SlideShare a Scribd company logo
1 of 19
PROJEK AKHIR
MUHAMMAD AMIRUL MUSTAQIM BIN MAHAT
A157238
PROR DATO' IR. DR RIZA ATIQ ABDULLAH BIN O.K. RAHMAT
LMCP 3152
ASAS-ASAS SAINS DATA DALAM
PENGANGKUTAN
SOALAN
JADUAL
Rumah Luas Lantai
A 16,500 1,050,000
B 19,000 1,290,000
C 31,000 1,940,000
D 27,000 1,850,000
E 21,500 1,430,000
F 17,500 1,230,000
Pengeluaran Penarikan
A 36300 34650
B 41800 42570
C 68200 64020
D 59400 61050
E 47300 47190
F 38500 40590
KADAR PENGELUARAN 2.2 SETIAP RUMAH DAN KADAR
PENARIKAN 3.3 BAGI SETIAP 100 M.PERSEGI LUAS LANTAI.
1. PENGELUARAN DAN PENARIKAN BAGI SETIAP BANDAR
Pengeluaran Penarikan
A 12,418 11,854
B 14,300 14,563
C 23,332 21,902
D 20,321 20,886
E 16,182 16,144
F 13,171 13,886
Jumlah 99,724 99,234
2.JIKA 65% PERJALANAN MENGGUNAKAN KERETA PERSENDIRIAN
DAN PURATA ISI KERETA IALAH 1.9 ORANG/KERETA,
KIRAKAN PENGELUARAN DAN PENARIKAN PERJALANAN KERETA
BAGI SETIAP BANDAR
Pengeluaran Penarikan
A 12,388 11,883
B 14,265 14,599
C 23,274 21,956
D 20,271 20,937
E 16,142 16,184
F 13,139 13,920
Jumlah 99,479 99,479
PURATA PENGELUARAN DAN PENARIKAN = (99724+99234)÷2
= 99479
PENGELUARAN DARAB 99479 BAHAGI JUMLAH KESULURUHAN PENGELUARAN
PENARIKAN DARAB 99479 BAHAGI JUMLAH KESELURUHAN PENARIKAN
CONTOH ZON A: PENGELUARAN = (12418X99479) ÷99724 =12387
CONTOH ZON B : PENARIKAN = (11854X99479) ÷ 99235= 11883
3. JUMLAH PENGELUARAN= JUMLAH PENARIKAN
Tujuan Jumlah
1 2 3 4 5 6 Pengeluaran
1 1480 1818 2734 2607 2015 1733 12388
2 1704 2093 3148 3002 2321 1996 14265
3 2780 3416 5137 4898 3786 3257 23274
4 2421 2975 4474 4266 3298 2837 20271
Asalan 5 1928 2369 3563 3397 2626 2259 16142
6 1570 1928 2900 2765 2138 1839 13139
Jumlah Penarikan 11883 14599 21956 20937 16184 13920 99479
4.MATRIKS PERJALANAN ASALAN-TUJUAN
5. JIKA70% PERJALANAN ANTARA BANDAR MENGGUNAKAN LEBUH RAYA,
KIRAKAN SEMULA MATRIKS PERJALANAN
ASALAN-TUJUAN BAGI KERETA YANG MELALUI LEBUH RAYA
Pengeluaran Penarikan
A 8,693 8,298
B 10,010 10,194
C 16,332 15,331
D 14,225 14,620
E 11,327 11,301
F 9,220 9,720
Jumlah 69,807 69,464
Pengeluaran Penarikan
A 8,672 8,318
B 9,985 10,219
C 16,292 15,369
D 14,190 14,656
E 11,300 11,329
F 9,197 9,744
Jumlah 69,636 69,636
PURATA PENGELUARAN DAN PENARIKAN = (69807+69464)÷2
= 69636
CONTOH ZON A: PENGELUARAN = (8693X69807) ÷69636 =8714
CONTOH ZON B : PENARIKAN = (11854X69464) ÷ 69636= 10122
Tujuan Jumlah
1 2 3 4 5 6 Pengeluaran
1 1036 1273 1914 1825 1411 1213 8672
2 1193 1465 2204 2102 1624 1397 9985
