===================== J A D W A L P E L A K S A N A A N =====================
PEKERJAAN : PEMBANGUNANAN RUMAH SUSUN PEMKAB INDRAGIRI HULU
TIPE PROTOTYPE : RUMAH SUSUN MBR TIPE 36 KDS D
JUMLAH LANTAI : 3 LANTAI
TAHUN ANGGARAN : 2020
BULAN I BULAN II BULAN III BULAN IV BULAN V
Mg 1 Mg 2 Mg 3 Mg 4 Mg 5 Mg 6 Mg 7 Mg 8 Mg 9 Mg 10 Mg 11 Mg 12 Mg 13 Mg 14 Mg 15 Mg 16 Mg 17 Mg 18 Mg 19 Mg 20
SATU DUA TIGA EMPAT LIMA ENAM TUJUH DELAPAN SEMBILAN SEPULUH SEBELAS DUABELAS TIGABELAS EMPATBELAS LIMABELAS ENAMBELAS TUJUHBELAS DELAPANBELAS SEMBILANBELAS
DUAPULUH
HARI KE 1 8 15 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133
sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd.
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
HARI KE 7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140
HKT = 7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140
SHK = 233 226 219 212 205 198 191 184 177 170 163 156 149 142 135 128 121 114 107 100
I.A. PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank 0,06493 0,0216 0,0216 0,0216
2 Direksi Keet 0,1662 0,0554 0,0554 0,0554
3 Papan Nama Proyek 0,00467 0,0047
4 Foto Proyek 0,00438 0,0015 0,0015 0,0015
5 Air Kerja 0,0292 0,0097
6 Listrik Kerja 0,04088 0,0012 0,0012 0,0012
7 Pagar Seng Keliling Proyek 0,26319 0,0877 0,0877 0,0877
8 GWFS 0,0876 0,0876
I.B. PEKERJAAN RK3K KONSTRUKSI 0,06237 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019
II. PEKERJAAN STRUKTUR
II.A PEKERJAAN STRUKTUR STANDAR
I PEKERJAAN STRUKTUR ATAS (UPPER STURCTURE)
2.1.1 Pekerjaan Struktur Lantai Dasar elv. -0.05 m
a Komponen Kolom
1 Kolom K1 ( 35 X 50 CM) 1,75632 0,5854 0,5854 0,5854
2 Kolom K2 ( 30 X 30 Cm ) 0,03164 0,0316
3 Pekerjaan dalam bangunan
Tanah urug peninggian lantai t= 100 cm (dalam bangunan ) 1,34514 0,6726 0,6726
Pasir urug diatas tanah urug t=10 cm (dalam bangunan) 0,13231 0,0662 0,0662
0 Cor beton lantai kerja t=5 cm (dalam bangunan) 0,25657 0,1283 0,1283
4 Pekerjaan luar bangunan
Tanah urug peninggian lantai t=20 cm (luar bangunan) + pemadatan CBR 5%
0,052 0,0260 0,0260
Pasir urug diatas tanah urug t=10 cm (luar bangunan) 0,02955 0,0148 0,0148
0 Cor beton lantai kerja t=5 cm (luar bangunan) 0,0573 0,0287 0,0287
5 Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (dalam bangunan)1,33543 0,6677 0,6677
7 Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (luarbngunan/teras)
0,31222 0,3122
8 Sear Wall (SW) 1,77938 0,8897 0,8897
9 Pelat Beton Canopy Jendela t= 10 cm 0,30798 0,1540 0,1540
10 Tangga Service lt. 1 0,42629 0,2131 0,2131
11 Balok Bordes 20x35 cm (tangga Service) 0,03377 0,0169 0,0169
12 Kolom KB (Tangga Service) 0,0089 0,0045 0,0045
13 Tangga Utama lt. 1 0,51191 0,2560 0,2560
14 Balok Bordes 20x35 cm Tangga Utama 0,03377 0,0169 0,0169
15 Kolom KB (Tangga Utama) 0,0089 0,0045 0,0045
2.1.2 Pekerjaan Struktur Lantai 2 elv. +3.55 m
1 Kolom K1 ( 35 X 50 CM) 1,39459 0,1992
2 Kolom K2 ( 30 X 30 Cm ) 0,02395
3 Balok G1.1 0,41982 0,2939 0,2939
4 Balok G1.2 0,17774 0,1244 0,1244
5 Balok G1.3 0,1662 0,1163 0,1163
6 Balok G1.4 0,30181 0,2113 0,2113
7 Balok G1.5 0,57382 0,4017 0,4017
8 Balok G1.6 0,03064 0,0214 0,0214
9 Balok G1.7 0,09972 0,0698 0,0698
10 Balok B1.1 0,03482 0,0244 0,0244
11 Plat lantai t =130 mm 3,07644 2,1535 2,1535
12 Plat lantai t =150 mm 0,04812 0,0337 0,0337
13 Sear Wall (SW) 1,37888 0,1724
14 Pelat Beton Canopy Jendela t= 10 cm 0,30798
15 Tangga Service lt.2 0,42629
16 Balok Bordes 20x35 cm (tangga Service) 0,03377
17 Kolom KB (Tangga Service) 0,0089
18 Tangga Utama lt. 2 0,51191
19 Balok Bordes 20x35 cm Tangga Utama 0,03377
20 Kolom KB (Tangga Utama) 0,0089
