3. Basic Overview
Location:Hefei, Anhui Province;—
Middle East of China
About 3 hours from Shanghai / 4 hours
from Beijing by high-speed railway;
Established in April, 2003, the first
cryogenics company in China
Occupied areas: 24,000 square meters;
Staff: 137
3/51
6. General
Manager
General
Manager
Technology CommitteeTechnology Committee
Vice G. MVice G. M Vice G.MVice G.M
Shareholder
Committee
Shareholder
Committee
Board of DirectorsBoard of Directors
Board of SupervisorsBoard of Supervisors
Organization Chart
MarketingDept.1
SystemR&DDept.
ProcurementOffice
MarketingDept.2
ProductR&DDept.
QualityDept.
FinancialDept.
AdministrationOffice
CustomerService
ProductionDept.
6/51
7. 2003~2007
History
2008~2012 2013~2015
● Developed Chinese
first superconducting
cable cryogenic systems;
● Cryogenic receivers had
been applied in the
national lunar exploration
project;
● Developed Large-
diameter
cryopump(Φ1200mm)
● Participated in the
transformation of key
project Beijing Electron
Positron Collider (BEPCII);
● Developed the
Cryomodule for China
Institute of Atomic
Energy(CIAE)
● Developed the first
domestic high purity
cryogenic helium
recovery equipment
(99.999%);
● Developed the CM1-
CM6 Cryomodule for
ADS Project
7/51
11. Rare Gas Recovery & Purification
Business
Helium R&P system for floating boat Application for Major Science project, MRI ,etc
System for Air Conditioner Helium leakage test Application for Optical Fiber Manufacture
11/51
13. Ansys Structure and Intensity Analysis
Design
•Autocad
•Pro-E
•Solidworks
•Caxa
•Regen
•Genesys
Simulation
•Ansys
•Maxwell
•Ansoft
•Fluent
•Matlab
•Flotherm
Design
Software Platform
Ansys Temperature Field Calculation
Assemble Simulation
13/51
14. Design
Personnel
Totally 62 engineers, 45% acquired master or doctor degree, available
to support three independent and experienced teams for cryomodule
at the same time.
14/51
Master,26
Doctor,3
15. Manufacture
Collabration with excellent vendors equipped with the advanced facilities and
quality control management for machine work
Cleanroom
Assembly
FMS
Vendor
15/51
16. Test
Helium Mass Spectrometer Leak Detector
Helium Purity Analyzer
大型多工位真空排气台
Test Bench of Multi-directional Cryogenic
& Vacuum Performance
Hydraulic Pressure
Test Bench
16/51
21. Composition:
Particle source
Accelerating chamber
Focusing system
Beam transport and analytic system
Control system, test terminal
Cryogenic superconducting:
Cryogenic helium refrigerator (4k, 2k)
Cryogenic pipelines (compound)
Cryogenic distribution chamber
Cryogenic cryomodule (test, online)
Superconducting magnet
Helium recovery and purification equipment
Measurement and control system
Vacuum system (cryopump, ion pump)
Superconducting Accelerator
Reference List
21/51
22. Cryogenic System Solution - Cryomodule
Ø 4.2K superconducting cavity vertical measurement
liquid helium cryomodule
Ø 4.2K superconducting cavity level measurement liquid
helium cryomodule
Ø4.2K single cavity on-line measuring cryomodule
Ø 4.2 K multi-cavity on-line measuring cryomodule
Ø1.8 K superconducting magnet cryomodule
Reference List
22/51
23. Time Products Users
2010
Superconducting linear energization
Cryomodule China Institute of Atomic Energy (CIAE)
