PERANCANGAN STRUKTUR 
KUDA-KUDA BAJA TIPE GABLE 
Afret Nobel, ST 
Akan Ahli Struktur 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
Page 2 of 45 
Daftar Isi 
www.LaporanTeknikSipil.wordpress.com 
1. Pendahuluan ................................................................................................................................... 4 
1.1 Peraturan umum ..................................................................................................................... 4 
1.2 Ketentuan umum .................................................................................................................... 4 
2. Perencanaan Gording ...................................................................................................................... 5 
2.1 Pembebanan gording .............................................................................................................. 5 
2.1.1 Beban mati ...................................................................................................................... 5 
2.1.2 Beban hidup .................................................................................................................... 5 
2.1.3 Beban angin ..................................................................................................................... 5 
2.2 Analisis pembebanan .............................................................................................................. 5 
2.2.1 Akibat beban mati ........................................................................................................... 5 
2.2.2 Akibat beban hidup ......................................................................................................... 5 
2.2.3 Akibat beban angin .......................................................................................................... 6 
2.3 Kombinasi pembebanan .......................................................................................................... 6 
2.4 Cek profil gording .................................................................................................................... 7 
2.4.1 Tinjauan terhadap tekuk lokal pelat sayap ..................................................................... 7 
2.4.2 Tinjauan terhadap tekuk lokal pelat badan..................................................................... 8 
2.4.3 
Tinjauan terhadap tekuk lateral 
...................................................................................... 8 
2.4.4 Kombinasi antara geser dan lentur ................................................................................. 9 
Kontrol kuat geser nominal gording tanpa pengaku lateral: .......................................................... 9 
Kuat geser badan tanpa adanya pengaku: ...................................................................................... 9 
2.4.5 Kontrol lendutan ............................................................................................................. 9 
3. Perhitungan batang tarik (Trackstang) .......................................................................................... 11 
4. Perhitungan Ikatan Angin .............................................................................................................. 12 
5. Perhitungan Kuda-kuda (Gable) .................................................................................................... 13 
5.1 Pembebanan pada balok gable ............................................................................................. 13 
5.1.1 Beban gording ............................................................................................................... 14 
5.1.2 Tekanan angin pada bidang atap .................................................................................. 15 
5.1.3 Tekanan angin pada bidang dinding ............................................................................. 15 
5.1.4 Gambar skema pembebanan ........................................................................................ 16 
5.2 Kontrol profil kuda-kuda gable .............................................................................................. 17 
5.2.1 Rafter ............................................................................................................................. 17 
5.2.2 Kolom ............................................................................................................................ 21 
5.3 Perencanaan peletakan ......................................................................................................... 26 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
www.LaporanTeknikSipil.wordpress.com 
5.3.1 Kontrol tegangan yang timbul: ...................................................................................... 26 
Page 3 of 45 
5.3.2 
Penentuan jumlah angkur 
............................................................................................. 26 
5.4 Perencanaan sambungan rafter puncak ............................................................................... 27 
5.4.1 Data baut ....................................................................................................................... 27 
5.4.2 Data plat ujung baut ...................................................................................................... 27 
5.4.3 Beban rencana ............................................................................................................... 27 
5.4.4 Menentukan letak garis netral ...................................................................................... 27 
5.4.5 Menentukan tegangan lentur yang terjadi ................................................................... 28 
5.4.6 Menentukan gaya-gaya yang terjadi ............................................................................. 28 
5.4.7 Perencanaan pengaku penumpu beban ....................................................................... 30 
5.5 Perencanaan sambungan rafter dengan kolom .................................................................... 31 
5.5.1 Data baut ....................................................................................................................... 32 
5.5.2 Data plat ujung baut ...................................................................................................... 32 
5.5.3 Beban rencana ............................................................................................................... 32 
5.5.4 Menentukan letak garis netral ...................................................................................... 32 
5.5.5 Menentukan tegangan lentur yang terjadi ................................................................... 33 
5.5.6 Menentukan gaya-gaya yang terjadi ............................................................................. 33 
5.5.7 Perencanaan pengaku penumpu beban ....................................................................... 35 
6. Perhitungan Pondasi ..................................................................................................................... 38 
6.1 Data Perencanaan ................................................................................................................. 38 
6.2 Rencana pondasi ................................................................................................................... 38 
6.3 Dimensi pondasi .................................................................................................................... 38 
6.4 Kuat lentur pondasi ............................................................................................................... 38 
6.5 Kuat geser pondasi ................................................................................................................ 40 
6.5.1 Geser satu arah ............................................................................................................. 40 
6.5.2 Geser pons ..................................................................................................................... 41 
7. Kesimpulan .................................................................................................................................... 43 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
Page 4 of 45 
1. Pendahuluan 
1.1 Peraturan umum 
1. Rangkuman PPIUG 1983 
2. SK SNI 03-1729-2002 tentang Perencanaan Struktur Baja untuk Bangunan 
Gedung 
3. Tabel profil PT. GUNUNG GARUDA STEEL 
1.2 Ketentuan umum 
1. Mutu baja yang digunakan adalah BJ 37 
- fy = 240 Mpa 
- fu = 370 Mpa 
2. Alat sambung yang digunakan : Baut HTB 
3. Jenis bangunan : bangunan industri 
- Jarak antar kuda-kuda : 6 meter 
- Bentang kuda-kuda : 30 meter 
- Jarak antar gording (horizontal) : 1 meter 
- Kemiringan atap : 10° 
4. Bentuk atap : atap pelana 
5. Profil kuda-kuda : Gable IWF 
6. Profil gording : Lipped channel 
7. Berat penutup atap : 0.20 kN/m2 
8. Beban angin : 0.30 kN/m2 
9. Beban orang : 1.00 kN/m2 
Figure 1 Layout kuda-kuda gable 
www.LaporanTeknikSipil.wordpress.com 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
Page 5 of 45 
2. Perencanaan Gording 
www.LaporanTeknikSipil.wordpress.com 
2.1 Pembebanan gording 
2.1.1 Beban mati 
- Profil yang digunakan adalah Lipped Channel 125x50x20 (3.2) 
- Berat sendiri gording = 0.068 kN/m 
- Berat penutup atap = q atap x jarak miring gording = 0.2 kN/m2 x 1.015 m = 
0.203 kN/m 
- Total beban mati = 0.068 + 0.203 = 0.271 kN/m 
2.1.2 Beban hidup 
- Beban air hujan 
ql = 40 – 0.8   0.2kN/m2 = 40 – 0.8 (10) = 0.32 kN/m2 
qah = ql x jarak antar gording = 0.32 kN/m2 x 1.015 m = 0.325 kN/m 
- Beban orang + peralatan = 1.00 kN 
2.1.3 Beban angin 
- Beban angin, P = 0.30 kN/m2 (nilai minimum untuk bangunan yang jauh dari 
tepi laut) 
- Beban angin tekan, Wt = 0.1 x 0.30 kN/m2 x 1.015 m = 0.030 kN/m 
- Beban angin hisap, Wh = -0.4 x 0.30 kN/m2 x 1.015 m = -0.122 kN/m 
2.2 Analisis pembebanan 
2.2.1 Akibat beban mati 
- M1 = 0.07 x qd x l2 = 0.07 x 0.271 kN/m x 62 m = 0.682 kNm 
- M2 = 0.125 x qd x l2 = 0.125 x 0.271 kN/m x 62 m = 1.218 kNm 
- V1 = 0.375 x qd x l = 0.375 x 0.271 kN/m x 6 m = 0.609 kN 
- V2 = 0.625 x qd x l = 0.625 x 0.271 kN/m x 6 m = 1.015 kN 
2.2.2 Akibat beban hidup 
a. Beban air hujan 
- M1 = 0.07 x qah x l2 = 0.07 x 0.325 kN/m x 62 m = 0.819 kNm 
- M2 = 0.125 x qah x l2 = 0.125 x 0.325 kN/m x 62 m = 1.462 kNm 
- V1 = 0.375 x qah x l = 0.375 x 0.325 kN/m x 6 m = 0.731 kN 
- V2 = 0.625 x qah x l = 0.625 x 0.325 kN/m x 6 m = 1.219 kN 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
Page 6 of 45 
www.LaporanTeknikSipil.wordpress.com 
b. Beban orang, P = 100 kN/m x Cos 10° = 0.985 kN 
- M1 = 0.098 x P x l = 0.098 x 0.985 kN x 6 m = 0.579 kNm 
- M2 = 0.375 x P x l = 0.375 x 0.985 kN x 6 m = 2.216 kNm 
- V1 = 0.31 x P = 0.31 x 0.985 kN = 0.305 kN 
- V2 = 0.69 x P = 0.69 x 0.985 kN = 0.680 kN 
2.2.3 Akibat beban angin 
a. Angin tekan 
- M1 = 0.07 x qw x l2 = 0.07 x 0.030 kN/m x 62 m = 0.077 kNm 
- M2 = 0.125 x qw x l2 = 0.125 x 0.030 kN/m x 62 m = 0.137 kNm 
- V1 = 0.375 x qw x l = 0.375 x 0.030 kN/m x 6 m = 0.069 kN 
- V2 = 0.625 x qw x l = 0.625 x 0.030 kN/m x 6 m = 0.114 kN 
b. Angin hisap 
- M1 = 0.07 x qw x l2 = 0.07 x 0.122 kN/m x 62 m = 0.307 kNm 
- M2 = 0.125 x qw x l2 = 0.125 x 0.122 kN/m x 62 m = 0.548 kNm 
- V1 = 0.375 x qw x l = 0.375 x 0.122 kN/m x 6 m = 0.274 kN 
- V2 = 0.625 x qw x l = 0.625 x 0.122 kN/m x 6 m = 0.457 kN 
2.3 Kombinasi pembebanan 
Table 1 Momen 
Tabel 1. Momen 
M (kNm) 
Mx = M.cos My = M.sin 
Beban M 
Beban mati (DL) 1.218 1.200 0.212 
Beban hidup (LL) 2.216 2.182 0.385 
Beban hujan (qah) 1.462 1.440 0.254 
Beban angin (qw) 0.548 0.540 0.095 
Table 2 Gaya lintang 
Tabel 2. Gaya Geser 
V (kNm) 
Vx = V.cos Vy = V.sin 
V 
Beban 
Beban mati (DL) 1.015 1.000 0.176 
Beban hidup (LL) 0.680 0.669 0.118 
Beban hujan (qah) 1.219 1.200 0.212 
Beban angin (qw) 0.457 0.450 0.079 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
Page 7 of 45 
Table 3 Kombinasi pembebanan 
Tabel 3. Kombinasi pembebanan 
Kombinasi Mx My Vx Vy 
1,4DL 1.679 0.296 1.400 0.247 
1,2Dl+1,6LL+0.5qah 5.363 0.946 2.630 0.464 
1,2DL+1,6LL+0.8qw 4.049 0.714 2.455 0.433 
1,2Dl+1,3qw+0.5qah 2.861 0.505 2.385 0.420 
0,9DL+1,3qw 1.782 0.314 1.485 0.262 
Used Load 5.363 0.946 2.630 0.464 
2.4 Cek profil gording 
Dicoba dimensi gording C150.50.20x3.2 
A = 7.81 cm2 fy =240 Mpa 
w = 6.76 Kg/m E =200,000 Mpa 
Sx = 37.4 cm3 G =80,000 Mpa 
Sy = 8.19 cm3 fr =70 Mpa 
Ix = 280 cm4 H =150 mm 
Iy = 28 cm4 B =50 mm 
rx = 5.71 cm tw =3.2 mm 
ry = 1.81 cm C =20 mm 
tf =3.2 mm 
Zx = (b x tf) (H – tf) + tw (0.5H – tf) (0.5H – tf) 
= (50 x 3.2) (150 – 3.2) + 3.2 (0.5x150-3.2) (0.5x150-3.2) 
= 39.98 cm3 
2.4.1 Tinjauan terhadap tekuk lokal pelat sayap 
-  = B/t = 50/3.2 = 15.625 
- p = 170/fy = 170/240 = 10.973 
- r=370/ fy-fr =370/ 240-70=28.378 
- Karena p    r, maka pelat sayap tidak kompak 
- Mp = Zx . fy = (39.98 x 103) x 240 = 9.596 kNm 
- Mr = Sx (fy-fr) = (37.4 x 103) (240 -70) = 6.358 kNm 
- 
 l − 
l 
 
  
 l − 
l 
 
Mn =Mp-(Mp-Mr) p 
r p 
  
  
  
