“In designing the sports lighting for the retractable roof on Wimbledon’s Centre Court we
were presented with a unique challenge. The sliding roof was to be far lower than any
other major professional venue in the world, creating a potential problem with glare to the
players. Everything from the selection of a fabric roof membrane to the colour selection of
the moving roof trusses played a major role in the symbiosis of the system integration.”
Corey Berhost, associate director, M-E Engineers Ltd
Background:
Since the Wimbledon tennis tournament began
more than 130 years ago, the game has always
been subject to the volatility of English weather
and fading light levels. However, thanks to
companies such as Lutron, spectators and TV
viewers alike are now able to watch the
Championship safe in the knowledge that Centre
Court’s new retractable roof and lighting system
make these threats a thing of the past.
The challenge:
As would be expected with the refurbishment of a
90 year old building, the lighting scheme installed
in the project had to overcome a variety of
challenges; these included lighting one of the
lowest roof spaces in any professional sports
venue worldwide and meeting the high illuminance
levels required by the BBC for its high-definition
coverage of the event. An additional requirement
specified by The All England Lawn Tennis Club
(AELTC) was to ensure an easy to use, fail-safe
way of controlling the lighting for Championship
and non-Championship games was installed,
whether the roof was open or closed.
Lutron Case Study l leisure sector
Wimbledon Centre Court
London, UK
image courtesy of All England Lawn Tennis Club (AELTC)
Lutron’s GRAFIKTM 7000 Series:
Client	 The All England Lawn Tennis Club (AELTC)
Architect	 Populous
Lighting Architect	 M-E Engineers Ltd
Equipment provider	 Lutron Electronics Co., Inc.
Photography	 The All England Lawn Tennis Club (AELTC)
Lutron products	 GRAFIKTM 7000 control processor and Lutron XP SoftswitchTM
©2009 Lutron Electronics Co., Inc. Made and printed in the U.K. 2009. P/N 367-1680/EA
•	 capacity to offer control of multiple zones, separated into distinct areas
•	 offering users a simple graphical user interface
•	 interfaces easily with AV, security and building management systems
Tel: +44 (0)20 7702 0657
www.lutron.com/europe
The solution:
Working with the architects, Populous, and the
client, M-E Engineers introduced the technique of
indirect sports lighting. What was discovered was
that by reflecting some of the light off the roof itself,
a layer of diffuse light could be added to blanket
the court and reduce the number of direct
luminaires required, therefore minimising glare for
spectators and viewers. The indirect light also had
another effect; by increasing the illuminance of the
roof, it made the lights aimed directly at the court
appear less glaring.
Not only did Berhost and his team have to
consider the experience for visitors, viewers and
players, but they also had to ensure that the
lighting scheme could be controlled with ultimate
precision. To achieve the levels of light control
required, three of Lutron’s GRAFIK™ 7000
processors have been used and 24 Lutron XP
Softswitch™ power and switching panels,
alongside a Graphical User Interface in the master
control room, to ensure ultimate control of all the
lighting circuits.
The results:
The GRAFIKTM 7000 system has been programmed
to have two operating modes – Championship and
non-Championship. When the system is in non-
Championship mode, the lighting levels can be
altered to suit specific requirements, however, once
switched to Championship mode there is no room
for user error, as everything is pre-programmed and
fully automated.
Once installed, the lighting scheme still had to meet
the requirements of the TV companies. On
installation sports lighting testing was carried out on
Centre Court with the BBC. The design passed with
flying colours and the scheme was praised by the
BBC team for its innovative use of materials to bring
“elements of theatricality, drama and sophistication”
to the overall design.
So, with Wimbledon Centre Court’s capacity
increased to 15,000, the installation of new, wider
seats and the retractable roof and lighting system,
the Wimbledon Championships look set to continue
bigger and better than ever for many years to come.
image courtesy of All England Lawn Tennis Club (AELTC) image courtesy of All England Lawn Tennis Club (AELTC) image courtesy of M-E Engineers Ltd

More Related Content

Similar to Lutron Case Study_Leisure_Wimbledon (UK)

IECPM Profile_ALL Updated March2016
IECPM Profile_ALL Updated March2016IECPM Profile_ALL Updated March2016
IECPM Profile_ALL Updated March2016
L.W. Wong
 
Outdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyOutdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case Study
Lindsay Franklin
 
Outdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyOutdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case Study
Anna Bancroft
 
Outdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyOutdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case Study
Andy Clark
 
Outdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyOutdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case Study
Andy Innes
 
MCG Concrete 2005 050725
MCG Concrete 2005 050725MCG Concrete 2005 050725
MCG Concrete 2005 050725
Mark Sheldon
 

Similar to Lutron Case Study_Leisure_Wimbledon (UK) (20)

IABSE 2002
IABSE 2002IABSE 2002
IABSE 2002
 
Eur 605-en
Eur 605-enEur 605-en
Eur 605-en
 
IECPM Profile_ALL Updated March2016
IECPM Profile_ALL Updated March2016IECPM Profile_ALL Updated March2016
IECPM Profile_ALL Updated March2016
 
Tas - dynamic simulations of lightweight construction and phase change materi...
Tas - dynamic simulations of lightweight construction and phase change materi...Tas - dynamic simulations of lightweight construction and phase change materi...
Tas - dynamic simulations of lightweight construction and phase change materi...
 
