North Dock
1200 UCH coil
on KLP
Water proof
Structure, C/B
fencing @ 3.0
metres height
fencing @ 3.0
metres height
2.7 metres in coil
height
3
North Dock North DockNorth Dock
2.7 metres in coil
height
Approx 7.5 metres
distance of beams
centres
1200 UCH coil
on KLP
4
Project Costing
• RHS-150-050-03.0-C350-Pregal-3000 (90ea), Cost $3,936
• FL-150-16-L300-400 (90ea), Cost $1,380
• Caps for RHS (90ec), Cost $135
• TS61- 1.0mm x 91lm (+ 15% for Lineal Tally for Laps = 105lm), Cost $638
• TS61- 0.75mm x 182lm (+ 15% for Lineal Tally for Laps = 210lm), Cost $730
• TD42SM @$6.00m2 x 290m2, Cost $1,740 (This includes an 2.62ton coil, Ex SCP Lysaght St)
• Trimdek Fasteners, Cost $100
• Blue Tip Anchor bolts, Cost $5,864
• TopSpan Post Fasteners, Cost $245
• Gates @ $200 ea x 2, Cost $400
• Transport, Cost $300
• Labour for the install, Cost $4,400
Total Cost $19,868

More Related Content

Similar to Warehouse Fence Project - Steve Irwin

QCCanada FORESTRY Catalogue- V3compressed
QCCanada FORESTRY Catalogue- V3compressedQCCanada FORESTRY Catalogue- V3compressed
QCCanada FORESTRY Catalogue- V3compressed
Derek Lamb
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...
Engineers Australia
 
Best practices day one new morning
Best practices day one new morningBest practices day one new morning
Best practices day one new morning
Ahmed Radwan
 
Senior Design Project Final Presentation
Senior Design Project Final PresentationSenior Design Project Final Presentation
Senior Design Project Final Presentation
btpguitar723
 
100615Trecora Chemical presentation_1
100615Trecora Chemical presentation_1100615Trecora Chemical presentation_1
100615Trecora Chemical presentation_1
PlastiChem LatAm
 
TACA Mining and Quarrying (2)
TACA Mining and Quarrying (2)TACA Mining and Quarrying (2)
TACA Mining and Quarrying (2)
Barry McCartney
 

Similar to Warehouse Fence Project - Steve Irwin (20)

Delta Group 2018.pdf
Delta Group 2018.pdfDelta Group 2018.pdf
Delta Group 2018.pdf
 
Basic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining projectBasic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining project
 
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, RajasthanHDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
 
QCCanada FORESTRY Catalogue- V3compressed
QCCanada FORESTRY Catalogue- V3compressedQCCanada FORESTRY Catalogue- V3compressed
QCCanada FORESTRY Catalogue- V3compressed
 
Rural electrification
Rural electrificationRural electrification
Rural electrification
 
W
WW
W
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...
 
5S Systems Catalogue
5S Systems Catalogue5S Systems Catalogue
5S Systems Catalogue
 
Chst math 2019 w answers
Chst math 2019 w answersChst math 2019 w answers
Chst math 2019 w answers
 
Mike's presentation
Mike's presentationMike's presentation
Mike's presentation
 
Best practices day one new morning
Best practices day one new morningBest practices day one new morning
Best practices day one new morning
 
ppty
pptyppty
ppty
 
Senior Design Project Final Presentation
Senior Design Project Final PresentationSenior Design Project Final Presentation
Senior Design Project Final Presentation
 
100615Trecora Chemical presentation_1
100615Trecora Chemical presentation_1100615Trecora Chemical presentation_1
100615Trecora Chemical presentation_1
 
Enhancing asset strategies to strengthen financial sustainability
Enhancing asset strategies to strengthen financial sustainabilityEnhancing asset strategies to strengthen financial sustainability
Enhancing asset strategies to strengthen financial sustainability
 
Electric Heating and Freeze Protection Solutions
Electric Heating and Freeze Protection SolutionsElectric Heating and Freeze Protection Solutions
Electric Heating and Freeze Protection Solutions
 
TACA Mining and Quarrying (2)
TACA Mining and Quarrying (2)TACA Mining and Quarrying (2)
TACA Mining and Quarrying (2)
 
Ship design project Final presentation
Ship design project Final presentationShip design project Final presentation
Ship design project Final presentation
 
6. pipe support and restraint.ppt
6. pipe support and restraint.ppt6. pipe support and restraint.ppt
6. pipe support and restraint.ppt
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptx
 

Warehouse Fence Project - Steve Irwin

  • 2. 2 North Dock 1200 UCH coil on KLP Water proof Structure, C/B fencing @ 3.0 metres height fencing @ 3.0 metres height 2.7 metres in coil height
  • 3. 3 North Dock North DockNorth Dock 2.7 metres in coil height Approx 7.5 metres distance of beams centres 1200 UCH coil on KLP
  • 4. 4 Project Costing • RHS-150-050-03.0-C350-Pregal-3000 (90ea), Cost $3,936 • FL-150-16-L300-400 (90ea), Cost $1,380 • Caps for RHS (90ec), Cost $135 • TS61- 1.0mm x 91lm (+ 15% for Lineal Tally for Laps = 105lm), Cost $638 • TS61- 0.75mm x 182lm (+ 15% for Lineal Tally for Laps = 210lm), Cost $730 • TD42SM @$6.00m2 x 290m2, Cost $1,740 (This includes an 2.62ton coil, Ex SCP Lysaght St) • Trimdek Fasteners, Cost $100 • Blue Tip Anchor bolts, Cost $5,864 • TopSpan Post Fasteners, Cost $245 • Gates @ $200 ea x 2, Cost $400 • Transport, Cost $300 • Labour for the install, Cost $4,400 Total Cost $19,868