=9.596-(9.596-6.358) 15.625-10.973 =8.731kNm 
28.378-10.973 
www.LaporanTeknikSipil.wordpress.com 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
www.LaporanTeknikSipil.wordpress.com
Page 8 of 45 
2.4.2 Tinjauan terhadap tekuk lokal pelat badan 
-  = H/tw = (150-3.2x2)/3.2 = 44.88 
- p = 1680/fy = 1680/240 = 108.44 
- r = 2550/fy = 2550/240 = 164.60 
- Karena   p , maka pelat sayap kompak 
- Mn = Mp = Zx (fy) = (39.98 x 103) x 240 = 9.56 kNm 
2.4.3 
Tinjauan terhadap tekuk lateral 
- Lb (jarak antar pengaku/sokongan lateral) = 2000 mm 
- Lp = 1.76 ry (E/fy) = 1.76 (57.1) (200,000/240) = 919.60 mm 
- fl = fy – fr = 240 – 70 = 170 Mpa 
- 
bt3 (50×3.23×3)+(3.2×1503)+(3.2(20-3.2)3 4 J= = =3606mm 
3 3 
 
-
( / ) . . . 1 2 
X = 
p Sx EGJ A 
-
= × × × × = 
( / (37.4 103)) 200,000 80,000 3606,15 781 12608,71 1 2 
X p Nmm 
- 
2
Iw Iy Ht 
4 
= 
28 104 2 6 (150 2 3.2) 1443467200 
4 
mm
= × − × = 
- 
2 2 2 = 4 = 4 39.98 × 
103 1443467200 80,000 3606.15 280,000 
X Zx Iw 
Gj Iy 
× 
= 3.3 x10-4 N/mm2 
-
Lr ry X1 1 1 X2 fl2 
= + + × 
fl 
-
5.71 12608,71 1 1 (3.3 10 4) 1702 2768.14 
= + + × − × = 
Lr mm 
170 
Karena Lp  L  Lr, maka penampang termasuk bentang menengah 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
Page 9 of 45 
  
  
  
www.LaporanTeknikSipil.wordpress.com 
= − − − 
- Mn Cb(Mp (Mp Mr)) Lb Lp 
− 
Lr Lp 
  
  
  
=9.596-(9.596-6.358) 2000-919,6 =10,01kNm 
2768,14-919,6 
Kuat lentur penampang diambil yang terkecil dari 3 tinjauan di atas, 
Mn = 8.73 kNm 
2.4.4 Kombinasi antara geser dan lentur 
Kontrol kuat geser nominal gording tanpa pengaku lateral: 
- Kn = 5 + 5/(a/h2)2 = 5 
- h/tw = (150-2x3.2)/3.2 = 44.88 
Batas-batas : 
- 1.10(kn*E/fy) = 1.10(5*200,000/240) = 71.00 
- 1.37(kn*E/fy) = 1.37(5*200,000/240) = 88.43 
Maka penampang mengalami leleh geser 
Kuat geser badan tanpa adanya pengaku: 
- Aw = h.tw = (150-2x3.2) 3.2 = 459.52 mm2 
- Vn = 0.6 fy Aw = 0.6 (240) (459.52) = 66.17 kN 
- Vu = 2.63 kN 
Mu/Mn+0.625xVu/Vn  1.375 
- 5.37/0.9(8.73) +0.625x2.63/0.75(66,17) =0,72  1.375 (OK) 
2.4.5 Kontrol lendutan 
qdx = 0,271 x Sin 10° = 0.047 kN/m 
Px = 1,00 x Sin 10° = 0.174 kN/m 
5 4 3 5 0,047 60004 0.174 60003 
384 48 384 200,000 (28 104) 48 200,000 (28 104) 
qdx L Px L x 
E Iy E Iy 
d
= × × × = × × × 
× × × × × × × × × × 
d x =14.18mm 
qdy = 0,271 x Cos 10° = 0.267 kN/m 
Py = 1,00 x Cos 10° = 0.985 kN/m 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
www.LaporanTeknikSipil.wordpress.com 
5 4 3 5 0,267 60004 0.985 60003 
384 48 384 200,000 (280 104) 48 200,000 (280 104) 
Page 10 of 45 
qdy L Py L 
x 
E Ix E Ix 
d
= × × × = × × × 
× × × × × × × × × × 
d x =8,041mm 
2 2 
240 
d = d dx +d dy £L 
14,1782 8,0412 6000 16,30 25,00( ) 
d = + £ Û  OK 
240 
‡ Kesimpulan : profil Lipped Channel 125x50x20 (3.2) memenuhi persyaratan. 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
Page 11 of 45 
www.LaporanTeknikSipil.wordpress.com 
3. Perhitungan batang tarik (Trackstang) 
Batang tarik (Trackstang) berfungsi untuk mengurangi lendutan gording pada arah 
sumbu x (miting atap) sekaligus untuk mengurangi tegangan lendutan yang timbul pada arah 
x. Beban-beban yang dipikul oleh trackstang yaitu beban-beban yang sejajar bidang atap 
(sumbu x), maka gaya yang bekerja adalah gaya tarik Gx dan Px. 
Gx = Berat sendiri gording + penutup atap sepanjang gording arah sumbu x 
Px = Beban berguna arah sumbu x 
P total = Gx + Px = (ql. L) + Px 
Karena batang tarik dipasang dua buah, jadi per batang tarik adalah: 
P = P tot/2 = (ql. L) + Px 
= {(0,642 x 6) + (1 x sin 10°)}/2 
= 2,013 kN 
 = P 
Fn 
£s = 160 Mpa, dimana diambil  =  
Fn = Ps 
= 2,013 1000 
x = 12,58 mm2 
160 
Fbr = 125% x Fn = 1,25 x 12,58 = 15,73 mm2 
Fbr = ¼  d2, dimana: 
d 4.Fbr 
= 4x15,73 
p 
= = 4,47 mm 
p 
Maka, batang tarik yang dipakai adalah Ø 5 mm. 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
Page 12 of 45 
www.LaporanTeknikSipil.wordpress.com 
4. Perhitungan Ikatan Angin 
Ikatan angin hanya bekerja menahan gaya normal (axial) tarik saja. Adapun cara 
kerjanya adalah apabila salah satu ikatan angin bekerja sebagai batang tarik, maka yang 
lainnya tidak menahan apa-apa. Sebaliknya apabila arah angin berubah, maka secara 
bergantian betang tersebut bekerja sebagai batang tarik. 
Figure 2 Pembebanan pada ikatan angin 
N dicari dengan syarat keseimbangan, sedangkan P = gaya/tekanan angin. 
7,62 
6 
tgb = = 1,27 	 
 = arc tg 1,27 = 51,78° 
P = (0,25 x 7,62) = 1,91 kN 
H = 0, 	 Nx = P 
	 N cos 
 = P 
= = 1,91 
N P 
cos 
b 
= = 2,60 kN 
cos51,78 
N 
Fn 
= = 2,6 1000 
s = 	Fn N 
s 
x = 16,26 mm2 
160 
Fbr = 125% x Fn = 1,25 x 16,26 = 20,33 mm2 
Fbr = ¼  d2, dimana: 
d 4.Fbr 
= 4x20,33 
p 
= = 5,09 mm 
p 
Maka, batang tarik yang dipakai adalah Ø 6 mm. 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
Page 13 of 45 
www.LaporanTeknikSipil.wordpress.com 
5. Perhitungan Kuda-kuda (Gable) 
5.1 Pembebanan pada balok gable 
Figure 3 Gambar distribusi pembebanan 
Pembebanan pada balok gable akibat beban-beban yang dipikul oleh gording 
terpanjang yaitu = 6 meter. 
Kaki kuda-kuda Kaki kuda-kuda 
2,03 m 
15,23 m 
Figure 4 Pembebanan yang dipikul oleh gording 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
www.LaporanTeknikSipil.wordpress.com 
Balok yang direncanakan menggunakan IWF 700x300x12x14 dengan data penampang 
sebagai berikut: 
H = 700 mm 
A = 235.50 mm2 rx = 29.3 cm 
Page 14 of 45 
B = 300 mm 
Ix = 201,000 cm4 ry = 6.78 cm 
t1 = 13 mm 
Iy = 10,800 cm4 
Sx = 5.760 cm3 
t2 = 24 mm 
Sy = 722 cm3 
Figure 5 Penampang baja IWF 
Pembebanan pada balok gable akibat beban-beban yang dipikul oleh 1 gording dengan 
bentang 6 meter: 
5.1.1 Beban gording 
• Gording P1 (karena terletak pada ujung balok, maka menerima beban setengah jarak 
gording = 0.508 m) 
- Berat sendiri penutup atap : 6 m x 20 kg/m2 x 0.508 m = 60.96 kg 
- Berat sendiri gording : 6 m x 6.76 kg/m = 40.56 kg 
- Berat sendiri balok : 0.508 m x 185 kg/m = 93.98 kg 
- Berat alat penyambung : 10% x BS = 9.398 kg 
- Beban hidup : = 100 kg 
• Gording P2 s/d P15 (karena terletak pada tengah balok, maka menerima beban satu 
kali jarak gording = 1.016 m) 
- Berat sendiri penutup atap : 6 m x 20 kg/m2 x 1.016m = 121.92 kg 
- Berat sendiri gording : 6 m x 6.76 kg/m = 40.56 kg 
- Berat sendiri balok : 1.016 m x 185 kg/m = 187.96 kg 
- Berat alat penyambung : 10% x BS = 18.796 kg 
- Beban hidup : = 100 kg 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
www.LaporanTeknikSipil.wordpress.com 
Dengan cara yang sama untuk mempermudah perhitungan beban-beban pada gording 
dilakukan secara tabel sebagai berikut: 
Page 15 of 45 
Table 4 Tabel pembebanan pada gording 
No Pembebanan P1 (kg) P2 s/d P15 
1 Berat penutup atap 60.96 121.92 
2 Berat gording 40.56 40.56 
3 Berat sendiri balok 93.98 187.96 
4 Berat alat sambung 9.94 18.80
205.44 369.24 
Beban merata akibat beban mati: 
P 
q= 
 
0.5L 
2(205.4)+14(369.24) 5580.16 
q= = =372.01kg/m 
0.5(30) 15 
Beban merata akibat beban hidup : 
Dipilih yang terbesar antara beban orang atau beban air hujan, 
Beban orang = 100 kg 
Beban air hujan qah = 40 – 0.8   20 kg/m2 = 40 – 0.8 x 10 = 32 kg/m2 
P = qah x jarak antar gording x jarak antar kuda-kuda 
= 32 kg/m2 x 1.016 m x 6 m = 195.07 kg 
Maka dipilih beban akibat air hujan = 195.07 kg 
16(195.07) 3121.15 
q= = =208.08kg/m 
0.5(30) 15 
5.1.2 Tekanan angin pada bidang atap 
Tekanan angin = 30 kg/m2 
Koefisien angin tekan Ctk = 0.1 	 Wt = 0.1 x 30 kg/m2 x 6 m = 18 kg/m 
Koefisien angin hisap Chs = -0.4 	 Wh = -0.4 x 30 kg/m2 x 6 m = -72 kg/m 
5.1.3 Tekanan angin pada bidang dinding 
Koefisien angin tekan Ctk = 0.9 	 Wt = 0.9 x 30 kg/m2 x 6 m = 162 kg/m 
Koefisien angin hisap Chs = -0.4 	 Wh = -0.4 x 30 kg/m2 x 6 m = -72 kg/m 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
Page 16 of 45 
www.LaporanTeknikSipil.wordpress.com 
5.1.4 Gambar skema pembebanan 
Figure 6 Skema pembebanan akibat beban mati 
Figure 7 Skema pembebanan akibat beban hidup 
Figure 8 Skema pembebanan akibat beban angin kiri 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
Page 17 of 45 
www.LaporanTeknikSipil.wordpress.com 
5.2 Kontrol profil kuda-kuda gable 
5.2.1 Rafter 
Modulus elastisitas (E) = 200,000.00 Mpa 
Modulus geser (G) = 80,000.00 Mpa 
Tegangan leleh (fy) = 240.00 Mpa 
Tegangan putus (fu) = 70.00 Mpa 
Data beban dan geometri struktur: 
Momen maksimum (Mu) = 461,990,771.00 Nmm 
Gaya geser maksimum (Vu) = 100,867.80 N 
Gaya aksial (Nu) = 110,134.97 N 
M1x = 182,417,847.00 Nmm 
M2x = 461,990,771.00 Nmm 
MA = 461,990,771.00 Nmm 
MB = 172,164,923.00 Nmm 
MC = 88,367,983.00 Nmm 
Lx = 15,287.33 Mm 
Ly = 1,019.00 mm 
Data profil: 
H = 700 mm 
A = 235.50 mm2 rx = 29.3 cm 
B = 300 mm 
Ix = 201,000 cm4 ry = 6.78 cm 
t1 = 13 mm 
Iy = 10,800 cm4 
Sx = 5.760 cm3 
t2 = 24 mm 
r = 28.00 mm Sy = 722 cm3 
Efek kolom: 
Menentukan panjang tekuk rafter (Jepit-jepit): 
Lkx = (15,287.33 x 0.5) = 7,643.67 mm 
Lky = (1,019.00 x 0.5) = 509.58 mm 
Menentukan parameter kelangsingan rafter: 
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja 
Page 18 of 45 
www.LaporanTeknikSipil.wordpress.com
1 1 7,643.67 240 0.29 
= = = 
293 200,000 
cx Lkx fy 
rx E 
l 
p p

