SlideShare a Scribd company logo
1 of 10
ETSI/OCG35(08)XX
European Accessibility
Requirements for ICT Public
Procurement:
Actions Required to Progress the
Work (ETSI STF333)
Bruno von Niman
Leader, ETSI STF333
M 376 Open Conference, Brussels, June 3-4, 2008
World Class Standards
European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 2
”Accessibility as a competitive edge”
 One, globally harmonized Norm
 One usable and accessible toolkit
 Based on deep insight about user needs and contexxts of use
 Relyingupon competitive innovation
 On at least two levels:
• Minimum required
• +
• (Super + required by industry to ease competition)
 With at least two profiles:
• Procurer
• Provider
 Providers positioning and competing with accessibility as a
competitive edge
World Class Standards
European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 3
Actions planned and agreed until the end of the project
 Steering Committee, CEN/BTWG185 AND ETSI TC HF reporting and
coordination in June 2008
 with comments from this meeting taken on board
 ISO/IEC JTC1-SWG-A liaison (June) and ICCHP presentation in July 2008
 Comments until August 11
 those received from you do not have to be repeated
 Resolutions, draft updates, final review
 Final draft for ESO approval on September 24
 A 5th public draft may be released (and announced) for validation
purposes, without any commitment
 for a compacted period, e.g. September 8- 18)
 Final draft for ESO approval on September 24
 ETSI TC Human Factors and cross-ESO approval on October 8, 2008
 ETSI publication after editorial processing
 in October- November 2008
World Class Standards
European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 4
Public draft releases
Preliminary public draft release
dates
Commenting deadlines Status and notes
November 20, 2007 January 10, 2008 First public draft
February 12, 2008 March 4, 2008 Second public draft
March 17, 2008 (this version) April 16, 2008 Third public draft
May 19, 2008 August 11, 2008 (18:00 CET) Final Public (Open Workshop)
draft;
Last public comment opportunity!
September 22, 2008 Following ETSI process Final draft for ETSI and CEN TB
approval
NOTE: The above dates are preliminary and subject to change at any time, as required by the progress of the
work. An additional (post- Open Workshop) draft version may be announced later.
Note: This is a draft document that will be updated, replaced or made obsolete by future versions at any time. It is
inappropriate to cite this document as other than “work in progress”.
World Class Standards
European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 5
11 – Two main possible approaches
1. (“Shopping list”: an exhaustive listing and reference to existing
external standards, adding only minimal new content (not
recommended):
 10.000 pages?, 2- 5.000 €?, own structures and vocabularies, limited
accessibility
 would require all stakeholders to purchase, or otherwise obtain all
necessary, referenced standards.)
2. “One-stop-shop”: a self-contained standard which, while
supported by previous work, stands alone and provides the basis
for procurement:
1. More accessible for the intended users, easier to maintain
2. Would enable a more useful toolkit – with login profiles and
contextual applicability
World Class Standards
European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 6
Considerations and recommendations
 Regardless the approach chosen, a “refresh” policy should be
defined (3-5 year “refresh” cycle).
 Close collaboration with the US Access Board is strongly
recommended
 More insight about the user segment requirements and contexts
of use (including procurers and processes)
 Requirements on the Toolkit:
• Usability and accessibility requirements similar to those on products
Language,
• Languages and translations
• Maintenance, et cetera
World Class Standards
European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 7
Five Phase II tasks
1. A European Standard (ES/EN)
 specifying the requirements for accessibility for all ICT products and
services within each of the technical areas (to be used in terms of
technical specifications in the sense mentioned in the public
procurement Directives).
2. A Report on the standards and specifications (building on the
ETSI TR)
3. Guidelines on accessibility award criteria that are relevant to each
technical area, to be used in the procurement,
World Class Standards
European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 8
Five Phase II tasks
4. Guidance and support material for public procurements, which
should address at least the following areas:
• Information Technology planning guidelines,
• Broad circulation of materials on accessible information technology,
• Technical advice on new ICT hardware or software,
• Training of IT staff on the use of the developed material,
• Inventory of existing accessibility support services and of accessibility support
needs,
• Inclusion of accessibility in ICT call for proposals,
• Verification of supplier claims of accessibility,
• Tracking of non-compliance of products and services with accessibility
requirements in tenders,
• Information on the testing and conformity aspects.
5. An on-line, accessible toolkit providing structured access to the
full content of the EN, the report, the guidelines and the guidance
material. It shall provide, in particular, thorough guidance and
ready text to public procurers who will access it.
World Class Standards
European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 9
Phase II
 Enough information has been found in Phase I to permit a single
EN to be written in Phase II which contains all of the functional
requirements
 will need to refer to other International and/or European standards,
particularly for test methods (which need to be based on harmonized
International requirements).
 For each requirement identified references will be noted
 The first work is to merge them into consensual statements
 Conformance statements need to be associated with each
requirement
 Gaps will need to be filled
 Need to agree gaps are genuine
 Requirements need to be written
 International standard bodies must be approached to write a
couple of new standards
World Class Standards
European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 10
Phase II continued
 A Report will list all standards referenced out from the EN
 update of status of standards currently under development
 Guidance may be needed on applying the various requirements to
actual products
 The work can provide all necessary information to support
preparation of an on-line toolkit for public procurers.
 It is believed that the toolkit should also be able to assist suppliers
and designers
 The toolkit should be so structured as to permit a number of
approaches to the information that it contains