3 1946 2391 3596 3429 2651 2280 16292
4 1695 2082 3132 2987 2309 1986 14190
Asalan 5 1350 1658 2494 2378 1838 1581 11300
6 1099 1350 2030 1936 1496 1287 9197
Jumlah Penarikan 8318 10219 15369 14656 11329 9744 69636
A B C D E F
A 1273 1914 1825 1411 1213
B 1193 2204 2102 1624 1397
C 1946 2391 3429 2651 2280
D 1695 2082 3132 2309 1986
E 1350 1658 2494 2378 1581
F 1099 1350 2030 1936 1496
6.UMPUKKAN PENGALIRAN LALU LINTAS KERETA DI ANTARA BANDAR-
BANAR BAGI KEDUA-DUA ARAH
A B C D E F
7636 14963 17932 14871 8457
7283 13571 16890 14294 7911
BANDAR A B C D E F
JUMLAH KERETA
YANG MEMASUKI
TOL
7636 6363 4449 2624 1213
7327 5123 3021 1397
8360 4931 2280
4295 1986
1581
JARAK*0.2 19xRM0.20=
RM3.80
21xRM0.20=
RM4.20
15xRM0.20=
RM3.00
17xRM0.20=
RM3.40
18xRM0.20=
RM3.60
RM29016.80 RM57498 RM53796 RM50561.40 RM30445.20
7.JIKA KADAR TOL YANG DIKENAKAN SEBANYAK RM 0.20 BAGI SETIAP KM, KIRAKAN
JUMLAH KUTIPAN TOL
Jumlah kutipan tol dari
bandar A ke bandar F
Jumlah kutipan tol dari bandar A ke bandar F=
RM221317.40
BANDAR A B C D E F
JUMLAH KERETA
YANG
MEMASUKI TOL
1193 4337 6909 7880 7911
1946 3777 5502 6415
1695 3008 4479
1350 2449
1099
JARAK*0.2 19xRM0.20=
RM3.80
21XRM0.20=
RM4.20
15xRM0.20=
RM3.00
17xRM0.20=
RM3.40
18xRM0.20=
RM3.60
RM27675.40 RM56998.20 RM50670 RM48603 RM28479.60
JUMLAH RM212426.20
Jumlah kutipan tol dari
bandar F ke bandar A
Jumlah kutipan tol dari bandar F kebandar
A =RM212426.20
A B C D E F
Pengaliran
maksimum
/
jam
232 194 135 80 37
223 156 92 43
254 150 70
131 60
48
8.PENGALIRAN LALU LINTAS YANG ANDA KIRA ADALAH PERJALAN SEHARI. JIKA 30%
PENGALIRAN INI ADALAH DALAM
MASA SATU JAM PUNCAK, KIRAKAN PENGALIRAN MAKSIMUM/JAM
PENGALIRAN MAKSIMUM= (0.7 × PERJALANAN)÷23
Dari bandar A ke bandar F
A B C D E F
Pengaliran
maksimum/
jam
36 132 210 240 241
59 115 167 195
52 92 136
41 75
33
Dari bandar F ke bandar A
9. VISUAL UMPUKAN PERJALANAN ANTARA BANDAR
LALUAN JUMLAH UMPUKAN ×30% JUMLAH LORONG
YANG DIPERLUKAN
JUMLAH
KEPUTUSAN
LORONG
A ke B 7636 2291 1.27 1
B ke C 14963 4489 2.50 3
C ke D 17932 5380 2.99 3
D ke E 14781 4434 2.46 3
E ke F 8457 2537 1.41 2
10. JIKA MUATAN JALAN RAYA IALAH 1800 KERETA/JAM, BERAPA
LORONG LEBUH RAYA INI PATUT DIBINA?
LALUAN DARI BANDAR A KE BANDAR F
LALUAN JUMLAH UMPUKAN ×30% JUMLAH LORONG
YANG DIPERLUKAN
JUMLAH
KEPUTUSAN
LORONG
F ke E 7911 2373 1.32 2
E ke D 14294 4288 2.38 3
D ke C 16890 5067 2.82 3
C ke B 13571 4071 2.26 3
B ke A 7283 2185 1.21 2
LALUAN DARI BANDAR F KE BANDAR A
1 3 3
3
2
23332