hs_solar_brochure
hs_solar_brochurehs_solar_brochure
hs_solar_brochure
 
Euroclad Introduction July09
Euroclad Introduction July09Euroclad Introduction July09
Euroclad Introduction July09
 
The Singapore Engineer - NTU Sports Hall Cover Story
The Singapore Engineer - NTU Sports Hall Cover StoryThe Singapore Engineer - NTU Sports Hall Cover Story
The Singapore Engineer - NTU Sports Hall Cover Story
 
Moving mirror-goniospectroradiometer
Moving mirror-goniospectroradiometerMoving mirror-goniospectroradiometer
Moving mirror-goniospectroradiometer
 
Moving mirror-goniospectroradiometer
Moving mirror-goniospectroradiometerMoving mirror-goniospectroradiometer
Moving mirror-goniospectroradiometer
 
London Olympic Stadium
London Olympic Stadium London Olympic Stadium
London Olympic Stadium
 
Titan CV series spraybooth
Titan  CV series sprayboothTitan  CV series spraybooth
Titan CV series spraybooth
 
Outdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyOutdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case Study
 
Outdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyOutdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case Study
 
Outdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyOutdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case Study
 
Outdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyOutdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case Study
 
MCG Concrete 2005 050725
MCG Concrete 2005 050725MCG Concrete 2005 050725
MCG Concrete 2005 050725
 
Lunarlight.pdf
Lunarlight.pdfLunarlight.pdf
Lunarlight.pdf
 
Webinar managing instrument obsolence in nuclear edited
Webinar   managing instrument obsolence in nuclear editedWebinar   managing instrument obsolence in nuclear edited
Webinar managing instrument obsolence in nuclear edited
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
 
Google
GoogleGoogle
Google
 

Lutron Case Study_Leisure_Wimbledon (UK)

  • 1. “In designing the sports lighting for the retractable roof on Wimbledon’s Centre Court we were presented with a unique challenge. The sliding roof was to be far lower than any other major professional venue in the world, creating a potential problem with glare to the players. Everything from the selection of a fabric roof membrane to the colour selection of the moving roof trusses played a major role in the symbiosis of the system integration.” Corey Berhost, associate director, M-E Engineers Ltd Background: Since the Wimbledon tennis tournament began more than 130 years ago, the game has always been subject to the volatility of English weather and fading light levels. However, thanks to companies such as Lutron, spectators and TV viewers alike are now able to watch the Championship safe in the knowledge that Centre Court’s new retractable roof and lighting system make these threats a thing of the past. The challenge: As would be expected with the refurbishment of a 90 year old building, the lighting scheme installed in the project had to overcome a variety of challenges; these included lighting one of the lowest roof spaces in any professional sports venue worldwide and meeting the high illuminance levels required by the BBC for its high-definition coverage of the event. An additional requirement specified by The All England Lawn Tennis Club (AELTC) was to ensure an easy to use, fail-safe way of controlling the lighting for Championship and non-Championship games was installed, whether the roof was open or closed. Lutron Case Study l leisure sector Wimbledon Centre Court London, UK image courtesy of All England Lawn Tennis Club (AELTC)
  • 2. Lutron’s GRAFIKTM 7000 Series: Client The All England Lawn Tennis Club (AELTC) Architect Populous Lighting Architect M-E Engineers Ltd Equipment provider Lutron Electronics Co., Inc. Photography The All England Lawn Tennis Club (AELTC) Lutron products GRAFIKTM 7000 control processor and Lutron XP SoftswitchTM ©2009 Lutron Electronics Co., Inc. Made and printed in the U.K. 2009. P/N 367-1680/EA • capacity to offer control of multiple zones, separated into distinct areas • offering users a simple graphical user interface • interfaces easily with AV, security and building management systems Tel: +44 (0)20 7702 0657 www.lutron.com/europe The solution: Working with the architects, Populous, and the client, M-E Engineers introduced the technique of indirect sports lighting. What was discovered was that by reflecting some of the light off the roof itself, a layer of diffuse light could be added to blanket the court and reduce the number of direct luminaires required, therefore minimising glare for spectators and viewers. The indirect light also had another effect; by increasing the illuminance of the roof, it made the lights aimed directly at the court appear less glaring. Not only did Berhost and his team have to consider the experience for visitors, viewers and players, but they also had to ensure that the lighting scheme could be controlled with ultimate precision. To achieve the levels of light control required, three of Lutron’s GRAFIK™ 7000 processors have been used and 24 Lutron XP Softswitch™ power and switching panels, alongside a Graphical User Interface in the master control room, to ensure ultimate control of all the lighting circuits. The results: The GRAFIKTM 7000 system has been programmed to have two operating modes – Championship and non-Championship. When the system is in non- Championship mode, the lighting levels can be altered to suit specific requirements, however, once switched to Championship mode there is no room for user error, as everything is pre-programmed and fully automated. Once installed, the lighting scheme still had to meet the requirements of the TV companies. On installation sports lighting testing was carried out on Centre Court with the BBC. The design passed with flying colours and the scheme was praised by the BBC team for its innovative use of materials to bring “elements of theatricality, drama and sophistication” to the overall design. So, with Wimbledon Centre Court’s capacity increased to 15,000, the installation of new, wider seats and the retractable roof and lighting system, the Wimbledon Championships look set to continue bigger and better than ever for many years to come. image courtesy of All England Lawn Tennis Club (AELTC) image courtesy of All England Lawn Tennis Club (AELTC) image courtesy of M-E Engineers Ltd