More Related Content

What's hot

Baja - Balok Komposit
Baja - Balok Komposit Baja - Balok Komposit
Baja - Balok Komposit Yasmin Rosyad
 
240279231 perencanaan-gudang-baja-docx
240279231 perencanaan-gudang-baja-docx240279231 perencanaan-gudang-baja-docx
240279231 perencanaan-gudang-baja-docxAris Munandar Saputra
 
Laporan tugas struktur baja
Laporan tugas struktur bajaLaporan tugas struktur baja
Laporan tugas struktur bajatanchul
 
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)Sumarno Feriyal
 
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedungSni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedungWSKT
 
Sni 03-2834-2000
Sni 03-2834-2000Sni 03-2834-2000
Sni 03-2834-2000frans1982
 
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan GedungSNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan GedungMira Pemayun
 
Pengujian kuat tarik_baja_beton (umum)
Pengujian kuat tarik_baja_beton (umum)Pengujian kuat tarik_baja_beton (umum)
Pengujian kuat tarik_baja_beton (umum)Surya BS
 
Kuliah minggu ke 9 struktur jembatan,06 nopb2012
Kuliah minggu ke 9 struktur jembatan,06 nopb2012Kuliah minggu ke 9 struktur jembatan,06 nopb2012
Kuliah minggu ke 9 struktur jembatan,06 nopb2012فهرودين سفي
 
3. koefisien momen pbi 71-two way #1
3. koefisien momen pbi 71-two way #13. koefisien momen pbi 71-two way #1
3. koefisien momen pbi 71-two way #1MuhammadYasin301812
 

What's hot (20)

Tabel baja-wf-lrfd
Tabel baja-wf-lrfdTabel baja-wf-lrfd
Tabel baja-wf-lrfd
 
Baja - Balok Komposit
Baja - Balok Komposit Baja - Balok Komposit
Baja - Balok Komposit
 
Analisa matriks
Analisa matriksAnalisa matriks
Analisa matriks
 
1 perhitungan-balok
1 perhitungan-balok1 perhitungan-balok
1 perhitungan-balok
 
240279231 perencanaan-gudang-baja-docx
240279231 perencanaan-gudang-baja-docx240279231 perencanaan-gudang-baja-docx
240279231 perencanaan-gudang-baja-docx
 
Laporan tugas struktur baja
Laporan tugas struktur bajaLaporan tugas struktur baja
Laporan tugas struktur baja
 
Buku etabs
Buku etabsBuku etabs
Buku etabs
 
150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf
 
Perencanaan Kolom
Perencanaan KolomPerencanaan Kolom
Perencanaan Kolom
 
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
 
Sni tiang pancang
Sni tiang pancangSni tiang pancang
Sni tiang pancang
 
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedungSni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
 
Sni 03-2834-2000
Sni 03-2834-2000Sni 03-2834-2000
Sni 03-2834-2000
 
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan GedungSNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
 
Pengujian kuat tarik_baja_beton (umum)
Pengujian kuat tarik_baja_beton (umum)Pengujian kuat tarik_baja_beton (umum)
Pengujian kuat tarik_baja_beton (umum)
 
Perhitungan tulangAN kolom
Perhitungan tulangAN kolomPerhitungan tulangAN kolom
Perhitungan tulangAN kolom
 
Kuliah minggu ke 9 struktur jembatan,06 nopb2012
Kuliah minggu ke 9 struktur jembatan,06 nopb2012Kuliah minggu ke 9 struktur jembatan,06 nopb2012
Kuliah minggu ke 9 struktur jembatan,06 nopb2012
 
Perencanaan balok
Perencanaan balokPerencanaan balok
Perencanaan balok
 
3. koefisien momen pbi 71-two way #1
3. koefisien momen pbi 71-two way #13. koefisien momen pbi 71-two way #1
3. koefisien momen pbi 71-two way #1
 
Preliminary design kel. 3revisi
Preliminary design kel. 3revisiPreliminary design kel. 3revisi
Preliminary design kel. 3revisi
 

Viewers also liked

Konstruksi gudang-baja
Konstruksi gudang-bajaKonstruksi gudang-baja
Konstruksi gudang-bajaekobudi27
 
Desain struktur portal baja dan detailing
Desain struktur portal baja dan detailingDesain struktur portal baja dan detailing
Desain struktur portal baja dan detailingrhtrusli
 
Rencana Atap dan Detail Kuda Kuda
Rencana Atap dan Detail Kuda Kuda Rencana Atap dan Detail Kuda Kuda
Rencana Atap dan Detail Kuda Kuda Rian Irvandi
 
Tahapan perenc kuda-kuda-02
Tahapan perenc kuda-kuda-02Tahapan perenc kuda-kuda-02
Tahapan perenc kuda-kuda-02wijaya01
 
Teknik Bangunan Bentang Lebar
Teknik Bangunan Bentang LebarTeknik Bangunan Bentang Lebar
Teknik Bangunan Bentang LebarBarley Prima
 
Tugas baja 2 model denah
Tugas baja 2 model denahTugas baja 2 model denah
Tugas baja 2 model denahanditulus
 
Perhitungan rangka atap_baja_ringan_umum
Perhitungan rangka atap_baja_ringan_umumPerhitungan rangka atap_baja_ringan_umum
Perhitungan rangka atap_baja_ringan_umumAulia syahputra
 
M.tech Project
M.tech ProjectM.tech Project
M.tech ProjectUdit Roy
 
Pemodelan Rangka kuda - kuda dengan mengunakan aplikasi Sap 2000
Pemodelan Rangka kuda - kuda dengan mengunakan aplikasi Sap 2000Pemodelan Rangka kuda - kuda dengan mengunakan aplikasi Sap 2000
Pemodelan Rangka kuda - kuda dengan mengunakan aplikasi Sap 2000Shdw 1
 
Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983
Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983
Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983Yusrizal Mahendra
 
Cold Formed Steel Presentation
Cold Formed Steel PresentationCold Formed Steel Presentation
Cold Formed Steel Presentationwhutton1
 
Perencanaan laboratorium
Perencanaan laboratoriumPerencanaan laboratorium
Perencanaan laboratoriumMuhammad Wakil
 
Handout mer iv d iii
Handout mer iv d iiiHandout mer iv d iii
Handout mer iv d iiiJunaida Wally
 
Baja btg tekan + tarik
Baja btg tekan + tarikBaja btg tekan + tarik
Baja btg tekan + tarikDeddy Prasetyo
 
Kajian ulang stabilitas geser dan guling parafet di sungai g
Kajian ulang stabilitas geser dan guling parafet di sungai gKajian ulang stabilitas geser dan guling parafet di sungai g
Kajian ulang stabilitas geser dan guling parafet di sungai gYuli Fransisca Santana
 
123756903 perhitungan-struktur-baja-gedung
123756903 perhitungan-struktur-baja-gedung123756903 perhitungan-struktur-baja-gedung
123756903 perhitungan-struktur-baja-gedungWendo Enyos
 

Viewers also liked (20)

Konstruksi gudang-baja
Konstruksi gudang-bajaKonstruksi gudang-baja
Konstruksi gudang-baja
 
Desain struktur portal baja dan detailing
Desain struktur portal baja dan detailingDesain struktur portal baja dan detailing
Desain struktur portal baja dan detailing
 
Baja kuda kuda
Baja kuda kudaBaja kuda kuda
Baja kuda kuda
 
Rencana Atap dan Detail Kuda Kuda
Rencana Atap dan Detail Kuda Kuda Rencana Atap dan Detail Kuda Kuda
Rencana Atap dan Detail Kuda Kuda
 
Tahapan perenc kuda-kuda-02
Tahapan perenc kuda-kuda-02Tahapan perenc kuda-kuda-02
Tahapan perenc kuda-kuda-02
 
Teknik Bangunan Bentang Lebar
Teknik Bangunan Bentang LebarTeknik Bangunan Bentang Lebar
Teknik Bangunan Bentang Lebar
 
Tugas baja 2 model denah
Tugas baja 2 model denahTugas baja 2 model denah
Tugas baja 2 model denah
 
Konstruksi atap
Konstruksi atapKonstruksi atap
Konstruksi atap
 
Baja masih belajar
Baja masih belajarBaja masih belajar
Baja masih belajar
 
Perhitungan rangka atap_baja_ringan_umum
Perhitungan rangka atap_baja_ringan_umumPerhitungan rangka atap_baja_ringan_umum
Perhitungan rangka atap_baja_ringan_umum
 
M.tech Project
M.tech ProjectM.tech Project
M.tech Project
 
Pemodelan Rangka kuda - kuda dengan mengunakan aplikasi Sap 2000
Pemodelan Rangka kuda - kuda dengan mengunakan aplikasi Sap 2000Pemodelan Rangka kuda - kuda dengan mengunakan aplikasi Sap 2000
Pemodelan Rangka kuda - kuda dengan mengunakan aplikasi Sap 2000
 
Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983
Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983
Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983
 
Cold Formed Steel Presentation
Cold Formed Steel PresentationCold Formed Steel Presentation
Cold Formed Steel Presentation
 
Perencanaan laboratorium
Perencanaan laboratoriumPerencanaan laboratorium
Perencanaan laboratorium
 
Handout mer iv d iii
Handout mer iv d iiiHandout mer iv d iii
Handout mer iv d iii
 
Baja btg tekan + tarik
Baja btg tekan + tarikBaja btg tekan + tarik
Baja btg tekan + tarik
 
Kajian ulang stabilitas geser dan guling parafet di sungai g
Kajian ulang stabilitas geser dan guling parafet di sungai gKajian ulang stabilitas geser dan guling parafet di sungai g
Kajian ulang stabilitas geser dan guling parafet di sungai g
 
123756903 perhitungan-struktur-baja-gedung
123756903 perhitungan-struktur-baja-gedung123756903 perhitungan-struktur-baja-gedung
123756903 perhitungan-struktur-baja-gedung
 
Bab iv
Bab ivBab iv
Bab iv
 

Similar to Perancangan-gable-pdf

Rsni t 03-2005. jembatan
Rsni t 03-2005. jembatanRsni t 03-2005. jembatan
Rsni t 03-2005. jembataniky
 
Perancangan struktur beton perpustakaan 4 lantai
Perancangan struktur beton perpustakaan 4 lantaiPerancangan struktur beton perpustakaan 4 lantai
Perancangan struktur beton perpustakaan 4 lantaiAfret Nobel
 
Sistim tarikan kabel pln 20 kv
Sistim tarikan kabel pln 20 kvSistim tarikan kabel pln 20 kv
Sistim tarikan kabel pln 20 kvNurdinSudrajat
 
LEMBAR_KERJA_PESERTA_DIDIK_LKPD_TEKNIK_S.pdf
LEMBAR_KERJA_PESERTA_DIDIK_LKPD_TEKNIK_S.pdfLEMBAR_KERJA_PESERTA_DIDIK_LKPD_TEKNIK_S.pdf
LEMBAR_KERJA_PESERTA_DIDIK_LKPD_TEKNIK_S.pdfMuchtarbagus1
 
2002 12 sni 03-2847-2002 (beton)
2002 12 sni 03-2847-2002 (beton)2002 12 sni 03-2847-2002 (beton)
2002 12 sni 03-2847-2002 (beton)franst
 
2002 12 sni 03-2847-2002 (beton) 2
2002 12 sni 03-2847-2002 (beton) 22002 12 sni 03-2847-2002 (beton) 2
2002 12 sni 03-2847-2002 (beton) 2Fuad CR
 
61607365 pompa-hidram
61607365 pompa-hidram61607365 pompa-hidram
61607365 pompa-hidramRandu Mulia
 
