Clifton M. Hasegawa
President and CEO
Clifton M. Hasegawa & Associates, LLC
1044 Kilani Avenue 12
Wahiawa, Hawaii 96786-2243
Telephone: (808) 463-1057
Email: clifhasegawa@gmail.com
Internet: http://www.linkedin.com/in/cliftonhasegawa
May 3, 2015
Senate President Donna Mercado Kim
Members of the Hawaii State Senate
House Speaker Joseph Souki
Members of the Hawaii State House of Representatives
Mayor Kirk Caldwell
Members of the City & County of Honolulu City Council
Dear Senate President Kim, House Speaker Souki, Senators and
Representatives of the Hawaii Legislature, Mayor Caldwell, Members of the
Honolulu City Council,
The State of Hawaii and the City & County of Honolulu have been
patient and understanding to and for the beleaguered and financially troubled
Honolulu Rail Transit Project. On each occasion, many times over, precious
time and resources have been expended to "find money" to accede to the
Honolulu Authority for Rapid Transit (HART) demands.
Giving money to this troubled project, even with assurances "this is
the last time", is fool hardy and resource wasteful. The root cause of the
problem is not addressed and the situation lingers until the money runs out,
most assuredly soon enough. This has happened many times over during the
course of this project and will recur unless and until proactive aggressive
action is taken to get to the core issue and impose best management,
knowledge-based solutions to correct and remediate a problem that surfaces
and resurfaces time and time again, each time more massive and more
abhorrent than the time before.
The HART Monthly Progress Reports for January 2015, February
2015 and March 2015 highlight and underscore quality assurance and safety
considerations that have not been addressed satisfactorily and resolved to
prevent reoccurrence for many years. The cumulative effect is the cost
overruns and delays in meeting the delivery schedule. Most recently,
HART to replace rail segment after large crack in concrete
By Kristine Uyeno, KHON2, April 16, 2015
http://khon2.com/2015/04/16/hart-to-replace-rail-segment-after-large-crack-in-concrete/
“Oahu’s rail system is far from complete, but there’s already damage to
partsof the guideway.
A viewer contacted KHON2 via Report It, alerting us to a large crack at the
top of the column.
The rail line winds through Kapolei, but if you take a closer look, you’ll
notice something that shouldn’t be there.
On Kualakai Parkway in Kapolei, you can see the columns and guideway
going up and it looks consistent until you get to one particular spot. Then
there’s a horizontal crack in what is called a segment.
“Large-sized cracks are not normal, only hairline cracks are acceptable in
concrete,” said University of Hawaii engineering professor Panos
Prevedouros.
Prevedouros said there’s reason for concern because right now, the segment
is not structurally sound.
“How does a crack appear in heavy-duty concrete?” KHON2 asked.
“It’s actually a part of the natural curing of the concrete from being very wet
in the beginning and then getting dry,” he said.
In a statement, HART said, “The segment and column highlighted in the
photos were already identified by HART and are in the process of being
either replaced or repaired by Kiewit at their cost.”
Kiewit is the company that’s building rail. HART officials do not know how
long it will take for the replacement, but workers will have to make a new
segment, because even though they look alike, each is unique.
It takes five days to make one segment.
KHON2 also found out this isn’t the first time this has happened.
Another part of the guideway was damaged near Farrington Highway
last June. HART officials said it was damaged when it was installed.
Nearly a year later, workers are still trying to replace it.
“This is actually very complex because although it looks like a simple thing,
it’s a bridge. And every time you have a component that is questionable on a
bridge, it’s not very easy necessarily it’s easy to fix it,” Prevedouros said.”
[Emphasis Supplied]
Questions to be Addressed, Going Forward:
a. Is the root cause defective specifications and/or a failure to execute
and perform in conformance with the specifications by the contractor?
b. If the root cause is defective specifications, does this compromise
all Spans built and to be built, place in jeopardy the overall safety of the
Honolulu Rapid Transit (HART) system, and throw into harms way
passengers choosing to ride The Rail?
c. If the root cause is contractor performance, does this compromise
all Spans built, place in jeopardy the overall safety of the Honolulu Rapid
Transit (HART) system, and throw into harms way passengers choosing to
ride The Rail? Whether the contractor pays for the correction is part of the
remedy but the overall safety of the project is called into question as the
problems may surface later during the course of construction or during
operations when the guides and spans are stressed by the moving cars fully
loaded with passengers.
d. What remedies are available to the Legislators, to the City &
County of Honolulu and to HART?
Recommended is a thorough inquiry and investigation BEFORE committing
more money $$$$$ or more resources $$$$$. Money DOES NOT and
WILL NOT make quality assurance and safety related issues, ingrained and
systemic, go away or disappear; it just buys time and delays the inevitable.
Ensure that the inevitable is not the loss of life, the proximate cause
being defective work anywhere along the Honolulu Rail Transit Project.
Your duties and responsibilities extend beyond being the protectors of
the Treasury and the public funds, your duties and responsibilities are to
protect and safeguard the lives of the people. There is no room for
compromise when a life is placed in jeopardy of harm or injury, particularly
and especially when and where avoidable and preventable.
Thank you very much
Aloha
Respectfully,
Clifton M. Hasegawa
Enclosures: a. HART Progress Report January 2015
b. HART Progress Report February 2015
c. HART Progress Report March 2015
Honolulu Rail Transit Project Monthly Progress Report
January 2015
4.2 Section I – West O‘ahu/Farrington Highway: East Kapolei to Pearl
Highlands
A. West O‘ahu/Farrington Highway Guideway (WOFH)
Contract No.: DB‐120
DB Contractor: Kiewit Infrastructure West Company (KIWC)
Contract Start Date: December 2009
Contract Substantial Completion: July 2016
Projected Substantial Completion: October 2016
Project Description: Design and construction of 6.8 miles of rail alignment, starting at
the East Kapolei station and ending at the Pearl Highlands station.
KEY QUALITY ISSUES:
Span 67 Damage and Repair Procedures – During the erection process of
Span 67, the underside of Segments 67‐11 and 67‐12 were damaged due to unbalanced
support from the temporary bearings. NCR 00144 was opened on June 17, 2014, to
address this issue. In January 2015, KIWC began the process of constructing the
temporary falsework needed to slide Span 67 from its current position. This will allow
the span to be de‐stressed and the segments replaced. Both segments were casted by
month’s end.
Drill Shaft Quality – Nine additional drill shafts were Crosshole Sonic Logging (CSL)
tested in January 2015. Seven of the drilled shafts were found to have velocity
reductions outside of the acceptable design criteria limits potentially because concrete
was segregated during concrete placement, and two of the shafts had no issues. Of the
211 drilled shafts that have been tested to date, 38 shafts (18%) were found to have
issues. KIWC continues to have weekly Drill Shaft Quality Meetings with HART to discuss
testing results, quality issues, the concrete mix, and methods for repair.
Drill Shaft Repairs – Of the 38 drill shafts that were found to have velocity
reduction issues, seven new NCRs have been opened and submitted to HART this
month. HART will not close an NCR until KIWC completes another CSL test and
demonstrates soundness of the concrete shaft. KIWC completed repairs at Shaft 245
and began working on repairing Shaft 145. KIWC will move to Shaft 144 in the beginning
of February 2015.
Consistent Span Stressing Trends – In mid‐January, KIWC had stressed six
spans. KIWC has maintained this positive trend and momentum from previous months,
stressing 9‐11 per month. Progress is being made both westward towards East Kapolei
Station and eastward towards Farrington Highway. At this rate, KIWC will reach
Farrington Highway by the end of February 2015 and East Kapolei Station by the end of
April 2015.
Pre‐Cast Segment Progress/Quality – The Casting Yard has been very
consistent in producing approximately 62 segments per week and is currently 64.1%
complete with segment production for the overall project. 2,028 segments have been
casted to date. Although 85 of the total 283 NCRs (30%) have been related to segmental
issues like damaged shear keys, concrete voids, and spalls, proper correction
procedures have already been developed and are being implemented.
Closing Out NCRs – NCRs were being promptly corrected, validated, and closed
out during this period. Both KIWC and HART have been working together to complete all
the needed processes for timely validation. A total of 22 NCRs have been closed in
January 2015. Of the 22, 15 were related to pre‐cast segment issues and 5 were related
to drill shaft issues.
D. Maintenance and Storage Facility (MSF)
Contract No.: DB‐200
Contractor: Kiewit/Kobayashi Joint Venture (KKJV)
Contract Start Date: July 2011
Contract Substantial Completion: April 2016
Projected Substantial Completion: April 2016
Project Description: The MSF contract consists of the operations and servicing
building, maintenance of way, train wash facility and wheel truing building. In addition
to the four (4) facility buildings, MSF includes rail procurement, special trackwork, ties,
third rail and other track material for the four guideway segments on the project.
KEY QUALITY ISSUES:
Two NCRs remain open solely until the dispositions are constructed including removal
and replacement of column base plate grout and MOW steel edge form, both underway.
OSB Grout Under Columns – The grout mix installed under the columns at the OSB
was installed without accurately measuring the water added to the mix and without
accurately timing the grout mixing time. The contractor is currently removing the
non‐conformance grout and replacing it with proper grout.
MOW Steel Edge Form – In order to erect the tilt‐up panels, the metal edging that
was welded to the beam flanges along line 4 was cut off of the beams. In the cutting
process, the flange of the beam was gouged at every location the fillet weld was air
arc’d out. The gouging is approx. 1/16 to 1/4 inches in depth along the flange at every
location on every beam.
Establishing satisfactory sub grade in track work areas which involves geotechnical
exploration resulting in limited removal and replacement of unsuitable expansive
material. Although the limit has not been determined, it is envisioned that sufficient
satisfactory material can be obtained from on‐site borrow areas.
4.3 Section II – Kamehameha Highway: Pearl Highlands to Aloha Stadium
A. Kamehameha Highway Guideway (KHG)
Contract No.: DB‐320
Contractor: Kiewit Infrastructure West Company (KIWC)
Contract Start Date: June 2011
Contract Substantial Completion: September 2016
Projected Substantial Completion: April 4, 2017
KEY QUALITY ISSUES:
Design – Design packages seem to lack QC prior to submittal for review to third
parties, resulting in longer than expected review times and additional review
requirements.
Field Design Change (FDC) vs. Notice of Design Change (NDC) – Changes
made to the FDC/NDC process in the latest Quality Assurance Plan (QAP Rev 7) removed
HART from the approval process. NCR 00029 was issued on Aug. 21, with a corrective
action response from KIWC proposed the same day. The proposed revision continues to
