SlideShare a Scribd company logo
1 of 19
Deployable Disaster Device
D3 Wind Turbine
PEEC/IKE (SEE3)
June-Aug 2014
University of Hawaii at Manoa
Department of Mechanical Engineering
Advisor: Dr. Mehrdad Nejhad
Mentors: Horton, Dave (UH)
Minei, Brenden(UH)
Wong, Kyle (UH)
Team Members:
Baker, Keanu (LCC)
Carias, Zachary (KCC)
Gabrick, Caton (KCC)
Han, William (HCC)
Kheradpey, Shireen (BU)
Overview
● Hurricane Iselle (Aug 7, 2014)
● Puna, Big Island
D3 Project- Solar Power (PEEC/SEE3 SU 2013)
Budget: $10,000
Weight: 200+ lbs
Output: 240 Watts
Goals - D3 Wind Turbine
● Improve on the previous
design of the solar
powered D3
● Design a product that can
produce power 24 hours a
day
● Make it cheaper, lighter,
and more reliable
Project objectives - Parameters
● Budget: $2,500
● Size: Compacted into Pelican
Box
● Weight: Carryable by a single
person
● Power Output: 250 Watts
Project Schedule
Budget
Material / Component Estimated Budget Actual Cost
NPower Marine Turbine $500 $600
Raw Materials $400 $360
PELICAN Box $650 $420
Battery $200 $300
Power inverter $50 $50
Suspension $90 $90
Electrical $200 $150
Hardware $100 $100
TOTAL $2,190 $2,070
Decision Making Matrix (Battery)
Wind Turbine Options
NPower Turbine SunPower Turbine WindMax Turbine
Decision Making Matrix (Wind Turbine)
Project Design - Undeployed
Switch Box
BatteryWind Turbine
Suspension
(wire rope
isolators) Base
Chassis
Project Design - Deployed
Tower
BaseLegs
Wind Turbine
Analysis
● Wind Speed Tolerance: 40 MPH
● Peak power: 28 MPH
Fabrication
Manufacturing
Assembly
Comparison
D3 SolarD3 Wind Turbine
Turbine Turbine
Conclusion
D3 Wind Turbine D3 Solar
Cost $2,070 $10,000
Weight 60 lbs 200+ lbs
Assembly Time 9 minutes 1 minute
Power Output 250 Watts 240 Watts
Acknowledgments
● PEEC/ SEE3: Bubba Lipe, Josh Ka’akua, Kelly Ching
● Mechanical Engineering Departement
○ Professor Mehrdad Nejhad
○ Dave Horton
○ Kyle Wong
○ Brenden Minei
● Shireen Kheradpey (Boston University)

More Related Content

Viewers also liked

Comunicato stampa piano spiagge Marinella
Comunicato stampa piano spiagge MarinellaComunicato stampa piano spiagge Marinella
Comunicato stampa piano spiagge MarinellaClaudia Bertanza
 
Ribishan Avunhipuram
Ribishan AvunhipuramRibishan Avunhipuram
Ribishan AvunhipuramRibishan Ap
 
Presentación voz pasiva.Francisco Fernández Mayor
Presentación  voz pasiva.Francisco Fernández MayorPresentación  voz pasiva.Francisco Fernández Mayor
Presentación voz pasiva.Francisco Fernández Mayormaritechu
 
Work lifeleader Manifesto
Work lifeleader ManifestoWork lifeleader Manifesto
Work lifeleader ManifestoJulie Cohen
 
відповідаючи перед майбутнім
відповідаючи перед майбутнімвідповідаючи перед майбутнім
відповідаючи перед майбутнімPoltava municipal lyceum #1
 
Brownbear brownbear new
Brownbear brownbear newBrownbear brownbear new
Brownbear brownbear newAnna Martínez
 
у рідному краї серце співає
у рідному краї серце співаєу рідному краї серце співає
у рідному краї серце співаєPoltava municipal lyceum #1
 
Building Science 2 Project 2
Building Science 2 Project 2Building Science 2 Project 2
Building Science 2 Project 2YeeQun
 
Mfh then&now presentation
Mfh then&now presentationMfh then&now presentation
Mfh then&now presentationNadene Brunk
 
Kearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggis
Kearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggisKearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggis
Kearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggismarlinasitipriyati
 
дії під час виникнення пожеж
дії під час виникнення пожеждії під час виникнення пожеж
дії під час виникнення пожежPoltava municipal lyceum #1
 
Kearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggis
Kearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggisKearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggis
Kearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggismarlinasitipriyati
 
