SlideShare a Scribd company logo
1 of 16
Download to read offline
Svein Gaute Bleivik, CEO
TAREC-IN AS
Technology Asset Management
Consultancy Services
July 2013 ©
 TAREC-IN AS resting on 45 years in telecom business
 Planning and Roll-Out/In Experience last 30 years
 Network Development, Optimization & Utilization
 Asset Management of Technology shifts/swaps
 ARS Execution support by Preferred Partner
 Independent and Reliable Engineering Services
 Assist & Consultancy in any part of MNO value chain
 Visit website or LinkedIn company pages for info
Experience & Capabilities
post@tarec-in.com ML#12, 5534 Haugesund, Norway
 Technology Asset Management, mobile/fixed
 Network Upgrade initiatives, NGN 3G and 4G
 Planning & Implementation, review/enhancement
 Input process
 Network Performance
 Planning process
 Market & Network strategies
 RFI/Q processes
 Asset Recovery
 Reverse Logistics by Preferred Partner
Available Services
post@tarec-in.com ML#12, 5534 Haugesund, Norway
 Providing support to MNO’s life cycle management
 Network infrastructure assets design, engineering,
planning, commissioning, roll-out and operation
 Infrastructure modifying, upgrade, technology shifts
 Replacements, decommissioning & disposal of idle,
obsolete, swapped excess equipment
 RFI/Q planning, preparation, execution, evaluation
 Eco-friendly and sustainable operation E2E
Technology Asset Management
post@tarec-in.com ML#12, 5534 Haugesund, Norway
 Maximizing profit in Infrastructure Techology shifts
 Optimize Vendor/Brand swap processes
 Minimize capex for current last Roll-Out period
 Utilize available sourcing of 2nd user products
 Syncronize Roll-Out/In RFQ processes
 Minimize Reverse Logistics expenditure
 Introduce TTO «Touch&Transport Once» principle
Network upgrade initiatives, NGN
post@tarec-in.com ML#12, 5534 Haugesund, Norway
 Marketing inputs, forecasting, scenarios
 Payload/signal traffic capacity/performance analyses
 Logical/physical network architecture & design
 Reliability & redundancy consepts
 Site and footprint design, Clean Power supply
 Numbering, Routing, Signalling, POI
 Quality enhancements, innovative New Services
 Managing Technology & Network development
Planning & Implementation
post@tarec-in.com ML#12, 5534 Haugesund, Norway
Scope:
 Review the process of receiving demands, forecast
and performance data from different business Units
 Assessment of the comprehensiveness, effectiveness,
regularity and quality of available input
 Verification of the current planning process, searching
for enhancements for a new Strategic Business Plan
 Budget aligned plan for continous Optimized
Expansions to capture potential market volume
Network Planning inputs1
post@tarec-in.com ML#12, 5534 Haugesund, Norway
Approach:
 Verifying reported Network QoS KPIs, versus planned
Network capacity Roll-Out and redesign
 Evaluate ex-/internal data granularity, regularity, quality
 Evaluating collection&analyses process of data for market
potentials of subscribers, services, products, churn
 Capture new Mega-Trend services to boost revenue
 Consider partnerships for innovative new products
 Verify network ability to cater for increase in peaked traffic
 Considering financials, revenue, opex/capex constraints
Network Planning inputs2
post@tarec-in.com ML#12, 5534 Haugesund, Norway
 Availability&Reliability, failure-ratio, interrupts, dropcall
 Optimized utilization of all assets, infra/NEs
 Timing of Technology shifts, swaps, downscaling obsolete
 Channels for obtaining market/customer demand/need
 Value Based Segmentation, keeping top 20% of sub base
 Protecting topline/revenue from adjacent players
(VoIP/Skype/Messenger) and canibalism of own services
 Environment requirements, energy-consum/CO2/pollution
 Regulatory policy, spectrum, site-/infra-sharing
Network Planning inputs3
post@tarec-in.com ML#12, 5534 Haugesund, Norway
Required Inputs:
 Network statistics, traffic & QoS
 Marketing statistics & forecasts
 Global generic trends and innovation
 Financial frames, long&short term
 Coverage per service 2/3/4G, in-/outdoor, rural/urban
 Regulator, Competetion & Business Strategies
Targeted Output:
Network Strategy Plan for Access&Core infrastructure
Network Strategy Plan
post@tarec-in.com ML#12, 5534 Haugesund, Norway
Includes:
 Assets Survey & Roll-In requirements in RFQ process
 Decommissioning process, handl-/pack-ing/transport
 Roll-In & Reverse Logistics process improvements
 Guidelines for execution of Asset Recovery project
 Avoid MNO’s exposure of sensitive data and brand
 Process to secure assets max revenue, minimize opex
 Execution according to Environmental Regulations
 Project management, utilizing Process Descriptions
Asset Recovery Services
post@tarec-in.com ML#12, 5534 Haugesund, Norway
Scope:
 Project Mandate & Budget approved
 Availability of signed SoW doc, Specified SoR
 Qualified Personnel, Tools, Packing materials
 Transporting, Storage, Export Licenses
 Site facility; Doors, Stairs, Lifts, Access, NEs O&M
 Inventory Database; Check versus on-site, Volumes
 Labelling of equipment for Scrap/Recycling
Reverse Logistic Process1
post@tarec-in.com ML#12, 5534 Haugesund, Norway
Approach:
 Verify required SoW, personnel & utilities present
 Ensure all prepartions and precautions at site
 Verify shut down procedures and erasing sensitive data
 Register all equipment on-site and outbound transport
 Safe ESD handling/packing of resalable equipment
 Packaging methods - certified 4 hz-waste, unfumigated
 Transport preparations, Loading Plan, Tax & Licenses
 Process performed by RL experienced Preferred Partner
Reverse Logistic Process2
post@tarec-in.com ML#12, 5534 Haugesund, Norway
Technology Asset Management for MNO’s
 Building up
 Tearing down
With equal efficiency and professionalism
Providing peace of mind whilst shaping the future
Maintaining favorable reputation in the public eye
TAREC-IN Full Life Cycle support
post@tarec-in.com ML#12, 5534 Haugesund, Norway
ONE-STEP-AHEAD
www.tarec-in.com
Follow TAREC-IN AS on Company pages
Contact us on: post@tarec-in.com ©
http://www.linkedin.com/company/tarec-in-as
Internationally highly recognized, awarded and certified:
Our Preferred Partner
- Reverse Logistics
BSI ISO 9001:2008 Quality Management
BSI ISO 14001:2004 Environmental Management
Waste Management Exemption
Full Waste Management Permit
Waste carriers Licence
Hazardous waste Producers permit
ASCDI/NATD Approved Members
Check out DTC-Telecom’s capabilities at
www.dtc-telecom.co.uk