More Related Content

Similar to ETSI STF 333 Open Conference ActionsRequiredToProgress.ppt

Mug 'core' cross industry invoice european message implementation guideline...
Mug   'core' cross industry invoice european message implementation guideline...Mug   'core' cross industry invoice european message implementation guideline...
Mug 'core' cross industry invoice european message implementation guideline...Friso de Jong
 
EUnetHTA Training course for Stakeholders - Introduction to the HTA Core Mode...
EUnetHTA Training course for Stakeholders - Introduction to the HTA Core Mode...EUnetHTA Training course for Stakeholders - Introduction to the HTA Core Mode...
EUnetHTA Training course for Stakeholders - Introduction to the HTA Core Mode...EUnetHTA
 
Business Plan for a CEN Workshop on eInvoicing phase 3
Business Plan for a CEN Workshop on eInvoicing phase 3Business Plan for a CEN Workshop on eInvoicing phase 3
Business Plan for a CEN Workshop on eInvoicing phase 3Friso de Jong
 
TAUS MT Showcase, MT@EC for European public administrations and online servic...
TAUS MT Showcase, MT@EC for European public administrations and online servic...TAUS MT Showcase, MT@EC for European public administrations and online servic...
TAUS MT Showcase, MT@EC for European public administrations and online servic...TAUS - The Language Data Network
 
EUnetHTA Training course for Stakeholders - HTA Core Model (r) (Kristian LAMPE)
EUnetHTA Training course for Stakeholders - HTA Core Model (r) (Kristian LAMPE)EUnetHTA Training course for Stakeholders - HTA Core Model (r) (Kristian LAMPE)
EUnetHTA Training course for Stakeholders - HTA Core Model (r) (Kristian LAMPE)EUnetHTA
 
WSB14 - Session 111-1 CEN presentation: overview Rules and Regulations and EN...
WSB14 - Session 111-1 CEN presentation: overview Rules and Regulations and EN...WSB14 - Session 111-1 CEN presentation: overview Rules and Regulations and EN...
WSB14 - Session 111-1 CEN presentation: overview Rules and Regulations and EN...Chris Hamans
 
2009 11 17 Transforming The At Ecosystem
2009 11 17 Transforming The At Ecosystem2009 11 17 Transforming The At Ecosystem
2009 11 17 Transforming The At Ecosystemguest7e87f9
 