be reviewed by a HART FDC/NDC task force.
Sidewalk / Curb & Gutter installation – Workmanship on portions of the
sidewalk and curb & gutter does not meet specifications. Non‐compliance reports have
been issued, and a quality stand down was ordered by KIWC. A field meeting with the
responsible sub‐contractor has been scheduled to address deficiencies.
http://www.honolulutransit.org/media/315607/201501-monthly-progress-report.pdf
Honolulu Rail Transit Project Monthly Progress Report February 2015
4.2 Section I – West O‘ahu/Farrington Highway: East Kapolei to Pearl
Highlands
A. West O‘ahu/Farrington Highway Guideway (WOFH)
Contract No.: DB‐120
DB Contractor: Kiewit Infrastructure West Company (KIWC)
Contract Start Date: December 2009
Contract Substantial Completion: July 2016
Projected Substantial Completion: October 2016
Project Description: Design and construction of 6.8 miles of rail alignment, starting at
the East Kapolei station and ending at the Pearl Highlands station.
KEY QUALITY ISSUES:
Span 67 Damage and Repair – During the erection process of Span 67, the
underside of Segments 67‐11 and 67‐12 were damaged due to unbalanced support
from the temporary bearings. NCR 00144 was opened on June 17, 2014, to address this
issue. In February 2015, KIWC completed the temporary falsework needed to support
and slide Span 67 from its current position. The span is expected to be de‐stressed and
the segments replaced. Span 67 will be re‐stressed and brought back into its original
location in March 2015. The replacement is being done to ensure the segments meet
HART’s high quality standards.
Drill Shaft Quality – HART received four additional drill shaft Crosshole Sonic
Logging (CSL) Reports in February 2015. Two of the drilled shafts were found to have
velocity reductions outside of the acceptable design criteria limits potentially because
concrete was segregated during concrete placement, and two of the shafts had no
issues. Of the 215 drilled shafts that have been tested to date, HART has requested that
Kiewit provide additional testing and/or modifications to 40 shafts to ensure that the
shafts meet the specifications. KIWC continues to have weekly Drill Shaft Quality
Meetings with HART to discuss testing results, quality, the concrete mix, and methods
for repair.
Drill Shaft Repairs – Of the 40 drill shafts that are being reviewed in detail, two
new NCRs have been opened and submitted to HART this month. HART will not close an
NCR until KIWC completes another CSL test and demonstrates soundness of the
concrete shaft as well as when all HART comments are responded to.
KIWC completed repairs at Shaft 145 and began repair work at Shaft 144. The repair at
Shaft 144 will continue until the end of March 2015 and KIWC can continue with column
construction as the span continues its approach eastbound on Farrington Highway
toward West Loch Station.
Consistent Span Stressing Trends – In mid‐February, KIWC had stressed 10
spans. KIWC has maintained this positive trend and momentum from previous months,
stressing 9‐11 per month. KIWC has now left the Ho‘opili area and has reached
Farrington Highway in February as the span erection proceeds eastward towards West
Loch Station. KIWC should reach East Kapolei Station by April 2015.
Pre‐Cast Segment Progress/Quality – The Casting Yard has been very
consistent in producing approximately 60 segments per week and is currently 71.8%
complete with segment production for the overall project. 2,270 segments have been
cast to date. WOFH segment casting should be completed by June 2015. Although 93 of
the total 296 NCRs (31.4%) have been related to segmental issues like damaged shear
keys, concrete voids, and spalls, proper correction procedures have already been
developed and are being implemented.
Closing Out NCRs – NCRs were being promptly corrected, validated, and closed
out during this period. Both KIWC and HART have been working together to complete all
the needed processes for timely validation. A total of six NCRs have been closed in
February 2015. Of the six, one was related to pre‐cast segment issues, one was design
related, one was for the superstructure, and three were related to drill shaft issues.
Concrete Plinth Quality – KIWC completed work on the concrete plinths under
the double crossover east of Ho‘opili Station on Spans 78 and 79. This is the first of four
double crossovers for this project. HART has inspected the quality of the work
performed and no issues were found. The trackwork will continue to be surveyed and
placed on its final alignment.
Flash Butt Track Welding Operations – Work began on welding trackwork
north of the Maintenance and Storage Facility where approximately 439 welds are to be
completed. KIWC is currently achieving 20‐25 welds per day and this is in‐line with the
current baseline schedule. KIWC will continue to report completed quantities to HART
on a weekly basis.
Quality Assurance and Buy America Audit – In mid‐February, KIWC was
audited by HART in areas of management responsibility, design control, purchasing,
document/process control, product identification and traceability, inspection, handling
and storage of equipment, nonconformance, corrective actions, quality record, and
training. KIWC’s performance was found to be commendable and no major issues were
found.
A. Kamehameha Highway Guideway (KHG)
Contract No.: DB‐320
Contractor: Kiewit Infrastructure West Company (KIWC)
Contract Start Date: June 2011
Contract Substantial Completion: September 2016
Projected Substantial Completion: April 2017
Project Description: Kamehameha Highway Guideway DB Contract (KHG) consists of
3.9 miles and starts 400 feet east of the Pearl Highlands Station and terminates 1,400
feet beyond the Aloha Stadium Station. KHG is made up of utility relocations, highway
widening, drilled shaft foundations, columns and aerial structure.
KEY QUALITY ISSUES:
- Shafts – As shaft construction resumes, the quality of the shafts will be closely
monitored to ensure any quality issues are identified and resolved in a timely manner.
- Sub‐contractor Quality – The Design‐Builder has been asked to improve their QC/QA
efforts as they relate to the work being performed by their sub‐contractors.
http://honolulutransit.org/media/322188/201502-monthly-progress-report.pdf
Honolulu Rail Transit Project Monthly Progress Report
March 2015
4.2 Section I – West O‘ahu/Farrington Highway: East Kapolei to Pearl
Highlands
A. West O‘ahu/Farrington Highway Guideway (WOFH)
Contract No.: DB‐120
DB Contractor: Kiewit Infrastructure West Company (KIWC)
Contract Start Date: December 2009
Contract Substantial Completion: July 2016
Projected Substantial Completion: October 2016
Project Description: Design and construction of 6.8 miles of rail alignment, starting at
the East Kapolei station and ending at the Pearl Highlands station.
KEY QUALITY ISSUES:
Span 67 Damage and Repair Procedures – During the erection process of
Span 67, the underside of Segments 67‐11 and 67‐12 were damaged due to unbalanced
support from the temporary bearings. NCR 00144 was opened on June 17, 2014, to
address this issue. In March 2015, KIWC distressed the span and erected the two
replacement segments onto the falsework. KIWC is still determining how to best to
form the closure segment. Afterwards, the span will be re-stressed and brought back to
its original location. This replacement is being done to ensure the segments meet
HART’S quality standards.
Span 17 Damages and Repair Analysis – During the erection process of Span
17, segments 17-1, 17-2m 17-11 and 17-12 were damaged due to unbalanced support
from the temporary bearings. NCR 00314 was opened on March 17, 2015, to address
this issue. KWIC is in the process of evaluating the extent of damage. Afterwards a root
cause analysis and repair procedure will be submitted to HART for review.
[Highlighting and Emphasis Supplied}
Questions:
a. Is the root cause defective specifications and/or a failure to execute
and perform in conformance with the specifications by the contractor?
b. If the root cause is defective specifications, does this compromise all
Spans built and to be built, place in jeopardy the overall safety of the Honolulu
Rapid Transit (HART) system, and throw into harms way passengers choosing to
ride The Rail?
c. If the root cause is contractor performance, does this compromise all
Spans built, place in jeopardy the overall safety of the Honolulu Rapid Transit
(HART) system, and throw into harms way passengers choosing to ride The
Rail?
d. What remedies are available to HART?
Damage Drill Shaft Quality – HART received nine additional Crosshole Sonic
Logging (CSL) Reports in March 2015. Eight of the drilled shafts were found to have
velocity reductions outside of the acceptable design criteria limits potentially because
concrete was segregated during concrete placement; one of the shaft had no issues. Of
the 224 drilled shafts that have been tested to date, HART has requested that KWIC
provide additional testing and/or modifications to 50 shafts to ensure that the shafts
meet the specifications. KWIC continues to have weekly Drill Shaft Quality meetings
with HART to discuss testing results, quality, the concrete mix, and methods for repair.
Drill Shaft Repairs – Of the 50 drill shafts that are being reviewed in detail, eight
new NCRs have been opened and submitted to HART this month. HART will not close an
NCR until KIWC completes another CSL test and demonstrates soundness of the
concrete shaft as well as when all HART comments are responded to. KIWC continues
repair work at Shaft 144 and completion is expected in mid-April. The repair is taking
longer than expected because low strength concrete only be removed and re-grouted in
6 FT zones. KWIC has continued with column construction approaching eastbound on
Farrington Highway toward West Loch Station in preparation for the segment erection.
Span Stressing Trends – In March, KIWC stressed 7 spans to date. A lower
number of spans were stressed due to issues encountered at Span 17 and in the spiral
between Spans 113 and 114. As KWIC continues to evaluate and eventually repair Span
17, span erection has not been able to continue moving westward towards the East
Kapolei Station. Due to mechanical issues and difficulty in keeping the truss system
leveled between Spans 113 and 114, KWIC remained in this area for almost 3 weeks.
The designer-builder has since overcome this obstacle and is now proceeding eastwards
to the West Loch Station.
Pre‐Cast Segment Progress/Quality – The Casting Yard has been very
consistent in producing approximately 60 segments per week and is currently 78.4%
complete with segment production for the overall project. 2,513 segments have been
casted to date. Although 101 of the total 323 NCRs (31.3%) have been related to
segmental issues like damaged shear keys, concrete voids, and spalls, proper correction
procedures have already been developed and are being implemented.
Closing Out NCRs – NCRs were being promptly corrected, validated, and closed
out during this period. Both KIWC and HART have been working together to complete all
the needed processes for timely validation. A total of 31, 17 were related to pre‐cast
segment issues, one was for superstructure, 10 were related to drill shaft issues, one
welding issue, two concrete strength issues.
Flash Butt Track Welding Operations – Work began on welding trackwork
north of the Maintenance and Storage Facility where approximately 439 welds were
made on the rails. These welds cover track between STA 650+00 to STA 754+34. KWIC
has begun to move their welding operations to the Ho`opili Station area where another
347 welds are expected to be made. KWIC is expected to complete 20-25 welds per day
and quantities will be reported to HART on a weekly basis.
http://www.honolulutransit.org/media/329397/201503-monthly-progress-report.pdf