SMARTWaste Brochure 2015
SMARTWaste Brochure 2015SMARTWaste Brochure 2015
SMARTWaste Brochure 2015Stuart Blofeld
 

Viewers also liked (20)

ME461 Final Presentation
ME461 Final PresentationME461 Final Presentation
ME461 Final Presentation
 
Comunicato stampa piano spiagge Marinella
Comunicato stampa piano spiagge MarinellaComunicato stampa piano spiagge Marinella
Comunicato stampa piano spiagge Marinella
 
Ribishan Avunhipuram
Ribishan AvunhipuramRibishan Avunhipuram
Ribishan Avunhipuram
 
Presentazione app ATC
Presentazione app ATC Presentazione app ATC
Presentazione app ATC
 
Presentación voz pasiva.Francisco Fernández Mayor
Presentación  voz pasiva.Francisco Fernández MayorPresentación  voz pasiva.Francisco Fernández Mayor
Presentación voz pasiva.Francisco Fernández Mayor
 
resume 2
resume 2resume 2
resume 2
 
ME460 Presentation
ME460 PresentationME460 Presentation
ME460 Presentation
 
Work lifeleader Manifesto
Work lifeleader ManifestoWork lifeleader Manifesto
Work lifeleader Manifesto
 
відповідаючи перед майбутнім
відповідаючи перед майбутнімвідповідаючи перед майбутнім
відповідаючи перед майбутнім
 
Brownbear brownbear new
Brownbear brownbear newBrownbear brownbear new
Brownbear brownbear new
 
Muzika torkayetsya dushi
Muzika torkayetsya dushiMuzika torkayetsya dushi
Muzika torkayetsya dushi
 
у рідному краї серце співає
у рідному краї серце співаєу рідному краї серце співає
у рідному краї серце співає
 
Building Science 2 Project 2
Building Science 2 Project 2Building Science 2 Project 2
Building Science 2 Project 2
 
Mfh then&now presentation
Mfh then&now presentationMfh then&now presentation
Mfh then&now presentation
 
Kearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggis
Kearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggisKearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggis
Kearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggis
 
bài trình diễn con lật đật
bài trình diễn con lật đậtbài trình diễn con lật đật
bài trình diễn con lật đật
 
дії під час виникнення пожеж
дії під час виникнення пожеждії під час виникнення пожеж
дії під час виникнення пожеж
 
Bai trinh dien_gioi_thieu_bai_day
Bai trinh dien_gioi_thieu_bai_dayBai trinh dien_gioi_thieu_bai_day
Bai trinh dien_gioi_thieu_bai_day
 
Kearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggis
Kearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggisKearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggis
Kearifan Lokal tentang Pencemaran limbah di Sungai kampungan pondok manggis
 
SMARTWaste Brochure 2015
SMARTWaste Brochure 2015SMARTWaste Brochure 2015
SMARTWaste Brochure 2015
 

Deployable Disaster Device

Editor's Notes

  1. Specify what aspects of the design you are improving on: Comparable power, cheaper. - by a $2,500 budget. 150lbs. same power. more power generation. increase in money. 250 watt but possibility of 400 watts in perfect conditions. 240watt for solar power
  2. PROJECT objectives - parameters
  3. Continuous research? because… why? Figure out better way to phrase this “Did research and am continuously modifying” Top labels (week 24, week 25...week 33): crop out top section with weekly labels. Use photoshop put in own headings
  4. say that red is where we went over budget but say that green is where you were under budget. and total is under budget
  5. Explain the DMM- (logical projection) based on the parameters we named we looked at the values between options. Because we weighted x factors as more important we gave those parameters a higher weighting factor. Because the LiFe was the most favorable in these parameter aspects this alternative was chosen.
  6. Insert slide showing pictures of the turbines and explain that structurally they are similar its the performance is where it differs
  7. say what the power is at 28mph. Peak Power: 400 Watts at 28mph Convert chart into 2D chart. add y-axis label. keep entire chart, explain that turbine has internal dampening system to slow self down at higher wind speeds to prevent the instrument from braking. Specify that wind speed tolerance of 40mph is of the structure, not of the turbine itself. include free standing chart and tied down turbine chart.
  8. Dont have two slides with same name. fabrication, manufacturing,
  9. Intergration assembly chassis and base for tower
  10. insert chart comparing wind turbine to solar panels. make it look like budget chart. use pictures of both (put pictures on another chart.) budget, weight, assmebly time, Power output,)
  11. PEEC ike C3 first, josh baba kelly. still keep nejhad guys for acknowledgements Do you want to include other interns? any other names?