PENGUNAAN BATU KAPUR, BATA RINGAN, KACA, ASPHALT CONCRETE BINDER COURSE (AC-...
PENGUNAAN BATU KAPUR, BATA RINGAN, KACA,  ASPHALT CONCRETE BINDER COURSE (AC-...PENGUNAAN BATU KAPUR, BATA RINGAN, KACA,  ASPHALT CONCRETE BINDER COURSE (AC-...
PENGUNAAN BATU KAPUR, BATA RINGAN, KACA, ASPHALT CONCRETE BINDER COURSE (AC-...Dian Werokila
 
Lembar pengesahan dan daftar isi
Lembar pengesahan dan daftar  isiLembar pengesahan dan daftar  isi
Lembar pengesahan dan daftar isiAndriansyah Tsk
 
Struktur Baja: Desain dan Perilaku Jilid 2
Struktur Baja: Desain dan Perilaku Jilid 2Struktur Baja: Desain dan Perilaku Jilid 2
Struktur Baja: Desain dan Perilaku Jilid 2Nurul Angreliany
 
Rsni t 02-2005
Rsni t 02-2005Rsni t 02-2005
Rsni t 02-2005iky
 
Kp 06 2010 parameter bangunan
Kp 06 2010 parameter bangunanKp 06 2010 parameter bangunan
Kp 06 2010 parameter bangunanArizki_Hidayat
 
Modul 5 Lembar Sebar
Modul 5   Lembar SebarModul 5   Lembar Sebar
Modul 5 Lembar SebarAan Solo
 
STANDAR_KONSTRUKSI_JARINGAN_TEGANGAN_REN.pdf
STANDAR_KONSTRUKSI_JARINGAN_TEGANGAN_REN.pdfSTANDAR_KONSTRUKSI_JARINGAN_TEGANGAN_REN.pdf
STANDAR_KONSTRUKSI_JARINGAN_TEGANGAN_REN.pdfAdityaPutra940515
 
Kp 01 2010 perencanaan jaringan irigasi
Kp 01 2010 perencanaan jaringan irigasiKp 01 2010 perencanaan jaringan irigasi
Kp 01 2010 perencanaan jaringan irigasiArizki_Hidayat
 
Sni 03 1729-2002 (baja)
Sni 03 1729-2002 (baja)Sni 03 1729-2002 (baja)
Sni 03 1729-2002 (baja)Jamal Bahajaj
 

Similar to Perancangan-gable-pdf (20)

Bendungan tipe urugan
Bendungan tipe uruganBendungan tipe urugan
Bendungan tipe urugan
 
Rsni t 03-2005. jembatan
Rsni t 03-2005. jembatanRsni t 03-2005. jembatan
Rsni t 03-2005. jembatan
 
Perancangan struktur beton perpustakaan 4 lantai
Perancangan struktur beton perpustakaan 4 lantaiPerancangan struktur beton perpustakaan 4 lantai
Perancangan struktur beton perpustakaan 4 lantai
 
Sistim tarikan kabel pln 20 kv
Sistim tarikan kabel pln 20 kvSistim tarikan kabel pln 20 kv
Sistim tarikan kabel pln 20 kv
 
LEMBAR_KERJA_PESERTA_DIDIK_LKPD_TEKNIK_S.pdf
LEMBAR_KERJA_PESERTA_DIDIK_LKPD_TEKNIK_S.pdfLEMBAR_KERJA_PESERTA_DIDIK_LKPD_TEKNIK_S.pdf
LEMBAR_KERJA_PESERTA_DIDIK_LKPD_TEKNIK_S.pdf
 
2002 12 sni 03-2847-2002 (beton)
2002 12 sni 03-2847-2002 (beton)2002 12 sni 03-2847-2002 (beton)
2002 12 sni 03-2847-2002 (beton)
 
2002 12 sni 03-2847-2002 (beton) 2
2002 12 sni 03-2847-2002 (beton) 22002 12 sni 03-2847-2002 (beton) 2
2002 12 sni 03-2847-2002 (beton) 2
 
61607365 pompa-hidram
61607365 pompa-hidram61607365 pompa-hidram
61607365 pompa-hidram
 
PENGUNAAN BATU KAPUR, BATA RINGAN, KACA, ASPHALT CONCRETE BINDER COURSE (AC-...
PENGUNAAN BATU KAPUR, BATA RINGAN, KACA,  ASPHALT CONCRETE BINDER COURSE (AC-...PENGUNAAN BATU KAPUR, BATA RINGAN, KACA,  ASPHALT CONCRETE BINDER COURSE (AC-...
PENGUNAAN BATU KAPUR, BATA RINGAN, KACA, ASPHALT CONCRETE BINDER COURSE (AC-...
 
Lembar pengesahan dan daftar isi
Lembar pengesahan dan daftar  isiLembar pengesahan dan daftar  isi
Lembar pengesahan dan daftar isi
 
Struktur Baja: Desain dan Perilaku Jilid 2
Struktur Baja: Desain dan Perilaku Jilid 2Struktur Baja: Desain dan Perilaku Jilid 2
Struktur Baja: Desain dan Perilaku Jilid 2
 
Galo2 kp
Galo2 kpGalo2 kp
Galo2 kp
 
Rsni t 02-2005
Rsni t 02-2005Rsni t 02-2005
Rsni t 02-2005
 
Kp 06 2010 parameter bangunan
Kp 06 2010 parameter bangunanKp 06 2010 parameter bangunan
Kp 06 2010 parameter bangunan
 
Kp 03 2010 saluran
Kp 03 2010 saluranKp 03 2010 saluran
Kp 03 2010 saluran
 
Modul 5 Lembar Sebar
Modul 5   Lembar SebarModul 5   Lembar Sebar
Modul 5 Lembar Sebar
 
STANDAR_KONSTRUKSI_JARINGAN_TEGANGAN_REN.pdf
STANDAR_KONSTRUKSI_JARINGAN_TEGANGAN_REN.pdfSTANDAR_KONSTRUKSI_JARINGAN_TEGANGAN_REN.pdf
STANDAR_KONSTRUKSI_JARINGAN_TEGANGAN_REN.pdf
 
Kp 01 2010 perencanaan jaringan irigasi
Kp 01 2010 perencanaan jaringan irigasiKp 01 2010 perencanaan jaringan irigasi
Kp 01 2010 perencanaan jaringan irigasi
 
Sni 03 1729-2002 (baja)
Sni 03 1729-2002 (baja)Sni 03 1729-2002 (baja)
Sni 03 1729-2002 (baja)
 
