREEK GOLD PROJECT dated December 31, 2012 and;
REPORT ON THE MINERAL RESOURCES & MINERAL RESERVES OF THE BURNSIDE GOLD AND BASE METAL PROJECT dated December 12, 2013.
Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Notes for Page 28: For information regarding mineral resource and reserve estimates, including parameters used to generate the estimates and depletion, please see the technical
reports titled: NI43-101 TECHNICAL REPORT AND RESOURCE UPDATE 2011, ON THE SILVERTIP PROPERTY, NORTHERN BRITISH COLUMBIA, CANADA FOR
SILVERCORP METALS INC. dated June 15, 2011.
30
Non-IFRS and Additional Information
Laura Lepore
Director, Investor Relations
e: llepore@crocgold.com t: 416-847-1847

More Related Content

What's hot

Kemess Site Visit Presentation
Kemess Site Visit PresentationKemess Site Visit Presentation
Kemess Site Visit PresentationAuricoCorporate
 
January 2016 Corporate Presentation
January 2016 Corporate PresentationJanuary 2016 Corporate Presentation
January 2016 Corporate PresentationChris Donaldson
 
Dalradian Presentation September 30 2015 Final
Dalradian Presentation September 30 2015 FinalDalradian Presentation September 30 2015 Final
Dalradian Presentation September 30 2015 FinalDalradianResource
 
Dalradian presentation may 14 2016 final
Dalradian presentation may 14 2016 finalDalradian presentation may 14 2016 final
Dalradian presentation may 14 2016 finalDalradianResource
 
Dalradian presentation bmo final 2014
Dalradian presentation bmo final 2014Dalradian presentation bmo final 2014
Dalradian presentation bmo final 2014DalradianResource
 
2021.07.22 probe corporate presentation final
2021.07.22 probe corporate presentation final2021.07.22 probe corporate presentation final
2021.07.22 probe corporate presentation finalProbe Gold
 
Dalradian presentation may 24 2016 final
Dalradian presentation may 24 2016 finalDalradian presentation may 24 2016 final
Dalradian presentation may 24 2016 finalDalradianResource
 
Ami corporate update mar.23.17 (1)
Ami corporate update   mar.23.17 (1)Ami corporate update   mar.23.17 (1)
Ami corporate update mar.23.17 (1)AuricoCorporate
 
Dalradian corporate presentation sept 10 2013 final
Dalradian corporate presentation sept 10 2013 finalDalradian corporate presentation sept 10 2013 final
Dalradian corporate presentation sept 10 2013 finalDalradianResource
 
Corporate Summary - January 2017
Corporate Summary - January 2017Corporate Summary - January 2017
Corporate Summary - January 2017yamanagold2016
 
Ssr mining corp. pres. 092517
Ssr mining corp. pres.   092517Ssr mining corp. pres.   092517
Ssr mining corp. pres. 092517SilverStandard
 
Sulliden Mining Capital Inc. (TSX: SMC) - Corporate Presentation, February 2017
Sulliden Mining Capital Inc. (TSX: SMC) - Corporate Presentation, February 2017Sulliden Mining Capital Inc. (TSX: SMC) - Corporate Presentation, February 2017
Sulliden Mining Capital Inc. (TSX: SMC) - Corporate Presentation, February 2017Sulliden Mining Capital Inc.
 
Probe Metals Corporate Presentation
 Probe Metals Corporate Presentation  Probe Metals Corporate Presentation
Probe Metals Corporate Presentation Karen Willoughby
 
Osisko Gold Royalties - 2017 Denver Gold Forum
Osisko Gold Royalties - 2017 Denver Gold ForumOsisko Gold Royalties - 2017 Denver Gold Forum
Osisko Gold Royalties - 2017 Denver Gold ForumOsisko Gold Royalties Ltd
 
Outback Goldfields January 2022 Corporate Presentation
Outback Goldfields January 2022 Corporate PresentationOutback Goldfields January 2022 Corporate Presentation
Outback Goldfields January 2022 Corporate PresentationCarolynGraham14
 
Dna invest pre_feb2011_vfinal
Dna invest pre_feb2011_vfinalDna invest pre_feb2011_vfinal
Dna invest pre_feb2011_vfinalDalradianResource
 
Dalradian presentation june 1 2016 final2
Dalradian presentation june 1 2016 final2Dalradian presentation june 1 2016 final2
Dalradian presentation june 1 2016 final2DalradianResource
 
2021.12.20 prb presentation final
2021.12.20 prb presentation final2021.12.20 prb presentation final
2021.12.20 prb presentation finalProbe Gold
 
Inca One Gold Corp Corporate Presentation
Inca One Gold Corp Corporate PresentationInca One Gold Corp Corporate Presentation
Inca One Gold Corp Corporate PresentationMomentumPR
 
Dalradian presentation nov5 2014 final
Dalradian presentation nov5 2014 finalDalradian presentation nov5 2014 final
Dalradian presentation nov5 2014 finalDalradianResource
 

What's hot (20)

Kemess Site Visit Presentation
Kemess Site Visit PresentationKemess Site Visit Presentation
Kemess Site Visit Presentation
 
January 2016 Corporate Presentation
January 2016 Corporate PresentationJanuary 2016 Corporate Presentation
January 2016 Corporate Presentation
 
Dalradian Presentation September 30 2015 Final
Dalradian Presentation September 30 2015 FinalDalradian Presentation September 30 2015 Final
Dalradian Presentation September 30 2015 Final
 
Dalradian presentation may 14 2016 final
Dalradian presentation may 14 2016 finalDalradian presentation may 14 2016 final
Dalradian presentation may 14 2016 final
 
Dalradian presentation bmo final 2014
Dalradian presentation bmo final 2014Dalradian presentation bmo final 2014
Dalradian presentation bmo final 2014
 
2021.07.22 probe corporate presentation final
2021.07.22 probe corporate presentation final2021.07.22 probe corporate presentation final
2021.07.22 probe corporate presentation final
 
