2. OUTLINE
Introduction & Objectives
My educations, experiences & skills
Junghee Kim
What I can do
Example ( project )
Activities
Conclusion
2
3. Introduction
1man 1woman first son.
From Seoul
Present: studying petroleum geophysics in
Imperial College London ( September 2012
completion expected )
Junghee Kim
Interest: Energy (Resource(petroleum),
Renewable (bio-fuel, CCU)
Strength: Challenging mind.
Through previous experiences, having global
mind, and socialising ability.
Hoping task: Petroleum geophysicist
Hobby : traveling, socialising and so on.
3
4. MY EDUCATIONS, EXPERIENCES & SKILLS
Educations
University of Nottingham (MSc)–Petroleum and environmental process engineering
Imperial College London (MSc) – Petroleum geophysics
Junghee Kim
Experiences
Yonsei University – Research Assistant
Korean National Military Service – Second Lieutenant
Western Canadian Wilderness Committee – Assistant Manager
JK Engineering & Construction Co.,Ltd. – Plant Project Assistant Engineer
JK World Trading Ltd. – Project analyst
Skills
Project management skill
Team management and leadership
Various kinds of experimental devices and software. 4
5. WHAT I CAN DO
analysing hydrocarbon reservoirs by using modern
geophysical methods (Data acquisition, data
processing, interpretation)
Junghee Kim
exploration with geological concepts by
understanding the formation of reservoir rocks and
structures
Production and development with engineering
concepts for hydrocarbon
Seismic interpretation using state-of-the-art seismic
methods, including 2D, 3D, 4D and continuous
monitoring techniques
Advice on CCU & bio-fuel
5
6. EXAMPLE ( PROJECT )
Wytch farm proejct
Project Objectives
- Analyse and review data
- Produce a geological model
Junghee Kim
- Investigate uncertainties
- STOIIP/Recoverable
Reserves estimates
- Develop reservoir model
Well data review conditioning smoothing synthetic data obtained
Extract wavelet phase shifting horizon picking depth conversion
Residual well calculation well testing STOIIP estimate.
6
Software used : Rock dot, kingdom, Petrel
7. ACTIVITIES
Junghee Kim
Gathering Clubbing Language exchange social group
Travelling Camping 7
Socialising Campaigning
Climbing
Volunteering Boating
8. CONCLUSIONS
- Basic system set for organisational life
- Petroleum engineering knowledge
- Petroleum geophysics knowledge
Junghee Kim
- Eager to work and have enormous potentials
- Can work from Oct. 2012
8
Change for a map to locate the field in the wessex basinOnshore/offshore Oil fieldTriassicFluvialDimension/depthReservoir name: sherwoodAnticline structure fault bounded to the south Tilted fault blockEasterly dip5 well penetration in the seismic 3D survey
Title!Qc the log dataGenerate the syntheticBlablablaWhy blank cells and red and yellow?The seismic data in wtchy farm is not zero phase, convert to zero phase allows better identifying horizons to pick. As well as ensure the well top match the seismic picks, Four steps of well tie : 1. QC log data 2. log calibration 3. generate sytheticseisomogram by constructing the convolution model (reflection series with wavelet) and compare the synthetics with the actual data from the wells 4. choose the correct wavelet that makes the synthetics match the most of the seismic, phase rotation converts the seismic data to zero phase.
TitleRotated and prerotated data instead of geoscientist and geophysicist
TitleRotated and prerotated data instead of geoscientist and geophysicist
TitleRotated and prerotated data instead of geoscientist and geophysicist