TRAINING PROGRAM FOR SITE MANAGERS
AS PER LEED INDIA CS & IGBC GREEN HOMES
ARCHITECT AMEE MANGALDAS & SANDEEP GOSWAMI
CONSULTANTS – CLEAN TECHNOLOGIES
SITE ACTION PLAN
LEED Compliance Training to Site
Managers
• Site specific Prerequisites and credit points.
• List of Construction Submittals.
• Safety Measures
• Other Measures
• Intent of photographs required for
Documentation.
• Other Supporting documents required for
Submission.
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Sustainable Sites
SS Prerequisite 1: Erosion & Sedimentation Control
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Sustainable Sites
SS Credit 5.1: Reduced Site Disturbance, Protect or
Restore Habitat
Before:
After:
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS –Sustainable Sites
SS Credit 6.1-6.2: Storm Water Design, Quantity
& Quality Control
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS –Sustainable Sites
SS Credit 7.1: Heat Island Effect, Non-roof
Show 50% or more capacity of Parking All Non-roof surfaces to have materials
Under cover or underground. With high SRI values and/or vegetation.
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS –Water Efficiency
WE Credit 1: Water Efficient Landscaping, 50% Reduction
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS –Water Efficiency
WE Credit 4.1: Water Use Reduction, 20%, 30%
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Energy & Atmosphere
EA Prerequisite 1: Fundamental Building Systems
Commissioning
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Energy & Atmosphere
EA Prerequisite 2: Minimum Energy Performance
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Energy & Atmosphere
EA Credit 1: Optimize Energy Performance
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Energy & Atmosphere
EA Credit 5.1-5.2: Measurement & Verification – Base Building &
Tenant Sub metering
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Material & Resources
At every floor of the building.
During Construction of building.
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Material & Resources
MR Credit 1.1-1.3: Building Reuse
MR Credit 3: Resources Reuse
MR Credit 5.1-5.2: Regional Materials
MR Credit 6: Certified Wood
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Material & Resources
MR Credit 4.1-4.2: Recycled Content
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Material & Resources
MR Credit 2.1-2.2: Construction Waste Management
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Indoor Environmental Quality
EQ Prerequisite 2: Environmental Tobacco Smoke (ETS)
Control
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Indoor Environmental Quality
EQ Credit 3: Construction IAQ Management Plan (During
Const)
SITE SPECIFIC PREREQUISITES & CREDIT
POINTS – Indoor Environmental Quality
EQ Credit 4.1-4.4: Low Emitting Materials; Paints, Adhesives,
carpets & Composite wood
EQ Credit 5: Indoor Chemical & Pollutant source control
SITE ACTION PLAN
Safety Measures
• Construction nets – avoid debris from falling on
workers and going to other neighboring sites.
• Helmets – for workers, visitors, anyone entering site.
• Signages – “Dangerous”, “Pitfall ahead” and other
important labels around the site.
• First Aid box – All essential medicines as required
(Antibiotics, pain killers, antiseptic etc)
• Emergency Vehicles
• Contact Numbers of Medical Facility, Doctors,
Ambulance etc on site, put up in Site office.
Safety Measures
Other Measures
• Signages/Information kiosks for Visitors on site.
• Storage of construction materials.
• Segregation of waste materials.
• Labeling of waste bins, storage areas of different
materials, sanitation for workers etc to be
mentioned in native language.
Other Measures
List of Construction Submittals – Core & Shell
• SS pre 1: Erosion & Sedimentation Control
Measures taken supported with Photographs
• SS Credit 5.1: Reduced Site Disturbance, Protect & Restore
Habitat
Layout plan, calculations supported with Photographs
• SS Credit 7.1: Heat Island Effect , Non –roof
Layout plan & calculations (Photographs optional)
• EA pre 1: F.B.S.C
Final Report from Commissioning Authority
• EA Credit 3: Additional Commissioning
Final Report from Additional Commissioning Authority
• EA Credit 6: Green Power
Types of Renewable Energy Investments & Base building Annual
Energy Consumption
• MR pre 1: Storage & Collection of Recyclables
Floor Plans and Photographs
List of Construction Submittals – Core & Shell
• MR Credit 2.1-2.2: Construction Waste Management
CWM Design & Execution Plan, Measures taken & Photographs
• MR Credit 3: Resources Reuse
Const. Materials data sheet and Photographs (reuse)
• MR Credit 4.1-4.2: Recycled Content
Const Materials Cost sheet and calculations
• MR Credit 5.1-5.2: Regional Materials
Const. Materials cost sheet, calculations, Vendor details
• MR Credit 6: Certified Wood
Material data sheet, manufacturer cut sheets.
• EQ Credit 3: Construction IAQ Management Plan (During
Const)
IAQ Plan, Measures, Photographs (18)
• EQ Credit 4.1-4.4: Low Emitting Materials; Paints, Adhesives,
carpets & Composite wood
Manufacturers cut sheets, limits & certificates
List of Construction Submittals – Green Homes
• Site Mandatory 1: Local Regulations
CWM Design & Execution Plan, Measures taken & Photographs
• MR Credit 3: Resources Reuse
Const. Materials data sheet and Photographs (reuse)
• MR Credit 4.1-4.2: Recycled Content
Const Materials Cost sheet and calculations
• MR Credit 5.1-5.2: Regional Materials
Const. Materials cost sheet, calculations, Vendor details
• MR Credit 6: Certified Wood
Material data sheet, manufacturer cut sheets.
• EQ Credit 3: Construction IAQ Management Plan (During
Const)
IAQ Plan, Measures, Photographs (18)
• EQ Credit 4.1-4.4: Low Emitting Materials; Paints, Adhesives,
carpets & Composite wood
Manufacturers cut sheets, limits & certificates
Construction documents.
Intent of Photographs for Documentation
• SS Prerequisite 1: Erosion & Sedimentation Control
• SS Credit 2: Development Density & Community
Connectivity
• SS Credit 5.1: Reduced Site Disturbance, Protect or
Restore Habitat
• MR Credit 2.1-2.2: Construction Waste Management
• EQ Credit 3: Construction IAQ Management Plan
(During Const)
Other Documentation
• Building Plans
• Elevations & Sections
• Project Approvals
• Landscape Plans
• Building Footprint (Site layout) Plan
• Community Connectivity – Google maps, Transit/Public
Transportation maps
• Parking plans
• Cut sheets, Certificates from Manufacturers/Vendors (Fixtures,
materials, systems etc)
• Water Balance, Annual Energy consumption, Materials cost data
sheet.
• Tenant Design & Construction guidelines
• FBSC report( if applicable), Energy Report, Daylight & Views