Dalradian presentation may 24 2016 final
Dalradian presentation may 24 2016 finalDalradian presentation may 24 2016 final
Dalradian presentation may 24 2016 final
 
Ami corporate update mar.23.17 (1)
Ami corporate update   mar.23.17 (1)Ami corporate update   mar.23.17 (1)
Ami corporate update mar.23.17 (1)
 
Dalradian corporate presentation sept 10 2013 final
Dalradian corporate presentation sept 10 2013 finalDalradian corporate presentation sept 10 2013 final
Dalradian corporate presentation sept 10 2013 final
 
Corporate Summary - January 2017
Corporate Summary - January 2017Corporate Summary - January 2017
Corporate Summary - January 2017
 
Ssr mining corp. pres. 092517
Ssr mining corp. pres.   092517Ssr mining corp. pres.   092517
Ssr mining corp. pres. 092517
 
Sulliden Mining Capital Inc. (TSX: SMC) - Corporate Presentation, February 2017
Sulliden Mining Capital Inc. (TSX: SMC) - Corporate Presentation, February 2017Sulliden Mining Capital Inc. (TSX: SMC) - Corporate Presentation, February 2017
Sulliden Mining Capital Inc. (TSX: SMC) - Corporate Presentation, February 2017
 
Probe Metals Corporate Presentation
 Probe Metals Corporate Presentation  Probe Metals Corporate Presentation
Probe Metals Corporate Presentation
 
Osisko Gold Royalties - 2017 Denver Gold Forum
Osisko Gold Royalties - 2017 Denver Gold ForumOsisko Gold Royalties - 2017 Denver Gold Forum
Osisko Gold Royalties - 2017 Denver Gold Forum
 
Outback Goldfields January 2022 Corporate Presentation
Outback Goldfields January 2022 Corporate PresentationOutback Goldfields January 2022 Corporate Presentation
Outback Goldfields January 2022 Corporate Presentation
 
Dna invest pre_feb2011_vfinal
Dna invest pre_feb2011_vfinalDna invest pre_feb2011_vfinal
Dna invest pre_feb2011_vfinal
 
Dalradian presentation june 1 2016 final2
Dalradian presentation june 1 2016 final2Dalradian presentation june 1 2016 final2
Dalradian presentation june 1 2016 final2
 
2021.12.20 prb presentation final
2021.12.20 prb presentation final2021.12.20 prb presentation final
2021.12.20 prb presentation final
 
Inca One Gold Corp Corporate Presentation
Inca One Gold Corp Corporate PresentationInca One Gold Corp Corporate Presentation
Inca One Gold Corp Corporate Presentation
 
Dalradian presentation nov5 2014 final
Dalradian presentation nov5 2014 finalDalradian presentation nov5 2014 final
Dalradian presentation nov5 2014 final
 

Viewers also liked

Cеть медицинских центров Клиницист в Краснодаре - Презентация
Cеть медицинских центров Клиницист в Краснодаре - ПрезентацияCеть медицинских центров Клиницист в Краснодаре - Презентация
Cеть медицинских центров Клиницист в Краснодаре - ПрезентацияClinicist
 
example comparison internet connection
example comparison internet connectionexample comparison internet connection
example comparison internet connectionfadrifenny
 
Presentacion juana y karen
Presentacion juana y karenPresentacion juana y karen
Presentacion juana y karenMabel Suazo
 
áLbum de fotografías
áLbum de fotografíasáLbum de fotografías
áLbum de fotografíasEstitxu99
 
Diofanto
DiofantoDiofanto
Diofantohugobj
 
Biệt thự 120 tỷ ngắm biển của triệu vy
Biệt thự 120 tỷ ngắm biển của triệu vyBiệt thự 120 tỷ ngắm biển của triệu vy
Biệt thự 120 tỷ ngắm biển của triệu vyThi công sơn giá rẻ
 
EXPRESIÓN ESCRITA.EL PERIÓDICO
EXPRESIÓN ESCRITA.EL PERIÓDICOEXPRESIÓN ESCRITA.EL PERIÓDICO
EXPRESIÓN ESCRITA.EL PERIÓDICOemelledin
 
Иванюк Наталья
Иванюк Наталья Иванюк Наталья
Иванюк Наталья Smile Expo
 
Константин Дебликов
Константин Дебликов Константин Дебликов
Константин Дебликов Smile Expo
 
Клубный репертуар2014 35-36
Клубный репертуар2014 35-36Клубный репертуар2014 35-36
Клубный репертуар2014 35-36nekrasovbibl
 

Viewers also liked (19)

Journal 2
Journal 2Journal 2
Journal 2
 
Cеть медицинских центров Клиницист в Краснодаре - Презентация
Cеть медицинских центров Клиницист в Краснодаре - ПрезентацияCеть медицинских центров Клиницист в Краснодаре - Презентация
Cеть медицинских центров Клиницист в Краснодаре - Презентация
 
example comparison internet connection
example comparison internet connectionexample comparison internet connection
example comparison internet connection
 
10 aplicaciones
10 aplicaciones10 aplicaciones
10 aplicaciones
 
Chordeleg
ChordelegChordeleg
Chordeleg
 
Geo trasformazioni
Geo trasformazioniGeo trasformazioni
Geo trasformazioni
 
Presentacion juana y karen
Presentacion juana y karenPresentacion juana y karen
Presentacion juana y karen
 
Journal 3
Journal 3Journal 3
Journal 3
 
áLbum de fotografías
áLbum de fotografíasáLbum de fotografías
áLbum de fotografías
 
OER
OEROER
OER
 
Journal 1
Journal 1Journal 1
Journal 1
 
Diofanto
DiofantoDiofanto
Diofanto
 
Biệt thự 120 tỷ ngắm biển của triệu vy
Biệt thự 120 tỷ ngắm biển của triệu vyBiệt thự 120 tỷ ngắm biển của triệu vy
Biệt thự 120 tỷ ngắm biển của triệu vy
 