Emerging Technologies and Business Processes – Anders Grangard & Adrian Mueller
Emerging Technologies and Business Processes – Anders Grangard & Adrian MuellerEmerging Technologies and Business Processes – Anders Grangard & Adrian Mueller
Emerging Technologies and Business Processes – Anders Grangard & Adrian MuellerDanny Gaethofs
 
Tg 4 Adrian Mueller Cen 18 06 2009
Tg 4 Adrian Mueller Cen 18 06 2009Tg 4 Adrian Mueller Cen 18 06 2009
Tg 4 Adrian Mueller Cen 18 06 2009Friso de Jong
 
20061025 Current Research & Future Directions in Software Technologies
20061025 Current Research & Future Directions in Software Technologies20061025 Current Research & Future Directions in Software Technologies
20061025 Current Research & Future Directions in Software TechnologiesArian Zwegers
 
Recommendations for Successful Adoption in Europe of Emerging Technical Stand...
Recommendations for Successful Adoption in Europe of Emerging Technical Stand...Recommendations for Successful Adoption in Europe of Emerging Technical Stand...
Recommendations for Successful Adoption in Europe of Emerging Technical Stand...eraser Juan José Calderón
 
MeAC 2: overall results - presentation at INCOM meeting
MeAC 2: overall results - presentation at INCOM meetingMeAC 2: overall results - presentation at INCOM meeting
MeAC 2: overall results - presentation at INCOM meetingJose Angel Martinez Usero
 
ITU-T Study Group 16 Meeting Achievements
ITU-T Study Group 16 Meeting AchievementsITU-T Study Group 16 Meeting Achievements
ITU-T Study Group 16 Meeting AchievementsITU
 

Similar to ETSI STF 333 Open Conference ActionsRequiredToProgress.ppt (20)

Mug 'core' cross industry invoice european message implementation guideline...
Mug   'core' cross industry invoice european message implementation guideline...Mug   'core' cross industry invoice european message implementation guideline...
Mug 'core' cross industry invoice european message implementation guideline...
 
John Ketchell
John KetchellJohn Ketchell
John Ketchell
 
Consultation 2009
Consultation 2009Consultation 2009
Consultation 2009
 
EUnetHTA Training course for Stakeholders - Introduction to the HTA Core Mode...
EUnetHTA Training course for Stakeholders - Introduction to the HTA Core Mode...EUnetHTA Training course for Stakeholders - Introduction to the HTA Core Mode...
EUnetHTA Training course for Stakeholders - Introduction to the HTA Core Mode...
 
Business Plan for a CEN Workshop on eInvoicing phase 3
Business Plan for a CEN Workshop on eInvoicing phase 3Business Plan for a CEN Workshop on eInvoicing phase 3
Business Plan for a CEN Workshop on eInvoicing phase 3
 
IBE-NZE Bruxelles Workshop
IBE-NZE Bruxelles WorkshopIBE-NZE Bruxelles Workshop
IBE-NZE Bruxelles Workshop
 
TAUS MT Showcase, MT@EC for European public administrations and online servic...
TAUS MT Showcase, MT@EC for European public administrations and online servic...TAUS MT Showcase, MT@EC for European public administrations and online servic...
TAUS MT Showcase, MT@EC for European public administrations and online servic...
 
EUnetHTA Training course for Stakeholders - HTA Core Model (r) (Kristian LAMPE)
EUnetHTA Training course for Stakeholders - HTA Core Model (r) (Kristian LAMPE)EUnetHTA Training course for Stakeholders - HTA Core Model (r) (Kristian LAMPE)
EUnetHTA Training course for Stakeholders - HTA Core Model (r) (Kristian LAMPE)
 
WSB14 - Session 111-1 CEN presentation: overview Rules and Regulations and EN...
WSB14 - Session 111-1 CEN presentation: overview Rules and Regulations and EN...WSB14 - Session 111-1 CEN presentation: overview Rules and Regulations and EN...
WSB14 - Session 111-1 CEN presentation: overview Rules and Regulations and EN...
 