2.1.3 Pekerjaan Struktur Lantai 3 elv. +6.95 m
c. Komponen Kolom
1 Kolom K3 1,23346
2 Kolom K2 0,02471
3 Balok G1.1 0,41982
4 Balok G1.2 0,17407
5 Balok G1.3 0,1662
6 Balok G1.4 0,30181
7 Balok G1.5 0,57382
8 Balok G1.6 0,03064
9 Balok G1.7 0,09972
10 Balok B1.1 0,03482
b. Komponen Pelat Lantai
11 Plat lantai t=13 cm 3,07644
12 Plat lantai t =150 mm 0,04812
13 Pelat Beton Canopy Jendela t= 10 cm 0,30798
14 Tangga Service lt.4 0,42629
15 Balok Bordes 20x35 cm (tangga Service) 0,03377
16 Kolom KB (Tangga Service) 0,0089
2.1.4 Pekerjaan Struktur Lantai 4 elv. +10.35 m
1 Kolom K3 0
2 Kolom K2
a Komponen Balok
3 Balok G1.2 0
4 Balok G1.8 0
5 Balok G2.1 0
6 Balok B1.2 0
7 Plat Dak t=15 cm 0
8 Pondasi Water Tank Plat Dak t=15 cm 0
9 Beton Tanggulan 0
2.1.5 Pekerjaan Struktur Atap Elv. +13.750 m
1 Balok G3.1 0,11662
2 Kolom K3 (sopi-sopi) 0,13581
3 Balok G3.1 (sopi-sopi) 1,38017
2.1.6 RANGKA ATAP BAJA
a Pekerjaan Atap Baja Ringan 2,00507
b Pekerjaan rangka Atap Pipa Baja 0,17591
No. URAIAN PEKERJAAN BOBOT %
J A N G K A W A K T U P E L A K S A N A A N 2 4 0 H A R I K A L E N D E R
2.1.B. PEKERJAAN STRUKTUR NON STANDART
B.1 PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE)
A.1. Pondasi Tiang Pancang dan Tie Beam (Sloof)
1 Pekerjaan mobilisasi dan demobilisasi 0,2628 0,2628
Pekerjaan Pondasi Tiang Pancang 25x25 cm 8,50308 1,7006 1,7006 1,7006 1,7006 1,7006
Pemotongan kepala tiang 0,05613 0,0140 0,0140 0,0140 0,0140
2 Pile Cap Tipe PC-1 0,01109 0,0055 0,0055
3 Pile Cap Tipe PC-2 0,45572 0,2279 0,2279
4 Pile Cap Tipe PC-3 0,85202 0,4260 0,4260
5 Pile Cap Tipe PC-23 1,45673 0,7284 0,7284
6 Tie Beam / Sloof TB1 1,3005 0,6503 0,6503
7 Pekerjaan Rollag Bata, Pas 1 bt, (dibawah dinding bata) 0,25813 0,1291 0,1291
8 Pekerjaan Rollag Bata (disisi luar) 0,0916
9 Pekerjaan Sloof 15/20 0,65456 0,3273 0,3273
9 Besi Dowel Ø 10-1000 0,17707 0,0590 0,0590 0,0590
10 Pekerjaan Galian tanah : 0,06354 0,0212 0,0212 0,0212
11 Pekerjaan Urugan Pasir tebal 10 cm : 0,02953 0,0098 0,0098 0,0098
12 Pekerjaan Lantai Kerja tebal 5 cm : 0,05725 0,0191 0,0191 0,0191
13 Urugan tanah kembali bekas galian 0,03042 0,0304
14 Pekerjaan Test PDA Tiang 0,1168 0,1168
B.2 PEKERJAAN STRUKTUR GWT , RUANG POMPA DAN PONDASI STP
a PEKERJAAN STRUKTUR GWT
1 Pekerjaan Pondasi Tiang Pancang 25x25 cm 0,21436 0,2144
2 Pemotongan kepala tiang 0,00142 0,0014
3 Pile Cap Tipe PC-1 0,16452 0,1645
4 Pile Cap Tipe PC-2 0,06835
5 Pekerjaan Galian tanah : 0,00155 0,0016
6 Pekerjaan Urugan Pasir tebal 10 cm : 0,00092 0,0009
7 Pekerjaan Lantai Kerja tebal 5 cm : 0,00114 0,0011
8 Urugan tanah kembali bekas galian 0,00055 0,0006
9 Pekerjaan Lantai Dasar GWT 0,09271
3 Pekerjaan Dinding GWT 0,64637 0,0232
4 Pekerjaan Pelat Penutup GWT 0,0576
b PEKERJAAN STRUKTUR RUANG POMPA
1 Pekerjaan Pondasi Tiang Pancang 25x25 cm 0,14291 0,1429
2 Pemotongan kepala tiang 0,00094 0,0009
3 Pile Cap Tipe PC-1 0,15327 0,1533
4 Pekerjaan Galian tanah : 0,00193 0,0019
5 Pekerjaan Urugan Pasir tebal 10 cm : 0,00089 0,0009
6 Pekerjaan Lantai Kerja tebal 5 cm : 0,00173
7 Urugan tanah kembali bekas galian 0,00093
8 Pekerjaan Lantai Dasar R.Pompa 0,06277
9 Pekerjaan Pelat Dak R.Pompa 0,05893
10 Kolom K1 (R. Pompa) 0,02437
11 Balok B1 (R. Pompa) 0,036
12 Lantai Ramp 0,00687
0,1838 0,1694 0,4322 1,7025 1,7165 1,8333 2,0950 1,7690 1,5309 1,4215 0,9699 1,4257 2,0156 2,5675 0,0000 0,0000 4,3757 4,0883 1,3788 1,6476
0 0,1838 0,3531 0,7853 2,4878 4,2043 6,0377 8,1327 9,9017 11,4325 12,8541 13,8240 15,2497 17,2652 19,8328 19,8328 19,8328 24,2085 28,2968 29,6756 31,3231
PROGRESS (%)
KUMULATIF (%)