More Related Content

What's hot

What's hot (20)

Projek Akhir - Asas-Asas Sains Data Dalam Pengangkutan
Projek Akhir - Asas-Asas Sains Data Dalam PengangkutanProjek Akhir - Asas-Asas Sains Data Dalam Pengangkutan
Projek Akhir - Asas-Asas Sains Data Dalam Pengangkutan
 
Final project
Final projectFinal project
Final project
 
ASAS SAINS DATA DALAM PENGANGKUTAN
ASAS SAINS DATA DALAM PENGANGKUTANASAS SAINS DATA DALAM PENGANGKUTAN
ASAS SAINS DATA DALAM PENGANGKUTAN
 
Projek akhir
Projek akhirProjek akhir
Projek akhir
 
A159865 tugasanakhir
A159865 tugasanakhirA159865 tugasanakhir
A159865 tugasanakhir
 
A159865 tugasanakhir asas sains data dalam pengangkutan
A159865 tugasanakhir asas sains data dalam pengangkutanA159865 tugasanakhir asas sains data dalam pengangkutan
A159865 tugasanakhir asas sains data dalam pengangkutan
 
projek akhir (A153040)
projek akhir (A153040)projek akhir (A153040)
projek akhir (A153040)
 
Projek akhir LMCP 1532
Projek akhir LMCP 1532 Projek akhir LMCP 1532
Projek akhir LMCP 1532
 
(A158150) Projek Akhir LMCP 1352
(A158150) Projek Akhir LMCP 1352(A158150) Projek Akhir LMCP 1352
(A158150) Projek Akhir LMCP 1352
 
Projek akhir asas sains data dalam pengangkutan (projek akhir
Projek akhir asas sains data dalam pengangkutan (projek akhirProjek akhir asas sains data dalam pengangkutan (projek akhir
Projek akhir asas sains data dalam pengangkutan (projek akhir
 
A165912 PROJEK AKHIR LMCP1352
A165912 PROJEK AKHIR LMCP1352A165912 PROJEK AKHIR LMCP1352
A165912 PROJEK AKHIR LMCP1352
 
Projek akhir
Projek akhirProjek akhir
Projek akhir
 
LMCP 1352
LMCP 1352   LMCP 1352
LMCP 1352
 
Projek akhir a160806
Projek akhir a160806Projek akhir a160806
Projek akhir a160806
 
TUGASAN VISUAL PENGUMPUKAN PERJALANAN
TUGASAN VISUAL PENGUMPUKAN PERJALANANTUGASAN VISUAL PENGUMPUKAN PERJALANAN
TUGASAN VISUAL PENGUMPUKAN PERJALANAN
 
Projek akhir (a170308)
Projek akhir (a170308)Projek akhir (a170308)
Projek akhir (a170308)
 
Projek akhir
Projek akhirProjek akhir
Projek akhir
 
LMCP1352 ASAS-ASAS SAINS DATA DALAM PENGANGKUTAN_MOHD AFHAM_A163592_PROJEK A...
 LMCP1352 ASAS-ASAS SAINS DATA DALAM PENGANGKUTAN_MOHD AFHAM_A163592_PROJEK A... LMCP1352 ASAS-ASAS SAINS DATA DALAM PENGANGKUTAN_MOHD AFHAM_A163592_PROJEK A...
LMCP1352 ASAS-ASAS SAINS DATA DALAM PENGANGKUTAN_MOHD AFHAM_A163592_PROJEK A...
 
