3. Table of Contents 01
Table of Contents
Homeless Assistance
Women’s Health Center
MBA Construction Corporate Office Building
Table of
Contents
Pg 1
Pg 2-5
Pg 6-9
Pg 10-15
4. 02 Homeless Assistance Center
Houston Homeless Assistance Center
Design VII Group Project
Concept: To provide a central location for homeless individuals to access to resources
and housing.
Location: Downtown Houston
Program:
FIRST FLOOR - thrift store, bank, restrooms, library, kennel, mail room, receptionist,
barber/ beauty shop, dinning area, cafe, kitchen
SECOND FLOOR - daycare, offices, resource center, chapel, dinning area, laundry, showers
THIRD FLOOR - dental exam room, medical exam room, pharmacy, labs, waiting area
FOURTH FLOOR: classrooms, art studio, library
FIFTH AND SIXTH FLOORS: housing units, ada housing units and communal areas
Design Role: I was responsible for 50% of the work for this project from program
planning to 3D design to model building.
5. Schematic Design
1
During the Schematic
Design phase, my partner
and I carefully laid out the
program by sketching and
creating small models to better
map out the space.
Our inspiration was the
downtown street environment
itself.
03Homeless Assistance Center
6. 04 Homeless Assistance Center
2During the Design
Development phase, we
finalized our building layout.
We were able to incorporate
Houston’s downtown
atmosphere into the design by
creating an indoor courtyard and
building the structure around
the space.
Design Development
8. 06 Women’s Health Center
Women’s Health Center
Design VIII
Concept: The concept for my health clinic was derived from the site itself as well as the
Igbo people of Nigeria. Everything seemed to have flow. This lead to the idea of creating a
structure that was not forced but rather had a seamless movement. In addition to the initial
idea, I also incorporated a sense of community and unity within the center similar to the
culture of the people that would utilize the facility.
Location: Igbo Land, Nigeria
Program:
Outpatient - Reception, Emergency room, Pharmacy, Lab, Exam Room
Disease Prevention and Treatment - HIV Teaching Area, Treatment
Childbirth - Maternity Ward, Birthing Room, C-Section Room, Infant Ward
Inpatient - Waiting Area, Children Ward, Radiology, Lab, Pharmacy
Public Space - Shower/Restroom, Kitchen
9. Schematic Design
1During the Schematic
Design phase, I used
my research of the physical
environment, the native people,
and medical facility function to
determine the layout.
The final design was ultimately
influenced most by the peoples
normal utilization of the land.
07Women’s Health Center
10. 1
1
2
3
4
5
6
7
7
7
8
8
8
9
9
10
10
11
12
12
13
14
15
15
16
16
17
6
4
18
18
18
19
Design Development
2
This color coded plan shows the
5 sections of the medical facility
necessary for proper function. Purple
represents Outpatient. Orange represents
Disease Prevention and treatment. Blue
represents Inpatient. Light blue represents
Childbirth and green are seperate structures.
08 Women’s Health Center
2
Outpatient - Reception, Emergency
room, Pharmacy, Lab, Exam Room
Disease Prevention and Treatment - HIV
Teaching Area, Treatment
Childbirth - Maternity Ward, Birthing Room,
C-Section Room, Infant Ward
Inpatient - Waiting Area, Children Ward,
Radiology, Lab, Pharmacy
Public Space - Shower/Restroom, Kitchen
12. 10 MBA Construction Corporate Office
MBA Construction Corporate Office
Concept: The 20,000 sqft MBA office was to accomodate both the northern and
southern reginal offices. The owners wanted a rustic industrial modern design aesthetic to
match the industrial facade of the building.
Location:Magnolia, TX
Program: 33 Offices, Breakroom, 2 Conference rooms, Restrooms, Mechanical room,
Utility and Storage rooms.
Design Role: Assisted in schematic design and design developments phases for
commercial office building, including. Acted as project liaison between owners and
developer. Performed interior design duties on the 20,000 sqft. office space
13. 11MBA Construction Corporate Office
Schematic Design/
Programming
1
During the Programming
phase, I used my design skills
and creativity to figure out what
I thought spoke to the style and
taste of the owners and solved
design dilemmas along the way.
This process consisted of figuring
out the design aesthetic, color
scheme, and designing custom
woodwork.
14. 12 MBA Construction Corporate Office
Construction
Documentation
During the Construction
Docs phase, The designers
and I assessed and solved layout
and space planning issues.
2
15. 13MBA Construction Corporate Office
Construction/Installation
3During this phase, I was in
constant contact with the
developer to ensure that the
finishes that were spec’d out
were being installed properly.
This is also when the most
pressing design issues were
presented and solved.