More Related Content

Similar to Pembangunan Rumah Susun

1. rab rehab kelas 2020 kelas xi ips 2
1. rab rehab kelas   2020 kelas xi ips 21. rab rehab kelas   2020 kelas xi ips 2
1. rab rehab kelas 2020 kelas xi ips 2sma 10 semarang
 
1. rab rehab kelas 2020 kelas xi ips 1
1. rab rehab kelas   2020 kelas xi ips 11. rab rehab kelas   2020 kelas xi ips 1
1. rab rehab kelas 2020 kelas xi ips 1sma 10 semarang
 
1. rab rehab kelas 2020 kelas xi ips 3
1. rab rehab kelas   2020 kelas xi ips 31. rab rehab kelas   2020 kelas xi ips 3
1. rab rehab kelas 2020 kelas xi ips 3sma 10 semarang
 
2021 08 26 masjid djami'ul mujthadidin
2021 08 26   masjid djami'ul mujthadidin2021 08 26   masjid djami'ul mujthadidin
2021 08 26 masjid djami'ul mujthadidinzarril1972
 
Rab musholla juladri
Rab musholla juladriRab musholla juladri
Rab musholla juladriAgus Wahyu
 
Rab rumah tinggal type 36 ls tanah 120 m
Rab rumah tinggal type 36 ls tanah 120 mRab rumah tinggal type 36 ls tanah 120 m
Rab rumah tinggal type 36 ls tanah 120 mKashmir Brown
 
pw 2 PRESENTASI LAP 2.ppt
pw 2 PRESENTASI LAP 2.pptpw 2 PRESENTASI LAP 2.ppt
pw 2 PRESENTASI LAP 2.pptAgnisRangga
 