Asas sains data dalam pengangkutan
Asas sains data dalam pengangkutanAsas sains data dalam pengangkutan
Asas sains data dalam pengangkutan
 
PROJEK AKHIR ASAS SAINS DATA DALAM PENGANGKUTAN - AHMAD HAZIQ BIN ABDUL MANAF...
PROJEK AKHIR ASAS SAINS DATA DALAM PENGANGKUTAN - AHMAD HAZIQ BIN ABDUL MANAF...PROJEK AKHIR ASAS SAINS DATA DALAM PENGANGKUTAN - AHMAD HAZIQ BIN ABDUL MANAF...
PROJEK AKHIR ASAS SAINS DATA DALAM PENGANGKUTAN - AHMAD HAZIQ BIN ABDUL MANAF...
 

Similar to Tugasan akhir

Similar to Tugasan akhir (19)

Projek akhir asas sains data
Projek akhir asas sains dataProjek akhir asas sains data
Projek akhir asas sains data
 
PROJEK AKHIR A165651
PROJEK AKHIR A165651PROJEK AKHIR A165651
PROJEK AKHIR A165651
 
Projek akhir asas sains data dalam pengangkutan (projek akhir
Projek akhir asas sains data dalam pengangkutan (projek akhirProjek akhir asas sains data dalam pengangkutan (projek akhir
Projek akhir asas sains data dalam pengangkutan (projek akhir
 
A162781 lmcp1352 tugasan projek akhir
A162781 lmcp1352 tugasan projek akhirA162781 lmcp1352 tugasan projek akhir
A162781 lmcp1352 tugasan projek akhir
 
A162781 lmcp1352 tugasan projek akhir
A162781 lmcp1352 tugasan projek akhirA162781 lmcp1352 tugasan projek akhir
A162781 lmcp1352 tugasan projek akhir
 
LMCP 1352 ASAS SAINS DATA: PROJEK AKHIR
LMCP 1352 ASAS SAINS DATA: PROJEK AKHIRLMCP 1352 ASAS SAINS DATA: PROJEK AKHIR
LMCP 1352 ASAS SAINS DATA: PROJEK AKHIR
 
LMCP1352 ASAS-ASAS SAINS DATA DALAM PENGANGKUTAN
LMCP1352 ASAS-ASAS SAINS DATA DALAM PENGANGKUTANLMCP1352 ASAS-ASAS SAINS DATA DALAM PENGANGKUTAN
LMCP1352 ASAS-ASAS SAINS DATA DALAM PENGANGKUTAN
 
A176346 Projek Akhir.pptx
A176346 Projek Akhir.pptxA176346 Projek Akhir.pptx
A176346 Projek Akhir.pptx
 
A160181 projek akhir
A160181 projek akhirA160181 projek akhir
A160181 projek akhir
 
PROJEK AKHIR_A180260.pdf
PROJEK AKHIR_A180260.pdfPROJEK AKHIR_A180260.pdf
PROJEK AKHIR_A180260.pdf
 
Tugasan projek akhir
Tugasan projek akhirTugasan projek akhir
Tugasan projek akhir
 
Projek akhir sains data
Projek akhir sains dataProjek akhir sains data
Projek akhir sains data
 
A163610 final project lmcp 1352 -
A163610 final project lmcp 1352 - A163610 final project lmcp 1352 -
A163610 final project lmcp 1352 -
 
Sains data projek akhir slide A170280
Sains data projek akhir slide A170280Sains data projek akhir slide A170280
Sains data projek akhir slide A170280
 
Tugasan akhir
Tugasan akhirTugasan akhir
Tugasan akhir
 
PROJEK AKHIR A170461
PROJEK AKHIR A170461PROJEK AKHIR A170461
PROJEK AKHIR A170461
 
Lmcp 1352 projek akhir
Lmcp 1352 projek akhirLmcp 1352 projek akhir
Lmcp 1352 projek akhir
 
A172025 PROJEK AKHIR.pptx
A172025 PROJEK AKHIR.pptxA172025 PROJEK AKHIR.pptx
A172025 PROJEK AKHIR.pptx
 
Tugasan akhir
Tugasan akhirTugasan akhir
Tugasan akhir
 

More from Amirul Mustaqim (9)

