SlideShare a Scribd company logo
1 of 6
Download to read offline
SMS Phase 1 2012
What is SMS Phase 1?
Yasin Jamil Ali
Date: 22nd May 2012
2
16 Apr
2012
Operations Function Systematic Management
System implementation – a staged approach
1.Ops ELT engagement
2.Operations
Management System
built at Ops LT level
1.Ops ELT engagement
2.Operations Management System built at Site Leader level
1.Ops ELT
engagement
2.Metrics & resource
approved
1.Scorecards
built
2.Data entered
by Sites & POS
3.Data entry trg
completed
Scorecards reviewed by Site Leaders
100% installation of Ops Management System
TECHNOLOGY BUILD – to June 2012
2011
Q2 Q3 Q4
Nov Dec Jan
Q1
Feb Mar Apr
Q2
2012
100% installation
of Ops
Management
System
MANUAL BUILD
100% installation of Ops Management System
-TECHNOLOGY BUILD
May
Operations Functions Scorecards
By Site
Systematic Management
Scorecard
Process Safety Scorecard
Integrity Management
Scorecard
Business Scorecard
People Metrics
Safety Inputs & Outputs
FinancialsOperating Reliability
NUIs
Site Performance Boards – the reporting
structure – same for all 7 Scorecards
Cassia
A&B
Site
Imm
Flam Kapok
Mah B
Mah A
AreaFunctionNUIs
Term
Bd &
Pipeline
1 2 3 4 5 6 7 8 9 10 11 12
GCA
NUIs
GC Area GM Area
ONS
Area
Ops
Function
Amh
13 14
GMA
NUIs
NUIs
Cball Mango Ser Cash Sav
15
17
16
19 2018
21
21 # Reports
Option selected & approved by
VP Operations
GCA AOM
GMA AOM
ONS AOM
• This structure display relates to one of the 7 scorecards
• Exactly the same structure will be required for EACH of
the 7 scorecards
TT Region Ops Function 2012 AOP- Plan
Book
TT Region Operations Function 2012 Annual Operating Plan metric scorecard
TT Region Operations Function
2012 Annual Operating Plan
(AOP) - metrics
Data Entry for
metrics on FOP
Data Performance Resource
S&OR
Disc
Cap
R&M Finance ES AP PSCMIPE
Risk
Manager
TAR Team PEI TeamProduction
Analyst
Enters some data manually to FOP scorecard &
links data from other Excel sources
Passes data manually
to Data Performance
Resource
Data entry
automatically
updates
graphs
The solution – Master Data Entry
Systematic Management
Scorecard
R&M Op Plan
Ops F Op Plan
Operating Reliability
Scorecard
Orange Book
GFOUpstream Function
External toTT region
Internal toTT region
Area & Function Reporting
Upstream Function HoO 2012
AOP
Upstream Function RM 2012
AOP
Bp Group
TT region Master
Data Entry
Solution

More Related Content

Viewers also liked

OXIGENACION CELULAR
OXIGENACION CELULAROXIGENACION CELULAR
OXIGENACION CELULARCARLOS FELIX
 
Aparato locomotor (1)
Aparato locomotor (1)Aparato locomotor (1)
Aparato locomotor (1)Judith Pujols
 
Build an Effective Serious-injury Prevention Strategy (in Food Manufacturing)
Build an Effective Serious-injury  Prevention Strategy (in Food Manufacturing)Build an Effective Serious-injury  Prevention Strategy (in Food Manufacturing)
Build an Effective Serious-injury Prevention Strategy (in Food Manufacturing)Alchemy Systems
 
Ciencias naturales
Ciencias naturalesCiencias naturales
Ciencias naturalesrosa cuenca
 
Presentacion bugzilla
Presentacion bugzillaPresentacion bugzilla
Presentacion bugzillarenninudal
 
Hábitos de estudio
Hábitos de estudioHábitos de estudio
Hábitos de estudiolourdes neri
 