EXPRESIÓN ESCRITA.EL PERIÓDICO
EXPRESIÓN ESCRITA.EL PERIÓDICOEXPRESIÓN ESCRITA.EL PERIÓDICO
EXPRESIÓN ESCRITA.EL PERIÓDICO
 
how email works
how email workshow email works
how email works
 
Иванюк Наталья
Иванюк Наталья Иванюк Наталья
Иванюк Наталья
 
Константин Дебликов
Константин Дебликов Константин Дебликов
Константин Дебликов
 
Nlite 201 egr
Nlite 201 egrNlite 201 egr
Nlite 201 egr
 
Клубный репертуар2014 35-36
Клубный репертуар2014 35-36Клубный репертуар2014 35-36
Клубный репертуар2014 35-36
 

Similar to Fourth Quarter and Year End 2014 Financial Results

PDAC Investor Presentation - March 3, 2015
PDAC Investor Presentation - March 3, 2015PDAC Investor Presentation - March 3, 2015
PDAC Investor Presentation - March 3, 2015Crocodile Gold Corp
 
Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold
 
Crocodile Gold AGM Presentation from June 5, 2014
Crocodile Gold AGM Presentation from June 5, 2014Crocodile Gold AGM Presentation from June 5, 2014
Crocodile Gold AGM Presentation from June 5, 2014Crocodile Gold
 
Corporate Presentation July 2014
Corporate Presentation July 2014Corporate Presentation July 2014
Corporate Presentation July 2014Crocodile Gold
 
July 2014 Corporate Presentation
July 2014 Corporate PresentationJuly 2014 Corporate Presentation
July 2014 Corporate PresentationCrocodile Gold
 
August 2014 Corporate Presentation
August 2014 Corporate PresentationAugust 2014 Corporate Presentation
August 2014 Corporate PresentationCrocodile Gold
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013Crocodile Gold
 
Crocodile Gold Corporate Presentation Feb 2013
Crocodile Gold Corporate Presentation Feb 2013Crocodile Gold Corporate Presentation Feb 2013
Crocodile Gold Corporate Presentation Feb 2013Crocodile Gold
 
Crocodile Gold Corporate Presentation
Crocodile Gold Corporate PresentationCrocodile Gold Corporate Presentation
Crocodile Gold Corporate PresentationCrocodile Gold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationCrocodile Gold
 
SilverCrest Mines | Corporate Presentation | June 2015
SilverCrest Mines | Corporate Presentation | June 2015SilverCrest Mines | Corporate Presentation | June 2015
SilverCrest Mines | Corporate Presentation | June 2015Fred Cooper
 
Crk corp presentation feb2013
Crk corp presentation feb2013Crk corp presentation feb2013
Crk corp presentation feb2013Crocodile Gold
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013Crocodile Gold
 
SilverCrest Mines | Corporate Presentation | March 2015
SilverCrest Mines | Corporate Presentation | March 2015SilverCrest Mines | Corporate Presentation | March 2015
SilverCrest Mines | Corporate Presentation | March 2015Silvercrestmines
 
Investor Presentation January 2015
Investor Presentation January 2015Investor Presentation January 2015
Investor Presentation January 2015Crocodile Gold Corp
 
SilverCrest Mines | Corporate Presentation | April 2014
SilverCrest Mines | Corporate Presentation | April 2014SilverCrest Mines | Corporate Presentation | April 2014
SilverCrest Mines | Corporate Presentation | April 2014Silvercrestmines
 
SilverCrest Mines | Corporate Presentation | March 2014
SilverCrest Mines | Corporate Presentation | March 2014SilverCrest Mines | Corporate Presentation | March 2014
SilverCrest Mines | Corporate Presentation | March 2014Silvercrestmines
 
210426 silverton metals corp simplified_jun2021_v3
210426 silverton metals corp simplified_jun2021_v3210426 silverton metals corp simplified_jun2021_v3
210426 silverton metals corp simplified_jun2021_v3Adnet Communications
 
SilverCrest Mines | Corporate Presentation | May 2015
SilverCrest Mines | Corporate Presentation | May 2015SilverCrest Mines | Corporate Presentation | May 2015
SilverCrest Mines | Corporate Presentation | May 2015Silvercrestmines
 
Dalradian presentation april 10 2014 final
Dalradian presentation april 10 2014 finalDalradian presentation april 10 2014 final
Dalradian presentation april 10 2014 finalDalradianResource
 

Similar to Fourth Quarter and Year End 2014 Financial Results (20)

PDAC Investor Presentation - March 3, 2015
PDAC Investor Presentation - March 3, 2015PDAC Investor Presentation - March 3, 2015
PDAC Investor Presentation - March 3, 2015
 
Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014
 
Crocodile Gold AGM Presentation from June 5, 2014
Crocodile Gold AGM Presentation from June 5, 2014Crocodile Gold AGM Presentation from June 5, 2014
Crocodile Gold AGM Presentation from June 5, 2014
 
Corporate Presentation July 2014
Corporate Presentation July 2014Corporate Presentation July 2014
Corporate Presentation July 2014
 
July 2014 Corporate Presentation
July 2014 Corporate PresentationJuly 2014 Corporate Presentation
July 2014 Corporate Presentation
 
August 2014 Corporate Presentation
August 2014 Corporate PresentationAugust 2014 Corporate Presentation
August 2014 Corporate Presentation
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013
 
Crocodile Gold Corporate Presentation Feb 2013
Crocodile Gold Corporate Presentation Feb 2013Crocodile Gold Corporate Presentation Feb 2013
Crocodile Gold Corporate Presentation Feb 2013
 
Crocodile Gold Corporate Presentation
Crocodile Gold Corporate PresentationCrocodile Gold Corporate Presentation
Crocodile Gold Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
SilverCrest Mines | Corporate Presentation | June 2015
SilverCrest Mines | Corporate Presentation | June 2015SilverCrest Mines | Corporate Presentation | June 2015
SilverCrest Mines | Corporate Presentation | June 2015
 
Crk corp presentation feb2013
Crk corp presentation feb2013Crk corp presentation feb2013
Crk corp presentation feb2013
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013
 