Visual pengagihan a157238
Visual pengagihan a157238Visual pengagihan a157238
Visual pengagihan a157238
 
Lmcp 1532 tugasan 9
Lmcp 1532 tugasan 9Lmcp 1532 tugasan 9
Lmcp 1532 tugasan 9
 
Lmcp 1532 tugasan 5
Lmcp 1532 tugasan 5Lmcp 1532 tugasan 5
Lmcp 1532 tugasan 5
 
Lmcp 1532 tugasan 2
Lmcp 1532 tugasan 2Lmcp 1532 tugasan 2
Lmcp 1532 tugasan 2
 
Tugasan 11
Tugasan 11Tugasan 11
Tugasan 11
 
Lmcp 1532 tugasan 7
Lmcp 1532 tugasan 7Lmcp 1532 tugasan 7
Lmcp 1532 tugasan 7
 
Lmcp 1532 tugasan 6
Lmcp 1532 tugasan 6Lmcp 1532 tugasan 6
Lmcp 1532 tugasan 6
 
Lmcp 1532 tugasan 4
Lmcp 1532 tugasan 4Lmcp 1532 tugasan 4
Lmcp 1532 tugasan 4
 
Mapan tugasan 3
Mapan tugasan 3Mapan tugasan 3
Mapan tugasan 3
 

Recently uploaded

BAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptx
BAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptxBAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptx
BAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptx
JuliBriana2
 

Recently uploaded (20)

OPTIMALISASI KOMUNITAS BELAJAR DI SEKOLAH.pptx
OPTIMALISASI KOMUNITAS BELAJAR DI SEKOLAH.pptxOPTIMALISASI KOMUNITAS BELAJAR DI SEKOLAH.pptx
OPTIMALISASI KOMUNITAS BELAJAR DI SEKOLAH.pptx
 
7.PPT TENTANG TUGAS Keseimbangan-AD-AS .pptx
7.PPT TENTANG TUGAS Keseimbangan-AD-AS .pptx7.PPT TENTANG TUGAS Keseimbangan-AD-AS .pptx
7.PPT TENTANG TUGAS Keseimbangan-AD-AS .pptx
 
MODUL PENDIDIKAN PANCASILA KELAS 6 KURIKULUM MERDEKA.pdf
MODUL PENDIDIKAN PANCASILA KELAS 6 KURIKULUM MERDEKA.pdfMODUL PENDIDIKAN PANCASILA KELAS 6 KURIKULUM MERDEKA.pdf
MODUL PENDIDIKAN PANCASILA KELAS 6 KURIKULUM MERDEKA.pdf
 
AKSI NYATA Numerasi Meningkatkan Kompetensi Murid_compressed (1) (1).pptx
AKSI NYATA  Numerasi  Meningkatkan Kompetensi Murid_compressed (1) (1).pptxAKSI NYATA  Numerasi  Meningkatkan Kompetensi Murid_compressed (1) (1).pptx
AKSI NYATA Numerasi Meningkatkan Kompetensi Murid_compressed (1) (1).pptx
 
MODUL AJAR MATEMATIKA KELAS 3 KURIKULUM MERDEKA.pdf
MODUL AJAR MATEMATIKA KELAS 3 KURIKULUM MERDEKA.pdfMODUL AJAR MATEMATIKA KELAS 3 KURIKULUM MERDEKA.pdf
MODUL AJAR MATEMATIKA KELAS 3 KURIKULUM MERDEKA.pdf
 
LATAR BELAKANG JURNAL DIALOGIS REFLEKTIF.ppt
LATAR BELAKANG JURNAL DIALOGIS REFLEKTIF.pptLATAR BELAKANG JURNAL DIALOGIS REFLEKTIF.ppt
LATAR BELAKANG JURNAL DIALOGIS REFLEKTIF.ppt
 