Statement of Profit & Loss and Notes_Revised Schedule VI
Statement of Profit & Loss and Notes_Revised Schedule VIStatement of Profit & Loss and Notes_Revised Schedule VI
Statement of Profit & Loss and Notes_Revised Schedule VIBisworanjan Sutar
 
Gestión ambiental
Gestión ambientalGestión ambiental
Gestión ambientalpepe.moranco
 

Viewers also liked (14)

2016 Frente 3 módulo 15 Poluição
2016 Frente 3 módulo 15 Poluição2016 Frente 3 módulo 15 Poluição
2016 Frente 3 módulo 15 Poluição
 
OXIGENACION CELULAR
OXIGENACION CELULAROXIGENACION CELULAR
OXIGENACION CELULAR
 
Aparato locomotor (1)
Aparato locomotor (1)Aparato locomotor (1)
Aparato locomotor (1)
 
Build an Effective Serious-injury Prevention Strategy (in Food Manufacturing)
Build an Effective Serious-injury  Prevention Strategy (in Food Manufacturing)Build an Effective Serious-injury  Prevention Strategy (in Food Manufacturing)
Build an Effective Serious-injury Prevention Strategy (in Food Manufacturing)
 
2016 Frente 3 módulo 10 hormonios vegetais
2016 Frente 3 módulo 10 hormonios vegetais2016 Frente 3 módulo 10 hormonios vegetais
2016 Frente 3 módulo 10 hormonios vegetais
 
Ciencias naturales
Ciencias naturalesCiencias naturales
Ciencias naturales
 
Presentacion bugzilla
Presentacion bugzillaPresentacion bugzilla
Presentacion bugzilla
 
Hábitos de estudio
Hábitos de estudioHábitos de estudio
Hábitos de estudio
 
Statement of Profit & Loss and Notes_Revised Schedule VI
Statement of Profit & Loss and Notes_Revised Schedule VIStatement of Profit & Loss and Notes_Revised Schedule VI
Statement of Profit & Loss and Notes_Revised Schedule VI
 
Sistema urogenital.
Sistema urogenital.Sistema urogenital.
Sistema urogenital.
 
Evaluación proyecto
Evaluación proyectoEvaluación proyecto
Evaluación proyecto
 
2016 Frente 2 módulo 12 sistema nervoso
2016 Frente 2 módulo 12 sistema nervoso2016 Frente 2 módulo 12 sistema nervoso
2016 Frente 2 módulo 12 sistema nervoso
 
Gestión ambiental
Gestión ambientalGestión ambiental
Gestión ambiental
 
EC-449 tema: Taller de transportistas
EC-449 tema: Taller de transportistasEC-449 tema: Taller de transportistas
EC-449 tema: Taller de transportistas
 

Similar to SMS-Phase1

Improving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis SystemImproving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis SystemSteven Muñoz
 
Infrastructure Monitoring Maturity: Modeling Technology, Process, & Culture
Infrastructure Monitoring Maturity: Modeling Technology, Process, & CultureInfrastructure Monitoring Maturity: Modeling Technology, Process, & Culture
Infrastructure Monitoring Maturity: Modeling Technology, Process, & CultureEnterprise Management Associates
 
O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...
O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...
O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...Appnovation Technologies
 
Clarity Technology Assessment Itvamp 2007
Clarity Technology Assessment Itvamp 2007Clarity Technology Assessment Itvamp 2007
Clarity Technology Assessment Itvamp 2007ITVAMP, LLC
 
Services Industry Case Study: A Practical Approach To Process Automation
Services Industry Case Study: A Practical Approach To Process AutomationServices Industry Case Study: A Practical Approach To Process Automation
Services Industry Case Study: A Practical Approach To Process AutomationNathaniel Palmer
 
ING webcast platform
ING webcast platformING webcast platform
ING webcast platformOracleIDM
 
