The document describes a proprietary software called "SHUNTCARE SYSTEM" developed by Vaseem Farooqui to monitor railway shunting operations and ensure KPIs are met. The software provides visibility into KPI reporting through charts and dashboards. It can automatically measure serviceability based on timely KPIs like cycle times, volumes handled, safety incidents, and workforce training levels. The system aims to increase visibility and flexibility to adapt to client needs for hazardous material railway operations and maintenance.
1. Create, Designed and Developed By Vaseem Farooqui
Railway ShuntCare System
Target Audience: Railway O&M Market
Author: Vaseem Farooqui
(B-Tech-Computers, MIT-Computers-Australia, MBA from Melbourne
Business School-Australia)
Email: Vaseemfarooqui@hotmail.com
2. Create, Designed and Developed By Vaseem Farooqui
Railway Shunting Monitoring tool
For Hazardous Material Railway Operations & Maintenance
In order to ensure that the service provided by us conforms to the expectations of the client, Vaseem Farooqui has developed
Proprietary software called “SHUNTCARE SYSTEM”. The client will have visibility to reporting KPIs and access that operations are
as per the agreed service level in form of Spider Charts, Bar Charts & Volume Charts.
Reporting KPIs
“SHUNTCARE SYSTEM” software tool will automatically measure serviceability based on KPIs reported on timely basis i.e. Daily,
weekly, monthly and yearly on our dashboard. As this software is owned and built by Vaseem Farooqui, there is immense flexibility
to include extra features based on Client’s requirement at later date. This portal will be made available via Internet in a secure
manner using digital certificate so that all In-Yard Operations & Maintenance actions at multiple sites from single screen
simultaneously
3. Create, Designed and Developed By Vaseem Farooqui
Molten Sulphur Rake: Cycle times KPI
Complete Operational Cycle KPI for Molten Sulphur Rake
The above screenshot shows complete operation cycle involved for unloading Molten Sulphur (MS) Rake
Where A: indicates agreed KPI threshold zone in Hours
B: indicates Actual operations hours taken for completing the cycle
C: indicates for a given operational task, time comparison between KPI threshold and Actual operation time.
4. Create, Designed and Developed By Vaseem Farooqui
Volume/quantity handled
The above screenshot shows complete Daily, Weekly, Monthly, Yearly chart with Molten Sulphur, Acidic Material,
Phosphoric Acid Volumes received and dispatched from source site and MGA/PPA volumes received at destination site
Where A: indicates Volume received/dispatched and commodity type received/dispatched
B: indicates option for selecting Daily, Weekly, Monthly, Yearly charts
5. Create, Designed and Developed By Vaseem Farooqui
C: indicates commodity type and quantity received/dispatched for a given date at Site
D: indicates commodity type and quantity received for a given date at Site
E: indicates average volume for selected year range
Safety KPI
The above screenshot shows complete Daily, Weekly, Monthly, Yearly Pie chart of Molten Sulphur Safety KPIs at site
Where A: indicates site Safety KPI at
B: indicates option for selecting Daily, Weekly, Monthly, Yearly Pie Charts
C: indicates number of incidents related to faulty wagon, asset incident related delay, workers incident related delay,
facility incident related delay, delays due to signalling conditions, delays due to Sand storm, delay due to loading process,
delays due to unloading process, non-arrival of rake on time, break-down of client facilities, locomotive not in working
6. Create, Designed and Developed By Vaseem Farooqui
condition, Wagons not in sequence, delays due to overlapping prayer’s time, delay due to National holiday, delay due to
local seasonal activity, delays due to obstacles on railway facility, delay due to government restrictions at Site
Workforce capability KPI
Workforce Capability KPI
This screenshot shows Workforce Capability KPI
every quarter at Site with % of workforce trained for
Orientation, Safety Training, Team Building
Training, Locomotive O&M Training, Shunting
Operation Training, IT Training & Administrative
Training.
A: shows total % of employees trained for a given
program
B: Indicates % of employees not trained for a
given program
C: Indicates % of employees trained for a given
program
D: Shows various training program
E: Shows % of Workforce
7. Create, Designed and Developed By Vaseem Farooqui
Merchant Grade Acid/Pure Phosphoric Acid Loading Operation Cycle
8. Create, Designed and Developed By Vaseem Farooqui
Above Screenshot shows all operational tasks involved from arrival of empty all acid Rake at site to dispatch of loaded all
acid rake
A: Indicates Operational details
B: Final destination where locomotive will de-couple and then taken over by owner’s Locomotives
C: Authorised person’s name who carried out the operation
D: List of all operation tasks involved
E: Location from where a given operation begun
F: Location where a given operation ended
G: Which product was carried during a given operational task
H: Estimated product Weight KPI (In tonnes) expected at the time of arrival or dispatch
I: Estimated KPI start time for carrying out given operation
J: Estimated KPI end time for a given operation
K: Estimated KPI start time of first operation
L: Estimated KPI end time of last operation
M: Shows status of whole operation (if completed) or currently being carried out