SilverCrest Mines | Corporate Presentation | March 2015
SilverCrest Mines | Corporate Presentation | March 2015SilverCrest Mines | Corporate Presentation | March 2015
SilverCrest Mines | Corporate Presentation | March 2015
 
Investor Presentation January 2015
Investor Presentation January 2015Investor Presentation January 2015
Investor Presentation January 2015
 
SilverCrest Mines | Corporate Presentation | April 2014
SilverCrest Mines | Corporate Presentation | April 2014SilverCrest Mines | Corporate Presentation | April 2014
SilverCrest Mines | Corporate Presentation | April 2014
 
SilverCrest Mines | Corporate Presentation | March 2014
SilverCrest Mines | Corporate Presentation | March 2014SilverCrest Mines | Corporate Presentation | March 2014
SilverCrest Mines | Corporate Presentation | March 2014
 
210426 silverton metals corp simplified_jun2021_v3
210426 silverton metals corp simplified_jun2021_v3210426 silverton metals corp simplified_jun2021_v3
210426 silverton metals corp simplified_jun2021_v3
 
SilverCrest Mines | Corporate Presentation | May 2015
SilverCrest Mines | Corporate Presentation | May 2015SilverCrest Mines | Corporate Presentation | May 2015
SilverCrest Mines | Corporate Presentation | May 2015
 
Dalradian presentation april 10 2014 final
Dalradian presentation april 10 2014 finalDalradian presentation april 10 2014 final
Dalradian presentation april 10 2014 final
 