2012 Cryogenic radiometer vacuum chamber Hefei Institutes of Physical Science (CASHIPS)
2013 Cryomudule system used in rotating test board Dongfang Elecrtic Corporation
2013 Superconducting cable terminal crymodule Shanghai Sanyuan cable accessories Co., Ltd.
2013 4k test cryomodule (BEPC II) Institute of High Energy Physics (IHEP)
2013 CF250 cryomodule (ADS) Institute of Modern Physics (IMP)
2013 CM1 cryomodule (ADS) Institute of Modern Physics (IMP)
2014 TCM6 cryomodule(ADS) Institute of Modern Physics (IMP)
2014 12KA current lead test dewar (HIAF) Institute of High Energy Physics (IHEP)
2014 Superconducting cable test dewar (HIAF) Institute of Modern Physics (IMP)
2015 HCM6 cryomodule(ADS) Institute of Modern Physics (IMP)
Application of Cryomodule
Since establishment, 50 Sets cryomodule have been delivered
Reference List
23/51
24. CM6 Cryomodule for Institute of Modern Physics (IMP)
Reference List
24/51
25. Jan.24, 2013
Team
Technical support: members of technical committee
Project leader: Zhihe Sun
R&D personnel: Qian Huang , Maolei Lu, Pei Wang
Technology director: Zhi Luo
Project management director: Wanrong Du
Contract signed time
Project delivery time Jun.17, 2013
Reference List
25/51
26. Project design and development plans Project milestones
Project task arrangement
Reference List
26/51
37. Development of cryomodule
• Strength, heat transmission and
thermal insulation analysis
• Engineering drawing design
• Simulation assembly and check
Design and
simulation
• Welding
• Removable seal connection
• Various tools and workholder
Processing and
assembly
• High and low temperature impact
test
• Negative pressure helium mass
spectrometer leak detection
• Positive pressure leak detection
Commissioning
and test
• Delivery test
• Installation
• Final test and service
Delivery
service
Design and simulation
Processing and assembling
Removable seal connections:
indium wire, CF, metal C ring,
POST, steel aluminum joints
Commissioning and testDelivery Service
Reference List
37/51
38. Vacree was awarded the outstanding contribution prize for BEPC II
Reference List
Successfully developed several models of cryomodule for ADS, joint debugging with
helium purification equipment.
38/51
39. Application of helium recovery and purification equipments
Users Capacity Time
Institute of High Energy Physics (IHEP) 100Nm3/h 2012
Institute of Modern Physics (IMP) 100Nm3/h 2012
Wuhan Institute of Physics and
Mathematics (WIPM) of Chinese
Academy of Sciences
20Nm3/h 2013
Institute of Plasma Physics, Chinese
Academy of Sciences(ASIPP)
80Nm3/h 2014
China Academy of Engineering
Physics
20Nm3/h 2014
Shanghai Institute of Applied Physics
(SINAP)
50Nm3/h 2015
China Aerospace Science and
Industry Corporation (CASIC)
100Nm3/h 2015
Reference List
39/51
40. Reference List
Cryogenic system solutions – helium recovery and purification equipments
Purification efficiency: 100Nm3/h
Operating pressure: 200bar
Raw helium purity: 95%
Product gas Purity: 99.9995%
High purity helium Recovery
and purification System
Small-size cryogenic Helium
purification equipment
Purification efficiency: 100Nm3/h
Operating pressure: 20bar
Raw helium purity: 98%
Product gas Purity: 99.999%
40/51
41. Technical specifications of
superconducting magnet
Direct cooling (dry-type) Zero evaporation rate
• Magnetic density: 0~5.5T
• Room temperature aperture:
30~200mm
• Axial length of room
temperature hole: 210~
670mm
• Magnetic field uniformity:
≤±4%
Cryogenic system solutions – Cryogenic superconducting magnet
• Research institutes
• Institute of Modern Physics
(IMP)
• China electronics
technology group
corporation (CETC)
Reference List
41/51
42. • 2~4.2K
• Cryogenic fluid distribution and control
• Institute of High Energy Physics (IHEP)
• Institute of Modern Physics (IMP)
• Shanghai Qiyuan Air Separate
Technology Development Co., Ltd.
Reference List
Cryogenic system solutions –
cryogenic distribution chamber
42/51
44. Construction site of 300m helium gas recycling pipeline
Construction site of high-purity
helium gas pipelines for
Shanghai Astronomical Observatory
Vacuum system solutions – cryogenic pipelines
Construction site of pipelines for
Xinjiang Astronomical Observatory
Reference List
44/51
46. Strategy
u Committed to be world famous enterprise in cryogenics
Enterprise goalEnterprise goal
u Meticulous management, globalized development
Development approachDevelopment approach
46/51
47. Strategy
n Developing the international market
actively
n International communication
Participating international conferences;
Participating international exhibitions;
Inviting foreign specialists to work or
teach at Vacree
47/51
(KEK Hosoyama )
48. Export business
In 2006, 160W/20K cryogenic
refrigeration system was
exported to Pakistan.
In 2008, cryogenic test
instrument was exported to
Singapore.
In 2013, dewar flask was
exported to France.
►
►
►
In 2012, mobile argon 37 rapid
detection system was supplied
to the United Nations.
►
Strategy
International cooperation
48/51
49. Team Building
New Year Celebration
Colorful Running Football Match
Company Culture
49/51