More Related Content

What's hot (8)

Shameera - Work Report - Access Engineering
Shameera - Work Report - Access EngineeringShameera - Work Report - Access Engineering
Shameera - Work Report - Access Engineering
 
Bhalinder Riars CV
Bhalinder Riars CVBhalinder Riars CV
Bhalinder Riars CV
 
Henry-Jenkins
Henry-JenkinsHenry-Jenkins
Henry-Jenkins
 
CV~PW~02-02-16 Opus
CV~PW~02-02-16 OpusCV~PW~02-02-16 Opus
CV~PW~02-02-16 Opus
 
CV_mki2015Nov
CV_mki2015NovCV_mki2015Nov
CV_mki2015Nov
 
September 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual WorkshopSeptember 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual Workshop
 
Iain Cameron CV presentation oct14
Iain Cameron CV presentation oct14Iain Cameron CV presentation oct14
Iain Cameron CV presentation oct14
 
Waynewood l Force Main Rehabilitation Project Jan 8, 2021
Waynewood l Force Main Rehabilitation Project Jan 8, 2021Waynewood l Force Main Rehabilitation Project Jan 8, 2021
Waynewood l Force Main Rehabilitation Project Jan 8, 2021
 

Viewers also liked

Maui - Sustainability and Viability - House Bill 2501 - Sign into law -Messag...
Maui - Sustainability and Viability - House Bill 2501 - Sign into law -Messag...Maui - Sustainability and Viability - House Bill 2501 - Sign into law -Messag...
Maui - Sustainability and Viability - House Bill 2501 - Sign into law -Messag...Clifton M. Hasegawa & Associates, LLC
 
Department of the Interior - Government to Goverment Relationship - Final Rul...
Department of the Interior - Government to Goverment Relationship - Final Rul...Department of the Interior - Government to Goverment Relationship - Final Rul...
Department of the Interior - Government to Goverment Relationship - Final Rul...Clifton M. Hasegawa & Associates, LLC
 
