1. L&T Infotech Confidential Page 1 of 1
SACHIN TAMHANE
Photo
size upto 30
KB (JPEG) in
formals with
light backgnd
Experience Summary
Domain experience of over 13 years in the area of continuous manufacturing process
Hands on experience of more than 13 years in SAP
Managed multiple projects including the production support engagement for the
fortune 500 organization
End to end Implementation of two BW-BPS projects for Chevron Corporations (US)
Migration to BI7.0 and technical upgrade for MunichRe
SAP R3 implementationand8 rolloutsacrossallmanufacturinglocationsandProduction
Support
Working as Costa Rica Delivery Lead for a large scale engagement with P&G Account
Led multi-locationandmulti-nationalteammembersinDelivery thatgeneratedrevenue
in excess of $3.5Mn
Skills Summary
Domain Manufacturing, Oil & Energy,
Programming
Languages
ABAP
Operating System /
ERP Version
SAP 6.0, BW7.3
Tools / DB /
Packages /
Framework / ERP
Components
SAP BW 7.3, SAP BI 4.0
Hardware Platforms
Professional Certifications/ Trainings
PMP Certified
ITIL FoundationCertified
CompletedProject ManagementSimulationworkshop
Attended Leader ship Journeyman Program
Various trainingon communication, Teambuilding, Time management
Work Experience
Project 1
Project Name Delivery Lead Costa Rica Team Size 60
Start Date Jun’2014 End Date Sep’2016
Project
Description
CostaRica Delivery andproject mangerfor FSS,PSS&SEM Support
2. L&T Infotech Confidential Page 2 of 2
SACHIN TAMHANE
Photo
size upto 30
KB (JPEG) in
formals with
light backgnd
Role &
Contribution
Workingas CostaRica Delivery Manger
Delivering Projects worth revenue of 6M with 100 associates
Local talenthiring to grow in CostRica
Businessdevelopment
Responsiblefor complete financial model Topline, Bottomline
ManagingSAP BU KRA for new location
Technology &
Tools
BW
Project 2
Project Name P&G FSSBW Support Team Size 60
Start Date Oct’ 2010 End Date May 2014
Project
Description
FSS/PSSOperationL3&L2 supportin BW Space
Role &
Contribution
ManagedTeam of 60 Consultantsandsuccessfully delivered
projects executed from India, US
Workedclosely with CIOstoensure organizationalalignment to
achieve Operational Excellence.
Monitoredandreported weekly, monthly andannualteam
performance basedon SLA Metric, Process improvementtargets
andcost savingproposals.
Exceeded all SLA andcost savingproposaltargets consistently for
3 years.
Customerinteraction andrelationshipmanagement
Managingresources – SuccessionPlanning, Rotationand Pyramid
ratio
Technology &
Tools
BW
Key
Achievements
Successfully implemented FMR, Roll out of MSA andEDNOSapplication
Project 3
Project Name MunichRe Upgrade Team Size 10
Start Date Jul’10 End Date Oct 2010
3. L&T Infotech Confidential Page 3 of 3
SACHIN TAMHANE
Photo
size upto 30
KB (JPEG) in
formals with
light backgnd
Project
Description
Munich Reinsurance Company, establishedin1880, isthe leading
reinsurance groupin the world. MunichRe America (formerly American
Re-InsuranceCompany)isa member of the MunichRe Group. MunichRe
America, founded in 1917, isoneof the largest writers of property and
casualty reinsurance in the UnitedStates.