BOQ kosongan.pdf
BOQ kosongan.pdfBOQ kosongan.pdf
BOQ kosongan.pdfheru70830
 
Perencanaa rumah dua lantai
Perencanaa rumah dua lantaiPerencanaa rumah dua lantai
Perencanaa rumah dua lantairezasholahudin
 
Perencanaa rumah dua lantai
Perencanaa rumah dua lantaiPerencanaa rumah dua lantai
Perencanaa rumah dua lantairezasholahudin
 
Materi-Bahan Presentasi_013362.pdf
Materi-Bahan Presentasi_013362.pdfMateri-Bahan Presentasi_013362.pdf
Materi-Bahan Presentasi_013362.pdfArif Matondang
 
Sistem bangunan tinggi analisis shearwall
Sistem bangunan tinggi analisis shearwallSistem bangunan tinggi analisis shearwall
Sistem bangunan tinggi analisis shearwalldwifilo
 
METODE KERJA AKR revisi 1 FEB 2021-ARYANA.pdf
METODE  KERJA AKR  revisi 1 FEB 2021-ARYANA.pdfMETODE  KERJA AKR  revisi 1 FEB 2021-ARYANA.pdf
METODE KERJA AKR revisi 1 FEB 2021-ARYANA.pdfMemedPermadiSatriyo1
 
Laporan Struktur Rumah Tinggal
Laporan Struktur Rumah TinggalLaporan Struktur Rumah Tinggal
Laporan Struktur Rumah TinggalAli Hasan
 
PRESENTASI ACTIONPLAN 33.ppt
PRESENTASI ACTIONPLAN 33.pptPRESENTASI ACTIONPLAN 33.ppt
PRESENTASI ACTIONPLAN 33.pptNunung Muhammad
 

Similar to Pembangunan Rumah Susun (20)

RAB PLTMH Sirin-Punti-dgn-ppn
RAB PLTMH  Sirin-Punti-dgn-ppnRAB PLTMH  Sirin-Punti-dgn-ppn
RAB PLTMH Sirin-Punti-dgn-ppn
 
1. rab rehab kelas 2020 kelas xi ips 2
1. rab rehab kelas   2020 kelas xi ips 21. rab rehab kelas   2020 kelas xi ips 2
1. rab rehab kelas 2020 kelas xi ips 2
 
1. rab rehab kelas 2020 kelas xi ips 1
1. rab rehab kelas   2020 kelas xi ips 11. rab rehab kelas   2020 kelas xi ips 1
1. rab rehab kelas 2020 kelas xi ips 1
 
Contoh penawaran jembatan
Contoh penawaran jembatanContoh penawaran jembatan
Contoh penawaran jembatan
 
1. rab rehab kelas 2020 kelas xi ips 3
1. rab rehab kelas   2020 kelas xi ips 31. rab rehab kelas   2020 kelas xi ips 3
1. rab rehab kelas 2020 kelas xi ips 3
 
TKDN.pdf
TKDN.pdfTKDN.pdf
TKDN.pdf
 
2021 08 26 masjid djami'ul mujthadidin
2021 08 26   masjid djami'ul mujthadidin2021 08 26   masjid djami'ul mujthadidin
2021 08 26 masjid djami'ul mujthadidin
 
Rab musholla juladri
Rab musholla juladriRab musholla juladri
Rab musholla juladri
 
Rab rumah tinggal type 36 ls tanah 120 m
Rab rumah tinggal type 36 ls tanah 120 mRab rumah tinggal type 36 ls tanah 120 m
Rab rumah tinggal type 36 ls tanah 120 m
 
pw 2 PRESENTASI LAP 2.ppt
pw 2 PRESENTASI LAP 2.pptpw 2 PRESENTASI LAP 2.ppt
pw 2 PRESENTASI LAP 2.ppt
 
BOQ kosongan.pdf
BOQ kosongan.pdfBOQ kosongan.pdf
BOQ kosongan.pdf
 
Perencanaa rumah dua lantai
Perencanaa rumah dua lantaiPerencanaa rumah dua lantai
Perencanaa rumah dua lantai
 
Perencanaa rumah dua lantai
Perencanaa rumah dua lantaiPerencanaa rumah dua lantai
Perencanaa rumah dua lantai
 
KP Gudang.pptx
KP Gudang.pptxKP Gudang.pptx
KP Gudang.pptx
 
Materi-Bahan Presentasi_013362.pdf
Materi-Bahan Presentasi_013362.pdfMateri-Bahan Presentasi_013362.pdf
Materi-Bahan Presentasi_013362.pdf
 
Sistem bangunan tinggi analisis shearwall
Sistem bangunan tinggi analisis shearwallSistem bangunan tinggi analisis shearwall
Sistem bangunan tinggi analisis shearwall
 
METODE KERJA AKR revisi 1 FEB 2021-ARYANA.pdf
METODE  KERJA AKR  revisi 1 FEB 2021-ARYANA.pdfMETODE  KERJA AKR  revisi 1 FEB 2021-ARYANA.pdf
METODE KERJA AKR revisi 1 FEB 2021-ARYANA.pdf
 
Laporan Struktur Rumah Tinggal
Laporan Struktur Rumah TinggalLaporan Struktur Rumah Tinggal
Laporan Struktur Rumah Tinggal
 
Bo q
Bo qBo q
Bo q
 
PRESENTASI ACTIONPLAN 33.ppt
PRESENTASI ACTIONPLAN 33.pptPRESENTASI ACTIONPLAN 33.ppt
PRESENTASI ACTIONPLAN 33.ppt
 

Pembangunan Rumah Susun

  • 1. ===================== J A D W A L P E L A K S A N A A N ===================== PEKERJAAN : PEMBANGUNANAN RUMAH SUSUN PEMKAB INDRAGIRI HULU TIPE PROTOTYPE : RUMAH SUSUN MBR TIPE 36 KDS D JUMLAH LANTAI : 3 LANTAI TAHUN ANGGARAN : 2020 BULAN I BULAN II BULAN III BULAN IV BULAN V Mg 1 Mg 2 Mg 3 Mg 4 Mg 5 Mg 6 Mg 7 Mg 8 Mg 9 Mg 10 Mg 11 Mg 12 Mg 13 Mg 14 Mg 15 Mg 16 Mg 17 Mg 18 Mg 19 Mg 20 SATU DUA TIGA EMPAT LIMA ENAM TUJUH DELAPAN SEMBILAN SEPULUH SEBELAS DUABELAS TIGABELAS EMPATBELAS LIMABELAS ENAMBELAS TUJUHBELAS DELAPANBELAS SEMBILANBELAS DUAPULUH HARI KE 1 8 15 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. sd. 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 HARI KE 7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 HKT = 7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 SHK = 233 226 219 212 205 198 191 184 177 170 163 156 149 142 135 128 121 114 107 100 I.A. PEKERJAAN PERSIAPAN 1 Pengukuran dan Pemasangan Bouwplank 0,06493 0,0216 0,0216 0,0216 2 Direksi Keet 0,1662 0,0554 0,0554 0,0554 3 Papan Nama Proyek 0,00467 0,0047 4 Foto Proyek 0,00438 0,0015 0,0015 0,0015 5 Air Kerja 0,0292 0,0097 6 Listrik Kerja 0,04088 0,0012 0,0012 0,0012 7 Pagar Seng Keliling Proyek 0,26319 0,0877 0,0877 0,0877 8 GWFS 0,0876 0,0876 I.B. PEKERJAAN RK3K KONSTRUKSI 0,06237 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 0,0019 II. PEKERJAAN STRUKTUR II.A PEKERJAAN STRUKTUR STANDAR I PEKERJAAN STRUKTUR ATAS (UPPER STURCTURE) 2.1.1 Pekerjaan Struktur Lantai Dasar elv. -0.05 m a Komponen Kolom 1 Kolom K1 ( 35 X 50 CM) 1,75632 0,5854 0,5854 0,5854 2 Kolom K2 ( 30 X 30 Cm ) 0,03164 0,0316 3 Pekerjaan dalam bangunan Tanah urug peninggian lantai t= 100 cm (dalam bangunan ) 1,34514 0,6726 