Honolulu Authoirty for Rapid Transit - Unsafe at Any Speed - Part II - Jeopardy
Honolulu Authoirty for Rapid Transit - Unsafe at Any Speed - Part II - JeopardyHonolulu Authoirty for Rapid Transit - Unsafe at Any Speed - Part II - Jeopardy
Honolulu Authoirty for Rapid Transit - Unsafe at Any Speed - Part II - JeopardyClifton M. Hasegawa & Associates, LLC
 
MAUNA KEA - THIRTY METER TELESCOPE - ISSUANCE OF AN EXECUTIVE ORDER REQUIRED...
MAUNA KEA - THIRTY METER TELESCOPE -  ISSUANCE OF AN EXECUTIVE ORDER REQUIRED...MAUNA KEA - THIRTY METER TELESCOPE -  ISSUANCE OF AN EXECUTIVE ORDER REQUIRED...
MAUNA KEA - THIRTY METER TELESCOPE - ISSUANCE OF AN EXECUTIVE ORDER REQUIRED...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - An Island State - Commerce, Community, Culture - The Maritime Shippi...
Hawaii - An Island State - Commerce, Community, Culture - The Maritime Shippi...Hawaii - An Island State - Commerce, Community, Culture - The Maritime Shippi...
Hawaii - An Island State - Commerce, Community, Culture - The Maritime Shippi...Clifton M. Hasegawa & Associates, LLC
 
Yesterday - Honolulu Authority for Rapid Transit (HART) - Governor David Y. I...
Yesterday - Honolulu Authority for Rapid Transit (HART) - Governor David Y. I...Yesterday - Honolulu Authority for Rapid Transit (HART) - Governor David Y. I...
Yesterday - Honolulu Authority for Rapid Transit (HART) - Governor David Y. I...Clifton M. Hasegawa & Associates, LLC
 
Honolulu Authority for Rapid Transit - Executive Director Daniel A. Grabauska...
Honolulu Authority for Rapid Transit - Executive Director Daniel A. Grabauska...Honolulu Authority for Rapid Transit - Executive Director Daniel A. Grabauska...
Honolulu Authority for Rapid Transit - Executive Director Daniel A. Grabauska...Clifton M. Hasegawa & Associates, LLC
 
THE UNITED STATES ARMY - Forced Reductions 2015 by President Barack Obama & C...
THE UNITED STATES ARMY - Forced Reductions 2015 by President Barack Obama & C...THE UNITED STATES ARMY - Forced Reductions 2015 by President Barack Obama & C...
THE UNITED STATES ARMY - Forced Reductions 2015 by President Barack Obama & C...Clifton M. Hasegawa & Associates, LLC
 
President Barack Obama - Honolulu Authoirty for Rapid Transit (HART) - SOS - ...
President Barack Obama - Honolulu Authoirty for Rapid Transit (HART) - SOS - ...President Barack Obama - Honolulu Authoirty for Rapid Transit (HART) - SOS - ...
President Barack Obama - Honolulu Authoirty for Rapid Transit (HART) - SOS - ...Clifton M. Hasegawa & Associates, LLC
 
Hanjin - US Bankruptcy Court - Federal Maritime Commission - Update - 09-29- ...
Hanjin - US Bankruptcy Court - Federal Maritime Commission - Update - 09-29- ...Hanjin - US Bankruptcy Court - Federal Maritime Commission - Update - 09-29- ...
Hanjin - US Bankruptcy Court - Federal Maritime Commission - Update - 09-29- ...Clifton M. Hasegawa & Associates, LLC
 

Viewers also liked (16)

Maui - Sustainability and Viability - House Bill 2501 - Sign into law -Messag...
Maui - Sustainability and Viability - House Bill 2501 - Sign into law -Messag...Maui - Sustainability and Viability - House Bill 2501 - Sign into law -Messag...
Maui - Sustainability and Viability - House Bill 2501 - Sign into law -Messag...
 
Department of the Interior - Government to Goverment Relationship - Final Rul...
Department of the Interior - Government to Goverment Relationship - Final Rul...Department of the Interior - Government to Goverment Relationship - Final Rul...
Department of the Interior - Government to Goverment Relationship - Final Rul...
 
Honolulu Authoirty for Rapid Transit - Unsafe at Any Speed - Part II - Jeopardy
Honolulu Authoirty for Rapid Transit - Unsafe at Any Speed - Part II - JeopardyHonolulu Authoirty for Rapid Transit - Unsafe at Any Speed - Part II - Jeopardy
Honolulu Authoirty for Rapid Transit - Unsafe at Any Speed - Part II - Jeopardy
 
Barack Obama - The American Presidency
Barack Obama - The American PresidencyBarack Obama - The American Presidency
Barack Obama - The American Presidency
 
MAUNA KEA - THIRTY METER TELESCOPE - ISSUANCE OF AN EXECUTIVE ORDER REQUIRED...
MAUNA KEA - THIRTY METER TELESCOPE -  ISSUANCE OF AN EXECUTIVE ORDER REQUIRED...MAUNA KEA - THIRTY METER TELESCOPE -  ISSUANCE OF AN EXECUTIVE ORDER REQUIRED...
MAUNA KEA - THIRTY METER TELESCOPE - ISSUANCE OF AN EXECUTIVE ORDER REQUIRED...
 
Hawaii - An Island State - Commerce, Community, Culture - The Maritime Shippi...
Hawaii - An Island State - Commerce, Community, Culture - The Maritime Shippi...Hawaii - An Island State - Commerce, Community, Culture - The Maritime Shippi...
Hawaii - An Island State - Commerce, Community, Culture - The Maritime Shippi...
 
Yesterday - Honolulu Authority for Rapid Transit (HART) - Governor David Y. I...
Yesterday - Honolulu Authority for Rapid Transit (HART) - Governor David Y. I...Yesterday - Honolulu Authority for Rapid Transit (HART) - Governor David Y. I...
Yesterday - Honolulu Authority for Rapid Transit (HART) - Governor David Y. I...
 
Honolulu Authority for Rapid Transit - Executive Director Daniel A. Grabauska...
Honolulu Authority for Rapid Transit - Executive Director Daniel A. Grabauska...Honolulu Authority for Rapid Transit - Executive Director Daniel A. Grabauska...
Honolulu Authority for Rapid Transit - Executive Director Daniel A. Grabauska...
 
MAUNA KEA - THE THIRTY METER TELESCOPE - LOOKING TO THE FUTURE
MAUNA KEA - THE THIRTY METER TELESCOPE - LOOKING TO THE FUTUREMAUNA KEA - THE THIRTY METER TELESCOPE - LOOKING TO THE FUTURE
MAUNA KEA - THE THIRTY METER TELESCOPE - LOOKING TO THE FUTURE
 
MAUNA KEA - Thirty Meter Telescope (TMT) - Hear Our Voices!
MAUNA KEA - Thirty Meter Telescope (TMT) - Hear Our Voices!MAUNA KEA - Thirty Meter Telescope (TMT) - Hear Our Voices!
MAUNA KEA - Thirty Meter Telescope (TMT) - Hear Our Voices!
 
Maui - Agriculture and Water -- Yesterday and Today
Maui  - Agriculture and Water -- Yesterday and TodayMaui  - Agriculture and Water -- Yesterday and Today
Maui - Agriculture and Water -- Yesterday and Today
 
THE UNITED STATES ARMY - Forced Reductions 2015 by President Barack Obama & C...
THE UNITED STATES ARMY - Forced Reductions 2015 by President Barack Obama & C...THE UNITED STATES ARMY - Forced Reductions 2015 by President Barack Obama & C...
THE UNITED STATES ARMY - Forced Reductions 2015 by President Barack Obama & C...
 
President Barack Obama - Honolulu Authoirty for Rapid Transit (HART) - SOS - ...
President Barack Obama - Honolulu Authoirty for Rapid Transit (HART) - SOS - ...President Barack Obama - Honolulu Authoirty for Rapid Transit (HART) - SOS - ...
President Barack Obama - Honolulu Authoirty for Rapid Transit (HART) - SOS - ...
 
