Airtherm Engineering Limited have designed, supplied and installed a 500mm diameter stainless steel, twin wall, fully welded gas and water tight Dinak DWhp flue system serving three high efficiency Clyde condensing boilers, with a total 2.2MW output load.
The system installed comprised of a 10m horizontal run and a 26m vertical, complete with the necessary drains incorporated to allow any unwanted condense to evacuate to the system.
The system was installed back in April 2012. Working closely with BAM Construction the installation was certainly a success.
The UCL Academy will be housed in brand-new, purpose-built accommodation on Adelaide Road in Swiss Cottage, North London.
The new building is specifically designed to support the curriculum and pastoral structures that the school will offer.
The Academy’s facilities include:
• State-of-the-art science laboratories, and a science demonstration theatre for interactive lectures, experiments and talks by visiting academics from UCL;
• An engineering science suite, which will include workshops and technology and science labs (for electronics and for engineering physics) designed to give students the experience of ‘being engineers’;
• Suites of rooms for art, music and drama, including highly-equipped performance spaces;
• ‘House’ spaces, providing comfortable, welcoming places for students to eat together, and to use for informal study during breaks and before and after school.
1. Project Profile
UCL Academy, Adelaid Road, Camden
Consultant
■ BAM
Client
■ BAM M&E
Front Entrance
Sector
■ Education
Products
■ Dinak Flue System
Aerial View of site
Equipment Camden gets all fired up….
■ Clyde Modulex 290 & 900 Airtherm Engineering Limited have designed, supplied and installed a 500mm
diameter stainless steel, twin wall, fully welded, 4 hour fire rated, gas and water
tight Dinak DWhp flue system serving three high efficiency Clyde condensing
boilers, with a total 2.2MW output load.
Application Airtherm Engineering Limited liaised with both the consultant and the contractor at
all times, attending site meetings, providing comprehensive technical submission,
including calculations and drawings for approval prior to manufacture of the
■ High Efficiency Condensing equipment.
The system installed comprised of a 12m horizontal run and a 26m vertical, complete
with draft stabilisers and the necessary drains incorporated to allow any unwanted
condense to evacuate to the system.
The flue system was installed back in April 2012, however the design and liaising
with the contractor begin some months earlier. Working closely with BAM
Construction the installation was certainly a success.
Clyde Modulex Boiler
0844 809 2509 | airtherm.co.uk | info@airtherm.co.uk
2. Product Solution
• Boilers: Clyde
• Model: Modulex 1 x 290kw & 2 x 900kw
• Application: Chimney / Flue system
• Operating mode: Dry / Wet
• Pressure: Negative / positive pressure
• Working pressure: 200 Pa (product will operate 1000pa max)
• Inner wall: 316L1.4404/1.457 thickness ≤ Ø250 0,4 mm, ≥ Ø300 0,5 mm
• Outer wall: AISI 304/ 1.4301 thickness 0,5 / 0,6 mm
• Insulation: 25mm thick Rockwool insulation
• Sealant : tri-lip 'o' type silicone ring
Airtherm Masterflue • Fuel type: Gas/Oil/Coal/Wood
• Other Application Dinak Flues can be used:
• Condensing boilers
• Atmospheric gas-fired boilers
• Gas blown boilers
MasterFlue
• Industrial ovens, large-scale establishments
Contact Details: • Wood-fired stoves
Airtherm Engineering Ltd
Ventilation House
Pedmore
Stoubridge
West Midlands
DY9 0DS
Tel: 0844 8092509
Fax: 01562 887312
0844 809 2509 | airtherm.co.uk | info@airtherm.co.uk