Sni baja
Sni bajaSni baja
Sni baja
 

Perancangan-gable-pdf

  • 1. PERANCANGAN STRUKTUR KUDA-KUDA BAJA TIPE GABLE Afret Nobel, ST Akan Ahli Struktur Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 2. Perancangan Struktur Baja Page 2 of 45 Daftar Isi www.LaporanTeknikSipil.wordpress.com 1. Pendahuluan ................................................................................................................................... 4 1.1 Peraturan umum ..................................................................................................................... 4 1.2 Ketentuan umum .................................................................................................................... 4 2. Perencanaan Gording ...................................................................................................................... 5 2.1 Pembebanan gording .............................................................................................................. 5 2.1.1 Beban mati ...................................................................................................................... 5 2.1.2 Beban hidup .................................................................................................................... 5 2.1.3 Beban angin ..................................................................................................................... 5 2.2 Analisis pembebanan .............................................................................................................. 5 2.2.1 Akibat beban mati ........................................................................................................... 5 2.2.2 Akibat beban hidup ......................................................................................................... 5 2.2.3 Akibat beban angin .......................................................................................................... 6 2.3 Kombinasi pembebanan .......................................................................................................... 6 2.4 Cek profil gording .................................................................................................................... 7 2.4.1 Tinjauan terhadap tekuk lokal pelat sayap ..................................................................... 7 2.4.2 Tinjauan terhadap tekuk lokal pelat badan..................................................................... 8 2.4.3 Tinjauan terhadap tekuk lateral ...................................................................................... 8 2.4.4 Kombinasi antara geser dan lentur ................................................................................. 9 Kontrol kuat geser nominal gording tanpa pengaku lateral: .......................................................... 9 Kuat geser badan tanpa adanya pengaku: ...................................................................................... 9 2.4.5 Kontrol lendutan ............................................................................................................. 9 3. Perhitungan batang tarik (Trackstang) .......................................................................................... 11 4. Perhitungan Ikatan Angin .............................................................................................................. 12 5. Perhitungan Kuda-kuda (Gable) .................................................................................................... 13 5.1 Pembebanan pada balok gable ............................................................................................. 13 5.1.1 Beban gording ............................................................................................................... 14 5.1.2 Tekanan angin pada bidang atap .................................................................................. 15 5.1.3 Tekanan angin pada bidang dinding ............................................................................. 15 5.1.4 Gambar skema pembebanan ........................................................................................ 16 5.2 Kontrol profil kuda-kuda gable .............................................................................................. 17 5.2.1 Rafter ............................................................................................................................. 17 5.2.2 Kolom ............................................................................................................................ 21 5.3 Perencanaan peletakan ......................................................................................................... 26 Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 3. Perancangan Struktur Baja www.LaporanTeknikSipil.wordpress.com 5.3.1 Kontrol tegangan yang timbul: ...................................................................................... 26 Page 3 of 45 5.3.2 Penentuan jumlah angkur ............................................................................................. 26 5.4 Perencanaan sambungan rafter puncak ............................................................................... 27 5.4.1 Data baut ....................................................................................................................... 27 5.4.2 Data plat ujung baut ...................................................................................................... 27 5.4.3 Beban rencana ............................................................................................................... 27 5.4.4 Menentukan letak garis netral ...................................................................................... 27 5.4.5 Menentukan tegangan lentur yang terjadi ................................................................... 28 5.4.6 Menentukan gaya-gaya yang terjadi ............................................................................. 28 5.4.7 Perencanaan pengaku penumpu beban ....................................................................... 30 5.5 Perencanaan sambungan rafter dengan kolom .................................................................... 31 5.5.1 Data baut ....................................................................................................................... 32 5.5.2 Data plat ujung baut ...................................................................................................... 32 5.5.3 Beban rencana ............................................................................................................... 32 5.5.4 Menentukan letak garis netral ...................................................................................... 32 5.5.5 Menentukan tegangan lentur yang terjadi ................................................................... 33 5.5.6 Menentukan gaya-gaya yang terjadi ............................................................................. 33 5.5.7 Perencanaan pengaku penumpu beban ....................................................................... 35 6. Perhitungan Pondasi ..................................................................................................................... 38 6.1 Data Perencanaan ................................................................................................................. 38 6.2 Rencana pondasi ................................................................................................................... 38 6.3 Dimensi pondasi .................................................................................................................... 38 6.4 Kuat lentur pondasi ............................................................................................................... 38 6.5 Kuat geser pondasi ................................................................................................................ 40 6.5.1 Geser satu arah ............................................................................................................. 40 6.5.2 Geser pons ..................................................................................................................... 41 7. Kesimpulan .................................................................................................................................... 43 Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 4. Perancangan Struktur Baja Page 4 of 45 1. Pendahuluan 1.1 Peraturan umum 1. Rangkuman PPIUG 1983 2. SK SNI 03-1729-2002 tentang Perencanaan Struktur Baja untuk Bangunan Gedung 3. Tabel profil PT. GUNUNG GARUDA STEEL 1.2 Ketentuan umum 1. Mutu baja yang digunakan adalah BJ 37 - fy = 240 Mpa - fu = 370 Mpa 2. Alat sambung yang digunakan : Baut HTB 3. Jenis bangunan : bangunan industri - Jarak antar kuda-kuda : 6 meter - Bentang kuda-kuda : 30 meter - Jarak antar gording (horizontal) : 1 meter - Kemiringan atap : 10° 4. Bentuk atap : atap pelana 5. Profil kuda-kuda : Gable IWF 6. Profil gording : Lipped channel 7. Berat penutup atap : 0.20 kN/m2 8. Beban angin : 0.30 kN/m2 9. Beban orang : 1.00 kN/m2 Figure 1 Layout kuda-kuda gable www.LaporanTeknikSipil.wordpress.com Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 5. Perancangan Struktur Baja Page 5 of 45 2. Perencanaan Gording www.LaporanTeknikSipil.wordpress.com 2.1 Pembebanan gording 2.1.1 Beban mati - Profil yang digunakan adalah Lipped Channel 125x50x20 (3.2) - Berat sendiri gording = 0.068 kN/m - Berat penutup atap = q atap x jarak miring gording = 0.2 kN/m2 x 1.015 m = 0.203 kN/m - Total beban mati = 0.068 + 0.203 = 0.271 kN/m 2.1.2 Beban hidup - Beban air hujan ql = 40 – 0.8 0.2kN/m2 = 40 – 0.8 (10) = 0.32 kN/m2 qah = ql x jarak antar gording = 0.32 kN/m2 x 1.015 m = 0.325 kN/m - Beban orang + peralatan = 1.00 kN 2.1.3 Beban angin - Beban angin, P = 0.30 kN/m2 (nilai minimum untuk bangunan yang jauh dari tepi laut) - Beban angin tekan, Wt = 0.1 x 0.30 kN/m2 x 1.015 m = 0.030 kN/m - Beban angin hisap, Wh = -0.4 x 0.30 kN/m2 x 1.015 m = -0.122 kN/m 2.2 Analisis pembebanan 2.2.1 Akibat beban mati - M1 = 0.07 x qd x l2 = 0.07 x 0.271 kN/m x 62 m = 0.682 kNm - M2 = 0.125 x qd x l2 = 0.125 x 0.271 kN/m x 62 m = 1.218 kNm - V1 = 0.375 x qd x l = 0.375 x 0.271 kN/m x 6 m = 0.609 kN - V2 = 0.625 x qd x l = 0.625 x 0.271 kN/m x 6 m = 1.015 kN 2.2.2 Akibat beban hidup a. Beban air hujan - M1 = 0.07 x qah x l2 = 0.07 x 0.325 kN/m x 62 m = 0.819 kNm - M2 = 0.125 x qah x l2 = 0.125 x 0.325 kN/m x 62 m = 1.462 kNm - V1 = 0.375 x qah x l = 0.375 x 0.325 kN/m x 6 m = 0.731 kN - V2 = 0.625 x qah x l = 0.625 x 0.325 kN/m x 6 m = 1.219 kN Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 6. Perancangan Struktur Baja Page 6 of 45 www.LaporanTeknikSipil.wordpress.com b. Beban orang, P = 100 kN/m x Cos 10° = 0.985 kN - M1 = 0.098 x P x l = 0.098 x 0.985 kN x 6 m = 0.579 kNm - M2 = 0.375 x P x l = 0.375 x 0.985 kN x 6 m = 2.216 kNm - V1 = 0.31 x P = 0.31 x 0.985 kN = 0.305 kN - V2 = 0.69 x P = 0.69 x 0.985 kN = 0.680 kN 2.2.3 Akibat beban angin a. Angin tekan - M1 = 0.07 x qw x l2 = 0.07 x 0.030 kN/m x 62 m = 0.077 