HAWAII - STATE LOTTERY - THE VIRGINIA MODEL - 2017 LEGISLATURE
HAWAII - STATE LOTTERY - THE VIRGINIA MODEL - 2017 LEGISLATUREHAWAII - STATE LOTTERY - THE VIRGINIA MODEL - 2017 LEGISLATURE
HAWAII - STATE LOTTERY - THE VIRGINIA MODEL - 2017 LEGISLATURE
 
Hanjin - US Bankruptcy Court - Federal Maritime Commission - Update - 09-29- ...
Hanjin - US Bankruptcy Court - Federal Maritime Commission - Update - 09-29- ...Hanjin - US Bankruptcy Court - Federal Maritime Commission - Update - 09-29- ...
Hanjin - US Bankruptcy Court - Federal Maritime Commission - Update - 09-29- ...
 
HAWAII - HOUSE SPEAKER JOSEPH M. SOUKI - THANK YOU
HAWAII - HOUSE SPEAKER JOSEPH M. SOUKI - THANK YOUHAWAII - HOUSE SPEAKER JOSEPH M. SOUKI - THANK YOU
HAWAII - HOUSE SPEAKER JOSEPH M. SOUKI - THANK YOU
 

Similar to Honolulu Rail Transit Project Monthly Progress Report Summary

Honolulu Rail Project - Who's to Blame Game - Responsiblity and Accountabilit...
Honolulu Rail Project - Who's to Blame Game - Responsiblity and Accountabilit...Honolulu Rail Project - Who's to Blame Game - Responsiblity and Accountabilit...
Honolulu Rail Project - Who's to Blame Game - Responsiblity and Accountabilit...Clifton M. Hasegawa & Associates, LLC
 
"News and Views" newsletter
"News and Views" newsletter "News and Views" newsletter
"News and Views" newsletter Maribel Castillo
 
Overpass Solution
Overpass SolutionOverpass Solution
Overpass Solutionjgabateman
 
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsProposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsJames Chuck
 
ACT December 2015 - OM (2)
ACT December 2015 - OM (2)ACT December 2015 - OM (2)
ACT December 2015 - OM (2)Mark Shanholtzer
 
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationPublic Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationAGC of California
 
Where new york stands on 5 big transportation projects
Where new york stands on 5 big transportation projectsWhere new york stands on 5 big transportation projects
Where new york stands on 5 big transportation projectsJohn Clemenza
 
July/August "Transportation Builder" magazine
July/August "Transportation Builder" magazineJuly/August "Transportation Builder" magazine
July/August "Transportation Builder" magazineartba
 
Hawaii - HART Rail Project - FTA - Welcome Aboard - Taking Charge - Breaking...
Hawaii - HART Rail Project - FTA  - Welcome Aboard - Taking Charge - Breaking...Hawaii - HART Rail Project - FTA  - Welcome Aboard - Taking Charge - Breaking...
Hawaii - HART Rail Project - FTA - Welcome Aboard - Taking Charge - Breaking...Clifton M. Hasegawa & Associates, LLC
 
Altamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summaryAltamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summaryAltamont Commuter Express
 
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationAPWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationT.Y. Lin International
 
Caldwell for Mayor 2012: Build Rail Better
Caldwell for Mayor 2012: Build Rail BetterCaldwell for Mayor 2012: Build Rail Better
Caldwell for Mayor 2012: Build Rail BetterNeenz Faleafine
 
TMACOG Ohio Freight Conference 2011
TMACOG Ohio Freight Conference 2011TMACOG Ohio Freight Conference 2011
TMACOG Ohio Freight Conference 2011Joe_Cappel
 

Similar to Honolulu Rail Transit Project Monthly Progress Report Summary (20)

Honolulu Rail Project - Who's to Blame Game - Responsiblity and Accountabilit...
Honolulu Rail Project - Who's to Blame Game - Responsiblity and Accountabilit...Honolulu Rail Project - Who's to Blame Game - Responsiblity and Accountabilit...
Honolulu Rail Project - Who's to Blame Game - Responsiblity and Accountabilit...
 
"News and Views" newsletter
"News and Views" newsletter "News and Views" newsletter
"News and Views" newsletter
 
2015 March 16 ASCE TTG - I-405 Improvement Project
2015 March 16   ASCE TTG - I-405 Improvement Project 2015 March 16   ASCE TTG - I-405 Improvement Project
2015 March 16 ASCE TTG - I-405 Improvement Project
 
Overpass Solution
Overpass SolutionOverpass Solution
Overpass Solution
 
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsProposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
 
Ruma lvm
Ruma lvmRuma lvm
Ruma lvm
 
ACT December 2015 - OM (2)
ACT December 2015 - OM (2)ACT December 2015 - OM (2)
ACT December 2015 - OM (2)
 
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationPublic Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
 
Full board report 1 September 3 2014
Full board report 1 September 3 2014Full board report 1 September 3 2014
Full board report 1 September 3 2014
 
Winter 2012 Newsletter
Winter 2012 NewsletterWinter 2012 Newsletter
Winter 2012 Newsletter
 
Full board report June 2014
Full board report June 2014Full board report June 2014
Full board report June 2014
 
Where new york stands on 5 big transportation projects
Where new york stands on 5 big transportation projectsWhere new york stands on 5 big transportation projects
Where new york stands on 5 big transportation projects
 
RailWorks-Today-April-2016-L
RailWorks-Today-April-2016-LRailWorks-Today-April-2016-L
RailWorks-Today-April-2016-L
 
July/August "Transportation Builder" magazine
July/August "Transportation Builder" magazineJuly/August "Transportation Builder" magazine
July/August "Transportation Builder" magazine
 
Hawaii - HART Rail Project - FTA - Welcome Aboard - Taking Charge - Breaking...
Hawaii - HART Rail Project - FTA  - Welcome Aboard - Taking Charge - Breaking...Hawaii - HART Rail Project - FTA  - Welcome Aboard - Taking Charge - Breaking...
Hawaii - HART Rail Project - FTA - Welcome Aboard - Taking Charge - Breaking...
 
Altamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summaryAltamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summary
 
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationAPWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
 
Ronnie CV 2015
Ronnie CV  2015Ronnie CV  2015
Ronnie CV 2015
 
Caldwell for Mayor 2012: Build Rail Better
Caldwell for Mayor 2012: Build Rail BetterCaldwell for Mayor 2012: Build Rail Better
Caldwell for Mayor 2012: Build Rail Better
 
TMACOG Ohio Freight Conference 2011
TMACOG Ohio Freight Conference 2011TMACOG Ohio Freight Conference 2011
TMACOG Ohio Freight Conference 2011
 

More from Clifton M. Hasegawa & Associates, LLC

Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...
Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...
Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...Clifton M. Hasegawa & Associates, LLC
 
Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...
Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...
Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...Clifton M. Hasegawa & Associates, LLC
 
Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...
Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...
Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...Clifton M. Hasegawa & Associates, LLC
 
Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...
Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...
Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...Clifton M. Hasegawa & Associates, LLC
 
Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...
Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...
Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...Clifton M. Hasegawa & Associates, LLC
 
Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...
Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...
Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...
Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...
Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A Mission
Hawaii  - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A MissionHawaii  - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A Mission
Hawaii - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A MissionClifton M. Hasegawa & Associates, LLC
 
Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...
Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...
Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...
Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...
Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...
Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...
Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...
Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...
Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...Clifton M. Hasegawa & Associates, LLC
 
HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...
HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...
HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...
Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...
Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - Vaccine Research - Advancing Humanity - Invest in Our Future
Hawaii - Vaccine Research - Advancing Humanity - Invest in Our FutureHawaii - Vaccine Research - Advancing Humanity - Invest in Our Future
Hawaii - Vaccine Research - Advancing Humanity - Invest in Our FutureClifton M. Hasegawa & Associates, LLC
 
Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...
Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...
Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...Clifton M. Hasegawa & Associates, LLC
 
Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...
Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...
Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...Clifton M. Hasegawa & Associates, LLC
 
Maui - Communities at Risk - Wildfire Protection Plans - Ride the Fire-Breath...
Maui - Communities at Risk - Wildfire Protection Plans - Ride the Fire-Breath...Maui - Communities at Risk - Wildfire Protection Plans - Ride the Fire-Breath...
Maui - Communities at Risk - Wildfire Protection Plans - Ride the Fire-Breath...Clifton M. Hasegawa & Associates, LLC
 

More from Clifton M. Hasegawa & Associates, LLC (20)

Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...
Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...
Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...
 
Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...
Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...
Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...
 
Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...
Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...
Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...
 
Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...
Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...
Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...
 
Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...
Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...
Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...
 
Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...
Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...
Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...
 
Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...
Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...
Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...
 
Hawaii - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A Mission
Hawaii  - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A MissionHawaii  - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A Mission
Hawaii - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A Mission
 
Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...
Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...
Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...
 
Hawaii - Mayor Mitch Roth - Freedom, Equality, and Justice for All
Hawaii - Mayor Mitch Roth - Freedom, Equality, and Justice for AllHawaii - Mayor Mitch Roth - Freedom, Equality, and Justice for All
Hawaii - Mayor Mitch Roth - Freedom, Equality, and Justice for All
 
Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...
Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...
Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...
 
Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...
Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...
Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...
 
Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...
Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...
Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...
 
HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...
HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...
HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...
 
Hawaii - Unite 5 - Protect Our Workers - Labor Day 2021
Hawaii - Unite 5 - Protect Our Workers - Labor Day 2021Hawaii - Unite 5 - Protect Our Workers - Labor Day 2021
Hawaii - Unite 5 - Protect Our Workers - Labor Day 2021
 
Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...
Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...
Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...
 
Hawaii - Vaccine Research - Advancing Humanity - Invest in Our Future
Hawaii - Vaccine Research - Advancing Humanity - Invest in Our FutureHawaii - Vaccine Research - Advancing Humanity - Invest in Our Future
Hawaii - Vaccine Research - Advancing Humanity - Invest in Our Future
 
Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...
Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...
Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...
 
Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...
Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...
Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...
 
Maui - Communities at Risk - Wildfire Protection Plans - Ride the Fire-Breath...
Maui - Communities at Risk - Wildfire Protection Plans - Ride the Fire-Breath...Maui - Communities at Risk - Wildfire Protection Plans - Ride the Fire-Breath...
Maui - Communities at Risk - Wildfire Protection Plans - Ride the Fire-Breath...
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 