More Related Content

Similar to TAREC-IN AS Technology Asset MgM v3.1

Similar to TAREC-IN AS Technology Asset MgM v3.1 (20)

Spectrum- ERP solution for EPC industries
Spectrum- ERP solution for EPC industriesSpectrum- ERP solution for EPC industries
Spectrum- ERP solution for EPC industries
 
Trudy Winterburn Resume
Trudy Winterburn ResumeTrudy Winterburn Resume
Trudy Winterburn Resume
 
Shivayogayya Hiremath_CV
Shivayogayya Hiremath_CVShivayogayya Hiremath_CV
Shivayogayya Hiremath_CV
 
Resume (Shawn Nash)
Resume (Shawn Nash)Resume (Shawn Nash)
Resume (Shawn Nash)
 
CV_SANDEEP_PROF
CV_SANDEEP_PROFCV_SANDEEP_PROF
CV_SANDEEP_PROF
 
Manish garg resume
Manish garg resumeManish garg resume
Manish garg resume
 
Greythorn Telecom Specialist 09
Greythorn Telecom Specialist 09Greythorn Telecom Specialist 09
Greythorn Telecom Specialist 09
 
Yogishwar2
Yogishwar2Yogishwar2
Yogishwar2
 
Zeeshan_Jafri_T
Zeeshan_Jafri_TZeeshan_Jafri_T
Zeeshan_Jafri_T
 
Joydeep PMO Executive resume
Joydeep PMO Executive resumeJoydeep PMO Executive resume
Joydeep PMO Executive resume
 
Cv. mohamed riadh belaid
Cv. mohamed riadh belaid Cv. mohamed riadh belaid
Cv. mohamed riadh belaid
 
Skills summary
Skills summarySkills summary
Skills summary
 
Baryons extended development centres
Baryons extended development centresBaryons extended development centres
Baryons extended development centres
 
Baryons Extended Development Centre
Baryons Extended Development CentreBaryons Extended Development Centre
Baryons Extended Development Centre
 
Devon Blaylock Revised Resume
Devon Blaylock Revised ResumeDevon Blaylock Revised Resume
Devon Blaylock Revised Resume
 
Indusa Corporate Presentation
Indusa Corporate PresentationIndusa Corporate Presentation
Indusa Corporate Presentation
 
Kathleen cassady resume
Kathleen cassady resumeKathleen cassady resume
Kathleen cassady resume
 
CV Harjeet
CV HarjeetCV Harjeet
CV Harjeet
 
ToddBuchananResume (1)
ToddBuchananResume (1)ToddBuchananResume (1)
ToddBuchananResume (1)
 