More Related Content

Similar to LEED Compliance Training for Site Managers

LEED BDC Credit SummaryLEED BDCSheet.pdf
LEED BDC Credit SummaryLEED BDCSheet.pdfLEED BDC Credit SummaryLEED BDCSheet.pdf
LEED BDC Credit SummaryLEED BDCSheet.pdfihjjvv1
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminarOsama Khadra
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminarOsama Khadra
 
Fss Career Day
Fss Career DayFss Career Day
Fss Career Daymsmpaulson
 
Designing with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsDesigning with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsReshma Philip
 
Designing with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsDesigning with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsReshma Philip
 
Rak precast vs sustainability
Rak precast vs sustainability   Rak precast vs sustainability
Rak precast vs sustainability Farah Abdullah
 
City Projects - Concepts, Costing & Construction
City Projects - Concepts, Costing & ConstructionCity Projects - Concepts, Costing & Construction
City Projects - Concepts, Costing & ConstructionUGPTI
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Dhaval Jadhav
 
Land Quality Endorsement Services
Land Quality Endorsement Services Land Quality Endorsement Services
Land Quality Endorsement Services IES / IAQM
 
Presentation_LeedCD_245
Presentation_LeedCD_245Presentation_LeedCD_245
Presentation_LeedCD_245Adam Carducci
 
Straight Up Leed Mcac
Straight Up Leed McacStraight Up Leed Mcac
Straight Up Leed Mcaccmkces
 

Similar to LEED Compliance Training for Site Managers (20)

LEED BDC Credit SummaryLEED BDCSheet.pdf
LEED BDC Credit SummaryLEED BDCSheet.pdfLEED BDC Credit SummaryLEED BDCSheet.pdf
LEED BDC Credit SummaryLEED BDCSheet.pdf
 
Green
GreenGreen
Green
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
 
2011 Aei Soq
2011 Aei Soq2011 Aei Soq
2011 Aei Soq
 
Deterioration of Concrete
Deterioration of ConcreteDeterioration of Concrete
Deterioration of Concrete
 