Honolulu Rail Transit Project Monthly Progress Report Summary

  • 1. Clifton M. Hasegawa President and CEO Clifton M. Hasegawa & Associates, LLC 1044 Kilani Avenue 12 Wahiawa, Hawaii 96786-2243 Telephone: (808) 463-1057 Email: clifhasegawa@gmail.com Internet: http://www.linkedin.com/in/cliftonhasegawa May 3, 2015 Senate President Donna Mercado Kim Members of the Hawaii State Senate House Speaker Joseph Souki Members of the Hawaii State House of Representatives Mayor Kirk Caldwell Members of the City & County of Honolulu City Council Dear Senate President Kim, House Speaker Souki, Senators and Representatives of the Hawaii Legislature, Mayor Caldwell, Members of the Honolulu City Council, The State of Hawaii and the City & County of Honolulu have been patient and understanding to and for the beleaguered and financially troubled Honolulu Rail Transit Project. On each occasion, many times over, precious time and resources have been expended to "find money" to accede to the Honolulu Authority for Rapid Transit (HART) demands.
  • 2. Giving money to this troubled project, even with assurances "this is the last time", is fool hardy and resource wasteful. The root cause of the problem is not addressed and the situation lingers until the money runs out, most assuredly soon enough. This has happened many times over during the course of this project and will recur unless and until proactive aggressive action is taken to get to the core issue and impose best management, knowledge-based solutions to correct and remediate a problem that surfaces and resurfaces time and time again, each time more massive and more abhorrent than the time before. The HART Monthly Progress Reports for January 2015, February 2015 and March 2015 highlight and underscore quality assurance and safety considerations that have not been addressed satisfactorily and resolved to prevent reoccurrence for many years. The cumulative effect is the cost overruns and delays in meeting the delivery schedule. Most recently, HART to replace rail segment after large crack in concrete By Kristine Uyeno, KHON2, April 16, 2015 http://khon2.com/2015/04/16/hart-to-replace-rail-segment-after-large-crack-in-concrete/ “Oahu’s rail system is far from complete, but there’s already damage to partsof the guideway. A viewer contacted KHON2 via Report It, alerting us to a large crack at the top of the column. The rail line winds through Kapolei, but if you take a closer look, you’ll notice something that shouldn’t be there. On Kualakai Parkway in Kapolei, you can see the columns and guideway going up and it looks consistent until you get to one particular spot. Then there’s a horizontal crack in what is called a segment.
  • 3. “Large-sized cracks are not normal, only hairline cracks are acceptable in concrete,” said University of Hawaii engineering professor Panos Prevedouros. Prevedouros said there’s reason for concern because right now, the segment is not structurally sound. “How does a crack appear in heavy-duty concrete?” KHON2 asked. “It’s actually a part of the natural curing of the concrete from being very wet in the beginning and then getting dry,” he said. In a statement, HART said, “The segment and column highlighted in the photos were already identified by HART and are in the process of being either replaced or repaired by Kiewit at their cost.” Kiewit is the company that’s building rail. HART officials do not know how long it will take for the replacement, but workers will have to make a new segment, because even though they look alike, each is unique. It takes five days to make one segment. KHON2 also found out this isn’t the first time this has happened. Another part of the guideway was damaged near Farrington Highway last June. HART officials said it was damaged when it was installed. Nearly a year later, workers are still trying to replace it. “This is actually very complex because although it looks like a simple thing, it’s a bridge. And every time you have a component that is questionable on a bridge, it’s not very easy necessarily it’s easy to fix it,” Prevedouros said.” [Emphasis Supplied]
  • 4. Questions to be Addressed, Going Forward: a. Is the root cause defective specifications and/or a failure to execute and perform in conformance with the specifications by the contractor? b. If the root cause is defective specifications, does this compromise all Spans built and to be built, place in jeopardy the overall safety of the Honolulu Rapid Transit (HART) system, and throw into harms way passengers choosing to ride The Rail? c. If the root cause is contractor performance, does this compromise all Spans built, place in jeopardy the overall safety of the Honolulu Rapid Transit (HART) system, and throw into harms way passengers choosing to ride The Rail? Whether the contractor pays for the correction is part of the remedy but the overall safety of the project is called into question as the problems may surface later during the course of construction or during operations when the guides and spans are stressed by the moving cars fully loaded with passengers. d. What remedies are available to the Legislators, to the City & County of Honolulu and to HART? Recommended is a thorough inquiry and investigation BEFORE committing more money $$$$$ or more resources $$$$$. Money DOES NOT and WILL NOT make quality assurance and safety related issues, ingrained and systemic, go away or disappear; it just buys time and delays the inevitable.
  • 5. Ensure that the inevitable is not the loss of life, the proximate cause being defective work anywhere along the Honolulu Rail Transit Project. Your duties and responsibilities extend beyond being the protectors of the Treasury and the public funds, your duties and responsibilities are to protect and safeguard the lives of the people. There is no room for compromise when a life is placed in jeopardy of harm or injury, particularly and especially when and where avoidable and preventable. Thank you very much Aloha Respectfully, Clifton M. Hasegawa Enclosures: a. HART Progress Report January 2015 b. HART Progress Report February 2015 c. HART Progress Report March 2015
  • 6. Honolulu Rail Transit Project Monthly Progress Report January 2015 4.2 Section I – West O‘ahu/Farrington Highway: East Kapolei to Pearl Highlands A. West O‘ahu/Farrington Highway Guideway (WOFH) Contract No.: DB‐120 DB Contractor: Kiewit Infrastructure West Company (KIWC) Contract Start Date: December 2009 Contract Substantial Completion: July 2016 Projected Substantial Completion: October 2016 Project Description: Design and construction of 6.8 miles of rail alignment, starting at the East Kapolei station and ending at the Pearl Highlands station. KEY QUALITY ISSUES: Span 67 Damage and Repair Procedures – During the erection process of Span 67, the underside of Segments 67‐11 and 67‐12 were damaged due to unbalanced support from the temporary bearings. NCR 00144 was opened on June 17, 2014, to address this issue. In January 2015, KIWC began the process of constructing the temporary falsework needed to slide Span 67 from its current position. This will allow the span to be de‐stressed and the segments replaced. Both segments were casted by month’s end. Drill Shaft Quality – Nine additional drill shafts were Crosshole Sonic Logging (CSL) tested in January 2015. Seven of the drilled shafts were found to have velocity reductions outside of the acceptable design criteria limits potentially because concrete was segregated during concrete placement, and two of the shafts had no issues. Of the 211 drilled shafts that have been tested to date, 38 shafts (18%) were found to have issues. KIWC continues to have weekly Drill Shaft Quality Meetings with HART to discuss testing results, quality issues, the concrete mix, and methods for repair.
  • 7. Drill Shaft Repairs – Of the 38 drill shafts that were found to have velocity reduction issues, seven new NCRs have been opened and submitted to HART this month. HART will not close an NCR until KIWC completes another CSL test and demonstrates soundness of the concrete shaft. KIWC completed repairs at Shaft 245 and began working on repairing Shaft 145. KIWC will move to Shaft 144 in the beginning of February 2015. Consistent Span Stressing Trends – In mid‐January, KIWC had stressed six spans. KIWC has maintained this positive trend and momentum from previous months, stressing 9‐11 per month. Progress is being made both westward towards East Kapolei Station and eastward towards Farrington Highway. At this rate, KIWC will reach Farrington Highway by the end of February 2015 and East Kapolei Station by the end of April 2015. Pre‐Cast Segment Progress/Quality – The Casting Yard has been very consistent in producing approximately 62 segments per week and is currently 64.1% complete with segment production for the overall project. 2,028 segments have been casted to date. Although 85 of the total 283 NCRs (30%) have been related to segmental issues like damaged shear keys, concrete voids, and spalls, proper correction procedures have already been developed and are being implemented. Closing Out NCRs – NCRs were being promptly corrected, validated, and closed out during this period. Both KIWC and HART have been working together to complete all the needed processes for timely validation. A total of 22 NCRs have been closed in January 2015. Of the 22, 15 were related to pre‐cast segment issues and 5 were related to drill shaft issues. D. Maintenance and Storage Facility (MSF) Contract No.: DB‐200 Contractor: Kiewit/Kobayashi Joint Venture (KKJV) Contract Start Date: July 2011 Contract Substantial Completion: April 2016 Projected Substantial Completion: April 2016 Project Description: The MSF contract consists of the operations and servicing building, maintenance of way, train wash facility and wheel truing building. In addition to the four (4) facility buildings, MSF includes rail procurement, special trackwork, ties, third rail and other track material for the four guideway segments on the project.
  • 8. KEY QUALITY ISSUES: Two NCRs remain open solely until the dispositions are constructed including removal and replacement of column base plate grout and MOW steel edge form, both underway. OSB Grout Under Columns – The grout mix installed under the columns at the OSB was installed without accurately measuring the water added to the mix and without accurately timing the grout mixing time. The contractor is currently removing the non‐conformance grout and replacing it with proper grout. MOW Steel Edge Form – In order to erect the tilt‐up panels, the metal edging that was welded to the beam flanges along line 4 was cut off of the beams. In the cutting process, the flange of the beam was gouged at every location the fillet weld was air arc’d out. The gouging is approx. 1/16 to 1/4 inches in depth along the flange at every location on every beam. Establishing satisfactory sub grade in track work areas which involves geotechnical exploration resulting in limited removal and replacement of unsuitable expansive material. Although the limit has not been determined, it is envisioned that sufficient satisfactory material can be obtained from on‐site borrow areas. 4.3 Section II – Kamehameha Highway: Pearl Highlands to Aloha Stadium A. Kamehameha Highway Guideway (KHG) Contract No.: DB‐320 Contractor: Kiewit Infrastructure West Company (KIWC) Contract Start Date: June 2011 Contract Substantial Completion: September 2016 Projected Substantial Completion: April 4, 2017 KEY QUALITY ISSUES: Design – Design packages seem to lack QC prior to submittal for review to third parties, resulting in longer than expected review times and additional review requirements.