The AT ecosystem and why it is critical
The AT ecosystem and why it is criticalThe AT ecosystem and why it is critical
The AT ecosystem and why it is critical
 
2009 11 17 Transforming The At Ecosystem
2009 11 17 Transforming The At Ecosystem2009 11 17 Transforming The At Ecosystem
2009 11 17 Transforming The At Ecosystem
 
2009 11 17 Transforming The At Ecosystem
2009 11 17 Transforming The At Ecosystem2009 11 17 Transforming The At Ecosystem
2009 11 17 Transforming The At Ecosystem
 
ICT Assistive Technologies industry in Europe_Carmen Pastor_Tecnalia
ICT Assistive Technologies industry in Europe_Carmen Pastor_TecnaliaICT Assistive Technologies industry in Europe_Carmen Pastor_Tecnalia
ICT Assistive Technologies industry in Europe_Carmen Pastor_Tecnalia
 
Emerging Technologies and Business Processes – Anders Grangard & Adrian Mueller
Emerging Technologies and Business Processes – Anders Grangard & Adrian MuellerEmerging Technologies and Business Processes – Anders Grangard & Adrian Mueller
Emerging Technologies and Business Processes – Anders Grangard & Adrian Mueller
 
Tg 4 Adrian Mueller Cen 18 06 2009
Tg 4 Adrian Mueller Cen 18 06 2009Tg 4 Adrian Mueller Cen 18 06 2009
Tg 4 Adrian Mueller Cen 18 06 2009
 
20061025 Current Research & Future Directions in Software Technologies
20061025 Current Research & Future Directions in Software Technologies20061025 Current Research & Future Directions in Software Technologies
20061025 Current Research & Future Directions in Software Technologies
 
Recommendations for Successful Adoption in Europe of Emerging Technical Stand...
Recommendations for Successful Adoption in Europe of Emerging Technical Stand...Recommendations for Successful Adoption in Europe of Emerging Technical Stand...
Recommendations for Successful Adoption in Europe of Emerging Technical Stand...
 
MeAC 2: overall results - presentation at INCOM meeting
MeAC 2: overall results - presentation at INCOM meetingMeAC 2: overall results - presentation at INCOM meeting
MeAC 2: overall results - presentation at INCOM meeting
 
ITU-T Study Group 16 Meeting Achievements
ITU-T Study Group 16 Meeting AchievementsITU-T Study Group 16 Meeting Achievements
ITU-T Study Group 16 Meeting Achievements
 
20090921 Expp Presentation
20090921 Expp Presentation20090921 Expp Presentation
20090921 Expp Presentation
 

Recently uploaded

Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfjtzach
 
Protection of Children in context of IHL and Counter Terrorism
Protection of Children in context of IHL and  Counter TerrorismProtection of Children in context of IHL and  Counter Terrorism
Protection of Children in context of IHL and Counter TerrorismNilendra Kumar
 
Gray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdfGray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdfpadillaangelina0023
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改yuu sss
 
tools in IDTelated to first year vtu students is useful where they can refer ...
tools in IDTelated to first year vtu students is useful where they can refer ...tools in IDTelated to first year vtu students is useful where they can refer ...
tools in IDTelated to first year vtu students is useful where they can refer ...vinbld123
 
Kindergarten-DLL-MELC-Q3-Week 2 asf.docx
Kindergarten-DLL-MELC-Q3-Week 2 asf.docxKindergarten-DLL-MELC-Q3-Week 2 asf.docx
Kindergarten-DLL-MELC-Q3-Week 2 asf.docxLesterJayAquino
 
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...RegineManuel2
 
Ethics of Animal Research Laika mission.ppt
Ethics of Animal Research Laika mission.pptEthics of Animal Research Laika mission.ppt
Ethics of Animal Research Laika mission.pptShafqatShakeel1
 