Fss Career Day
Fss Career DayFss Career Day
Fss Career Day
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
 
Designing with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsDesigning with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratings
 
Designing with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsDesigning with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratings
 
Rak precast vs sustainability
Rak precast vs sustainability   Rak precast vs sustainability
Rak precast vs sustainability
 
LEED
LEEDLEED
LEED
 
City Projects - Concepts, Costing & Construction
City Projects - Concepts, Costing & ConstructionCity Projects - Concepts, Costing & Construction
City Projects - Concepts, Costing & Construction
 
PLS Brochure
PLS BrochurePLS Brochure
PLS Brochure
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
 
Land Quality Endorsement Services
Land Quality Endorsement Services Land Quality Endorsement Services
Land Quality Endorsement Services
 
Presentation_LeedCD_245
Presentation_LeedCD_245Presentation_LeedCD_245
Presentation_LeedCD_245
 
LEED Green Factory
LEED Green FactoryLEED Green Factory
LEED Green Factory
 
GREEN BUILDING
GREEN BUILDING GREEN BUILDING
GREEN BUILDING
 
Straight Up Leed Mcac
Straight Up Leed McacStraight Up Leed Mcac
Straight Up Leed Mcac
 

Recently uploaded

Purva Palm Hills Devanahalli, Bangalore E- Brochure.pdf
Purva Palm Hills Devanahalli, Bangalore E- Brochure.pdfPurva Palm Hills Devanahalli, Bangalore E- Brochure.pdf
Purva Palm Hills Devanahalli, Bangalore E- Brochure.pdffaheemali990101
 
Call Girls in Khan Market 9654467111 ESCORTS SERVICE
Call Girls in Khan Market 9654467111 ESCORTS SERVICECall Girls in Khan Market 9654467111 ESCORTS SERVICE
Call Girls in Khan Market 9654467111 ESCORTS SERVICESapana Sha
 
Omaxe Dwarka In Delhi E Brochure Pdf
Omaxe Dwarka In Delhi E Brochure     PdfOmaxe Dwarka In Delhi E Brochure     Pdf
Omaxe Dwarka In Delhi E Brochure Pdfashiyadav24
 
Listing Turkey Sylvana Istanbul - Bahcesehir
Listing Turkey Sylvana Istanbul - BahcesehirListing Turkey Sylvana Istanbul - Bahcesehir
Listing Turkey Sylvana Istanbul - BahcesehirListing Turkey
 
Shapoorji Pallonji Parkwest Sequoia Tower Bangalore.pdf
Shapoorji Pallonji Parkwest Sequoia Tower Bangalore.pdfShapoorji Pallonji Parkwest Sequoia Tower Bangalore.pdf
Shapoorji Pallonji Parkwest Sequoia Tower Bangalore.pdfashiyadav24
 
Nanke Area Estate commercial ( Dir. Kat Kuo)
Nanke Area Estate commercial ( Dir. Kat Kuo)Nanke Area Estate commercial ( Dir. Kat Kuo)
Nanke Area Estate commercial ( Dir. Kat Kuo)jessica288382
 
The Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdfThe Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdfkratirudram
 
9990771857 Call Girls in Noida Sector 10 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 10 Noida (Call Girls) Delhi9990771857 Call Girls in Noida Sector 10 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 10 Noida (Call Girls) Delhidelhimodel235
 
Call Girls in Kashmiri Gate Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Kashmiri Gate Delhi 💯Call Us 🔝8264348440🔝Call Girls in Kashmiri Gate Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Kashmiri Gate Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDFMs Riya
 
Choose Noida's Leading Architect
Choose    Noida's    Leading   ArchitectChoose    Noida's    Leading   Architect
Choose Noida's Leading ArchitectMM Design Studio
 
83770-87607 ۞Call Girls In Near The Park Hotel (Cp) Delhi
83770-87607 ۞Call Girls In Near The Park Hotel (Cp) Delhi83770-87607 ۞Call Girls In Near The Park Hotel (Cp) Delhi
83770-87607 ۞Call Girls In Near The Park Hotel (Cp) Delhidollysharma2066
 
9990771857 Call Girls in Noida Sector 06 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 06 Noida (Call Girls) Delhi9990771857 Call Girls in Noida Sector 06 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 06 Noida (Call Girls) Delhidelhimodel235
 