SOC-2 Compliance Status Report sample v10.0
SOC-2 Compliance Status Report   sample v10.0SOC-2 Compliance Status Report   sample v10.0
SOC-2 Compliance Status Report sample v10.0Mark S. Mahre
 
Edcil Techncial PPT_V1.0.pptx
Edcil Techncial PPT_V1.0.pptxEdcil Techncial PPT_V1.0.pptx
Edcil Techncial PPT_V1.0.pptxAshokKumar705948
 
Bml 303 past papers pack
Bml 303 past papers packBml 303 past papers pack
Bml 303 past papers packSan King
 
Cpm 200 c technical performance measures - alleman (ppm)
Cpm 200 c   technical performance measures - alleman (ppm)Cpm 200 c   technical performance measures - alleman (ppm)
Cpm 200 c technical performance measures - alleman (ppm)Glen Alleman
 
E2E technology Asset Management Transformation Example
E2E technology Asset Management Transformation ExampleE2E technology Asset Management Transformation Example
E2E technology Asset Management Transformation ExampleAkshyadeep Raghav
 
7 Key Elements for Operation Quality Improvement
7 Key Elements for Operation Quality Improvement7 Key Elements for Operation Quality Improvement
7 Key Elements for Operation Quality ImprovementQuEST Forum
 
Michelle Redfield, Schneider Electric, Global Management Systems for Enterpri...
Michelle Redfield, Schneider Electric, Global Management Systems for Enterpri...Michelle Redfield, Schneider Electric, Global Management Systems for Enterpri...
Michelle Redfield, Schneider Electric, Global Management Systems for Enterpri...Kevin Perry
 

Similar to SMS-Phase1 (20)

Improving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis SystemImproving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis System
 
Infrastructure Monitoring Maturity: Modeling Technology, Process, & Culture
Infrastructure Monitoring Maturity: Modeling Technology, Process, & CultureInfrastructure Monitoring Maturity: Modeling Technology, Process, & Culture
Infrastructure Monitoring Maturity: Modeling Technology, Process, & Culture
 
O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...
O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...
O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...
 
Clarity Technology Assessment Itvamp 2007
Clarity Technology Assessment Itvamp 2007Clarity Technology Assessment Itvamp 2007
Clarity Technology Assessment Itvamp 2007
 
The benefits of ALM and PLM Integration
The benefits of ALM and PLM IntegrationThe benefits of ALM and PLM Integration
The benefits of ALM and PLM Integration
 
Services Industry Case Study: A Practical Approach To Process Automation
Services Industry Case Study: A Practical Approach To Process AutomationServices Industry Case Study: A Practical Approach To Process Automation
Services Industry Case Study: A Practical Approach To Process Automation
 
RESUME-lyf-20161129
RESUME-lyf-20161129RESUME-lyf-20161129
RESUME-lyf-20161129
 
ING webcast platform
ING webcast platformING webcast platform
ING webcast platform
 
SOC-2 Compliance Status Report sample v10.0
SOC-2 Compliance Status Report   sample v10.0SOC-2 Compliance Status Report   sample v10.0
SOC-2 Compliance Status Report sample v10.0
 
RamananS_Resume
RamananS_ResumeRamananS_Resume
RamananS_Resume
 
Mohamed El-Hady - Detailed
Mohamed El-Hady - DetailedMohamed El-Hady - Detailed
Mohamed El-Hady - Detailed
 
Resume BI and DataAnalyst
Resume BI and DataAnalystResume BI and DataAnalyst
Resume BI and DataAnalyst
 
Corrective Action_.pptx
Corrective Action_.pptxCorrective Action_.pptx
Corrective Action_.pptx
 
Edcil Techncial PPT_V1.0.pptx
Edcil Techncial PPT_V1.0.pptxEdcil Techncial PPT_V1.0.pptx
Edcil Techncial PPT_V1.0.pptx
 