Digital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, IndiaDigital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, IndiaDigital Discovery Institute
 
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书saphesg8
 
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证diploma001
 
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCRdollysharma2066
 
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
Outsmarting the Attackers A Deep Dive into Threat Intelligence.docx
Outsmarting the Attackers A Deep Dive into Threat Intelligence.docxOutsmarting the Attackers A Deep Dive into Threat Intelligence.docx
Outsmarting the Attackers A Deep Dive into Threat Intelligence.docxmanas23pgdm157
 
如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一
如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一
如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一ypfy7p5ld
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxGry Tina Tinde
 
办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一
办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一
办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一F La
 
定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一z zzz
 
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...nitagrag2
 

Recently uploaded (20)

Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdf
 
Protection of Children in context of IHL and Counter Terrorism
Protection of Children in context of IHL and  Counter TerrorismProtection of Children in context of IHL and  Counter Terrorism
Protection of Children in context of IHL and Counter Terrorism
 
Gray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdfGray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdf
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
 
tools in IDTelated to first year vtu students is useful where they can refer ...
tools in IDTelated to first year vtu students is useful where they can refer ...tools in IDTelated to first year vtu students is useful where they can refer ...
tools in IDTelated to first year vtu students is useful where they can refer ...
 
Kindergarten-DLL-MELC-Q3-Week 2 asf.docx
Kindergarten-DLL-MELC-Q3-Week 2 asf.docxKindergarten-DLL-MELC-Q3-Week 2 asf.docx
Kindergarten-DLL-MELC-Q3-Week 2 asf.docx
 
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
 
Ethics of Animal Research Laika mission.ppt
Ethics of Animal Research Laika mission.pptEthics of Animal Research Laika mission.ppt
Ethics of Animal Research Laika mission.ppt
 
Digital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, IndiaDigital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, India
 
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
 
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
 
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
 
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
 
Outsmarting the Attackers A Deep Dive into Threat Intelligence.docx
Outsmarting the Attackers A Deep Dive into Threat Intelligence.docxOutsmarting the Attackers A Deep Dive into Threat Intelligence.docx
Outsmarting the Attackers A Deep Dive into Threat Intelligence.docx
 
如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一
如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一
如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptx
 
FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974
 
办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一
办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一
办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一
 