Call Girls In Vasundhara Ghaziabad ❤️8860477959 Low Rate Escorts Service In 2...
Call Girls In Vasundhara Ghaziabad ❤️8860477959 Low Rate Escorts Service In 2...Call Girls In Vasundhara Ghaziabad ❤️8860477959 Low Rate Escorts Service In 2...
Call Girls In Vasundhara Ghaziabad ❤️8860477959 Low Rate Escorts Service In 2...lizamodels9
 
Low Rate Call Girls in Tughlakabad Delhi Call 9990771857
Low Rate Call Girls in Tughlakabad Delhi Call 9990771857Low Rate Call Girls in Tughlakabad Delhi Call 9990771857
Low Rate Call Girls in Tughlakabad Delhi Call 9990771857delhimodel235
 
Puravankara Mundhwa Pune E-Brochure.pdf
Puravankara Mundhwa Pune  E-Brochure.pdfPuravankara Mundhwa Pune  E-Brochure.pdf
Puravankara Mundhwa Pune E-Brochure.pdfManishSaxena95
 

Recently uploaded (20)

Low Rate Call Girls in Triveni Complex Delhi Call 9873940964
Low Rate Call Girls in Triveni Complex Delhi Call 9873940964Low Rate Call Girls in Triveni Complex Delhi Call 9873940964
Low Rate Call Girls in Triveni Complex Delhi Call 9873940964
 
Purva Palm Hills Devanahalli, Bangalore E- Brochure.pdf
Purva Palm Hills Devanahalli, Bangalore E- Brochure.pdfPurva Palm Hills Devanahalli, Bangalore E- Brochure.pdf
Purva Palm Hills Devanahalli, Bangalore E- Brochure.pdf
 
Call Girls in Khan Market 9654467111 ESCORTS SERVICE
Call Girls in Khan Market 9654467111 ESCORTS SERVICECall Girls in Khan Market 9654467111 ESCORTS SERVICE
Call Girls in Khan Market 9654467111 ESCORTS SERVICE
 
Omaxe Dwarka In Delhi E Brochure Pdf
Omaxe Dwarka In Delhi E Brochure     PdfOmaxe Dwarka In Delhi E Brochure     Pdf
Omaxe Dwarka In Delhi E Brochure Pdf
 
Listing Turkey Sylvana Istanbul - Bahcesehir
Listing Turkey Sylvana Istanbul - BahcesehirListing Turkey Sylvana Istanbul - Bahcesehir
Listing Turkey Sylvana Istanbul - Bahcesehir
 
Shapoorji Pallonji Parkwest Sequoia Tower Bangalore.pdf
Shapoorji Pallonji Parkwest Sequoia Tower Bangalore.pdfShapoorji Pallonji Parkwest Sequoia Tower Bangalore.pdf
Shapoorji Pallonji Parkwest Sequoia Tower Bangalore.pdf
 
Nanke Area Estate commercial ( Dir. Kat Kuo)
Nanke Area Estate commercial ( Dir. Kat Kuo)Nanke Area Estate commercial ( Dir. Kat Kuo)
Nanke Area Estate commercial ( Dir. Kat Kuo)
 
The Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdfThe Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdf
 
9990771857 Call Girls in Noida Sector 10 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 10 Noida (Call Girls) Delhi9990771857 Call Girls in Noida Sector 10 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 10 Noida (Call Girls) Delhi
 
Call Girls in Kashmiri Gate Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Kashmiri Gate Delhi 💯Call Us 🔝8264348440🔝Call Girls in Kashmiri Gate Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Kashmiri Gate Delhi 💯Call Us 🔝8264348440🔝
 
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
 
9953056974 Low Rate Call Girls In Saket, Delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR9953056974 Low Rate Call Girls In Saket, Delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Choose Noida's Leading Architect
Choose    Noida's    Leading   ArchitectChoose    Noida's    Leading   Architect
Choose Noida's Leading Architect
 
Call Girls in Mahavir Nagar whatsaap call US +919953056974
Call Girls in Mahavir Nagar  whatsaap call US  +919953056974Call Girls in Mahavir Nagar  whatsaap call US  +919953056974
Call Girls in Mahavir Nagar whatsaap call US +919953056974
 