kNm - M2 = 0.125 x qw x l2 = 0.125 x 0.030 kN/m x 62 m = 0.137 kNm - V1 = 0.375 x qw x l = 0.375 x 0.030 kN/m x 6 m = 0.069 kN - V2 = 0.625 x qw x l = 0.625 x 0.030 kN/m x 6 m = 0.114 kN b. Angin hisap - M1 = 0.07 x qw x l2 = 0.07 x 0.122 kN/m x 62 m = 0.307 kNm - M2 = 0.125 x qw x l2 = 0.125 x 0.122 kN/m x 62 m = 0.548 kNm - V1 = 0.375 x qw x l = 0.375 x 0.122 kN/m x 6 m = 0.274 kN - V2 = 0.625 x qw x l = 0.625 x 0.122 kN/m x 6 m = 0.457 kN 2.3 Kombinasi pembebanan Table 1 Momen Tabel 1. Momen M (kNm) Mx = M.cos My = M.sin Beban M Beban mati (DL) 1.218 1.200 0.212 Beban hidup (LL) 2.216 2.182 0.385 Beban hujan (qah) 1.462 1.440 0.254 Beban angin (qw) 0.548 0.540 0.095 Table 2 Gaya lintang Tabel 2. Gaya Geser V (kNm) Vx = V.cos Vy = V.sin V Beban Beban mati (DL) 1.015 1.000 0.176 Beban hidup (LL) 0.680 0.669 0.118 Beban hujan (qah) 1.219 1.200 0.212 Beban angin (qw) 0.457 0.450 0.079 Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 7. Perancangan Struktur Baja Page 7 of 45 Table 3 Kombinasi pembebanan Tabel 3. Kombinasi pembebanan Kombinasi Mx My Vx Vy 1,4DL 1.679 0.296 1.400 0.247 1,2Dl+1,6LL+0.5qah 5.363 0.946 2.630 0.464 1,2DL+1,6LL+0.8qw 4.049 0.714 2.455 0.433 1,2Dl+1,3qw+0.5qah 2.861 0.505 2.385 0.420 0,9DL+1,3qw 1.782 0.314 1.485 0.262 Used Load 5.363 0.946 2.630 0.464 2.4 Cek profil gording Dicoba dimensi gording C150.50.20x3.2 A = 7.81 cm2 fy =240 Mpa w = 6.76 Kg/m E =200,000 Mpa Sx = 37.4 cm3 G =80,000 Mpa Sy = 8.19 cm3 fr =70 Mpa Ix = 280 cm4 H =150 mm Iy = 28 cm4 B =50 mm rx = 5.71 cm tw =3.2 mm ry = 1.81 cm C =20 mm tf =3.2 mm Zx = (b x tf) (H – tf) + tw (0.5H – tf) (0.5H – tf) = (50 x 3.2) (150 – 3.2) + 3.2 (0.5x150-3.2) (0.5x150-3.2) = 39.98 cm3 2.4.1 Tinjauan terhadap tekuk lokal pelat sayap - = B/t = 50/3.2 = 15.625 - p = 170/fy = 170/240 = 10.973 - r=370/ fy-fr =370/ 240-70=28.378 - Karena p r, maka pelat sayap tidak kompak - Mp = Zx . fy = (39.98 x 103) x 240 = 9.596 kNm - Mr = Sx (fy-fr) = (37.4 x 103) (240 -70) = 6.358 kNm - l − l l − l Mn =Mp-(Mp-Mr) p r p =9.596-(9.596-6.358) 15.625-10.973 =8.731kNm 28.378-10.973 www.LaporanTeknikSipil.wordpress.com Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 8. Perancangan Struktur Baja www.LaporanTeknikSipil.wordpress.com
  • 9.
  • 10.
  • 11.
  • 12. Page 8 of 45 2.4.2 Tinjauan terhadap tekuk lokal pelat badan - = H/tw = (150-3.2x2)/3.2 = 44.88 - p = 1680/fy = 1680/240 = 108.44 - r = 2550/fy = 2550/240 = 164.60 - Karena p , maka pelat sayap kompak - Mn = Mp = Zx (fy) = (39.98 x 103) x 240 = 9.56 kNm 2.4.3 Tinjauan terhadap tekuk lateral - Lb (jarak antar pengaku/sokongan lateral) = 2000 mm - Lp = 1.76 ry (E/fy) = 1.76 (57.1) (200,000/240) = 919.60 mm - fl = fy – fr = 240 – 70 = 170 Mpa - bt3 (50×3.23×3)+(3.2×1503)+(3.2(20-3.2)3 4 J= = =3606mm 3 3 -
  • 13. ( / ) . . . 1 2 X = p Sx EGJ A -
  • 14. = × × × × = ( / (37.4 103)) 200,000 80,000 3606,15 781 12608,71 1 2 X p Nmm - 2
  • 15.
  • 16. Iw Iy Ht 4 = 28 104 2 6 (150 2 3.2) 1443467200 4 mm
  • 17. = × − × = - 2 2 2 = 4 = 4 39.98 × 103 1443467200 80,000 3606.15 280,000 X Zx Iw Gj Iy × = 3.3 x10-4 N/mm2 -
  • 18.
  • 19. Lr ry X1 1 1 X2 fl2 = + + × fl -
  • 20.
  • 21. 5.71 12608,71 1 1 (3.3 10 4) 1702 2768.14 = + + × − × = Lr mm 170 Karena Lp L Lr, maka penampang termasuk bentang menengah Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 22. Perancangan Struktur Baja Page 9 of 45 www.LaporanTeknikSipil.wordpress.com = − − − - Mn Cb(Mp (Mp Mr)) Lb Lp − Lr Lp =9.596-(9.596-6.358) 2000-919,6 =10,01kNm 2768,14-919,6 Kuat lentur penampang diambil yang terkecil dari 3 tinjauan di atas, Mn = 8.73 kNm 2.4.4 Kombinasi antara geser dan lentur Kontrol kuat geser nominal gording tanpa pengaku lateral: - Kn = 5 + 5/(a/h2)2 = 5 - h/tw = (150-2x3.2)/3.2 = 44.88 Batas-batas : - 1.10(kn*E/fy) = 1.10(5*200,000/240) = 71.00 - 1.37(kn*E/fy) = 1.37(5*200,000/240) = 88.43 Maka penampang mengalami leleh geser Kuat geser badan tanpa adanya pengaku: - Aw = h.tw = (150-2x3.2) 3.2 = 459.52 mm2 - Vn = 0.6 fy Aw = 0.6 (240) (459.52) = 66.17 kN - Vu = 2.63 kN Mu/Mn+0.625xVu/Vn 1.375 - 5.37/0.9(8.73) +0.625x2.63/0.75(66,17) =0,72 1.375 (OK) 2.4.5 Kontrol lendutan qdx = 0,271 x Sin 10° = 0.047 kN/m Px = 1,00 x Sin 10° = 0.174 kN/m 5 4 3 5 0,047 60004 0.174 60003 384 48 384 200,000 (28 104) 48 200,000 (28 104) qdx L Px L x E Iy E Iy d
  • 23.
  • 24.
  • 25.
  • 26. = × × × = × × × × × × × × × × × × × d x =14.18mm qdy = 0,271 x Cos 10° = 0.267 kN/m Py = 1,00 x Cos 10° = 0.985 kN/m Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 27. Perancangan Struktur Baja www.LaporanTeknikSipil.wordpress.com 5 4 3 5 0,267 60004 0.985 60003 384 48 384 200,000 (280 104) 48 200,000 (280 104) Page 10 of 45 qdy L Py L x E Ix E Ix d
  • 28.
  • 29.
  • 30.
  • 31. = × × × = × × × × × × × × × × × × × d x =8,041mm 2 2 240 d = d dx +d dy £L 14,1782 8,0412 6000 16,30 25,00( ) d = + £ Û OK 240 ‡ Kesimpulan : profil Lipped Channel 125x50x20 (3.2) memenuhi persyaratan. Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 32. Perancangan Struktur Baja Page 11 of 45 www.LaporanTeknikSipil.wordpress.com 3. Perhitungan batang tarik (Trackstang) Batang tarik (Trackstang) berfungsi untuk mengurangi lendutan gording pada arah sumbu x (miting atap) sekaligus untuk mengurangi tegangan lendutan yang timbul pada arah x. Beban-beban yang dipikul oleh trackstang yaitu beban-beban yang sejajar bidang atap (sumbu x), maka gaya yang bekerja adalah gaya tarik Gx dan Px. Gx = Berat sendiri gording + penutup atap sepanjang gording arah sumbu x Px = Beban berguna arah sumbu x P total = Gx + Px = (ql. L) + Px Karena batang tarik dipasang dua buah, jadi per batang tarik adalah: P = P tot/2 = (ql. L) + Px = {(0,642 x 6) + (1 x sin 10°)}/2 = 2,013 kN = P Fn £s = 160 Mpa, dimana diambil = Fn = Ps = 2,013 1000 x = 12,58 mm2 160 Fbr = 125% x Fn = 1,25 x 12,58 = 15,73 mm2 Fbr = ¼ d2, dimana: d 4.Fbr = 4x15,73 p = = 4,47 mm p Maka, batang tarik yang dipakai adalah Ø 5 mm. Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 33. Perancangan Struktur Baja Page 12 of 45 www.LaporanTeknikSipil.wordpress.com 4. Perhitungan Ikatan Angin Ikatan angin hanya bekerja menahan gaya normal (axial) tarik saja. Adapun cara kerjanya adalah apabila salah satu ikatan angin bekerja sebagai batang tarik, maka yang lainnya tidak menahan apa-apa. Sebaliknya apabila arah angin berubah, maka secara bergantian betang tersebut bekerja sebagai batang tarik. Figure 2 Pembebanan pada ikatan angin N dicari dengan syarat keseimbangan, sedangkan P = gaya/tekanan angin. 7,62 6 tgb = = 1,27 = arc tg 1,27 = 51,78° P = (0,25 x 7,62) = 1,91 kN H = 0, Nx = P N cos = P = = 1,91 N P cos b = = 2,60 kN cos51,78 N Fn = = 2,6 1000 s = Fn N s x = 16,26 mm2 160 Fbr = 125% x Fn = 1,25 x 16,26 = 20,33 mm2 Fbr = ¼ d2, dimana: d 4.Fbr = 4x20,33 p = = 5,09 mm p Maka, batang tarik yang dipakai adalah Ø 6 mm. Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 34. Perancangan Struktur Baja Page 13 of 45 www.LaporanTeknikSipil.wordpress.com 5. Perhitungan Kuda-kuda (Gable) 5.1 Pembebanan pada balok gable Figure 3 Gambar distribusi pembebanan Pembebanan pada balok gable akibat beban-beban yang dipikul oleh gording terpanjang yaitu = 6 meter. Kaki kuda-kuda Kaki kuda-kuda 2,03 m 15,23 m Figure 4 Pembebanan yang dipikul oleh gording Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 35. Perancangan Struktur Baja www.LaporanTeknikSipil.wordpress.com Balok yang direncanakan menggunakan IWF 700x300x12x14 dengan data penampang sebagai berikut: H = 700 mm A = 235.50 mm2 rx = 29.3 cm Page 14 of 45 B = 300 mm Ix = 201,000 cm4 ry = 6.78 cm t1 = 13 mm Iy = 10,800 cm4 Sx = 5.760 cm3 t2 = 24 mm Sy = 722 cm3 Figure 5 Penampang baja IWF Pembebanan pada balok gable akibat beban-beban yang dipikul oleh 1 gording dengan bentang 6 meter: 5.1.1 Beban gording • Gording P1 (karena terletak pada ujung balok, maka menerima beban setengah jarak gording = 0.508 m) - Berat sendiri penutup atap : 6 m x 20 kg/m2 x 0.508 m = 60.96 kg - Berat sendiri gording : 6 m x 6.76 kg/m = 40.56 kg - Berat sendiri balok : 0.508 m x 185 kg/m = 93.98 kg - Berat alat penyambung : 10% x BS = 9.398 kg - Beban hidup : = 100 kg • Gording P2 s/d P15 (karena terletak pada tengah balok, maka menerima beban satu kali jarak gording = 1.016 m) - Berat sendiri penutup atap : 6 m x 20 kg/m2 x 1.016m = 121.92 kg - Berat sendiri gording : 6 m x 6.76 kg/m = 40.56 kg - Berat sendiri balok : 1.016 m x 185 kg/m = 187.96 kg - Berat alat penyambung : 10% x BS = 18.796 kg - Beban hidup : = 100 kg Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 36. Perancangan Struktur Baja www.LaporanTeknikSipil.wordpress.com Dengan cara yang sama untuk mempermudah perhitungan beban-beban pada gording dilakukan secara tabel sebagai berikut: Page 15 of 45 Table 4 Tabel pembebanan pada gording No Pembebanan P1 (kg) P2 s/d P15 1 Berat penutup atap 60.96 121.92 2 Berat gording 40.56 40.56 3 Berat sendiri balok 93.98 187.96 4 Berat alat sambung 9.94 18.80
  • 37. 205.44 369.24 Beban merata akibat beban mati: P q= 0.5L 2(205.4)+14(369.24) 5580.16 q= = =372.01kg/m 0.5(30) 15 Beban merata akibat beban hidup : Dipilih yang terbesar antara beban orang atau beban air hujan, Beban orang = 100 kg Beban air hujan qah = 40 – 0.8 20 kg/m2 = 40 – 0.8 x 10 = 32 kg/m2 P = qah x jarak antar gording x jarak antar kuda-kuda = 32 kg/m2 x 1.016 m x 6 m = 195.07 kg Maka dipilih beban akibat air hujan = 195.07 kg 16(195.07) 3121.15 q= = =208.08kg/m 0.5(30) 15 5.1.2 Tekanan angin pada bidang atap Tekanan angin = 30 kg/m2 Koefisien angin tekan Ctk = 0.1 Wt = 0.1 x 30 kg/m2 x 6 m = 18 kg/m Koefisien angin hisap Chs = -0.4 Wh = -0.4 x 30 kg/m2 x 6 m = -72 kg/m 5.1.3 Tekanan angin pada bidang dinding Koefisien angin tekan Ctk = 0.9 Wt = 0.9 x 30 kg/m2 x 6 m = 162 kg/m Koefisien angin hisap Chs = -0.4 Wh = -0.4 x 30 kg/m2 x 6 m = -72 kg/m Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 38. Perancangan Struktur Baja Page 16 of 45 www.LaporanTeknikSipil.wordpress.com 5.1.4 Gambar skema pembebanan Figure 6 Skema pembebanan akibat beban mati Figure 7 Skema pembebanan akibat beban hidup Figure 8 Skema pembebanan akibat beban angin kiri Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 39. Perancangan Struktur Baja Page 17 of 45 www.LaporanTeknikSipil.wordpress.com 5.2 Kontrol profil kuda-kuda gable 5.2.1 Rafter Modulus elastisitas (E) = 200,000.00 Mpa Modulus geser (G) = 80,000.00 Mpa Tegangan leleh (fy) = 240.00 Mpa Tegangan putus (fu) = 70.00 Mpa Data beban dan geometri struktur: Momen maksimum (Mu) = 461,990,771.00 Nmm Gaya geser maksimum (Vu) = 100,867.80 N Gaya aksial (Nu) = 110,134.97 N M1x = 182,417,847.00 Nmm M2x = 461,990,771.00 Nmm MA = 461,990,771.00 Nmm MB = 172,164,923.00 Nmm MC = 88,367,983.00 Nmm Lx = 15,287.33 Mm Ly = 1,019.00 mm Data profil: H = 700 mm A = 235.50 mm2 rx = 29.3 cm B = 300 mm Ix = 201,000 cm4 ry = 6.78 cm t1 = 13 mm Iy = 10,800 cm4 Sx = 5.760 cm3 t2 = 24 mm r = 28.00 mm Sy = 722 cm3 Efek kolom: Menentukan panjang tekuk rafter (Jepit-jepit): Lkx = (15,287.33 x 0.5) = 7,643.67 mm Lky = (1,019.00 x 0.5) = 509.58 mm Menentukan parameter kelangsingan rafter: Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 40. Perancangan Struktur Baja Page 18 of 45 www.LaporanTeknikSipil.wordpress.com