MODUL AJAR SENI RUPA KELAS 6 KURIKULUM MERDEKA.pdf
MODUL AJAR SENI RUPA KELAS 6 KURIKULUM MERDEKA.pdfMODUL AJAR SENI RUPA KELAS 6 KURIKULUM MERDEKA.pdf
MODUL AJAR SENI RUPA KELAS 6 KURIKULUM MERDEKA.pdf
 
MODUL AJAR IPAS KELAS 3 KURIKULUM MERDEKA.pdf
MODUL AJAR IPAS KELAS 3 KURIKULUM MERDEKA.pdfMODUL AJAR IPAS KELAS 3 KURIKULUM MERDEKA.pdf
MODUL AJAR IPAS KELAS 3 KURIKULUM MERDEKA.pdf
 
Salinan dari JUrnal Refleksi Mingguan modul 1.3.pdf
Salinan dari JUrnal Refleksi Mingguan modul 1.3.pdfSalinan dari JUrnal Refleksi Mingguan modul 1.3.pdf
Salinan dari JUrnal Refleksi Mingguan modul 1.3.pdf
 
KELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKA
KELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKAKELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKA
KELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKA
 
vIDEO kelayakan berita untuk mahasiswa.ppsx
vIDEO kelayakan berita untuk mahasiswa.ppsxvIDEO kelayakan berita untuk mahasiswa.ppsx
vIDEO kelayakan berita untuk mahasiswa.ppsx
 
PPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptx
PPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptxPPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptx
PPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptx
 
Bab 4 Persatuan dan Kesatuan di Lingkup Wilayah Kabupaten dan Kota.pptx
Bab 4 Persatuan dan Kesatuan di Lingkup Wilayah Kabupaten dan Kota.pptxBab 4 Persatuan dan Kesatuan di Lingkup Wilayah Kabupaten dan Kota.pptx
Bab 4 Persatuan dan Kesatuan di Lingkup Wilayah Kabupaten dan Kota.pptx
 
Konseptual Model Keperawatan Jiwa pada manusia
Konseptual Model Keperawatan Jiwa pada manusiaKonseptual Model Keperawatan Jiwa pada manusia
Konseptual Model Keperawatan Jiwa pada manusia
 
Panduan Memahami Data Rapor Pendidikan 2024
Panduan Memahami Data Rapor Pendidikan 2024Panduan Memahami Data Rapor Pendidikan 2024
Panduan Memahami Data Rapor Pendidikan 2024
 
Pendidikan-Bahasa-Indonesia-di-SD MODUL 3 .pptx
Pendidikan-Bahasa-Indonesia-di-SD MODUL 3 .pptxPendidikan-Bahasa-Indonesia-di-SD MODUL 3 .pptx
Pendidikan-Bahasa-Indonesia-di-SD MODUL 3 .pptx
 
Aksi Nyata PMM Topik Refleksi Diri (1).pdf
Aksi Nyata PMM Topik Refleksi Diri (1).pdfAksi Nyata PMM Topik Refleksi Diri (1).pdf
Aksi Nyata PMM Topik Refleksi Diri (1).pdf
 
PANDUAN PENGEMBANGAN KSP SMA SUMBAR TAHUN 2024 (1).pptx
PANDUAN PENGEMBANGAN KSP SMA SUMBAR TAHUN 2024 (1).pptxPANDUAN PENGEMBANGAN KSP SMA SUMBAR TAHUN 2024 (1).pptx
PANDUAN PENGEMBANGAN KSP SMA SUMBAR TAHUN 2024 (1).pptx
 
Program Kerja Public Relations - Perencanaan
Program Kerja Public Relations - PerencanaanProgram Kerja Public Relations - Perencanaan
Program Kerja Public Relations - Perencanaan
 
BAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptx
BAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptxBAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptx
BAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptx
 