83770-87607 ۞Call Girls In Near The Park Hotel (Cp) Delhi
83770-87607 ۞Call Girls In Near The Park Hotel (Cp) Delhi83770-87607 ۞Call Girls In Near The Park Hotel (Cp) Delhi
83770-87607 ۞Call Girls In Near The Park Hotel (Cp) Delhi
 
9990771857 Call Girls in Noida Sector 06 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 06 Noida (Call Girls) Delhi9990771857 Call Girls in Noida Sector 06 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 06 Noida (Call Girls) Delhi
 
young call girls in Lajpat Nagar,🔝 9953056974 🔝 escort Service
young call girls in Lajpat Nagar,🔝 9953056974 🔝 escort Serviceyoung call girls in Lajpat Nagar,🔝 9953056974 🔝 escort Service
young call girls in Lajpat Nagar,🔝 9953056974 🔝 escort Service
 
Call Girls In Vasundhara Ghaziabad ❤️8860477959 Low Rate Escorts Service In 2...
Call Girls In Vasundhara Ghaziabad ❤️8860477959 Low Rate Escorts Service In 2...Call Girls In Vasundhara Ghaziabad ❤️8860477959 Low Rate Escorts Service In 2...
Call Girls In Vasundhara Ghaziabad ❤️8860477959 Low Rate Escorts Service In 2...
 
Low Rate Call Girls in Tughlakabad Delhi Call 9990771857
Low Rate Call Girls in Tughlakabad Delhi Call 9990771857Low Rate Call Girls in Tughlakabad Delhi Call 9990771857
Low Rate Call Girls in Tughlakabad Delhi Call 9990771857
 
Puravankara Mundhwa Pune E-Brochure.pdf
Puravankara Mundhwa Pune  E-Brochure.pdfPuravankara Mundhwa Pune  E-Brochure.pdf
Puravankara Mundhwa Pune E-Brochure.pdf
 