  • 41.
  • 42.
  • 43.
  • 44. 1 1 7,643.67 240 0.29 = = = 293 200,000 cx Lkx fy rx E l p p
  • 45.
  • 46.
  • 47.
  • 48. 1 1 509,58 240 0.08 = = = 67.8 200,000 Lky fy cy ry E l p p Menentukan daya dukung nominal rafter: Jika, c =0.25 maka = 1.00 Jika, 0.25 c 1.2 maka = 1.43/(1.6-0.67 c) Jika, c 1.2 maka = 1.25 c2 Nnx = Ag × fy x = 5,559,938.28 N Nny = Ag × fy y = 5,652,000.00 N w w Digunakan Nn minimum = 5,559,938.28 N Nn = 0.85 x 5,559,938.28 = 4,725,947.54 N (Nu/ Nn)1…OK Efek balok: Menentukan konstanta-konstanta untuk profil WF simetris: h1 = tf + r = 24 + 28 = 52.00 mm h2 = ht – 2(h1) = 700 – 2 (52) = 596.00 mm h = ht – tf = 700 – 24 = 676.00 mm J =
  • 49. bt3/3 = 3,242,281.33 mm Iw = (Iy.h2)/4 = (108,000.6762)/4 = 1.23E+13 mm6 Zx = (b.tf)(h-tf)+tw(0.5h-tf)(0.5h-tf) = 6,352,372.00 mm3 = p X EGJA 1 2 Zx = 12,223.05 Mpa ( )2 Zx Iw X 2 4 GJ Iy = = 2.74E-04 mm2/N2 Menentukan kuat nominal lentur penampang dengan pengaruh tekuk lokal. Kontrol penampang, termasuk kompak, tidak kompak atau langsing Untuk tekuk lokal pelat sayap: Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 50. Perancangan Struktur Baja Page 19 of 45 www.LaporanTeknikSipil.wordpress.com = bf/2tf = 6.25 p = 170/fy = 10.97 r = 370/(fy - fr) = 28.38 p, maka Penampang Kompak Untuk tekuk lokal pelat badan: = (h - 2tf)/tw = 48.31 p = 1680/fy = 108.44 r = 2550/fy = 164.60 p, maka Penampang Kompak Menentukan batasan momen plastis, Mp: Mp = Zx fy = 1,524,569,280.00 Nmm Mr = Sx(fy - fr) = 979,200,000.00 Nmm Maka, Mn = 1,524,569,280.00 Nmm Menentukan kuat nominal lentur penampang dengan pengaruh tekuk lateral Kontrol penampang, termasuk bentang pendek, menengah atau panjang Panjang Lb = jarak antar pengaku/sokongan lateral = Ly fl = fy - fr = 170.00 MPa Lb = 1,019.16 mm Lp = 1.76*ry*(E/fy) = 344.06 mm Lr = ry*(X1/fL)*(1+(1+X2*fL2)) = 9,722.10 mm maka, termasuk bentang: Bentang menengah Cb = 2.30 Untuk bentang menengah, Mn = Cb*(Mp - (Mp - Mr) *(Lb - Lp)/(Lr - Lp)) = 1,524,569,280.00 Nmm Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 51. Perancangan Struktur Baja www.LaporanTeknikSipil.wordpress.com Momen nominal yang paling menentukan = 1,524,569,280.00 Nmm Page 20 of 45 Menentukan faktor perbesaran momen: Momen lentur terhadap sumbu x Ditinjau untuk kondisi portal tak bergoyang (braced) Ncrb = Ab fy/cx2 = 67,908,245.28 N m=M1x/M2x = 0.39 Cmx = 0,6-0,4m1 = 0.44 bx = (Cmx/(1-(Nu/Ncrb)))1 = 1.00 Ditinjau untuk kondisi portal bergoyang (unbraced): Ncrs = Ab fy/cx2 = 67,908,245.28 N sx = 1/(1-(Nu/Ncrs)) = 1.00 Menentukan momen ultimit (Mu): Mux = bx Mntux + sx Mltux = 895,438,647.15 Nu/Nn = 0.02 Interaksi aksial momen = 0.35 Kontrol kuat geser nominal tanpa pengaku: Ketebalan minimum pelat badan tanpa adanya pengaku; h2/tw6,36E/fy h2/tw = 45.85 6,36E/fy = 183.60 Kuat geser pelat badan tanpa adanya pengaku; Aw = tw x ht = 9,100.00 mm2 Vn = 0,6 fy Aw = 1,310,400.00 N Vu/Vn 1, OK = 0.10 Kesimpulan, Profil; 700x300x13x24 = AMAN Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 52. Perancangan Struktur Baja www.LaporanTeknikSipil.wordpress.com 5.2.2 Kolom Modulus elastisitas (E) = 200,000.00 Mpa Modulus geser (G) = 80,000.00 Mpa Tegangan leleh (fy) = 240.00 Mpa Tegangan putus (fu) = 70.00 Mpa Data beban dan geometri struktur: Momen maksimum (Mu) = 461,990,771.00 Nmm Gaya geser maksimum (Vu) = 95,575,51 N Gaya aksial (Nu) = 130,502.06 N M1x = 461,990,771.00 Nmm M2x = 461,990,771.00 Nmm MA = 432,697,393.00 Nmm MB = 216,348,696.70 Nmm MC = 324,523,045.00 Nmm Lx = 5,000.00 Mm Ly = 1,000.00 mm Panjang rafter = 15,287.33 mm Page 21 of 45 Data profil: H = 700 mm A = 235.50 mm2 rx = 29.3 cm B = 300 mm Ix = 201,000 cm4 ry = 6.78 cm t1 = 13 mm Iy = 10,800 cm4 Sx = 5.760 cm3 t2 = 24 mm r = 28.00 mm Sy = 722 cm3 Efek kolom: Menentukan nilai perbandingan kekakuan pada rangka: Untuk lentur terhadap sumbu x : 10.00( )
  • 53. I column = = Gix L for hinge I beam L Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 54. Perancangan Struktur Baja Page 22 of 45 www.LaporanTeknikSipil.wordpress.com 3.06
  • 55. I column = = Gjx L I beam L Untuk lentur terhadap sumbu y : 10.00( )
  • 56. I column = = Giy L for hinge I beam L 3.06
  • 57. I column = = Gjy L I beam L Menurut Smith, 1996, faktor panjang tekuk dapat ditentukan tanpa nomogram, tetapi dengan menggunakan rumus dan untuk portal bergoyang adalah: = × + + = 1.6 Gix Gjx 4.0( Gix Gjx ) 2.30 7.5 Kx + + Gix Gjx = × + + = 1.6 Giy Gjy 4.0( Giy Gjy ) 2.30 7.5 Ky + + Giy Gjy Menentukan panjang tekuk Kolom: Lkx = (5,000.00 x 2.30) = 11,494.73 mm Lky = (1,000.00 x 2.30 = 2,298.95 mm Menentukan parameter kelangsingan rafter:
  • 58.
  • 59.
  • 60.
  • 61. 1 1 7,643.67 240 0.43 = = = 293 200,000 cx Lkx fy rx E l p p
  • 62.
  • 63.
  • 64.
  • 65. 1 1 509,58 240 0.37 = = = 67.8 200,000 Lky fy cy ry E l p p Menentukan daya dukung nominal rafter: Jika, c =0.25 maka = 1.00 Jika, 0.25 c 1.2 maka = 1.43/(1.6-0.67 c) Jika, c 1.2 maka = 1.25 c2 Nnx = Ag × fy x = 5,175,027.76 N Nny = Ag × fy y = 5,332,641,52 N w w Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 66. Perancangan Struktur Baja Page 23 of 45 www.LaporanTeknikSipil.wordpress.com Digunakan Nn minimum = 5,175,027.76 N Nn = 0.85 x 5,175,027.76 = 4,398,773.60 N (Nu/ Nn)1…OK Efek balok: Menentukan konstanta-konstanta untuk profil WF simetris: h1 = tf + r = 24 + 28 = 52.00 mm h2 = ht – 2(h1) = 700 – 2 (52) = 596.00 mm h = ht – tf = 700 – 24 = 676.00 mm 3 3 J =bt = 3,242,281.33 mm . 2 108,000 6762 Iw= Iy h = × 4 4 = 1.23E+13 mm6 Zx = (b.tf)(h-tf)+tw(0.5h-tf)(0.5h-tf) = 6,352,372.00 mm3 = p X EGJA 1 2 Zx = 12,223.05 Mpa ( )2 Zx Iw X 2 4 GJ Iy = = 2.74E-04 mm2/N2 Menentukan kuat nominal lentur penampang dengan pengaruh tekuk lokal. Kontrol penampang, termasuk kompak, tidak kompak atau langsing Untuk tekuk lokal pelat sayap: = bf/2tf = 6.25 p = 170/fy = 10.97 r = 370/(fy - fr) = 28.38 p, maka Penampang Kompak Untuk tekuk lokal pelat badan: Ny = A fy = 56,520.00 Nu/Ny = 2.57 = h/tw = 52.00 Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 67. Perancangan Struktur Baja Page 24 of 45 www.LaporanTeknikSipil.wordpress.com p = 1680/fy = 38,73 r = 2550/fy = -147.89 r , maka Penampang langsing Menentukan batasan momen plastis, Mp: Mp = Zx fy = 1,524,569,280.00 Nmm Mr = Sx(fy - fr) = 979,200,000.00 Nmm Maka, Mn = 1,373,089,538.93 Nmm Menentukan kuat nominal lentur penampang dengan pengaruh tekuk lateral Kontrol penampang, termasuk bentang pendek, menengah atau panjang Panjang Lb = jarak antar pengaku/sokongan lateral = Ly fl = fy - fr = 170.00 MPa Lb = 5,000 mm Lp = 1.76*ry*(E/fy) = 344.06 mm Lr = ry*(X1/fL)*(1+(1+X2*fL2)) = 9,722.10 mm maka, termasuk bentang: Bentang menengah Cb = 1.74 Untuk bentang menengah, Mn = Cb*(Mp - (Mp - Mr) *(Lb - Lp)/(Lr - Lp)) = 1,524,569,280.00 Nmm Momen nominal yang paling menentukan = 1,524,569,280.00 Nmm Menentukan faktor perbesaran momen: Momen lentur terhadap sumbu x Ditinjau untuk kondisi portal tak bergoyang (braced) Ncrb = Ab fy/cx2 = 30,028,134.88 N m=M1x/M2x = 0 Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 68. Perancangan Struktur Baja Page 25 of 45 www.LaporanTeknikSipil.wordpress.com Cmx = 0,6-0,4m1 = 0.60 bx = (Cmx/(1-(Nu/Ncrb)))1 = 1.00 Ditinjau untuk kondisi portal bergoyang (unbraced): Ncrs = Ab fy/cx2 = 30,028,134.88 N sx = 1/(1-(Nu/Ncrs)) = 1.00 Menentukan momen ultimit (Mu): Mux = bx Mntux + sx Mltux = 895,438,647.15 Nu/Nn = 0.03 Interaksi aksial momen = 0.74 Kontrol kuat geser nominal tanpa pengaku: Ketebalan minimum pelat badan tanpa adanya pengaku; h2/tw6,36E/fy h2/tw = 45.85 6,36E/fy = 183.60 Kuat geser pelat badan tanpa adanya pengaku; Aw = tw x ht = 9,100.00 mm2 Vn = 0,6 fy Aw = 1,310,400.00 N Vu/Vn 1, OK = 0.10 Kesimpulan, Profil; 700x300x13x24 = AMAN Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 69. Perancangan Struktur Baja Page 26 of 45 www.LaporanTeknikSipil.wordpress.com 5.3 Perencanaan peletakan Gaya-gaya pada kolom Gaya aksial (Nu) = 130,502 N Gaya geser (Vu) = 95,575.51 N Figure 9 Detail base plat 5.3.1 Kontrol tegangan yang timbul: s = £s = ' 25 Nu b b Mpa F F = a . b = 800 x 400 = 320,000 mm2 130,502 s b = = 0.41 Mpa 25 Mpa 320,000 5.3.2 Penentuan jumlah angkur Diambil diameter angkur = 19 mm fub = 370 Mpa 0.75 0.5 370 (0.25 192) 39,339.61 =f =f = × × × p = Vd fV f r f A N 1 n ub b Vu n.Vd 95,575.51n×39,339.61®n=2.43buah Digunakan 4 Ø 19 mm angkur. Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 70. Perancangan Struktur Baja Page 27 of 45 www.LaporanTeknikSipil.wordpress.com 5.4 Perencanaan sambungan rafter puncak Figure 10 Sambungan rafter puncak 5.4.1 Data baut Tegangan putus, fub = (Baut A490) 780 Mpa Diameter baut, db = (7/8 “) atau 22.23 mm Luas baut, Ab = 388.28 mm2 Jumlah baut, n = 12 Buah 5.4.2 Data plat ujung baut Tegangan leleh, fy = 240 Mpa Tegangan putus, fup = 370 Mpa Lebar plat, b = 300 mm Tinggi plat, h = 711 mm Tebal plat, t = 24 mm 5.4.3 Beban rencana Gaya geser, Vu = 20,926.26 N Momen, Mu = 182,417,847.00 Nmm 5.4.4 Menentukan letak garis netral Jarak antar baut: S1 = 1.5db – 3db = (1.5 x 22.23) - (3 x 22.23) = 33.35 mm – 66.69 mm S = 2.5db – 7db = (2.5 x 22.23) – (7 x 22.23) = 55.58 mm – 155.61 mm Sehingga digunakan S1 = 65 mm Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 71. Perancangan Struktur Baja Page 28 of 45 www.LaporanTeknikSipil.wordpress.com Jarak vertikal antar baut, g = 116.20 mm d = = × = 2 2 388.28 6.68 Ab mm g 116.20 d x0.5x=b'(h−x)0.5(h−x) 3.34x2 =112.50(h2 −2hx+ x2) 0=112.50(505,521−1,422x+ x2) X = 606.48 mm H – x = 711 – 606.48 = 104.52 mm − ( ) 3 1 3 0.17 1 h x x s s = Û s = s 5.4.5 Menentukan tegangan lentur yang terjadi (0.5 1 (23) ) (0.5 3 '( )(23)( ) s d x x + s b h− x h− x =Mu s + s = Mpa 819,363.34 819,363.34 182,417,847 1 3 s + s = Mpa 819,363.34 141,211.09 182,417,847 1 1 s = Mpa 960,574.09 182,417,847 1 s = 189.91 Mpa 1 1( 1) 102,829.40 169.55 x S 2 606.84 Mpa x s s − = = = s3=32.73Mpa 5.4.6 Menentukan gaya-gaya yang terjadi Gaya tarik maksimum yang terjadi pada baut: Gaya terbesar yang dipikul baris baut terbawah Tu=d gs = 6.68 × 116.20 × 169.55 = 131,666.65 N 2 Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 72. Perancangan Struktur Baja Page 29 of 45 www.LaporanTeknikSipil.wordpress.com Gaya yang dipikul satu baut terbawah: Tu = 0.5 Tu= 0.5 × 131,666.65 = 65,833.33 N 1 Kuat tarik rencana satu baut: =f × = × × × = Td f 0.75F A 0.75 0.75 780 388.28 170,357.28N ub b Tu f Tn …(OK) Gaya geser yang terjadi pada baut: 1 20,926.26 1,743.86 Vu Vu N = = = 12 n =f Vd r f A m 1 f ub b fVn=0.75×0.4×800×380.29×1=90,857.22N Vu1 f Vn …(OK) Gaya tumpu yang terjadi 1 20,926.26 1,743.86 Vu Vu N = = = 12 n = f Rd 2,4 d f T f b up p f fRn=2.4×0.75×22.23×24×370=355,324.32N Vu1 f Rn …(OK) Kombinasi gaya geser dan tarik 20,926.26 = f = × × × 1 0.4 0.75 780 1 4,659.34 Vu f r f m uv nA f ub b 4.59 234 … (OK) = = × = f 0.75 f 0.75 780 585Mpa t ub Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 73. Perancangan Struktur Baja Page 30 of 45 www.LaporanTeknikSipil.wordpress.com =f Td f A f t b f = × × = Tn 0.75 585 388.28 170,357.28N f 131,666.65 10,927.22 Tu N 12 n = = Td Tu/n …(OK) 5.4.7 Perencanaan pengaku penumpu beban 5.4.7.1 Cek terhadap kuat leleh pelat badan fRb=(5k +N) fy×twRu fRb=(5(13+28)+24)240×1320,926.26 Rb=0.75×714,48020,926.26N Rb=535,86020,926.26®OK 5.4.7.2 Cek terhadap kuat tekuk dukung pelat badan 1.5 = × × +