Tugasan akhir

  • 1. PROJEK AKHIR MUHAMMAD AMIRUL MUSTAQIM BIN MAHAT A157238 PROR DATO' IR. DR RIZA ATIQ ABDULLAH BIN O.K. RAHMAT LMCP 3152 ASAS-ASAS SAINS DATA DALAM PENGANGKUTAN
  • 3. JADUAL Rumah Luas Lantai A 16,500 1,050,000 B 19,000 1,290,000 C 31,000 1,940,000 D 27,000 1,850,000 E 21,500 1,430,000 F 17,500 1,230,000
  • 4. Pengeluaran Penarikan A 36300 34650 B 41800 42570 C 68200 64020 D 59400 61050 E 47300 47190 F 38500 40590 KADAR PENGELUARAN 2.2 SETIAP RUMAH DAN KADAR PENARIKAN 3.3 BAGI SETIAP 100 M.PERSEGI LUAS LANTAI. 1. PENGELUARAN DAN PENARIKAN BAGI SETIAP BANDAR
  • 5. Pengeluaran Penarikan A 12,418 11,854 B 14,300 14,563 C 23,332 21,902 D 20,321 20,886 E 16,182 16,144 F 13,171 13,886 Jumlah 99,724 99,234 2.JIKA 65% PERJALANAN MENGGUNAKAN KERETA PERSENDIRIAN DAN PURATA ISI KERETA IALAH 1.9 ORANG/KERETA, KIRAKAN PENGELUARAN DAN PENARIKAN PERJALANAN KERETA BAGI SETIAP BANDAR
  • 6. Pengeluaran Penarikan A 12,388 11,883 B 14,265 14,599 C 23,274 21,956 D 20,271 20,937 E 16,142 16,184 F 13,139 13,920 Jumlah 99,479 99,479 PURATA PENGELUARAN DAN PENARIKAN = (99724+99234)÷2 = 99479 PENGELUARAN DARAB 99479 BAHAGI JUMLAH KESULURUHAN PENGELUARAN PENARIKAN DARAB 99479 BAHAGI JUMLAH KESELURUHAN PENARIKAN CONTOH ZON A: PENGELUARAN = (12418X99479) ÷99724 =12387 CONTOH ZON B : PENARIKAN = (11854X99479) ÷ 99235= 11883 3. JUMLAH PENGELUARAN= JUMLAH PENARIKAN
  • 7. Tujuan Jumlah 1 2 3 4 5 6 Pengeluaran 1 1480 1818 2734 2607 2015 1733 12388 2 1704 2093 3148 3002 2321 1996 14265 3 2780 3416 5137 4898 3786 3257 23274 4 2421 2975 4474 4266 3298 2837 20271 Asalan 5 1928 2369 3563 3397 2626 2259 16142 6 1570 1928 2900 2765 2138 1839 13139 Jumlah Penarikan 11883 14599 21956 20937 16184 13920 99479 4.MATRIKS PERJALANAN ASALAN-TUJUAN
  • 8. 5. JIKA70% PERJALANAN ANTARA BANDAR MENGGUNAKAN LEBUH RAYA, KIRAKAN SEMULA MATRIKS PERJALANAN ASALAN-TUJUAN BAGI KERETA YANG MELALUI LEBUH RAYA Pengeluaran Penarikan A 8,693 8,298 B 10,010 10,194 C 16,332 15,331 D 14,225 14,620 E 11,327 11,301 F 9,220 9,720 Jumlah 69,807 69,464
  • 9. Pengeluaran Penarikan A 8,672 8,318 B 9,985 10,219 C 16,292 15,369 D 14,190 14,656 E 11,300 11,329 F 9,197 9,744 Jumlah 69,636 69,636 PURATA PENGELUARAN DAN PENARIKAN = (69807+69464)÷2 = 69636 CONTOH ZON A: PENGELUARAN = (8693X69807) ÷69636 =8714 CONTOH ZON B : PENARIKAN = (11854X69464) ÷ 69636= 10122