MunichRe is upgradingboththeinfrastructure and the underlying
applicationfrom SAP BW 3.5 to SAP BI 7.0
Role &
Contribution
Identification of Upgrademethodology
Technical upgradeand its preparation
Pre and postupgradeTesting andbug fixing
Rolloutto QA andProductionsystem
Functional–upgrade
Migrationof UpdateRule,Transfer Rule and Datasource
Pre and postupgradetesting
UAT
Customersign off
Technology &
Tools
BW
Key
Achievements
Successfully upgradeandkey learning sharedfor similar projects
Project 4
Project Name ChevronBW Support Team Size 20
Start Date Feb’07 End Date Jun’ 10
Project
Description
ChevronProduction24x7 BWsupport
Role &
Contribution
Successfully executed ProductionSupportfunction, BPS, B7
Upgrade
Exceeded all SLAs andOE targets
Generated additional revenueof $1.5M troughprojectexecution
for Chevron, Received CEO’saward for 2 projects
Customerinteraction andrelationshipmanagement
Training anddevelopment
Ensure the smoothtransitioningofactivities between onsiteand
offshore team members
4. L&T Infotech Confidential Page 4 of 4
SACHIN TAMHANE
Photo
size upto 30
KB (JPEG) in
formals with
light backgnd
Technology &
Tools
BW
Key
Achievements
Constantincrease in team size with revenue, Zero escalation in Support
Project 5
Project Name PETS Project Chevron Team Size 10
Start Date Jun’ 05 End Date Jan’07
Project
Description
Implementationof BW BPSSolutionto Project planningspace
Role &
Contribution
End to endImplementationof BW-BPSproject.
Leading the Team of 10 resource Since BusinessBlue print phase
till Go-Live
Close interaction with the customerto gather business
requirements
InvolvedinunderstandingtheBusinessprocess anddeveloping
businessblue print.
SolutionArchitecting and deploymentof the solution
Developingproject planand effort estimate
Allocation of roles andresponsibilities toindividual teammembers
Developingtesting strategy
ConductedEndUser training andUAT
Getting signoff from the project sponsorandstakeholders
Technology &
Tools
BW-BPS
Key
Achievements
Succeful implementationof Project with no schedule andcost variance
Project 6
Project Name UltraTech Cement BW implementation Team Size 06
Start Date Dec’ 04 End Date May’05
5. L&T Infotech Confidential Page 5 of 5
SACHIN TAMHANE
Photo
size upto 30
KB (JPEG) in
formals with
light backgnd
Project
Description
Implementation of BW Solutionin Ultra Tech Cement
Role &
Contribution
Identification of reportingelements and buildingthe data model
Activated StandardBusinessContentin BW as per the
Responsiblefor design, developmentandextraction from R/3
Source systemandflat file to BW for SD, MM PP.
Configured LO cockpitand LISmethodof extraction
Created Generic data source
Useddelta update mechanismsfor uploadingdatato BW from R/3
Design & Build InfoProviders(Infoobjects, Infocubes, ODSand
MultiProviders)
Extensively workedon BEx Query Designer
Query Performance Management
Technology &
Tools
BW
Key
Achievements
Succeful implementationof Project with no schedule andcost variance
Project 7
Project Name L&T Cement SAP Implementation Team Size 15
Start Date Dec’ 99 End Date Nov’03
Project
Description
Implementationof PP Modulein L&T Cement
Role &
Contribution
AS IS study
TO BE analysis
GAP analysis:
BusinessBlueprint
PrototypeDevelopment
IntegrationTesting
Full cycle Testing
Roll out to10 different plans
6. L&T Infotech Confidential Page 6 of 6
SACHIN TAMHANE
Photo
size upto 30
KB (JPEG) in
formals with
light backgnd
Technology &
Tools
SAP R3
Key
Achievements
Succeful implementationof Project with no schedule andcost variance
Other Experience
Title
Shopfloor engineer –Production
Start Date Jun’ 94 End Date Jun’03
Role &
Contribution
ProductionShiftIncharge
PlantOperation
Other Experience
Title
Shopfloor engineer –Production
Start Date Sep’ 86 End Date Jun’94
Role &
Contribution
ProductionShiftIncharge
PlantOperation
Educational Qualification
Education &
Credentials
Masterin Chemistry (M.Sc.)in 1986