Fourth Quarter and Year End 2014 Financial Results

  • 2. This presentation contains forward-looking information under Canadian securities legislation. Forward-looking information includes, but is not limited to, statements with respect to the development potential and timetable of the projects; the Company’s ability to raise additional funds as necessary or on commercially reasonable terms; the future price of gold; the estimation of mineral resources and mineral reserves; conclusions of economic evaluation (including scoping studies); the realization of mineral resource and reserve estimates; the timing and amount of estimated future production, development and exploration; costs of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; currency exchange rates; government regulation of mining operations; and environmental risks. Generally, forward-looking information can be identified by the use of forward-looking terminology such as “plans,” “expects” or “does not expect,” “is expected,” “budget,” “scheduled,” “estimates,” “forecasts,” “intends,” “anticipates” or “does not anticipate,” or “believes,” or variations of such words and phrases or statements that certain actions, events or results “may,” “could,” “would,” “might,” or “will be taken,” “occur” or “be achieved”. Forward-looking information is based on the opinions and estimates of management as of the date such statements are made. Estimates regarding the anticipated timing, amount and cost of mining at the projects are based on assumptions underlying mineral resource estimates and the realization of such estimates; results of previous mining activities at the projects, and detailed research and analysis completed by independent of the Company; research and estimates regarding the timing of delivery for long-lead items; knowledge regarding the factors involved in building a mine and other factors described in the technical reports and Annual Information Form filed under the profile of the Company on SEDAR. Capital and operating cost estimates are based on results of previous mining activities, research of the Company and independent consultants, recent estimates of construction and mining costs and other factors that are set out in the scoping study. Production estimates are based on mine plans and production schedules, which have been developed by the Company’s personnel and independent consultants. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to risks related to: timing and availability of external financing on acceptable terms; unexpected events and delays during construction, expansion and start-up; variations in ore grade and recovery rates; receipt and revocation of government approvals; actual results of exploration and mining activities; changes in project parameters as plans continue to be refined; future prices of gold; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information except in accordance with applicable securities laws. Investors are advised that National Instrument NI 43-101 of the Canadian Securities Administrators requires that each category of mineral reserves and mineral resources be reported separately. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Due to the uncertainty of measured, indicated or inferred mineral resources, these mineral resources may never be upgraded to proven and probable mineral reserves. Mark Edwards MAIG MAusIMM (CP)., is a “qualified person” as such term is defined in National Instrument 43-101 and has reviewed and approved the technical information and data included in this presentation. Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated or Inferred Resources The information presented uses the terms “measured”, “indicated” and “inferred” mineral resources. United States investors are advised that while such terms are recognized and required by Canadian regulations, the United States Securities and Exchange Commission does not recognize these terms. “Inferred mineral resources” have a great amount of uncertainty as to their existence, and as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically or legally mineable. 2 Forward Looking Information
  • 3. 3 Management Participants Rodney D. Lamond, President & Chief Executive Officer, Director • Professional Mining Engineer • Over 25 years of global operational experience in the mining industry • Appointed President and Chief Executive Officer in July 2013 Robert Dufour, Chief Financial Officer • Over 10 years of experience • Joined Crocodile Gold in July 2012, appointed Chief Financial Officer in May 2013 • Previously with AuRico Gold and Northgate Minerals
  • 4. 4 2014 Highlights Achieved Higher Sustainable Production from Current Assets Record Production 222,312 ounces – Exceeded Inital Guidance Significantly Decreased Operating Costs – Met Low End of Guidance Record Operating Cash Flow of $74.2M Strong Balance Sheet and Cash Position at Year End of ~$37M Terminated Net Free Cash Flow Sharing Arrangement 1 2 3 4 5 6
  • 5. Our Key Objectives 5 Sustainable Gold Production Maintain production from current assets between ~200,000oz -220,000oz Convert and replace resources in a timely manner Integrated company with experienced & unified Management Team Growing Cash Flow Excellent operational execution Lower costs and capital Requirements Disciplined capital investment & allocation – Achieve positive cash flow each quarter Maintain Balance Sheet Strength Strong cash position Low debt level Flexibility in a volatile gold price environment Strategic Growth Opportunities Unlock value from our current land holdings Strategic partnerships M&A to increase production
  • 6. 6 Australia - A Stable & Proven Gold Jurisdiction with Opportunity Australia recognized as a stable and low risk jurisdiction with access to infrastructure and skills 11% of the world’s Economic Demonstrated Resources of gold Future Asset Consolidation Declining gold prices have impacted many companies, there will be future asset consolidation in Australia – We are well positioned to make strategic acquisitions Potential for high producing discoveries in the same geographical regions where our assets are located Cosmo Mine Union Reefs Mill Stawell Fosterville 15M oz Since 1870 5M oz Since 1853 39M oz Since 1851
