2. BELOW REASONS MIGHT BETHE LOSS MAKING RESOURCES IN A
COMMON HOT WATER PIPELINE NETWORK.
Heat Loss
Quality of pipeline
material
Lifespan
Wrong primary
pipeline sizes
which may cause
higher investment
Inappropriate
pipeline routing &
Pressure Drop
Toxic Reaction &
Health Issues
Corrosive &
Scaling
Higher Investment
on Insulation
Friction Loss
Workmanship /
Possibilities of
leakage
3. Difference between PPR-C & Metal Pipe
Properties
Protocols PPR-C Metal Pipe
Service Life >50Years 10Years
Standard Length 3-4 Meters 5 Meters
Brittleness Characteristics Highly Resistant Resistant
Corrosion Resistant Non Corrosive Weak
Chemical Resistant Excellent Poor
Inner Surface Smoothness Excellent Smoothness
[Friction Reduction]
Semi Smooth
Leakage 100% Leak Proof for Entire Service Life Possibilities of Leakages
4. Corroded Metal Pipe Samples
Common observations in Metal Pipe
• Pressure Drop
• Flow Restriction
• Leakages
• Damage of supporting components
5. Metal Pipe Workmanship
Protocols PPR-C Metal Pipe
Jointing Method SimpleThermal Fusion Welding Joint
Time taken per joint Few Seconds Few hours
Strength Of Joints Fusion of Material-Perfect Homogeneity Surface Homogeneity
Minimum Labour One person Required Two Person Required
Repair & Maintenance Easy Difficult
Installation convenience Simple & Convenient Difficult
Skill We can do it ourselves Requires Expert Plumber
6. Benefits of PPR-C
• Public health, non-toxic: This product is a green building materials, can be used for hot
water, pure water, drinking water pipeline system.
• Anti-corrosive, Non-scaling: You can avoid pipe corrosion caused by basin, bath-related
macularWorries about rust, may dispense with pipeline caused by corrosion and scaling
Blockage
• High temperature, High pressure: piped water temperature up to 100 ℃.
• Insulation energy saving: thermal conductivity of metal pipes 1/200 only for excellent
energy saving effect of hot water pipe insulation.
• The quality of light: the proportion is only one-seventh of metal pipe
• Pleasing in appearance: product inside and outside the wall is smooth, fluid resistance
small, soft colors, handsome in appearance.
• Easy installation and reliable:The hot melt connection, a few seconds to complete, safe
and reliable.
• Long life: In the provision of long-term continuous working pressure, the use of the next life
of up to 50 years
7. Scope Of Work - Design
Correct Pipeline Size as per your requirement
Perfect Pipeline Routing Diagram
Design with control provisions
Design with future provisions
Suitable support/clamp design as per site condition
Reports on insulation & Savings on investment
8. Scope OfWork – Erection &Testing
Detailed techno-commercial proposal
Approved pipeline network diagram
Material supply as per approved diagram
Support / Clamp work – If needed
Erection Work
Testing & Project Completion Report.