Mohammad Elagha CV
Mohammad Elagha CVMohammad Elagha CV
Mohammad Elagha CV
 

TAREC-IN AS Technology Asset MgM v3.1

  • 1. Svein Gaute Bleivik, CEO TAREC-IN AS Technology Asset Management Consultancy Services July 2013 ©
  • 2.  TAREC-IN AS resting on 45 years in telecom business  Planning and Roll-Out/In Experience last 30 years  Network Development, Optimization & Utilization  Asset Management of Technology shifts/swaps  ARS Execution support by Preferred Partner  Independent and Reliable Engineering Services  Assist & Consultancy in any part of MNO value chain  Visit website or LinkedIn company pages for info Experience & Capabilities post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 3.  Technology Asset Management, mobile/fixed  Network Upgrade initiatives, NGN 3G and 4G  Planning & Implementation, review/enhancement  Input process  Network Performance  Planning process  Market & Network strategies  RFI/Q processes  Asset Recovery  Reverse Logistics by Preferred Partner Available Services post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 4.  Providing support to MNO’s life cycle management  Network infrastructure assets design, engineering, planning, commissioning, roll-out and operation  Infrastructure modifying, upgrade, technology shifts  Replacements, decommissioning & disposal of idle, obsolete, swapped excess equipment  RFI/Q planning, preparation, execution, evaluation  Eco-friendly and sustainable operation E2E Technology Asset Management post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 5.  Maximizing profit in Infrastructure Techology shifts  Optimize Vendor/Brand swap processes  Minimize capex for current last Roll-Out period  Utilize available sourcing of 2nd user products  Syncronize Roll-Out/In RFQ processes  Minimize Reverse Logistics expenditure  Introduce TTO «Touch&Transport Once» principle Network upgrade initiatives, NGN post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 6.  Marketing inputs, forecasting, scenarios  Payload/signal traffic capacity/performance analyses  Logical/physical network architecture & design  Reliability & redundancy consepts  Site and footprint design, Clean Power supply  Numbering, Routing, Signalling, POI  Quality enhancements, innovative New Services  Managing Technology & Network development Planning & Implementation post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 7. Scope:  Review the process of receiving demands, forecast and performance data from different business Units  Assessment of the comprehensiveness, effectiveness, regularity and quality of available input  Verification of the current planning process, searching for enhancements for a new Strategic Business Plan  Budget aligned plan for continous Optimized Expansions to capture potential market volume Network Planning inputs1 post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 8. Approach:  Verifying reported Network QoS KPIs, versus planned Network capacity Roll-Out and redesign  Evaluate ex-/internal data granularity, regularity, quality  Evaluating collection&analyses process of data for market potentials of subscribers, services, products, churn  Capture new Mega-Trend services to boost revenue  Consider partnerships for innovative new products  Verify network ability to cater for increase in peaked traffic  Considering financials, revenue, opex/capex constraints Network Planning inputs2 post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 9.  Availability&Reliability, failure-ratio, interrupts, dropcall  Optimized utilization of all assets, infra/NEs  Timing of Technology shifts, swaps, downscaling obsolete  Channels for obtaining market/customer demand/need  Value Based Segmentation, keeping top 20% of sub base  Protecting topline/revenue from adjacent players (VoIP/Skype/Messenger) and canibalism of own services  Environment requirements, energy-consum/CO2/pollution  Regulatory policy, spectrum, site-/infra-sharing Network Planning inputs3 post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 10. Required Inputs:  Network statistics, traffic & QoS  Marketing statistics & forecasts  Global generic trends and innovation  Financial frames, long&short term  Coverage per service 2/3/4G, in-/outdoor, rural/urban  Regulator, Competetion & Business Strategies Targeted Output: Network Strategy Plan for Access&Core infrastructure Network Strategy Plan post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 11. Includes:  Assets Survey & Roll-In requirements in RFQ process  Decommissioning process, handl-/pack-ing/transport  Roll-In & Reverse Logistics process improvements  Guidelines for execution of Asset Recovery project  Avoid MNO’s exposure of sensitive data and brand  Process to secure assets max revenue, minimize opex  Execution according to Environmental Regulations  Project management, utilizing Process Descriptions Asset Recovery Services post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 12. Scope:  Project Mandate & Budget approved  Availability of signed SoW doc, Specified SoR  Qualified Personnel, Tools, Packing materials  Transporting, Storage, Export Licenses  Site facility; Doors, Stairs, Lifts, Access, NEs O&M  Inventory Database; Check versus on-site, Volumes  Labelling of equipment for Scrap/Recycling Reverse Logistic Process1 post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 13. Approach:  Verify required SoW, personnel & utilities present  Ensure all prepartions and precautions at site  Verify shut down procedures and erasing sensitive data  Register all equipment on-site and outbound transport  Safe ESD handling/packing of resalable equipment  Packaging methods - certified 4 hz-waste, unfumigated  Transport preparations, Loading Plan, Tax & Licenses  Process performed by RL experienced Preferred Partner Reverse Logistic Process2 post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 14. Technology Asset Management for MNO’s  Building up  Tearing down With equal efficiency and professionalism Providing peace of mind whilst shaping the future Maintaining favorable reputation in the public eye TAREC-IN Full Life Cycle support post@tarec-in.com ML#12, 5534 Haugesund, Norway
  • 15. ONE-STEP-AHEAD www.tarec-in.com Follow TAREC-IN AS on Company pages Contact us on: post@tarec-in.com © http://www.linkedin.com/company/tarec-in-as
  • 16. Internationally highly recognized, awarded and certified: Our Preferred Partner - Reverse Logistics BSI ISO 9001:2008 Quality Management BSI ISO 14001:2004 Environmental Management Waste Management Exemption Full Waste Management Permit Waste carriers Licence Hazardous waste Producers permit ASCDI/NATD Approved Members Check out DTC-Telecom’s capabilities at www.dtc-telecom.co.uk