Bml 303 past papers pack
Bml 303 past papers packBml 303 past papers pack
Bml 303 past papers pack
 
Cpm 200 c technical performance measures - alleman (ppm)
Cpm 200 c   technical performance measures - alleman (ppm)Cpm 200 c   technical performance measures - alleman (ppm)
Cpm 200 c technical performance measures - alleman (ppm)
 
E2E technology Asset Management Transformation Example
E2E technology Asset Management Transformation ExampleE2E technology Asset Management Transformation Example
E2E technology Asset Management Transformation Example
 
7 Key Elements for Operation Quality Improvement
7 Key Elements for Operation Quality Improvement7 Key Elements for Operation Quality Improvement
7 Key Elements for Operation Quality Improvement
 
20100121 03 - Présentation CMMi Valeo
20100121 03 - Présentation CMMi Valeo20100121 03 - Présentation CMMi Valeo
20100121 03 - Présentation CMMi Valeo
 
Michelle Redfield, Schneider Electric, Global Management Systems for Enterpri...
Michelle Redfield, Schneider Electric, Global Management Systems for Enterpri...Michelle Redfield, Schneider Electric, Global Management Systems for Enterpri...
Michelle Redfield, Schneider Electric, Global Management Systems for Enterpri...
 

SMS-Phase1

  • 1. SMS Phase 1 2012 What is SMS Phase 1? Yasin Jamil Ali Date: 22nd May 2012
  • 2. 2 16 Apr 2012 Operations Function Systematic Management System implementation – a staged approach 1.Ops ELT engagement 2.Operations Management System built at Ops LT level 1.Ops ELT engagement 2.Operations Management System built at Site Leader level 1.Ops ELT engagement 2.Metrics & resource approved 1.Scorecards built 2.Data entered by Sites & POS 3.Data entry trg completed Scorecards reviewed by Site Leaders 100% installation of Ops Management System TECHNOLOGY BUILD – to June 2012 2011 Q2 Q3 Q4 Nov Dec Jan Q1 Feb Mar Apr Q2 2012 100% installation of Ops Management System MANUAL BUILD 100% installation of Ops Management System -TECHNOLOGY BUILD May
  • 3. Operations Functions Scorecards By Site Systematic Management Scorecard Process Safety Scorecard Integrity Management Scorecard Business Scorecard People Metrics Safety Inputs & Outputs FinancialsOperating Reliability
  • 4. NUIs Site Performance Boards – the reporting structure – same for all 7 Scorecards Cassia A&B Site Imm Flam Kapok Mah B Mah A AreaFunctionNUIs Term Bd & Pipeline 1 2 3 4 5 6 7 8 9 10 11 12 GCA NUIs GC Area GM Area ONS Area Ops Function Amh 13 14 GMA NUIs NUIs Cball Mango Ser Cash Sav 15 17 16 19 2018 21 21 # Reports Option selected & approved by VP Operations GCA AOM GMA AOM ONS AOM • This structure display relates to one of the 7 scorecards • Exactly the same structure will be required for EACH of the 7 scorecards
  • 5. TT Region Ops Function 2012 AOP- Plan Book TT Region Operations Function 2012 Annual Operating Plan metric scorecard TT Region Operations Function 2012 Annual Operating Plan (AOP) - metrics Data Entry for metrics on FOP Data Performance Resource S&OR Disc Cap R&M Finance ES AP PSCMIPE Risk Manager TAR Team PEI TeamProduction Analyst Enters some data manually to FOP scorecard & links data from other Excel sources Passes data manually to Data Performance Resource Data entry automatically updates graphs
  • 6. The solution – Master Data Entry Systematic Management Scorecard R&M Op Plan Ops F Op Plan Operating Reliability Scorecard Orange Book GFOUpstream Function External toTT region Internal toTT region Area & Function Reporting Upstream Function HoO 2012 AOP Upstream Function RM 2012 AOP Bp Group TT region Master Data Entry Solution