LEED Compliance Training for Site Managers

  • 1. TRAINING PROGRAM FOR SITE MANAGERS AS PER LEED INDIA CS & IGBC GREEN HOMES ARCHITECT AMEE MANGALDAS & SANDEEP GOSWAMI CONSULTANTS – CLEAN TECHNOLOGIES
  • 2. SITE ACTION PLAN LEED Compliance Training to Site Managers • Site specific Prerequisites and credit points. • List of Construction Submittals. • Safety Measures • Other Measures • Intent of photographs required for Documentation. • Other Supporting documents required for Submission.
  • 3. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Sustainable Sites SS Prerequisite 1: Erosion & Sedimentation Control
  • 4. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Sustainable Sites SS Credit 5.1: Reduced Site Disturbance, Protect or Restore Habitat Before: After:
  • 5. SITE SPECIFIC PREREQUISITES & CREDIT POINTS –Sustainable Sites SS Credit 6.1-6.2: Storm Water Design, Quantity & Quality Control
  • 6. SITE SPECIFIC PREREQUISITES & CREDIT POINTS –Sustainable Sites SS Credit 7.1: Heat Island Effect, Non-roof Show 50% or more capacity of Parking All Non-roof surfaces to have materials Under cover or underground. With high SRI values and/or vegetation.
  • 7. SITE SPECIFIC PREREQUISITES & CREDIT POINTS –Water Efficiency WE Credit 1: Water Efficient Landscaping, 50% Reduction
  • 8. SITE SPECIFIC PREREQUISITES & CREDIT POINTS –Water Efficiency WE Credit 4.1: Water Use Reduction, 20%, 30%
  • 9. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Energy & Atmosphere EA Prerequisite 1: Fundamental Building Systems Commissioning
  • 10. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Energy & Atmosphere EA Prerequisite 2: Minimum Energy Performance
  • 11. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Energy & Atmosphere EA Credit 1: Optimize Energy Performance
  • 12. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Energy & Atmosphere EA Credit 5.1-5.2: Measurement & Verification – Base Building & Tenant Sub metering
  • 13. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Material & Resources At every floor of the building. During Construction of building.
  • 14. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Material & Resources MR Credit 1.1-1.3: Building Reuse MR Credit 3: Resources Reuse MR Credit 5.1-5.2: Regional Materials MR Credit 6: Certified Wood
  • 15. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Material & Resources MR Credit 4.1-4.2: Recycled Content
  • 16. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Material & Resources MR Credit 2.1-2.2: Construction Waste Management
  • 17. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Indoor Environmental Quality EQ Prerequisite 2: Environmental Tobacco Smoke (ETS) Control
  • 18. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Indoor Environmental Quality EQ Credit 3: Construction IAQ Management Plan (During Const)
  • 19. SITE SPECIFIC PREREQUISITES & CREDIT POINTS – Indoor Environmental Quality EQ Credit 4.1-4.4: Low Emitting Materials; Paints, Adhesives, carpets & Composite wood EQ Credit 5: Indoor Chemical & Pollutant source control
  • 20. SITE ACTION PLAN Safety Measures • Construction nets – avoid debris from falling on workers and going to other neighboring sites. • Helmets – for workers, visitors, anyone entering site. • Signages – “Dangerous”, “Pitfall ahead” and other important labels around the site. • First Aid box – All essential medicines as required (Antibiotics, pain killers, antiseptic etc) • Emergency Vehicles • Contact Numbers of Medical Facility, Doctors, Ambulance etc on site, put up in Site office.
  • 22. Other Measures • Signages/Information kiosks for Visitors on site. • Storage of construction materials. • Segregation of waste materials. • Labeling of waste bins, storage areas of different materials, sanitation for workers etc to be mentioned in native language.
  • 24. List of Construction Submittals – Core & Shell • SS pre 1: Erosion & Sedimentation Control Measures taken supported with Photographs • SS Credit 5.1: Reduced Site Disturbance, Protect & Restore Habitat Layout plan, calculations supported with Photographs • SS Credit 7.1: Heat Island Effect , Non –roof Layout plan & calculations (Photographs optional) • EA pre 1: F.B.S.C Final Report from Commissioning Authority • EA Credit 3: Additional Commissioning Final Report from Additional Commissioning Authority • EA Credit 6: Green Power Types of Renewable Energy Investments & Base building Annual Energy Consumption • MR pre 1: Storage & Collection of Recyclables Floor Plans and Photographs
  • 25. List of Construction Submittals – Core & Shell • MR Credit 2.1-2.2: Construction Waste Management CWM Design & Execution Plan, Measures taken & Photographs • MR Credit 3: Resources Reuse Const. Materials data sheet and Photographs (reuse) • MR Credit 4.1-4.2: Recycled Content Const Materials Cost sheet and calculations • MR Credit 5.1-5.2: Regional Materials Const. Materials cost sheet, calculations, Vendor details • MR Credit 6: Certified Wood Material data sheet, manufacturer cut sheets. • EQ Credit 3: Construction IAQ Management Plan (During Const) IAQ Plan, Measures, Photographs (18) • EQ Credit 4.1-4.4: Low Emitting Materials; Paints, Adhesives, carpets & Composite wood Manufacturers cut sheets, limits & certificates
  • 26. List of Construction Submittals – Green Homes • Site Mandatory 1: Local Regulations CWM Design & Execution Plan, Measures taken & Photographs • MR Credit 3: Resources Reuse Const. Materials data sheet and Photographs (reuse) • MR Credit 4.1-4.2: Recycled Content Const Materials Cost sheet and calculations • MR Credit 5.1-5.2: Regional Materials Const. Materials cost sheet, calculations, Vendor details • MR Credit 6: Certified Wood Material data sheet, manufacturer cut sheets. • EQ Credit 3: Construction IAQ Management Plan (During Const) IAQ Plan, Measures, Photographs (18) • EQ Credit 4.1-4.4: Low Emitting Materials; Paints, Adhesives, carpets & Composite wood Manufacturers cut sheets, limits & certificates
  • 28. Intent of Photographs for Documentation • SS Prerequisite 1: Erosion & Sedimentation Control • SS Credit 2: Development Density & Community Connectivity • SS Credit 5.1: Reduced Site Disturbance, Protect or Restore Habitat • MR Credit 2.1-2.2: Construction Waste Management • EQ Credit 3: Construction IAQ Management Plan (During Const)
  • 29. Other Documentation • Building Plans • Elevations & Sections • Project Approvals • Landscape Plans • Building Footprint (Site layout) Plan • Community Connectivity – Google maps, Transit/Public Transportation maps • Parking plans • Cut sheets, Certificates from Manufacturers/Vendors (Fixtures, materials, systems etc) • Water Balance, Annual Energy consumption, Materials cost data sheet. • Tenant Design & Construction guidelines • FBSC report( if applicable), Energy Report, Daylight & Views