  • 7. 7 Management Committee – A Unified Team Rodney D. Lamond, P. Eng., President & Chief Executive Officer, Director Mr. Lamond joined Crocodile Gold as President and Chief Executive Officer of Crocodile Gold in July 2013. Mr. Lamond is a Professional Mining Engineer with over 25 years of operational experience in the mining industry in North Amercia and Internationally. Robert Dufour, CPA, CA, Chief Financial Officer Mr. Dufour is a Chartered Accountant with over 10 years of finance and accounting experience. He started his career with PricewaterhouseCoopers. He later joined Northgate Minerals and was the Group Financial Controller for Northgate’s Australian subsidiaries, based out of Victoria, Australia until its acquisition by AuRico Gold. Troy Cole, General Manager, Stawell Gold Mines Mr. Cole joined Crocodile Gold in 2012 through the acquisition of the Stawell Gold Mines from AuRico. Mr. Cole has been Stawell Gold Mines General Manager since 2007 and has had the responsibilities of director, mine management and engineering during his tenure. Ian Holland, General Manager, Fosterville Gold Mine Mr. Holland joined Crocodile Gold through the acquisition of the Fosterville Gold Mine in 2012 and has been in the role of General Manager since 2007. Ian has over 17 years experience across a number of gold and base metal mining operations throughout Australia. He is a geologist by background and has a strong track record in metalliferous operations. Jason Morin, General Manager, NT Operations Mr. Morin joined Crocodile Gold in September 2013. He was most recently the General Manager of the Langlois Mine in Quebec for Nyrstar where he successfully guided the site from care and maintenance to full plant capacity in 6 months. Mark Edwards, General Manager, Exploration and Business Development Mr. Edwards has been part of the Crocodile Gold Northern Territory Project since March 2010. Mr. Edwards is a qualified geologist with approximately 16 years experience working on Gold and Industrial Mineral deposits in the Northern Territory, Queensland, Western Australia, Tasmania and Botswana.
  • 8. 2015 Goals Increase underground productivity Follow up exploration development of the newly discovered East Dipping and Kestral structures 2015 Production guidance: 100,000 – 105,000 oz 2015 Operational Cash Costs: US$670 – $750 per oz* Fosterville Processing Facility 23,556 23,470 25,359 26,039 25,786 22,198 28,313 29,045 Q1/13 Q2/13 Q3/13 Q4/13 Q1/14 Q2/14 Q3/14 Q4/14 8 2014 Highlights Record annual gold production up 7% to 105,342 oz 2% improvement in grade to 4.62 g/t Au Increased total annual milled tonnes 2.9% to 814,837 tonnes Improved blending practices of carbonaceous ore and ongoing optimization of the leaching circuit *See Non-IFRS Disclosures on page 30. Fosterville 2014 Highlights
  • 9. 9 13,169 17,706 21,316 21,915 17,841 21,845 17,942 20,112 Q1/13 Q2/13 Q3/13 Q4/13 Q1/14 Q2/14 Q3/14 Q4/14 2015 Goals Continue cost reduction activities Further improve mill recovery levels Expand Mineral Resource estimate through underground drill programs 2015 Production guidance: 75,000 – 85,000 oz 2015 Operational Cash Costs: US$850 – $930 per oz* 2014 Highlights Record annual gold production up 4.9% to 77,740 oz Increased total annual milled tonnes up 20.7% to 868,399 tonnes Underground ore production up 8.8% to 793,156 tonnes Successful transition to new mining contractor resulted in record monthly and quarterly stoping Cosmo 2014 Highlights Cosmo Access Portal *See Non-IFRS Disclosures on page 30.
  • 10. Fosterville Processing Facility 10 Stawell 2014 Highlights 12,228 7,085 8,531 10,322 9,956 9,981 9,654 9,639 Q1/13 Q2/13 Q3/13 Q4/13 Q1/14 Q2/14 Q3/14 Q4/14 2015 Goals Big Hill Project plan modification and engagement with local community Continue to operate in a sustainable way, further streamline operations, and continue cost reduction 2015 Production guidance: ~30,000 oz 2015 Operational Cash Costs: US$945 – $1,025 per oz* 2014 Highlights Achieved full year results as it continues to focus on upper mine levels Strong annual gold production of 39,230 oz, a 2.8% increase vs. 2013 Underground ore production of 560,815 tonnes at 2.58 g/t Au Achieved operational sustainability on streamlined operating activities, reduced manpower, and infrastructure Stawell Gold Mines *See Non-IFRS Disclosures on page 30.
  • 11. Achieving Sustainable Production: A 5-Year Strategy 56,294 68,020 155,523 210,696 2010 2011 2012 2013 2014 5 Year Strategy – One year at a time Long life assets with small reserve base. 205,000oz – 220,000 oz 222,312oz Production (OZ) 11 Resource conversion to Reserves Crocodile Gold has achieved sustainable production by strategically executing its sustainable mining model and by converting resources into reserves in a timely manner. Sustainable Ounces
  • 12. Tonnes (MM) Au Grade (g/t) Au (Koz) Measured and Indicated Resources (incl. of Reserves) Fosterville 16.6 3.9 2,069 Cosmo 4.5 3.6 500 Stawell 4.7 2.6 399 Maud Creek 7.7 3.5 871 Pine Creek 8.4 1.4 380 Burnside 7.6 1.4 336 Union Reefs 3.0 2.4 236 M&I Resources 52.5 2.83 4,791 Inferred Resources Fosterville 6.3 3.8 777 Cosmo 1.2 2.9 109 Stawell 1.0 4.7 145 Burnside 11.8 1.6 602 Maud Creek 4.2 2.5 344 Union Reefs 4.3 2.2 305 Pine Creek 2.5 2.3 191 Inferred Resources 31.3 2.45 2,473 Crocodile Gold maintains significant Measured & Indicated Resources* of 4.8M and Inferred Resources of 2.5M ounces. 12 Mineral Resources and Reserves* *Please refer to additional information on page 30 of this presentation. Reserves Tonnes (MM) Au Grade (g/t) Au (Koz) Proven & Probable Reserves Fosterville 1.8 6.0 342 Cosmo 1.5 3.8 180 Stawell 1.0 3.4 107 Maud Creek 1.0 5.4 185 Pine Creek 1.3 1.6 62 Union Reefs 0.3 4.4 42 Burnside 0.2 1.9 10 Reserves 7.1 4.1 928 Crocodile Gold’s projects total approximately 0.928M ounces of Reserves*
  • 13. $1,680 $1,386 $1,236(2) AISC Guidance $1,020 – $1,100 $1,167 $1,027 $905(2) OCC Guidance $780 – $860 2012 2013 2014 Consolidated 2015 (18%) Decrease YoY Proven Ability to Decrease Costs 2014 Highlights Consistent decrease in annual Operating cash costs and AISC(1) Operating cash costs per oz decreased 22.5% from $1,167 in 2012 to $905 in 2014 AISC per oz decreased 26.6% from $1,680 in 2012 to $1,236 in 2014 Achieved Operating cash costs of $905/oz at lower end of 2014 guidance Q4/14 Operating cash costs were $793/oz and AISC were $1,098/oz Further cost reductions expected in 2015 due to continuous cost management and operational efficiencies DECREASING COSTS (11%) Decrease YoY (12%) Decrease YoY (12%) Decrease YoY 13 CostsPerOunce($US) All-in sustaining cash costs per oz Operating cash costs per oz *See Non-IFRS Disclosures on page 30 of this presentation. (1) All-In Sustaining cash costs per ounce (“AISC”) includes Corporate General and Administrative Expenses.
  • 14. 14 Long-Term Growth Opportunities Strategic projects Unlock value of current land holdings Strategic partnerships Acquisitions 1 2 3 Good pipeline of projects, several which have been approved by Management Committee to date including: Big Hill Development Project Maud Creek Regional exploration mapping at Esmeralda Cosmo Structural mapping Underground exploration drilling at Fosterville, Cosmo and Stawell Surface exploration drilling at Stawell 4
  • 15. Achieving Growth: A 5-Year Strategy 56,294 68,020 155,523 210,696 2010 2011 2012 2013 2014 5 Year Strategy – Maintaining production from current assets & growing production through acquisition 205,000oz – 220,000 oz 222,312oz Production (OZ) 15 Acquisition (M&A Growth) • Crocodile Gold’s 5-Year Strategy will continue to achieve sustainable production from current assets through its sustainable mining model and also grow production by acquisitions. • We look to acquire producing assets in low-risk jurisdictions where we can apply our disciplined strategy and quickly see results. Growth Ounces Growth Ounces Growth Ounces