  • 9. Field Design Change (FDC) vs. Notice of Design Change (NDC) – Changes made to the FDC/NDC process in the latest Quality Assurance Plan (QAP Rev 7) removed HART from the approval process. NCR 00029 was issued on Aug. 21, with a corrective action response from KIWC proposed the same day. The proposed revision continues to be reviewed by a HART FDC/NDC task force. Sidewalk / Curb & Gutter installation – Workmanship on portions of the sidewalk and curb & gutter does not meet specifications. Non‐compliance reports have been issued, and a quality stand down was ordered by KIWC. A field meeting with the responsible sub‐contractor has been scheduled to address deficiencies. http://www.honolulutransit.org/media/315607/201501-monthly-progress-report.pdf Honolulu Rail Transit Project Monthly Progress Report February 2015 4.2 Section I – West O‘ahu/Farrington Highway: East Kapolei to Pearl Highlands A. West O‘ahu/Farrington Highway Guideway (WOFH) Contract No.: DB‐120 DB Contractor: Kiewit Infrastructure West Company (KIWC) Contract Start Date: December 2009 Contract Substantial Completion: July 2016 Projected Substantial Completion: October 2016 Project Description: Design and construction of 6.8 miles of rail alignment, starting at the East Kapolei station and ending at the Pearl Highlands station. KEY QUALITY ISSUES: Span 67 Damage and Repair – During the erection process of Span 67, the underside of Segments 67‐11 and 67‐12 were damaged due to unbalanced support from the temporary bearings. NCR 00144 was opened on June 17, 2014, to address this issue. In February 2015, KIWC completed the temporary falsework needed to support and slide Span 67 from its current position. The span is expected to be de‐stressed and the segments replaced. Span 67 will be re‐stressed and brought back into its original location in March 2015. The replacement is being done to ensure the segments meet HART’s high quality standards.
  • 10. Drill Shaft Quality – HART received four additional drill shaft Crosshole Sonic Logging (CSL) Reports in February 2015. Two of the drilled shafts were found to have velocity reductions outside of the acceptable design criteria limits potentially because concrete was segregated during concrete placement, and two of the shafts had no issues. Of the 215 drilled shafts that have been tested to date, HART has requested that Kiewit provide additional testing and/or modifications to 40 shafts to ensure that the shafts meet the specifications. KIWC continues to have weekly Drill Shaft Quality Meetings with HART to discuss testing results, quality, the concrete mix, and methods for repair. Drill Shaft Repairs – Of the 40 drill shafts that are being reviewed in detail, two new NCRs have been opened and submitted to HART this month. HART will not close an NCR until KIWC completes another CSL test and demonstrates soundness of the concrete shaft as well as when all HART comments are responded to. KIWC completed repairs at Shaft 145 and began repair work at Shaft 144. The repair at Shaft 144 will continue until the end of March 2015 and KIWC can continue with column construction as the span continues its approach eastbound on Farrington Highway toward West Loch Station. Consistent Span Stressing Trends – In mid‐February, KIWC had stressed 10 spans. KIWC has maintained this positive trend and momentum from previous months, stressing 9‐11 per month. KIWC has now left the Ho‘opili area and has reached Farrington Highway in February as the span erection proceeds eastward towards West Loch Station. KIWC should reach East Kapolei Station by April 2015. Pre‐Cast Segment Progress/Quality – The Casting Yard has been very consistent in producing approximately 60 segments per week and is currently 71.8% complete with segment production for the overall project. 2,270 segments have been cast to date. WOFH segment casting should be completed by June 2015. Although 93 of the total 296 NCRs (31.4%) have been related to segmental issues like damaged shear keys, concrete voids, and spalls, proper correction procedures have already been developed and are being implemented. Closing Out NCRs – NCRs were being promptly corrected, validated, and closed out during this period. Both KIWC and HART have been working together to complete all the needed processes for timely validation. A total of six NCRs have been closed in February 2015. Of the six, one was related to pre‐cast segment issues, one was design related, one was for the superstructure, and three were related to drill shaft issues.
  • 11. Concrete Plinth Quality – KIWC completed work on the concrete plinths under the double crossover east of Ho‘opili Station on Spans 78 and 79. This is the first of four double crossovers for this project. HART has inspected the quality of the work performed and no issues were found. The trackwork will continue to be surveyed and placed on its final alignment. Flash Butt Track Welding Operations – Work began on welding trackwork north of the Maintenance and Storage Facility where approximately 439 welds are to be completed. KIWC is currently achieving 20‐25 welds per day and this is in‐line with the current baseline schedule. KIWC will continue to report completed quantities to HART on a weekly basis. Quality Assurance and Buy America Audit – In mid‐February, KIWC was audited by HART in areas of management responsibility, design control, purchasing, document/process control, product identification and traceability, inspection, handling and storage of equipment, nonconformance, corrective actions, quality record, and training. KIWC’s performance was found to be commendable and no major issues were found. A. Kamehameha Highway Guideway (KHG) Contract No.: DB‐320 Contractor: Kiewit Infrastructure West Company (KIWC) Contract Start Date: June 2011 Contract Substantial Completion: September 2016 Projected Substantial Completion: April 2017 Project Description: Kamehameha Highway Guideway DB Contract (KHG) consists of 3.9 miles and starts 400 feet east of the Pearl Highlands Station and terminates 1,400 feet beyond the Aloha Stadium Station. KHG is made up of utility relocations, highway widening, drilled shaft foundations, columns and aerial structure. KEY QUALITY ISSUES: - Shafts – As shaft construction resumes, the quality of the shafts will be closely monitored to ensure any quality issues are identified and resolved in a timely manner. - Sub‐contractor Quality – The Design‐Builder has been asked to improve their QC/QA efforts as they relate to the work being performed by their sub‐contractors. http://honolulutransit.org/media/322188/201502-monthly-progress-report.pdf
  • 12. Honolulu Rail Transit Project Monthly Progress Report March 2015 4.2 Section I – West O‘ahu/Farrington Highway: East Kapolei to Pearl Highlands A. West O‘ahu/Farrington Highway Guideway (WOFH) Contract No.: DB‐120 DB Contractor: Kiewit Infrastructure West Company (KIWC) Contract Start Date: December 2009 Contract Substantial Completion: July 2016 Projected Substantial Completion: October 2016 Project Description: Design and construction of 6.8 miles of rail alignment, starting at the East Kapolei station and ending at the Pearl Highlands station. KEY QUALITY ISSUES: Span 67 Damage and Repair Procedures – During the erection process of Span 67, the underside of Segments 67‐11 and 67‐12 were damaged due to unbalanced support from the temporary bearings. NCR 00144 was opened on June 17, 2014, to address this issue. In March 2015, KIWC distressed the span and erected the two replacement segments onto the falsework. KIWC is still determining how to best to form the closure segment. Afterwards, the span will be re-stressed and brought back to its original location. This replacement is being done to ensure the segments meet HART’S quality standards. Span 17 Damages and Repair Analysis – During the erection process of Span 17, segments 17-1, 17-2m 17-11 and 17-12 were damaged due to unbalanced support from the temporary bearings. NCR 00314 was opened on March 17, 2015, to address this issue. KWIC is in the process of evaluating the extent of damage. Afterwards a root cause analysis and repair procedure will be submitted to HART for review. [Highlighting and Emphasis Supplied} Questions: a. Is the root cause defective specifications and/or a failure to execute and perform in conformance with the specifications by the contractor?
  • 13. b. If the root cause is defective specifications, does this compromise all Spans built and to be built, place in jeopardy the overall safety of the Honolulu Rapid Transit (HART) system, and throw into harms way passengers choosing to ride The Rail? c. If the root cause is contractor performance, does this compromise all Spans built, place in jeopardy the overall safety of the Honolulu Rapid Transit (HART) system, and throw into harms way passengers choosing to ride The Rail? d. What remedies are available to HART? Damage Drill Shaft Quality – HART received nine additional Crosshole Sonic Logging (CSL) Reports in March 2015. Eight of the drilled shafts were found to have velocity reductions outside of the acceptable design criteria limits potentially because concrete was segregated during concrete placement; one of the shaft had no issues. Of the 224 drilled shafts that have been tested to date, HART has requested that KWIC provide additional testing and/or modifications to 50 shafts to ensure that the shafts meet the specifications. KWIC continues to have weekly Drill Shaft Quality meetings with HART to discuss testing results, quality, the concrete mix, and methods for repair. Drill Shaft Repairs – Of the 50 drill shafts that are being reviewed in detail, eight new NCRs have been opened and submitted to HART this month. HART will not close an NCR until KIWC completes another CSL test and demonstrates soundness of the concrete shaft as well as when all HART comments are responded to. KIWC continues repair work at Shaft 144 and completion is expected in mid-April. The repair is taking longer than expected because low strength concrete only be removed and re-grouted in 6 FT zones. KWIC has continued with column construction approaching eastbound on Farrington Highway toward West Loch Station in preparation for the segment erection. Span Stressing Trends – In March, KIWC stressed 7 spans to date. A lower number of spans were stressed due to issues encountered at Span 17 and in the spiral between Spans 113 and 114. As KWIC continues to evaluate and eventually repair Span 17, span erection has not been able to continue moving westward towards the East Kapolei Station. Due to mechanical issues and difficulty in keeping the truss system leveled between Spans 113 and 114, KWIC remained in this area for almost 3 weeks. The designer-builder has since overcome this obstacle and is now proceeding eastwards to the West Loch Station.
  • 14. Pre‐Cast Segment Progress/Quality – The Casting Yard has been very consistent in producing approximately 60 segments per week and is currently 78.4% complete with segment production for the overall project. 2,513 segments have been casted to date. Although 101 of the total 323 NCRs (31.3%) have been related to segmental issues like damaged shear keys, concrete voids, and spalls, proper correction procedures have already been developed and are being implemented. Closing Out NCRs – NCRs were being promptly corrected, validated, and closed out during this period. Both KIWC and HART have been working together to complete all the needed processes for timely validation. A total of 31, 17 were related to pre‐cast segment issues, one was for superstructure, 10 were related to drill shaft issues, one welding issue, two concrete strength issues. Flash Butt Track Welding Operations – Work began on welding trackwork north of the Maintenance and Storage Facility where approximately 439 welds were made on the rails. These welds cover track between STA 650+00 to STA 754+34. KWIC has begun to move their welding operations to the Ho`opili Station area where another 347 welds are expected to be made. KWIC is expected to complete 20-25 welds per day and quantities will be reported to HART on a weekly basis. http://www.honolulutransit.org/media/329397/201503-monthly-progress-report.pdf