定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一
 
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
 

ETSI STF 333 Open Conference ActionsRequiredToProgress.ppt

  • 1. ETSI/OCG35(08)XX European Accessibility Requirements for ICT Public Procurement: Actions Required to Progress the Work (ETSI STF333) Bruno von Niman Leader, ETSI STF333 M 376 Open Conference, Brussels, June 3-4, 2008
  • 2. World Class Standards European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 2 ”Accessibility as a competitive edge”  One, globally harmonized Norm  One usable and accessible toolkit  Based on deep insight about user needs and contexxts of use  Relyingupon competitive innovation  On at least two levels: • Minimum required • + • (Super + required by industry to ease competition)  With at least two profiles: • Procurer • Provider  Providers positioning and competing with accessibility as a competitive edge
  • 3. World Class Standards European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 3 Actions planned and agreed until the end of the project  Steering Committee, CEN/BTWG185 AND ETSI TC HF reporting and coordination in June 2008  with comments from this meeting taken on board  ISO/IEC JTC1-SWG-A liaison (June) and ICCHP presentation in July 2008  Comments until August 11  those received from you do not have to be repeated  Resolutions, draft updates, final review  Final draft for ESO approval on September 24  A 5th public draft may be released (and announced) for validation purposes, without any commitment  for a compacted period, e.g. September 8- 18)  Final draft for ESO approval on September 24  ETSI TC Human Factors and cross-ESO approval on October 8, 2008  ETSI publication after editorial processing  in October- November 2008
  • 4. World Class Standards European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 4 Public draft releases Preliminary public draft release dates Commenting deadlines Status and notes November 20, 2007 January 10, 2008 First public draft February 12, 2008 March 4, 2008 Second public draft March 17, 2008 (this version) April 16, 2008 Third public draft May 19, 2008 August 11, 2008 (18:00 CET) Final Public (Open Workshop) draft; Last public comment opportunity! September 22, 2008 Following ETSI process Final draft for ETSI and CEN TB approval NOTE: The above dates are preliminary and subject to change at any time, as required by the progress of the work. An additional (post- Open Workshop) draft version may be announced later. Note: This is a draft document that will be updated, replaced or made obsolete by future versions at any time. It is inappropriate to cite this document as other than “work in progress”.
  • 5. World Class Standards European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 5 11 – Two main possible approaches 1. (“Shopping list”: an exhaustive listing and reference to existing external standards, adding only minimal new content (not recommended):  10.000 pages?, 2- 5.000 €?, own structures and vocabularies, limited accessibility  would require all stakeholders to purchase, or otherwise obtain all necessary, referenced standards.) 2. “One-stop-shop”: a self-contained standard which, while supported by previous work, stands alone and provides the basis for procurement: 1. More accessible for the intended users, easier to maintain 2. Would enable a more useful toolkit – with login profiles and contextual applicability
  • 6. World Class Standards European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 6 Considerations and recommendations  Regardless the approach chosen, a “refresh” policy should be defined (3-5 year “refresh” cycle).  Close collaboration with the US Access Board is strongly recommended  More insight about the user segment requirements and contexts of use (including procurers and processes)  Requirements on the Toolkit: • Usability and accessibility requirements similar to those on products Language, • Languages and translations • Maintenance, et cetera
  • 7. World Class Standards European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 7 Five Phase II tasks 1. A European Standard (ES/EN)  specifying the requirements for accessibility for all ICT products and services within each of the technical areas (to be used in terms of technical specifications in the sense mentioned in the public procurement Directives). 2. A Report on the standards and specifications (building on the ETSI TR) 3. Guidelines on accessibility award criteria that are relevant to each technical area, to be used in the procurement,
  • 8. World Class Standards European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 8 Five Phase II tasks 4. Guidance and support material for public procurements, which should address at least the following areas: • Information Technology planning guidelines, • Broad circulation of materials on accessible information technology, • Technical advice on new ICT hardware or software, • Training of IT staff on the use of the developed material, • Inventory of existing accessibility support services and of accessibility support needs, • Inclusion of accessibility in ICT call for proposals, • Verification of supplier claims of accessibility, • Tracking of non-compliance of products and services with accessibility requirements in tenders, • Information on the testing and conformity aspects. 5. An on-line, accessible toolkit providing structured access to the full content of the EN, the report, the guidelines and the guidance material. It shall provide, in particular, thorough guidance and ready text to public procurers who will access it.
  • 9. World Class Standards European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 9 Phase II  Enough information has been found in Phase I to permit a single EN to be written in Phase II which contains all of the functional requirements  will need to refer to other International and/or European standards, particularly for test methods (which need to be based on harmonized International requirements).  For each requirement identified references will be noted  The first work is to merge them into consensual statements  Conformance statements need to be associated with each requirement  Gaps will need to be filled  Need to agree gaps are genuine  Requirements need to be written  International standard bodies must be approached to write a couple of new standards
  • 10. World Class Standards European Accessibility Requirements in ICT Public Procurement (ETSI DTR 102 612) 10 Phase II continued  A Report will list all standards referenced out from the EN  update of status of standards currently under development  Guidance may be needed on applying the various requirements to actual products  The work can provide all necessary information to support preparation of an on-line toolkit for public procurers.  It is believed that the toolkit should also be able to assist suppliers and designers  The toolkit should be so structured as to permit a number of approaches to the information that it contains