0,6726 Pasir urug diatas tanah urug t=10 cm (dalam bangunan) 0,13231 0,0662 0,0662 0 Cor beton lantai kerja t=5 cm (dalam bangunan) 0,25657 0,1283 0,1283 4 Pekerjaan luar bangunan Tanah urug peninggian lantai t=20 cm (luar bangunan) + pemadatan CBR 5% 0,052 0,0260 0,0260 Pasir urug diatas tanah urug t=10 cm (luar bangunan) 0,02955 0,0148 0,0148 0 Cor beton lantai kerja t=5 cm (luar bangunan) 0,0573 0,0287 0,0287 5 Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (dalam bangunan)1,33543 0,6677 0,6677 7 Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (luarbngunan/teras) 0,31222 0,3122 8 Sear Wall (SW) 1,77938 0,8897 0,8897 9 Pelat Beton Canopy Jendela t= 10 cm 0,30798 0,1540 0,1540 10 Tangga Service lt. 1 0,42629 0,2131 0,2131 11 Balok Bordes 20x35 cm (tangga Service) 0,03377 0,0169 0,0169 12 Kolom KB (Tangga Service) 0,0089 0,0045 0,0045 13 Tangga Utama lt. 1 0,51191 0,2560 0,2560 14 Balok Bordes 20x35 cm Tangga Utama 0,03377 0,0169 0,0169 15 Kolom KB (Tangga Utama) 0,0089 0,0045 0,0045 2.1.2 Pekerjaan Struktur Lantai 2 elv. +3.55 m 1 Kolom K1 ( 35 X 50 CM) 1,39459 0,1992 2 Kolom K2 ( 30 X 30 Cm ) 0,02395 3 Balok G1.1 0,41982 0,2939 0,2939 4 Balok G1.2 0,17774 0,1244 0,1244 5 Balok G1.3 0,1662 0,1163 0,1163 6 Balok G1.4 0,30181 0,2113 0,2113 7 Balok G1.5 0,57382 0,4017 0,4017 8 Balok G1.6 0,03064 0,0214 0,0214 9 Balok G1.7 0,09972 0,0698 0,0698 10 Balok B1.1 0,03482 0,0244 0,0244 11 Plat lantai t =130 mm 3,07644 2,1535 2,1535 12 Plat lantai t =150 mm 0,04812 0,0337 0,0337 13 Sear Wall (SW) 1,37888 0,1724 14 Pelat Beton Canopy Jendela t= 10 cm 0,30798 15 Tangga Service lt.2 0,42629 16 Balok Bordes 20x35 cm (tangga Service) 0,03377 17 Kolom KB (Tangga Service) 0,0089 18 Tangga Utama lt. 2 0,51191 19 Balok Bordes 20x35 cm Tangga Utama 0,03377 20 Kolom KB (Tangga Utama) 0,0089 2.1.3 Pekerjaan Struktur Lantai 3 elv. +6.95 m c. Komponen Kolom 1 Kolom K3 1,23346 2 Kolom K2 0,02471 3 Balok G1.1 0,41982 4 Balok G1.2 0,17407 5 Balok G1.3 0,1662 6 Balok G1.4 0,30181 7 Balok G1.5 0,57382 8 Balok G1.6 0,03064 9 Balok G1.7 0,09972 10 Balok B1.1 0,03482 b. Komponen Pelat Lantai 11 Plat lantai t=13 cm 3,07644 12 Plat lantai t =150 mm 0,04812 13 Pelat Beton Canopy Jendela t= 10 cm 0,30798 14 Tangga Service lt.4 0,42629 15 Balok Bordes 20x35 cm (tangga Service) 0,03377 16 Kolom KB (Tangga Service) 0,0089 2.1.4 Pekerjaan Struktur Lantai 4 elv. +10.35 m 1 Kolom K3 0 2 Kolom K2 a Komponen Balok 3 Balok G1.2 0 4 Balok G1.8 0 5 Balok G2.1 0 6 Balok B1.2 0 7 Plat Dak t=15 cm 0 8 Pondasi Water Tank Plat Dak t=15 cm 0 9 Beton Tanggulan 0 2.1.5 Pekerjaan Struktur Atap Elv. +13.750 m 1 Balok G3.1 0,11662 2 Kolom K3 (sopi-sopi) 0,13581 3 Balok G3.1 (sopi-sopi) 1,38017 2.1.6 RANGKA ATAP BAJA a Pekerjaan Atap Baja Ringan 2,00507 b Pekerjaan rangka Atap Pipa Baja 0,17591 No. URAIAN PEKERJAAN BOBOT % J A N G K A W A K T U P E L A K S A N A A N 2 4 0 H A R I K A L E N D E R