  • 74.
  • 75. N tw E fy tf Rb tw Ru f 0.79 2 1 3 d tf tw ( )24 1.5 200,000 240 24 0.79 132 1 3 13 Rb Ru 700 24 13 f × × = × +
  • 76. fRb=1,308,340.55 Ru Rb=0.75×1,308,340.5520,926.26N Rb=981,255.4120,926.26®OK 5.4.7.3 Cek terhadap kuat tekuk lateral pelat badan 3 3 / ( ) ( ) Cr E tw tf h tw 1 0.4 Rb Ru 2 3 / f × × × = + h L bf Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 77. Perancangan Struktur Baja Page 31 of 45 www.LaporanTeknikSipil.wordpress.com 3 3 3.25 200,000 13 24 700/13 ( ) ( ) 1 0.4 Rb Ru 2 3 700 1000/300 f × × × = + fRb=79,737.65Ru Rb=0.75×79,737.6520,926.26N Rb=59,803.2420,926.26N®OK 5.4.7.4 Cek terhadap kuat tekuk lentur pelat badan 24.08 tw 3 f = Rb Efy Ru h 24.08 133 200,000 240 20,926.26 700 f × Rb= × N fRb=523,611.4320,926.26N Rb=0.75×523,611.4320,926.26N Rb=392,708.5720,926.26N®OK Kesimpulan : Sambungan aman dan pelat badan tidak perlu diberi pengaku. 5.5 Perencanaan sambungan rafter dengan kolom Figure 11 Detail sambungan rafter kolom Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 78. Perancangan Struktur Baja Page 32 of 45 www.LaporanTeknikSipil.wordpress.com Figure 12 Distribusi tegangan pada sambungan 5.5.1 Data baut Tegangan putus, fub = (Baut A490) 780 Mpa Diameter baut, db = (7/8 “) atau 22.23 mm Luas baut, Ab = 388.12 mm2 Jarak baut ke tepi atas, S = 65 mm Jumlah baut, n = 12 Buah 5.5.2 Data plat ujung baut Tegangan leleh, fy = 240 Mpa Tegangan putus, fup = 370 Mpa Lebar plat, b = 300 mm Tinggi plat, h = 711 mm Tebal plat, t = 24 mm 5.5.3 Beban rencana Gaya geser, Vu = 100,867.80 N Momen, Mu = 461,990,771.00 Nmm 5.5.4 Menentukan letak garis netral Jarak vertikal antar baut, g = 116.20 mm d = = × = 2 2 388.12 6.68 Ab mm g 116.20 d x0.5x=b'(h−x)0.5(h−x) 3.34x2 =112.50(h2 −2hx+ x2) Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 79. Perancangan Struktur Baja Page 33 of 45 www.LaporanTeknikSipil.wordpress.com 0=112.50(505,521−1,422x+ x2) X = 606.50 mm H – x = 711 – 605.84 = 104.50 mm − ( ) 3 1 0.17 3 1 h x x s s = Û s = s 5.5.5 Menentukan tegangan lentur yang terjadi (0.5 1 (23) ) (0.5 3 '( )(23)( ) s d x x + s b h− x h− x =Mu s + s = Mpa 819,081.79 819,081.79 461,990,771.00 1 3 s + s = Mpa 819,081.79 141,134.23 461,990,771.00 1 1 s = Mpa 960,216.02 461,990,771.00 1 s = 481.13 Mpa 1 1( 1) 260,531.11 429.57 x S 2 606.50 Mpa x s s − = = = s3=82.90Mpa 5.5.6 Menentukan gaya-gaya yang terjadi Gaya tarik maksimum yang terjadi pada baut: Gaya terbesar yang dipikul baris baut terbawah Tu=d gs = 6.68 × 116.20 × 429.57 = 333,449.80 N 2 Gaya yang dipikul satu baut terbawah: Tu = 0.5 Tu= 0.5 × 333,449.80 = 166,724.90 N 1 Kuat tarik rencana satu baut: =f × = × × × = Td f 0.75F A 0.75 0.75 780 388.12 170,288.74N ub b Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 80. Perancangan Struktur Baja Page 34 of 45 www.LaporanTeknikSipil.wordpress.com Tu f Tn …(OK) Gaya geser yang terjadi pada baut: 1 100,867.80 8,405.65 Vu Vu N = = = 12 n =f Vd r f A m 1 f ub b fVn=0.75×0.4×780×380.29×1=90,820.66N Vu1 f Vn …(OK) Gaya tumpu yang terjadi 1 100,867.80 8,405.65 Vu Vu N = = = 12 n = f Rd 2,4 d f T f b up p f fRn=2.4×0.75×22.23×24×370=355,324.32N Vu1 f Rn …(OK) Kombinasi gaya geser dan tarik 100,867.80 = f = × × × 1 0.4 0.75 780 1 4,657.47 Vu f r f m uv nA f ub b 22.11 240 … (OK) = = × = f 0.75 f 0.75 780 585Mpa t ub =f Td f A f t b f = × × = Tn 0.75 585 388.12 170,288.74N f 333,449.80 27,787.48 Tu N 12 n = = Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 81. Perancangan Struktur Baja Page 35 of 45 www.LaporanTeknikSipil.wordpress.com Td Tu/n …(OK) 5.5.7 Perencanaan pengaku penumpu beban 5.5.7.1 Cek terhadap kuat leleh pelat badan fRb=(5k +N) fy×twRu fRb=(5(13+28)+24)240×13100,867.80N Rb=0.75×714,480.00100,867.80N Rb=535,860.00100,867.80N®OK 5.5.7.2 Cek terhadap kuat tekuk dukung pelat badan 1.5 = × × +
  • 82.
  • 83. N tw E fy tf Rb tw Ru f 0.79 2 1 3 d tf tw ( )24 1.5 200,000 240 24 0.79 132 1 3 13 Rb Ru 700 24 13 f × × = × +
  • 84. fRb=1,308,340.55Ru Rb=0.75×1,308,340.55100,867.80N Rb=981,255.41100,867.80N®OK 5.5.7.3 Cek terhadap kuat tekuk lateral pelat badan 3 3 / ( ) ( ) Cr E tw tf h tw 1 0.4 Rb Ru 2 3 / f × × × = + h L bf 3 3 3.25 200,000 13 24 700/13 ( ) ( ) 1 0.4 Rb Ru 2 3 700 1000/300 f × × × = + fRb=79,737.65Ru Rb=0.75×79,737.65100,867.80N Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 85. Perancangan Struktur Baja Page 36 of 45 www.LaporanTeknikSipil.wordpress.com 59,803.24 Rb= 100,867.80N®TidakOK 5.5.7.4 Cek terhadap kuat tekuk lentur pelat badan 24.08 tw 3 f = Rb Efy Ru h 24.08 133 200,000 240 100,867.80 700 f × Rb= × N fRb=523,611.43100,867.80N Rb=0.75×523,611.43100,867.80N Rb=392,708.57100,867.80N®OK 5.5.7.5 Ukuran pengaku Ru−f Rb£ As× fy 100,867.80−59,803.24£ As×240 41,064.56£ As×240 41,064.56 240 As³ As³171.10mm2 5.5.7.6 Lebar pengaku 1 bs ×bf − 0.5 tw 3 1 bs × − × 300 0.5 13 3 bs 93.50»95mm 5.5.7.7 Tebal pengaku 93.50 200,000 0.56 240 £ ts Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 86. Perancangan Struktur Baja Page 37 of 45 www.LaporanTeknikSipil.wordpress.com 93.50 £16.70 ts 93.50 5.78 6.00 16.70 ts³ = » mm Gunakan pelat pengaku dimensi 95 x 10 mm Kesimpulan : Sambungan aman. Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 87. Perancangan Struktur Baja Page 38 of 45 6. Perhitungan Pondasi www.LaporanTeknikSipil.wordpress.com 6.1 Data Perencanaan Kuat tekan beton (f’c) = 25 mPa Kuat tarik baja tulangan (fy) = 400 mPa Daya dukung tanah (s ) = 250 kN/m2 Berat jenis tanah(g ) = 18 kN/m2 6.2 Rencana pondasi Figure 13 Rencana pondasi 6.3 Dimensi pondasi Dimensi pondasi dihitungan dari beban tidak terfaktor : Kedalaman pondasi (z) = 1,5 m Tegangan efektif tanah (s ) s =s − zg = 223 kN/m2 eksentritas (e), tidak ada momen, maka = 0 P P e b b 2 3 1 6 s × ³ + Dipakai b = = 1.0 m 189.02 P P × e b b + = 2 3 2 1 6 1 = 189.02 kN/m2 dari Tegangan efektif tanah (s ) OK dipakai dimensi pondasi = 1,00x1,00 6.4 Kuat lentur pondasi Kombinasi beban Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 88. Perancangan Struktur Baja www.LaporanTeknikSipil.wordpress.com Beban Aksial = (1.2×126.63+1.6× 62.39) = 251.78 kN s =s − × s −s = − × − = 251.78 kN/m2 = p × s A = 663.66 mm2 Page 39 of 45 251.78 1.00 P b s = = max 2 2 = 251.78 kN/m2 251.78 1.00 P b s = = min 2 2 = 251.78 kN/m2 0,3 0,3 ( ) 251,78 ( 251.78 251.78 ) max max min 1,00 1.00 2 M =s × B×0,30 2 2 M = 251.78×1.00×0,30 2 = 11.33 kNm min s max s s max s Figure 14 Perhitungan momen pada pondasi Lebar Pondasi (B) = 1000 mm Tebal pondasi = 300 mm Tebal selimut beton = 75 mm jarak dari tepi beton ke tulangan = 100 mm Jarak dari beton tertekan ke tulangan tarik (d) = 200 mm Momen rencana (Mu) = 11.33 kNm Faktor reduksi momen (f ) = 0,80 a = − fM A f d 2 n s y
  • 89. Dipakai 5D13 2 1 13 5 4 Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 90. Perancangan Struktur Baja www.LaporanTeknikSipil.wordpress.com a = 12.49 mm + s A = 4064.06 mm2 Page 40 of 45 = s y ' 0,85 c A f a f b × 663.66 400 0,85 25 1000 = × × f = 0,8×663.66×400(200 −12.49) n M = 39.82 kNm Mu OK Tulangan minimum : ration Tulangan minimum untuk plat ( min r ) = 0,0018 Asmin = 0,0018×1000×300 = 540 mm2 As OK Tulangan maksimum ( ) 0,85 600 = × b A b d ( ) ' 0,75 f max 1 f f 600 c s w + y y ( × ) 0,85 25 600 = × b × 0,75 200 1000 max 400 1 ( 600 400 ) As OK Dipakai tulangan 5D13Û D13 – 200 Tulangan susut diambil 20% dari tulangan lentur 6.5 Kuat geser pondasi 6.5.1 Geser satu arah s max s 1000 Figure 15 Gaya geser satu arah pondasi Tegangan geser yang terjadi ( ) 2 100 V = s +s × B× u max Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 91. Perancangan Struktur Baja Page 41 of 45 www.LaporanTeknikSipil.wordpress.com V = (251.78 + 251.78) 2×1000×100 u = 25.18 kN Kuat geser yang disumbangkan oleh beton ' 25 f =f = × c 0,75 200 1000 6 6 c f V bd = 125 kN Vu OK Tidak diperlukan tulangan geser 6.5.2 Geser pons 1750 h h+d/2 Figure 16 Daerah gaya geser pons pada pondasi Sisi panjang kolom (h) = 800 mm sisi pendek kolon (b) = 400 mm perbandingan h dan b (b c ) = 2 mm Jarak dari beton tertekan ke tulangan tarik (d) = 200 mm (h+d) = 1000 mm (b+d) = 600 mm bo = 2×((h + d ) +(b + d )) = 3200 mm a (Untuk kolom tengah) = 40 s ( ) ( ) max min s% = s +s 2 = 251.78+ 251.78 2 = 251.78 kN/m2 Gaya geser pons ( ( ) ( )) ( ) 2 2 s% B − h + d × b + d = 251.78 1.00 −1.0×0.6 = 100.71 kN Kuat geser pons beton Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 92. Perancangan Struktur Baja Page 42 of 45 www.LaporanTeknikSipil.wordpress.com = +
  • 93. 2 ' 1 0 f b d V c c 1 6 b c × × = +
  • 94. 2 25 3200 200 1 V c 1 2 6 = 1066.67 kN ' a = +
  • 95. d f b d 2 0 V s c c b 2 12 0 × × × = +
  • 96. 40 200 25 3200 200 2 2 3200 12 V c = 6000 kN 1/ 3 ' = V f cb d c 3 0 V = × × c 1/ 3 25 3200 200 3 = 1066.67 kN dipakai Vc min = 1066.67 kN Vc = 0.75 x Vc = 800 kN Vc Vu OK Maka tidak diperlukan tulangan geser. Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 97. Perancangan Struktur Baja Page 43 of 45 7. Kesimpulan www.LaporanTeknikSipil.wordpress.com Item Ukuran Dimensi gording C150.50.20x3.2 Dimensi batang tarik (trackstang) Ø 5 mm Dimensi ikatan angin Ø 6 mm Dimensi profil gable WF 700.300.13.24 Dimensi baut pada sambungan puncak 12 Ø 7/8” Dimensi baut pada sambungan rafter dengan kolom 12 Ø 7/8” Dimensi base plat 400 x 800 (tebal 24 mm) Dimensi angkur 4 Ø 19 Dimensi pondasi 1000 x 1000 mm Tulangan pondasi 5D13 D13-200 mm Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 98. Perancangan Struktur Baja Page 44 of 45 Referensi www.LaporanTeknikSipil.wordpress.com Syahril A. Rahim Mulia, Diktat Perancangan Stukrur Baja Nobel, afret. 2011. Catatan kuliah Perancangan Struktur Baja semester 4 SNI 03-1729-2002. Tata Cara Perencanaan Struktur Baja Untuk Bangunan Gedung. Setiawan, Agus. 2008. Perencanaan Struktur Baja dengan Metode LRFD (Berdasarkan SNI 03-1729-2002) Jurnal, Perancangan Struktur Baja Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
  • 99. Perancangan Struktur Baja Page 45 of 45 Tentang Penulis www.LaporanTeknikSipil.wordpress.com Afret Nobel adalah alumni Diploma Teknik Sipil Universitas Gadjah Mada Angkatan 2005 dan Alumni Ekstensi Teknik Sipil Universitas Indonesia Angkatan 2009. Papanya seorang petani dan Mamanya pedagang. www.LaporanTeknikSipil.wordpress.com Anda diperbolehkan untuk mengirimkan lewat pos dan email dan memberikan buku elektronik ini kepada siapa saja yang Anda inginkan, selama Anda tidak mengubah, atau mengedit isinya dan format digitalnya. Sebenarnya, kami akan sangat senang bila Anda membuat duplikat buku elektronik ini sebanyak-banyaknya. Tetapi bagaimanapun, hak untuk membuat buku dalam bentuk cetak atas naskah ini untuk dijual adalah tindakan yang tidak dibenarkan. Kiranya buku ini masih jauh dari kesempurnaan, oleh karena itu, saran dan kritik yang membangun sangat kami harapkan. Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel