SlideShare a Scribd company logo
1 of 8
Download to read offline
BSOP 330 All Weeks Discussion Questions, Lab
Assignments, Quiz Case Study
https://homeworklance.com/downloads/bsop-330-all-weeks-discussion-questions-lab-assignments-quiz-
case-study/
BSOP 330 All Weeks Discussion Questions, Lab Assignments, Quiz Case Study
 
BSOP330 Week 1 Lab Assignment Problems 4.1, 4.5, 4.9 and 4.11, pages 140-141
BSOP330 Week 2 Lab Assignments Chapter Four Problems 4.23, 4.27, 4.33, and 4.35
BSOP330 Week 2 Southwestern Case study
BSOP330 Week 3 Lab Assignments Chapter 13 problems 13.3, 13.5, 13.9, 13.21
 
Chapter 12, problems 12.1
L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An
investigation of the company’s manufacturing facility in Charlotte yields the information
presented in the table below. How would the plant classify these items according to an ABC
classification system?
Chapter 12, problems 12.5
William Beville’s computer training school, in Richmond, stocks workbooks with the following
characteristics:
Demand ,500 units/year
Ordering cost S = $25/order
Holding cost H = $4/unit/year
a) Calculate the EOQ for the workbooks.
b) What are the annual holding costs for the workbooks?
c) What are the annual ordering costs?
Chapter 12, problems 12.9
Southeastern Bell stocks a certain switch connector at its central warehouse for supplying field
service offices. The yearly demand for these connectors is 15,000 units. Southeastern estimates
its annual holding cost for this item to be $25 per unit. The cost to place and process an order
from the supplier is $75. The company operates 300 days per year, and the lead time to receive
an order from the supplier is 2 working days.
a) Find the economic order quantity.
b) Find the annual holding costs.
c) Find the annual ordering costs.
d) What is the reorder point?
Chapter 12, problems 12.15
M. Cotteleer Electronics supplies microcomputer circuitry to a company that incorporates
microprocessors into refrigerators and other home appliances. One of the components has an
annual demand of 250 units, and this is constant throughout the year. Carrying cost is estimated
to be $1 per unit per year, and the ordering cost is $20 per order.
a) To minimize cost, how many units should be ordered each time an order is placed?
b) How many orders per year are needed with the optimal policy?
c) What is the average inventory if costs are minimized?
d) Suppose that the ordering cost is not $20, and Cotteleer has been ordering 150 units each time
an order is placed. For this order policy (of ) to be optimal, determine what the ordering cost
would have to be.
 
BSOP 330 Week 4 Lab Assignments Chapter 12, problems 12.1, 12.5, 12.9, 12.15
 
Chapter 12, problems 12.1
L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An
investigation of the company’s manufacturing facility in Charlotte yields the information
presented in the table below. How would the plant classify these items according to an ABC
classification system?
Chapter 12, problems 12.5
William Beville’s computer training school, in Richmond, stocks workbooks with the following
characteristics:
Demand ,500 units/year
Ordering cost S = $25/order
Holding cost H = $4/unit/year
a) Calculate the EOQ for the workbooks.
b) What are the annual holding costs for the workbooks?
c) What are the annual ordering costs?
Chapter 12, problems 12.9
Southeastern Bell stocks a certain switch connector at its central warehouse for supplying field
service offices. The yearly demand for these connectors is 15,000 units. Southeastern estimates
its annual holding cost for this item to be $25 per unit. The cost to place and process an order
from the supplier is $75. The company operates 300 days per year, and the lead time to receive
an order from the supplier is 2 working days.
a) Find the economic order quantity.
b) Find the annual holding costs.
c) Find the annual ordering costs.
d) What is the reorder point?
Chapter 12, problems 12.15
M. Cotteleer Electronics supplies microcomputer circuitry to a company that incorporates
microprocessors into refrigerators and other home appliances. One of the components has an
annual demand of 250 units, and this is constant throughout the year. Carrying cost is estimated
to be $1 per unit per year, and the ordering cost is $20 per order.
a) To minimize cost, how many units should be ordered each time an order is placed?
b) How many orders per year are needed with the optimal policy?
c) What is the average inventory if costs are minimized?
d) Suppose that the ordering cost is not $20, and Cotteleer has been ordering 150 units each time
an order is placed. For this order policy (of ) to be optimal, determine what the ordering cost
would have to be.
 
BSOP330 Week 4 Quiz
BSOP 330 Week 4 Southwestern Case study Printing companies Programs and Inserts
Southwestern University Case Study
1. For the programs, what are the EOQ’s for both printing companies? How many orders of each
size will be needed?
2. For the inserts, what are the EOQ’s for both printing companies? How many orders of each
size will be needed?
3. Using the EOQ’s above and volume order information provided, what will be the cost of the
programs and inserts if they are purchased from Quality Printing
4. Using the EOQ’s above and volume order information provided, what will be the cost of the
programs and inserts if they are purchased from First Printing.
BSOP 330 Week 5 Homework Problems Mater Production Schedule Problem 1, 2 and 3
 
BSOP330 Master Planning, Week 5, Problem 1
MASTER PRODUCTION SCHEDULE
MAKE-TO-STOCK
Beginning PAB prior to week number one is 500.
If the forecast is larger than the book orders, complete the MPS using the forecast demand. If the
booked orders is larger than the forecast complete the MPS using the booked orders
Lead-time for MPS releases is one week.
All MPS releases must be in lot sizes of 250 units.
Period order coverage is one period.
1. Complete the MPS due line and the MPS released line.
2. Complete the PAB line.
3. Complete the ATP line.
BSOP Master Planning, Week 5 Assignment, Problem Two
Make-to-Stock MPS
GIVENS FOR THE MPS PROBLEM:
1. Beginning on-hand inventory prior to week one is 200 units.
2. If the forecast is larger than the book orders, complete the MPS using the forecast demand. If
the booked orders is larger than the forecast complete the MPS using the booked orders
3. Lead-time for MPS planned orders is one week.
4. All MPS releases must be in lot sizes of 200 or multiples of 200.
REQUIRED:
Complete the MPS due and MPS planned lines.
Calculate the new projected on-hand inventory line.
Calculate the ATP line for the entire MPS.
BSOP330 Master Planning, Week 5, Problem 3
Forecast Disaggregation
Product Family Blenders
Model Number
Percent of the Annual Forecast
B-100
10.00%
B-200
7.00%
B-300
25.00%
B-400
30.00&
B-500
12.00%
B-600
16.00%
Total
100.00%
Note: the total percentage must equal exactly 100%.
If the aggregate forecast for the family of blenders for the month of September is 5,000 units,
complete the chart below.
 
BSOP 330 Week 5 Quiz
 
1.
Question :
(TCO 9, 10, & 12) The MPS
Student Answer:
must sum up to the total in the production plan.
can have any quantity necessary to meet customer demand.
is only used in make-to-stock manufacturing.
does not have to be tested for capacity limits.
2.
Question :
(TCO 12) In an assemble-to-order MPS, the items stocked in inventory are
Student Answer:
finished goods.
component parts.
raw materials.
sub-assemblies.
3.
Question :
(TCOs 9, 11, & 12) Which one of the following pieces of information would be more useful to
the order entry department in a make-to-stock company?
Student Answer:
The planned order receipt file
The planned MPS released quantity file
The available to promise file
The balance of the forecast quantity
4.
Question :
(TCO 12) A forecast
Student Answer:
is always 100 percent correct.
will get better and better the more time and money you spend.
is a time prediction of the future based on the past.
is a monthly project that marketing loves to do.
5.
Question :
(TCO 10 & 12) In job shop (make-to-order) operations, the master production schedule is
usually expressed in
Student Answer:
end items.
modules.
kits.
customer orders.
warehouse orders.
 
BSOP 330 Week 6 Lab Assignments Chapter 14, problems 14.1, 14.3, 14.9, 14.13
 
Chapter 14, problems 14.1
You have developed the following simple product structure of items needed for your gift bag for
a rush party for prospective pledges in your organization. You forecast 200 attendees. Assume
that there is no inventory on hand of any of the items. Explode the bill of material. (Subscripts
indicate the number of units required.)
Chapter 14, problems 14.3
The demand for subassembly S is 100 units in week 7. Each unit of S requires 1 unit of T and 2
units of U. Each unit of T requires 1 unit of V, 2 units of W, and 1 unit of X. Finally, each unit of
U requires 2 units of Y and 3 units of Z. One firm manufactures all items. It takes 2 weeks to
make S, 1 week to make T, 2 weeks to make U, 2 weeks to make V, 3 weeks to make W, 1 week
to make X, 2 weeks to make Y, and 1 week to make Z.
a) Construct a product structure. Identify all levels, parents, and components.
b) b) Prepare a time-phased product structure.
Chapter 14, problems 14.9
As the production planner for Gerry Cook Products, Inc., you have been given a bill of material
for a bracket that is made up of a base, two springs, and four clamps. The base is assembled from
one clamp and two housings. Each clamp has one handle and one casting. Each housing has two
bearings and one shaft. There is no inventory on hand.
Your boss at Gerry Cook Products, Inc., has just provided you with the schedule and lead times
for the bracket in Problem 14.8. The unit is to be prepared in week 10. The lead times for the
components are bracket (1 week), base (1 week), spring (1 week), clamp (1 week), housing (2
weeks), handle (1 week), casting (3 weeks), bearing (1 week), and shaft (1 week). a) Prepare the
time-phased product structure for the bracket. b) In what week do you need to start the castings?
Chapter 14, problems 14.13
Electro Fans has just received an order for one thousand 20-inch fans due week 7. Each fan
consists of a housing assembly, two grills, a fan assembly, and an electrical unit. The housing
assembly consists of a frame, two supports, and a handle. The fan assembly consists of a hub and
five blades. The electrical unit consists of a motor, a switch, and a knob. The following table
gives lead times, on-hand inventory, and scheduled receipts.
 
BSOP 330 Week 7 Case Study Final
 
Question 1. Which variations in demand for police services should be considered in an aggregate
plan for resources? Which variations can be accomplished with short-term scheduling
adjustments?
Question 2. Evaluate the current staffing plan. What does it cost? Are 26 officers sufficient to
handle the normal workload?
Question 3: Determine the cost of the Chiefs plan. Do you need to implement the Chief’s plan or
can the current staff handle the load? Explain your thinking
Question 4: From the data in the case, determine the schools current cost to provide police
services during football games.
Question 5: There isn’t any one right answer for this question. This a critical thinking question.
Based on what you have read and the scheduling and costs you put together, what do you see as
alternatives for the manning the schedule.
BSOP 330 Week 7 Lab Assignments Chapter 16, problems 16.1, 16.3, 16.5, and 16.9 (pages
640-641)
 
Chapter 16, problems 16.1, 16.3, 16.5, and 16.9 (pages 640-641)
16.1 Leblanc Electronics, Inc., in Nashville, produces short runs of custom airwave scanners for
the defense industry. You have been asked by the owner, Larry Leblanc, to reduce inventory by
introducing a kanban system. After several hours of analysis, you develop the following data for
scanner connectors used in one work cell. How many kanbans do you need for this connector?
Daily demand 1,000 connectors
Lead time 2 days
Safety stock day
Kanban size 500 connectors
16.3
Chris Millikan Manufacturing, Inc., is moving to kan-bans to support its telephone switching-
board assembly lines. Determine the size of the kanban for subassemblies and the number of
kanbans needed.
16.5
Discount-Mart, a major East Coast retailer, wants to determine the economic order quantity (see
Chapter 12 for EOQ formulas) for its halogen lamps. It currently buys all halogen lamps from
Specialty Lighting Manufacturers, in Atlanta. Annual demand is 2,000 lamps, ordering cost per
order is $30, annual carrying cost per lamp is $12.
a) What is the EOQ?
b) What are the total annual costs of holding and ordering (managing) this inventory?
c) How many orders should Discount-Mart place with Specialty Lighting per year?
16.9
a) Given the following information about a product, at Phyllis Simon’s firm, what is the
appropriate setup time?
BSOP330 Week 7 Quiz
1. (TCOs 5 & 12) Manufacturing cycle time is best defined as the (Points : 4)
length of the work shift, expressed in minutes per day.
time it takes a unit to move from one workstation to the next.
time between the start of one unit and the start of the next unit.
sum of all the task times to make one unit of a product.
time from raw materials receipt to finished product exit.
2. (TCOs 5 & 12) The implementation of JIT offers several advantages, including (Points : 4)
reduced throughput.
increase in variability to better respond to variable demand.
decreased profit margins.
support for lean production.
increased work in process inventory.
3. (TCOs 5 & 12) Which of the following statements regarding JIT in services is true? (Points :
4)
Restaurants do not use JIT layouts because they interfere with the creation of a good
servicescape.
Excess customer demand in services such as air travel is met by dipping into safety stocks.
All of the JIT techniques for dealing with suppliers, layout, inventory, and scheduling are used in
services.
Scheduling is not relevant to the effective use of JIT in services.
All of the above are false.
4. (TCO 12) Which of the following is the author of the phrase, “Inventory is evil”? (Points : 4)
Poka Yoke
Pat “Keiretsu” Morita
Kanban Polka
Shigeo Shingo
None of the above
5. (TCO 12) Great Lakes Barge and Baggage Company makes, among other things, battery-
operated bilge pumps. Which of the following activities isnot part of JIT? (Points : 4)
They communicate their schedules to suppliers.
They produce in long production runs to reduce the impact of setup costs.
They use a pull system to move inventory.
They continuously work on reducing setup time.
They produce in small lots.

More Related Content

Similar to Bsop 330 all weeks discussion questions

ACC 560 HELP Redefined Education--acc560help.com
ACC 560 HELP Redefined Education--acc560help.comACC 560 HELP Redefined Education--acc560help.com
ACC 560 HELP Redefined Education--acc560help.comclaric227
 
ACC 560 MART Redefined Education--acc560mart.com
ACC 560 MART  Redefined Education--acc560mart.comACC 560 MART  Redefined Education--acc560mart.com
ACC 560 MART Redefined Education--acc560mart.comclaric186
 
ACC 560 MART Achievement Education--acc560mart.com
ACC 560 MART Achievement Education--acc560mart.comACC 560 MART Achievement Education--acc560mart.com
ACC 560 MART Achievement Education--acc560mart.comshanaabe85
 
ACC 560 Enhance teaching - tutorialrank.com
ACC 560  Enhance teaching - tutorialrank.comACC 560  Enhance teaching - tutorialrank.com
ACC 560 Enhance teaching - tutorialrank.comLeoTolstoy09
 
ACCT 346 Expect Success/newtonhelp.com
ACCT 346 Expect Success/newtonhelp.comACCT 346 Expect Success/newtonhelp.com
ACCT 346 Expect Success/newtonhelp.commyblue13
 
ACC 560 MART Education on Your Terms/acc560mart.com
ACC 560 MART Education on Your Terms/acc560mart.comACC 560 MART Education on Your Terms/acc560mart.com
ACC 560 MART Education on Your Terms/acc560mart.comrock1234588
 
ACC 560 MART Education on Your Terms/acc560mart.com
ACC 560 MART Education on Your Terms/acc560mart.comACC 560 MART Education on Your Terms/acc560mart.com
ACC 560 MART Education on Your Terms/acc560mart.comrock1234590
 
ACC 560 MART Education on Your Terms/acc560mart.com
ACC 560 MART Education on Your Terms/acc560mart.comACC 560 MART Education on Your Terms/acc560mart.com
ACC 560 MART Education on Your Terms/acc560mart.comrock1234594
 
BSOP 330 TUTOR Real Education / bsop330tutor.com
BSOP 330 TUTOR Real Education / bsop330tutor.comBSOP 330 TUTOR Real Education / bsop330tutor.com
BSOP 330 TUTOR Real Education / bsop330tutor.communnaq7
 
ACCT 346 Education Specialist / snaptutorial.com
 ACCT 346 Education Specialist / snaptutorial.com ACCT 346 Education Specialist / snaptutorial.com
ACCT 346 Education Specialist / snaptutorial.comstevesonz110
 
ACC 560 MART Inspiring Innovation--acc560mart.com
ACC 560 MART Inspiring Innovation--acc560mart.comACC 560 MART Inspiring Innovation--acc560mart.com
ACC 560 MART Inspiring Innovation--acc560mart.comKeatonJennings39
 
ACC 560 MART Become Exceptional--acc560mart.com
ACC 560 MART Become Exceptional--acc560mart.comACC 560 MART Become Exceptional--acc560mart.com
ACC 560 MART Become Exceptional--acc560mart.comagathachristie65
 
ACC 349 PAPER Become Exceptional--acc349paper.com
ACC 349 PAPER Become Exceptional--acc349paper.comACC 349 PAPER Become Exceptional--acc349paper.com
ACC 349 PAPER Become Exceptional--acc349paper.comKeatonJennings114
 
ACC 560 Effective Communication - tutorialrank.com
ACC 560  Effective Communication - tutorialrank.comACC 560  Effective Communication - tutorialrank.com
ACC 560 Effective Communication - tutorialrank.comBartholomew4
 
ACCT 505 Introduction Education--acct505.com
ACCT 505 Introduction Education--acct505.comACCT 505 Introduction Education--acct505.com
ACCT 505 Introduction Education--acct505.comkopiko221
 
Session 5
Session 5Session 5
Session 5thangv
 
ACCT 346Education Redefined / snaptutorial.com
ACCT 346Education Redefined / snaptutorial.comACCT 346Education Redefined / snaptutorial.com
ACCT 346Education Redefined / snaptutorial.comMcdonaldRyan181
 
ACCT 505 Education Planning--acct505.com
ACCT 505 Education Planning--acct505.comACCT 505 Education Planning--acct505.com
ACCT 505 Education Planning--acct505.comWindyMiller42
 

Similar to Bsop 330 all weeks discussion questions (20)

Materials Management
Materials ManagementMaterials Management
Materials Management
 
ACC 560 HELP Redefined Education--acc560help.com
ACC 560 HELP Redefined Education--acc560help.comACC 560 HELP Redefined Education--acc560help.com
ACC 560 HELP Redefined Education--acc560help.com
 
ACC 560 MART Redefined Education--acc560mart.com
ACC 560 MART  Redefined Education--acc560mart.comACC 560 MART  Redefined Education--acc560mart.com
ACC 560 MART Redefined Education--acc560mart.com
 
ACC 560 MART Achievement Education--acc560mart.com
ACC 560 MART Achievement Education--acc560mart.comACC 560 MART Achievement Education--acc560mart.com
ACC 560 MART Achievement Education--acc560mart.com
 
ACC 560 Enhance teaching - tutorialrank.com
ACC 560  Enhance teaching - tutorialrank.comACC 560  Enhance teaching - tutorialrank.com
ACC 560 Enhance teaching - tutorialrank.com
 
ACCT 346 Expect Success/newtonhelp.com
ACCT 346 Expect Success/newtonhelp.comACCT 346 Expect Success/newtonhelp.com
ACCT 346 Expect Success/newtonhelp.com
 
ACC 560 MART Education on Your Terms/acc560mart.com
ACC 560 MART Education on Your Terms/acc560mart.comACC 560 MART Education on Your Terms/acc560mart.com
ACC 560 MART Education on Your Terms/acc560mart.com
 
ACC 560 MART Education on Your Terms/acc560mart.com
ACC 560 MART Education on Your Terms/acc560mart.comACC 560 MART Education on Your Terms/acc560mart.com
ACC 560 MART Education on Your Terms/acc560mart.com
 
ACC 560 MART Education on Your Terms/acc560mart.com
ACC 560 MART Education on Your Terms/acc560mart.comACC 560 MART Education on Your Terms/acc560mart.com
ACC 560 MART Education on Your Terms/acc560mart.com
 
BSOP 330 TUTOR Real Education / bsop330tutor.com
BSOP 330 TUTOR Real Education / bsop330tutor.comBSOP 330 TUTOR Real Education / bsop330tutor.com
BSOP 330 TUTOR Real Education / bsop330tutor.com
 
ACCT 346 Education Specialist / snaptutorial.com
 ACCT 346 Education Specialist / snaptutorial.com ACCT 346 Education Specialist / snaptutorial.com
ACCT 346 Education Specialist / snaptutorial.com
 
ACC 560 MART Inspiring Innovation--acc560mart.com
ACC 560 MART Inspiring Innovation--acc560mart.comACC 560 MART Inspiring Innovation--acc560mart.com
ACC 560 MART Inspiring Innovation--acc560mart.com
 
ACC 560 MART Become Exceptional--acc560mart.com
ACC 560 MART Become Exceptional--acc560mart.comACC 560 MART Become Exceptional--acc560mart.com
ACC 560 MART Become Exceptional--acc560mart.com
 
ACC 349 PAPER Become Exceptional--acc349paper.com
ACC 349 PAPER Become Exceptional--acc349paper.comACC 349 PAPER Become Exceptional--acc349paper.com
ACC 349 PAPER Become Exceptional--acc349paper.com
 
ACC 560 Effective Communication - tutorialrank.com
ACC 560  Effective Communication - tutorialrank.comACC 560  Effective Communication - tutorialrank.com
ACC 560 Effective Communication - tutorialrank.com
 
ACCT 505 Introduction Education--acct505.com
ACCT 505 Introduction Education--acct505.comACCT 505 Introduction Education--acct505.com
ACCT 505 Introduction Education--acct505.com
 
Session 5
Session 5Session 5
Session 5
 
Chapter 5_OM
Chapter 5_OMChapter 5_OM
Chapter 5_OM
 
ACCT 346Education Redefined / snaptutorial.com
ACCT 346Education Redefined / snaptutorial.comACCT 346Education Redefined / snaptutorial.com
ACCT 346Education Redefined / snaptutorial.com
 
ACCT 505 Education Planning--acct505.com
ACCT 505 Education Planning--acct505.comACCT 505 Education Planning--acct505.com
ACCT 505 Education Planning--acct505.com
 

More from Walter Bartlett

Cis336 (introduction to database w lab – oracle) complete class
Cis336 (introduction to database w lab – oracle) complete classCis336 (introduction to database w lab – oracle) complete class
Cis336 (introduction to database w lab – oracle) complete classWalter Bartlett
 
Cis 499 project deliverable 2
Cis 499 project deliverable 2Cis 499 project deliverable 2
Cis 499 project deliverable 2Walter Bartlett
 
Cis 333 case study 1 the officer and the drug arrest
Cis 333 case study 1  the officer and the drug arrestCis 333 case study 1  the officer and the drug arrest
Cis 333 case study 1 the officer and the drug arrestWalter Bartlett
 
Busn 5200 managerial finance complete class
Busn 5200 managerial finance complete classBusn 5200 managerial finance complete class
Busn 5200 managerial finance complete classWalter Bartlett
 
Busn 412 business policy complete class
Busn 412 business policy complete classBusn 412 business policy complete class
Busn 412 business policy complete classWalter Bartlett
 
Busn 410 midterm exam answers
Busn 410 midterm exam answersBusn 410 midterm exam answers
Busn 410 midterm exam answersWalter Bartlett
 
Busi 682 midterm examination answers
Busi 682 midterm examination answersBusi 682 midterm examination answers
Busi 682 midterm examination answersWalter Bartlett
 
Bshs 395 final exam answers
Bshs 395 final exam answersBshs 395 final exam answers
Bshs 395 final exam answersWalter Bartlett
 
Bshs 375 information management systems
Bshs 375 information management systemsBshs 375 information management systems
Bshs 375 information management systemsWalter Bartlett
 
Bos 3651 unit viii course project
Bos 3651 unit viii course projectBos 3651 unit viii course project
Bos 3651 unit viii course projectWalter Bartlett
 

More from Walter Bartlett (11)

Cis336 (introduction to database w lab – oracle) complete class
Cis336 (introduction to database w lab – oracle) complete classCis336 (introduction to database w lab – oracle) complete class
Cis336 (introduction to database w lab – oracle) complete class
 
Cis 499 project deliverable 2
Cis 499 project deliverable 2Cis 499 project deliverable 2
Cis 499 project deliverable 2
 
Cis 333 case study 1 the officer and the drug arrest
Cis 333 case study 1  the officer and the drug arrestCis 333 case study 1  the officer and the drug arrest
Cis 333 case study 1 the officer and the drug arrest
 
Busn 5200 managerial finance complete class
Busn 5200 managerial finance complete classBusn 5200 managerial finance complete class
Busn 5200 managerial finance complete class
 
Busn 412 business policy complete class
Busn 412 business policy complete classBusn 412 business policy complete class
Busn 412 business policy complete class
 
Busn 410 midterm exam answers
Busn 410 midterm exam answersBusn 410 midterm exam answers
Busn 410 midterm exam answers
 
Busi 682 midterm examination answers
Busi 682 midterm examination answersBusi 682 midterm examination answers
Busi 682 midterm examination answers
 
Bshs 395 final exam answers
Bshs 395 final exam answersBshs 395 final exam answers
Bshs 395 final exam answers
 
Bshs 375 information management systems
Bshs 375 information management systemsBshs 375 information management systems
Bshs 375 information management systems
 
Bos 3651 unit viii course project
Bos 3651 unit viii course projectBos 3651 unit viii course project
Bos 3651 unit viii course project
 
Bmgt 364 case study 3
Bmgt 364 case study 3Bmgt 364 case study 3
Bmgt 364 case study 3
 

Recently uploaded

7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 

Recently uploaded (20)

7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 

Bsop 330 all weeks discussion questions

  • 1. BSOP 330 All Weeks Discussion Questions, Lab Assignments, Quiz Case Study https://homeworklance.com/downloads/bsop-330-all-weeks-discussion-questions-lab-assignments-quiz- case-study/ BSOP 330 All Weeks Discussion Questions, Lab Assignments, Quiz Case Study   BSOP330 Week 1 Lab Assignment Problems 4.1, 4.5, 4.9 and 4.11, pages 140-141 BSOP330 Week 2 Lab Assignments Chapter Four Problems 4.23, 4.27, 4.33, and 4.35 BSOP330 Week 2 Southwestern Case study BSOP330 Week 3 Lab Assignments Chapter 13 problems 13.3, 13.5, 13.9, 13.21   Chapter 12, problems 12.1 L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An investigation of the company’s manufacturing facility in Charlotte yields the information presented in the table below. How would the plant classify these items according to an ABC classification system? Chapter 12, problems 12.5 William Beville’s computer training school, in Richmond, stocks workbooks with the following characteristics: Demand ,500 units/year Ordering cost S = $25/order Holding cost H = $4/unit/year a) Calculate the EOQ for the workbooks. b) What are the annual holding costs for the workbooks? c) What are the annual ordering costs? Chapter 12, problems 12.9 Southeastern Bell stocks a certain switch connector at its central warehouse for supplying field service offices. The yearly demand for these connectors is 15,000 units. Southeastern estimates its annual holding cost for this item to be $25 per unit. The cost to place and process an order from the supplier is $75. The company operates 300 days per year, and the lead time to receive an order from the supplier is 2 working days. a) Find the economic order quantity. b) Find the annual holding costs. c) Find the annual ordering costs. d) What is the reorder point? Chapter 12, problems 12.15 M. Cotteleer Electronics supplies microcomputer circuitry to a company that incorporates microprocessors into refrigerators and other home appliances. One of the components has an annual demand of 250 units, and this is constant throughout the year. Carrying cost is estimated
  • 2. to be $1 per unit per year, and the ordering cost is $20 per order. a) To minimize cost, how many units should be ordered each time an order is placed? b) How many orders per year are needed with the optimal policy? c) What is the average inventory if costs are minimized? d) Suppose that the ordering cost is not $20, and Cotteleer has been ordering 150 units each time an order is placed. For this order policy (of ) to be optimal, determine what the ordering cost would have to be.   BSOP 330 Week 4 Lab Assignments Chapter 12, problems 12.1, 12.5, 12.9, 12.15   Chapter 12, problems 12.1 L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An investigation of the company’s manufacturing facility in Charlotte yields the information presented in the table below. How would the plant classify these items according to an ABC classification system? Chapter 12, problems 12.5 William Beville’s computer training school, in Richmond, stocks workbooks with the following characteristics: Demand ,500 units/year Ordering cost S = $25/order Holding cost H = $4/unit/year a) Calculate the EOQ for the workbooks. b) What are the annual holding costs for the workbooks? c) What are the annual ordering costs? Chapter 12, problems 12.9 Southeastern Bell stocks a certain switch connector at its central warehouse for supplying field service offices. The yearly demand for these connectors is 15,000 units. Southeastern estimates its annual holding cost for this item to be $25 per unit. The cost to place and process an order from the supplier is $75. The company operates 300 days per year, and the lead time to receive an order from the supplier is 2 working days. a) Find the economic order quantity. b) Find the annual holding costs. c) Find the annual ordering costs. d) What is the reorder point? Chapter 12, problems 12.15 M. Cotteleer Electronics supplies microcomputer circuitry to a company that incorporates microprocessors into refrigerators and other home appliances. One of the components has an annual demand of 250 units, and this is constant throughout the year. Carrying cost is estimated to be $1 per unit per year, and the ordering cost is $20 per order. a) To minimize cost, how many units should be ordered each time an order is placed? b) How many orders per year are needed with the optimal policy? c) What is the average inventory if costs are minimized? d) Suppose that the ordering cost is not $20, and Cotteleer has been ordering 150 units each time
  • 3. an order is placed. For this order policy (of ) to be optimal, determine what the ordering cost would have to be.   BSOP330 Week 4 Quiz BSOP 330 Week 4 Southwestern Case study Printing companies Programs and Inserts Southwestern University Case Study 1. For the programs, what are the EOQ’s for both printing companies? How many orders of each size will be needed? 2. For the inserts, what are the EOQ’s for both printing companies? How many orders of each size will be needed? 3. Using the EOQ’s above and volume order information provided, what will be the cost of the programs and inserts if they are purchased from Quality Printing 4. Using the EOQ’s above and volume order information provided, what will be the cost of the programs and inserts if they are purchased from First Printing. BSOP 330 Week 5 Homework Problems Mater Production Schedule Problem 1, 2 and 3   BSOP330 Master Planning, Week 5, Problem 1 MASTER PRODUCTION SCHEDULE MAKE-TO-STOCK Beginning PAB prior to week number one is 500. If the forecast is larger than the book orders, complete the MPS using the forecast demand. If the booked orders is larger than the forecast complete the MPS using the booked orders Lead-time for MPS releases is one week. All MPS releases must be in lot sizes of 250 units. Period order coverage is one period. 1. Complete the MPS due line and the MPS released line. 2. Complete the PAB line. 3. Complete the ATP line. BSOP Master Planning, Week 5 Assignment, Problem Two Make-to-Stock MPS GIVENS FOR THE MPS PROBLEM: 1. Beginning on-hand inventory prior to week one is 200 units. 2. If the forecast is larger than the book orders, complete the MPS using the forecast demand. If the booked orders is larger than the forecast complete the MPS using the booked orders 3. Lead-time for MPS planned orders is one week. 4. All MPS releases must be in lot sizes of 200 or multiples of 200. REQUIRED: Complete the MPS due and MPS planned lines. Calculate the new projected on-hand inventory line. Calculate the ATP line for the entire MPS.
  • 4. BSOP330 Master Planning, Week 5, Problem 3 Forecast Disaggregation Product Family Blenders Model Number Percent of the Annual Forecast B-100 10.00% B-200 7.00% B-300 25.00% B-400 30.00& B-500 12.00% B-600 16.00% Total 100.00% Note: the total percentage must equal exactly 100%. If the aggregate forecast for the family of blenders for the month of September is 5,000 units, complete the chart below.   BSOP 330 Week 5 Quiz   1. Question : (TCO 9, 10, & 12) The MPS Student Answer: must sum up to the total in the production plan. can have any quantity necessary to meet customer demand. is only used in make-to-stock manufacturing. does not have to be tested for capacity limits. 2. Question : (TCO 12) In an assemble-to-order MPS, the items stocked in inventory are Student Answer: finished goods. component parts. raw materials. sub-assemblies. 3. Question :
  • 5. (TCOs 9, 11, & 12) Which one of the following pieces of information would be more useful to the order entry department in a make-to-stock company? Student Answer: The planned order receipt file The planned MPS released quantity file The available to promise file The balance of the forecast quantity 4. Question : (TCO 12) A forecast Student Answer: is always 100 percent correct. will get better and better the more time and money you spend. is a time prediction of the future based on the past. is a monthly project that marketing loves to do. 5. Question : (TCO 10 & 12) In job shop (make-to-order) operations, the master production schedule is usually expressed in Student Answer: end items. modules. kits. customer orders. warehouse orders.   BSOP 330 Week 6 Lab Assignments Chapter 14, problems 14.1, 14.3, 14.9, 14.13   Chapter 14, problems 14.1 You have developed the following simple product structure of items needed for your gift bag for a rush party for prospective pledges in your organization. You forecast 200 attendees. Assume that there is no inventory on hand of any of the items. Explode the bill of material. (Subscripts indicate the number of units required.) Chapter 14, problems 14.3 The demand for subassembly S is 100 units in week 7. Each unit of S requires 1 unit of T and 2 units of U. Each unit of T requires 1 unit of V, 2 units of W, and 1 unit of X. Finally, each unit of U requires 2 units of Y and 3 units of Z. One firm manufactures all items. It takes 2 weeks to make S, 1 week to make T, 2 weeks to make U, 2 weeks to make V, 3 weeks to make W, 1 week to make X, 2 weeks to make Y, and 1 week to make Z. a) Construct a product structure. Identify all levels, parents, and components. b) b) Prepare a time-phased product structure. Chapter 14, problems 14.9 As the production planner for Gerry Cook Products, Inc., you have been given a bill of material
  • 6. for a bracket that is made up of a base, two springs, and four clamps. The base is assembled from one clamp and two housings. Each clamp has one handle and one casting. Each housing has two bearings and one shaft. There is no inventory on hand. Your boss at Gerry Cook Products, Inc., has just provided you with the schedule and lead times for the bracket in Problem 14.8. The unit is to be prepared in week 10. The lead times for the components are bracket (1 week), base (1 week), spring (1 week), clamp (1 week), housing (2 weeks), handle (1 week), casting (3 weeks), bearing (1 week), and shaft (1 week). a) Prepare the time-phased product structure for the bracket. b) In what week do you need to start the castings? Chapter 14, problems 14.13 Electro Fans has just received an order for one thousand 20-inch fans due week 7. Each fan consists of a housing assembly, two grills, a fan assembly, and an electrical unit. The housing assembly consists of a frame, two supports, and a handle. The fan assembly consists of a hub and five blades. The electrical unit consists of a motor, a switch, and a knob. The following table gives lead times, on-hand inventory, and scheduled receipts.   BSOP 330 Week 7 Case Study Final   Question 1. Which variations in demand for police services should be considered in an aggregate plan for resources? Which variations can be accomplished with short-term scheduling adjustments? Question 2. Evaluate the current staffing plan. What does it cost? Are 26 officers sufficient to handle the normal workload? Question 3: Determine the cost of the Chiefs plan. Do you need to implement the Chief’s plan or can the current staff handle the load? Explain your thinking Question 4: From the data in the case, determine the schools current cost to provide police services during football games. Question 5: There isn’t any one right answer for this question. This a critical thinking question. Based on what you have read and the scheduling and costs you put together, what do you see as alternatives for the manning the schedule. BSOP 330 Week 7 Lab Assignments Chapter 16, problems 16.1, 16.3, 16.5, and 16.9 (pages 640-641)   Chapter 16, problems 16.1, 16.3, 16.5, and 16.9 (pages 640-641) 16.1 Leblanc Electronics, Inc., in Nashville, produces short runs of custom airwave scanners for the defense industry. You have been asked by the owner, Larry Leblanc, to reduce inventory by introducing a kanban system. After several hours of analysis, you develop the following data for scanner connectors used in one work cell. How many kanbans do you need for this connector? Daily demand 1,000 connectors Lead time 2 days Safety stock day Kanban size 500 connectors
  • 7. 16.3 Chris Millikan Manufacturing, Inc., is moving to kan-bans to support its telephone switching- board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. 16.5 Discount-Mart, a major East Coast retailer, wants to determine the economic order quantity (see Chapter 12 for EOQ formulas) for its halogen lamps. It currently buys all halogen lamps from Specialty Lighting Manufacturers, in Atlanta. Annual demand is 2,000 lamps, ordering cost per order is $30, annual carrying cost per lamp is $12. a) What is the EOQ? b) What are the total annual costs of holding and ordering (managing) this inventory? c) How many orders should Discount-Mart place with Specialty Lighting per year? 16.9 a) Given the following information about a product, at Phyllis Simon’s firm, what is the appropriate setup time? BSOP330 Week 7 Quiz 1. (TCOs 5 & 12) Manufacturing cycle time is best defined as the (Points : 4) length of the work shift, expressed in minutes per day. time it takes a unit to move from one workstation to the next. time between the start of one unit and the start of the next unit. sum of all the task times to make one unit of a product. time from raw materials receipt to finished product exit. 2. (TCOs 5 & 12) The implementation of JIT offers several advantages, including (Points : 4) reduced throughput. increase in variability to better respond to variable demand. decreased profit margins. support for lean production. increased work in process inventory. 3. (TCOs 5 & 12) Which of the following statements regarding JIT in services is true? (Points : 4) Restaurants do not use JIT layouts because they interfere with the creation of a good servicescape. Excess customer demand in services such as air travel is met by dipping into safety stocks. All of the JIT techniques for dealing with suppliers, layout, inventory, and scheduling are used in services. Scheduling is not relevant to the effective use of JIT in services. All of the above are false. 4. (TCO 12) Which of the following is the author of the phrase, “Inventory is evil”? (Points : 4) Poka Yoke Pat “Keiretsu” Morita Kanban Polka Shigeo Shingo None of the above 5. (TCO 12) Great Lakes Barge and Baggage Company makes, among other things, battery- operated bilge pumps. Which of the following activities isnot part of JIT? (Points : 4)
  • 8. They communicate their schedules to suppliers. They produce in long production runs to reduce the impact of setup costs. They use a pull system to move inventory. They continuously work on reducing setup time. They produce in small lots.