  • 2. 2.1.B. PEKERJAAN STRUKTUR NON STANDART B.1 PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE) A.1. Pondasi Tiang Pancang dan Tie Beam (Sloof) 1 Pekerjaan mobilisasi dan demobilisasi 0,2628 0,2628 Pekerjaan Pondasi Tiang Pancang 25x25 cm 8,50308 1,7006 1,7006 1,7006 1,7006 1,7006 Pemotongan kepala tiang 0,05613 0,0140 0,0140 0,0140 0,0140 2 Pile Cap Tipe PC-1 0,01109 0,0055 0,0055 3 Pile Cap Tipe PC-2 0,45572 0,2279 0,2279 4 Pile Cap Tipe PC-3 0,85202 0,4260 0,4260 5 Pile Cap Tipe PC-23 1,45673 0,7284 0,7284 6 Tie Beam / Sloof TB1 1,3005 0,6503 0,6503 7 Pekerjaan Rollag Bata, Pas 1 bt, (dibawah dinding bata) 0,25813 0,1291 0,1291 8 Pekerjaan Rollag Bata (disisi luar) 0,0916 9 Pekerjaan Sloof 15/20 0,65456 0,3273 0,3273 9 Besi Dowel Ø 10-1000 0,17707 0,0590 0,0590 0,0590 10 Pekerjaan Galian tanah : 0,06354 0,0212 0,0212 0,0212 11 Pekerjaan Urugan Pasir tebal 10 cm : 0,02953 0,0098 0,0098 0,0098 12 Pekerjaan Lantai Kerja tebal 5 cm : 0,05725 0,0191 0,0191 0,0191 13 Urugan tanah kembali bekas galian 0,03042 0,0304 14 Pekerjaan Test PDA Tiang 0,1168 0,1168 B.2 PEKERJAAN STRUKTUR GWT , RUANG POMPA DAN PONDASI STP a PEKERJAAN STRUKTUR GWT 1 Pekerjaan Pondasi Tiang Pancang 25x25 cm 0,21436 0,2144 2 Pemotongan kepala tiang 0,00142 0,0014 3 Pile Cap Tipe PC-1 0,16452 0,1645 4 Pile Cap Tipe PC-2 0,06835 5 Pekerjaan Galian tanah : 0,00155 0,0016 6 Pekerjaan Urugan Pasir tebal 10 cm : 0,00092 0,0009 7 Pekerjaan Lantai Kerja tebal 5 cm : 0,00114 0,0011 8 Urugan tanah kembali bekas galian 0,00055 0,0006 9 Pekerjaan Lantai Dasar GWT 0,09271 3 Pekerjaan Dinding GWT 0,64637 0,0232 4 Pekerjaan Pelat Penutup GWT 0,0576 b PEKERJAAN STRUKTUR RUANG POMPA 1 Pekerjaan Pondasi Tiang Pancang 25x25 cm 0,14291 0,1429 2 Pemotongan kepala tiang 0,00094 0,0009 3 Pile Cap Tipe PC-1 0,15327 0,1533 4 Pekerjaan Galian tanah : 0,00193 0,0019 5 Pekerjaan Urugan Pasir tebal 10 cm : 0,00089 0,0009 6 Pekerjaan Lantai Kerja tebal 5 cm : 0,00173 7 Urugan tanah kembali bekas galian 0,00093 8 Pekerjaan Lantai Dasar R.Pompa 0,06277 9 Pekerjaan Pelat Dak R.Pompa 0,05893 10 Kolom K1 (R. Pompa) 0,02437 11 Balok B1 (R. Pompa) 0,036 12 Lantai Ramp 0,00687 0,1838 0,1694 0,4322 1,7025 1,7165 1,8333 2,0950 1,7690 1,5309 1,4215 0,9699 1,4257 2,0156 2,5675 0,0000 0,0000 4,3757 4,0883 1,3788 1,6476 0 0,1838 0,3531 0,7853 2,4878 4,2043 6,0377 8,1327 9,9017 11,4325 12,8541 13,8240 15,2497 17,2652 19,8328 19,8328 19,8328 24,2085 28,2968 29,6756 31,3231 PROGRESS (%) KUMULATIF (%)