2. WHY DO YOU NEED A SOLAR PERMIT?
• Converting solar radiation to usable electric power requires careful
design and permitting. Your solar project will involve the attachment of
heavy equipment to your roof and the introduction of additional current
into your home’s electric distribution system. So, does it need a solar
permit?
• Not surprisingly, most jurisdictions require the submittal of a solar
permit before construction is allowed to begin. This permitting
process may take just a few days to a couple of months depending
where the project will be so it’s important to choose an experienced PV
design company to help you along the way.
3. WHAT IS SOLAR PERMIT DESIGN?
• Solar permit design includes detailed plans for individual Solar Projects.
This solar permit design not only can be submitted to their city for permit
approval but also can be used to guide contractors during solar
installations.
• For these services Wattmonk is a leading independent solar design
company with more than 100 designers on their payroll to ensure best in
class deliver
4. PERMIT PLAN IS A CUSTOMIZED
DOCUMENT FOR CUSTOMERS
• It includer following things:
• Cover Sheet
• Site Plan
• Roof Plan
• Equipment specification and calculations.
• Attachment Details
• String layout and bill of material
• Equipment Data sheets
• Signage (PV Safety label locations)
• Single line diagram and three line diagram