  • 10. Tujuan Jumlah 1 2 3 4 5 6 Pengeluaran 1 1036 1273 1914 1825 1411 1213 8672 2 1193 1465 2204 2102 1624 1397 9985 3 1946 2391 3596 3429 2651 2280 16292 4 1695 2082 3132 2987 2309 1986 14190 Asalan 5 1350 1658 2494 2378 1838 1581 11300 6 1099 1350 2030 1936 1496 1287 9197 Jumlah Penarikan 8318 10219 15369 14656 11329 9744 69636
  • 11. A B C D E F A 1273 1914 1825 1411 1213 B 1193 2204 2102 1624 1397 C 1946 2391 3429 2651 2280 D 1695 2082 3132 2309 1986 E 1350 1658 2494 2378 1581 F 1099 1350 2030 1936 1496 6.UMPUKKAN PENGALIRAN LALU LINTAS KERETA DI ANTARA BANDAR- BANAR BAGI KEDUA-DUA ARAH A B C D E F 7636 14963 17932 14871 8457 7283 13571 16890 14294 7911
  • 12. BANDAR A B C D E F JUMLAH KERETA YANG MEMASUKI TOL 7636 6363 4449 2624 1213 7327 5123 3021 1397 8360 4931 2280 4295 1986 1581 JARAK*0.2 19xRM0.20= RM3.80 21xRM0.20= RM4.20 15xRM0.20= RM3.00 17xRM0.20= RM3.40 18xRM0.20= RM3.60 RM29016.80 RM57498 RM53796 RM50561.40 RM30445.20 7.JIKA KADAR TOL YANG DIKENAKAN SEBANYAK RM 0.20 BAGI SETIAP KM, KIRAKAN JUMLAH KUTIPAN TOL Jumlah kutipan tol dari bandar A ke bandar F Jumlah kutipan tol dari bandar A ke bandar F= RM221317.40
  • 13. BANDAR A B C D E F JUMLAH KERETA YANG MEMASUKI TOL 1193 4337 6909 7880 7911 1946 3777 5502 6415 1695 3008 4479 1350 2449 1099 JARAK*0.2 19xRM0.20= RM3.80 21XRM0.20= RM4.20 15xRM0.20= RM3.00 17xRM0.20= RM3.40 18xRM0.20= RM3.60 RM27675.40 RM56998.20 RM50670 RM48603 RM28479.60 JUMLAH RM212426.20 Jumlah kutipan tol dari bandar F ke bandar A Jumlah kutipan tol dari bandar F kebandar A =RM212426.20
  • 14. A B C D E F Pengaliran maksimum / jam 232 194 135 80 37 223 156 92 43 254 150 70 131 60 48 8.PENGALIRAN LALU LINTAS YANG ANDA KIRA ADALAH PERJALAN SEHARI. JIKA 30% PENGALIRAN INI ADALAH DALAM MASA SATU JAM PUNCAK, KIRAKAN PENGALIRAN MAKSIMUM/JAM PENGALIRAN MAKSIMUM= (0.7 × PERJALANAN)÷23 Dari bandar A ke bandar F
  • 15. A B C D E F Pengaliran maksimum/ jam 36 132 210 240 241 59 115 167 195 52 92 136 41 75 33 Dari bandar F ke bandar A
  • 16. 9. VISUAL UMPUKAN PERJALANAN ANTARA BANDAR
  • 17. LALUAN JUMLAH UMPUKAN ×30% JUMLAH LORONG YANG DIPERLUKAN JUMLAH KEPUTUSAN LORONG A ke B 7636 2291 1.27 1 B ke C 14963 4489 2.50 3 C ke D 17932 5380 2.99 3 D ke E 14781 4434 2.46 3 E ke F 8457 2537 1.41 2 10. JIKA MUATAN JALAN RAYA IALAH 1800 KERETA/JAM, BERAPA LORONG LEBUH RAYA INI PATUT DIBINA? LALUAN DARI BANDAR A KE BANDAR F
  • 18. LALUAN JUMLAH UMPUKAN ×30% JUMLAH LORONG YANG DIPERLUKAN JUMLAH KEPUTUSAN LORONG F ke E 7911 2373 1.32 2 E ke D 14294 4288 2.38 3 D ke C 16890 5067 2.82 3 C ke B 13571 4071 2.26 3 B ke A 7283 2185 1.21 2 LALUAN DARI BANDAR F KE BANDAR A