  • 17. 17 Operating Results Operating Results Q4 2014 Q4 2013 FY 2014 FY 2013 Consolidated Gold Produced (oz) 58,796 58,276 222,312 210,696 Consolidated Gold Sold (oz) 58,070 57,503 222,903 212,723 Fosterville Gold Mine Ore Milled (Tonnes) 190,823 200,140 814,837 792,166 Average Grade (g/t Au) 5.26 4.63 4.62 4.53 Recovery (%) 88.5 87.4 86.4 85.2 Gold Produced (Ounces) 29,045 26,039 105,342 98,424 Cosmo Gold Mine Ore Milled (Tonnes) 225,601 202,743 868,399 719,337 Average Grade (g/t Au) 3.05 3.74 3.14 3.57 Recovery (%) 90.9 89.9 88.9 89.6 Gold Produced (Ounces) 20,112 21,915 77,740 74,106 Stawell Gold Mines Ore Milled (Tonnes) 232,157 215,062 926,987 888,860 Average Grade (g/t Au) 1.67 1.81 1.67 1.66 Recovery (%) 77.6 82.3 78.8 79.5 Gold Produced (Ounces) 9,639 10,322 39,230 38,166 Fosterville 98,424 Fosterville 105,342 Cosmo 74,106 Cosmo 77,740 Stawell 38,166 Stawell 39,230 0 50,000 100,000 150,000 200,000 250,000 2013 2014 222,312 oz Production (Au ounces) 5.5%+ 210,696 oz
  • 18. 18 Financial Results Financial Results ($US) 000’s Q4 2014 Q4 2013 FY 2014 FY 2013 Revenue 69,783 73,277 282,739 300,825 Cost of operations, including depletion and depreciation (56,511) (70,149) (241,458) (295,757) Mine operating income 13,272 3,128 41,281 5,068 Net income (loss) 10,759 (23,305) 19,952 (92,766) EPS (loss) (per share) 0.02 (0.06) 0.04 (0.23) Cash generated from operating activities 25,281 20,533 74,157 67,463 Investment in mine development, property, plant and equipment 15,288 15,049 66,743 72,761 Gold ounces produced 58,796 58,276 222,312 210,696 Gold ounces sold 58,070 57,503 222,903 212,723 Average realized gold price 1,202 1,273 1,268 1,407 Average quoted gold price 1,201 1,275 1,266 1,410 Operating cash costs per ounce sold 793 963 905 1,027 All-in sustaining cash costs per ounce sold 1,098 1,257 1,236 1,386 67,463 74,157 50,000 55,000 60,000 65,000 70,000 75,000 2013 2014 Operating Cash Flow ($ 000’s) 10%+
  • 19. Generating Positive Operational Cash Flow 20,532 12,459 18,184 18,232 25,281 Q4/13 Q1/14 Q2/14 Q3/14 Q4/14 19 *See Non-IFRS Disclosures on page 30 of this presentation. (1) All-In Sustaining Cash Costs per Ounce (“AISC”) includes Corporate General and Administrative Expenses. 2014 Highlights Generating positive operational cash flow despite decrease in gold prices Average realized gold price decreased (9.9%) from $1,407 per ounce in 2013 to US$1,268 per ounce in 2014 Achieved record annual operating cash flow of $74.2 million in 2014, a 9.9% improvement from $67.5 million in 2013 Operational cash flowof $25.3 million in Q4/14 Operationalcashflow(thousandsof$US)
  • 20. CAPEX 20 • Q4 2014 mine development was $13.6M, invested largely at Fosterville and Cosmo, with an additional $1.7 million invested into plant and equipment • 2014 mine development decreased to $59.4M versus $67.6M in 2013 and focused on sustainable mine development and resource definition drilling at Fosterville and Cosmo • The decrease in 2014 is mainly due to 32% less in capital expenditures at Cosmo, compared to the prior year, when Cosmo was ramping up operations • Total growth capital for the year was $3.1M
  • 21. Cash and Debt Positions 21 Unaudited Cash Position and Working Capital as at December 31, 2014 Cash Position: US$37.1M cash and gold bullion Working Capital: US$12.6M Debt—Convertible Debenture Fulfilled debt position requirements in cash prior to due date Successfully completed a private placement in Q1/14 to raise money and pay out a credit facility with Credit Suisse Convertible debentures of C$34.5M due April 30, 2018, with an 8% coupon and C$0.25 conversion price. Under the agreement, interest payments may be settled in cash or in shares. A total of three interest payments have been made to date on the debentures, all on time, all settled in cash Total Debt to LTM EBITDA was 0.41x as at December 31, 2014
  • 22. 2015 Production and Cash Cost Guidance 22 (US) $ Fosterville Cosmo Stawell Consolidated 2015 Gold Production ounces 100,000 – 105,000 75,000 – 85,000 ~30,000 205,000 – 220,000 Operational Cash Costs per ounce* $670 - $750 $850 - $930 $945 - $1,025 $780 - $860 AISC per ounce*(1) $1,020 - $1,100 • Current 2015 consolidated production guidance of 205,000 – 220,000 ounces • Current 2015 operating cash costs per ounce are expected between $780 - $860, down from 2014 operating cash costs of $905 per ounce • Focused on maintaining predictable and sustainable levels of production • Delivering cost efficiencies to drive down operating costs throughout our business *See Non-IFRS Disclosures on page 30 of this presentation. (1) All-In Sustaining Cash Costs per Ounce (“AISC”) includes Corporate General and Administrative Expenses.
  • 23. Q&A
  • 25. 25 Crocodile Gold Today Capital Structure & Financial Details Basic: 476.0 Million Options: 22.69 Million Fully Diluted: (includes 138M shares for full conversion of convertible debentures)* 636.7 Million Market Capitalization: (As of March 13, 2015) $100 Million 52 Week Trading Range $0.13 – $0.35 *Excludes OTM warrants with a strike of $2.25 SUSTAINABLE MID-TIER GOLD PRODUCER WITH A STRATEGY FOR LONG-TERM GROWTH Top 20 gold producers listed on the TSX with gold production of 222,312oz in 2014 4.8Moz of M&I Large resource base with strong track record of converting resources to production and replacing depleting resources 2.5Moz Inferred $37M (US) cash and gold bullion and generating positive cash flow at December 31, 2014 TSX:CRK Listed on the Toronto stock exchange Crocodile Gold is a strong mid-tier gold producer. We have three operating mines and significant land holdings in high producing jurisdictions in Australia. 3 Gold Mines
  • 26. Fosterville 64,427 oz Fosterville 98,424 oz Fosterville 105,342 oz NT NT Cosmo 40,731 oz Cosmo 74,106 oz Cosmo 77,740 ozStawell 50,366 oz Stawell 38,166 oz Stawell 39,230 oz 2010 2011 2012 2013 2014 155,524 oz 210,696 oz 222,312 oz 56,294 oz 41% 4-Year Production CAGR Historical Growth and Sustainable Production 68,020 oz GoldProductionounces(oz) 26 * Crocodile Gold acquired the Fosterville and Stawell Gold Mines with effect from May 5, 2012. Information presented prior to this date is for comparative purposes only. Record production in 2014 of 222,312 oz, up 5.5% from 2013 Achieved second consecutive year of production above 210,000 ounces.
  • 27. Free Cash Flow Agreement Completed 27 Crocodile Gold continues to generate strong free cash flow and now retains 100% of free cash flow generated from the Fosterville and Stawell Gold Mines On January 14, 2015, Crocodile Gold closed its Agreement with AuRico Gold Inc. (“AuRico”) to terminate a cash flow sharing arrangement previously established between the two companies when Crocodile Gold acquired the Fosterville and Stawell Gold Mines from AuRico in 2012. As part of the Agreement, Crocodile Gold has paid AuRico C$20.0M (US$16.7M) in cash and has granted AuRico a net smelter return royalty of 2% from the Fosterville Gold Mine, effective as of January 14, 2015, and a 1% royalty from Stawell Gold Mines commencing January 1, 2016. Strong Q4/14 performance resulted in a solid cash balance at year-end that enabled Crocodile Gold to fund the one-time payment without the addition of debt. As a result, Crocodile Gold is released from its obligation to pay AuRico any further net free cash flow generated from the Fosterville and Stawell Gold Mines. Crocodile Gold will now fully benefit and retain 100% of its strong free cash flows. This Agreement was a critical step in supporting the future growth toward the 5 Year Strategy of Crocodile Gold. Terms of the Net Free Cash Flow Sharing Arrangement on Fosterville and Stawell Gold Mines – Terminated January 14, 2015 1. First $60M of cumulative NFCF is paid 100% to Crocodile 2. Next $30M of cumulative NFCF is paid 100% to AuRico 3. Next $30M of cumulative NFCF is shared 50/50 between Crocodile and AuRico 4. Beyond the initial $120M, NFCF is shared 80/20 between Crocodile and AuRico
  • 28. Strategic Projects 28 Crocodile Gold continues to look for opportunities to invest in attractive projects in low-risk jurisdictions. Significant land holdings in the Northern Territory and also in the State of Victoria 2,061km2 in Northern Territory and 2,154km2 in Victoria JDS Silver: Silvertip Project, Northern British Columbia In early 2014, the company identified JDS Silver as a strategic opportunity given our extensive knowledge of the project. The Company completed its due diligence process and in Q3/14 invested $5.1M for a 19.9% minority interest The Silvertip project is a highly attractive near-production, high grade silver and polymetallic resource in a stable mining jurisdiction in North America. Indicated Resources are 2.7Mt @ 341g/t Ag, 6.53% Pb and 9.12% Zn* Capital requirements are low The mine includes a developed access decline, full camp facilities, and an access road. JDS Silver also owns a full processing plant with power generating capabilities that is in excellent condition. JDS Silver underscores our core mining principals as we are highly familiar with the project’s site location and geological setting. *Please refer to cautionary language on page 30 of this presentation.
  • 29. Crocodile Gold is open to entering into Joint Ventures (JVs) of non-core assets primarily in the Northern Territory and discussions are ongoing. Potential benefits include: • Return upside in the form of earn-in rights, royalties and other similar arrangements • Carrying cost savings • Sharper focus on core producing assets Crocodile Gold looks for opportunities to divest non-core assets and has completed a number of divestments in 2014 which include: Phoenix Copper Option and Sale Agreement • Crocodile Gold entered into a sale agreement with Phoenix Copper (“Phoenix”) for 100% of the Company’s Iron Blow and Mt. Bonnie massive sulphide deposits for a 2% royalty on precious metals and claw back rights • The Company also entered into an option agreement which allows Phoenix to earn up to a 90% interest in the nearby Burnside and Moline gold projects and the Chessman base metals project. Terms of the agreement include Phoenix's commitment to spend AUD$4M in exploration expenditures over the next four years Rockland Option Agreement • Crocodile Gold entered into a uranium exploration agreement with Rockland Resources, where Rockland received 100% uranium interest on the Company’s property for a AUD$1M exploration commitment over four years. A 1.0% net smelter royalty is capped at AUD$2.5M Non-Core Asset Divestment 29
  • 30. Non-IFRS Measures Crocodile Gold believes that investors use certain indicators to assess gold mining companies. The indicators are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance in accordance with the International Financial Reporting Standards. “Operational Cash Costs per Ounce” is a non-IFRS performance measure which could provide an indication of the mining and processing efficiency at the operations. The Company calculates operating cash costs per ounce by deducting silver sales revenue as a by-product from operating expenses per the consolidated statement of operations, then dividing by the gold ounces sold during the applicable period. Operating expenses include mine site operating costs such as mining, processing and administration as well as royalties, however excludes depletion and depreciation, share-based payments and rehabilitation costs. There are variations in the method of computation of “operational cash costs per ounce” as determined by the Company compared with other mining companies. For more detail on the operational cash costs per ounce determination for Crocodile Gold, please visit www.sedar.com or www.crocgold.com and review the latest Annual Financial Statements issued on March 19, 2014. “All-In Sustaining Costs per Ounce of Gold (“AISC”)” Effective December 31, 2013, the Company has adopted an all-in sustaining cost (“AISC”) performance measure that reflects all of the expenditures that are required to produce an ounce of gold from current operations. While there is no standardized meaning of the measure across the industry, the Company’s definition conforms to the AISC definition as set out by the World Gold Council in its guidance dated June 27, 2013. The World Gold Council is a non-regulatory, non-profit organization established in 1987 whose members include global senior mining companies. The Company believes that this measure will be useful to external users in assessing operating performance and the ability to generate free cash flow from current operations. The Company defines AISC as the sum of operating cash costs (per above), sustaining capital (capital required to maintain current operations at existing levels), capital lease repayments, corporate general and administrative expenses, in-mine exploration expenses and rehabilitation accretion and amortization related to current operations. AISC excludes capital expenditures for significant improvements at existing operations deemed to be expansionary in nature, exploration and evaluation related to growth projects, rehabilitation accretion and amortization not related to current operations, financing costs, debt repayments, share-based compensation not related to operations, and taxes. Additional Information Notes for Page 12: For information regarding mineral resource and reserve estimates, including parameters used to generate the estimates and depletion, please see the technical reports titled: NI43-101 TECHNICAL REPORT FOSTERVILLE GOLD MINE, VICTORIA, AUSTRALIA PREPARED FOR CROCODILE GOLD CORP dated May 27, 2014 and; NI43-101 TECHNICAL REPORT – BIG HILL ENHANCED DEVELOPMENT PROJECT AT STAWELL GOLD MINE MINERAL RESOURCES & RESERVES PREPARED FOR CROCODILE GOLD CORP dated June 6, 2014. For the Northern Territory Mineral Reserve Estimates please refer to the technical reports titled: REPORT ON THE MINERAL RESOURCES & MINERAL RESERVES OF THE COSMO DEEPS GOLD PROJECT dated May 27, 2014; REPORT ON THE MINERAL RESOURCES & MINERAL RESERVES OF THE UNION REEFS GOLD PROJECT dated December 31, 2012; REPORT ON THE MINERAL RESOURCES & MINERAL RESERVES OF THE PINE CREEK GOLD PROJECT dated December 31, 2012; REPORT ON THE MINERAL RESOURCES & MINERAL RESERVES OF THE MAUD CREEK GOLD PROJECT dated December 31, 2012 and; REPORT ON THE MINERAL RESOURCES & MINERAL RESERVES OF THE BURNSIDE GOLD AND BASE METAL PROJECT dated December 12, 2013. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Notes for Page 28: For information regarding mineral resource and reserve estimates, including parameters used to generate the estimates and depletion, please see the technical reports titled: NI43-101 TECHNICAL REPORT AND RESOURCE UPDATE 2011, ON THE SILVERTIP PROPERTY, NORTHERN BRITISH COLUMBIA, CANADA FOR SILVERCORP METALS INC. dated June 15, 2011. 30 Non-IFRS and Additional Information
  • 31. Laura Lepore Director, Investor Relations e: llepore@crocgold.com t: 416-847-1847